0% found this document useful (0 votes)
96 views3 pages

Bomb Disposal Squad 1.5 TSF

Uploaded by

azeb1879
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views3 pages

Bomb Disposal Squad 1.5 TSF

Uploaded by

azeb1879
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TORKHAM-BCP

CONSTRUCTION DRAWING

AL IMAM Enterprises Pvt. Ltd.

LIST OF DRAWINGS
NOS. DRAWING NAME DESCRIPTIONS
ELECTRICAL CONSULTANT :

ElekEn Associates
MEP Consultants - Project Managers
513, R.S.M Square, Plot-E1, Shaheed-e-millat Road,
Karachi-75300, Pakistan
Tel : +9221-4551602, 4552037, 4325537 Fax : +9221-4380154
e-mail: [email protected], [email protected]

STRUCTURAL CONSULTANT :

Mushtaq and Bilal


CONSULTING ENGINEERS
304, NOOR ESTATE, SHARAE FAISAL KARACHI-75350
TEL: O21-4554153, 021-4554253 FAX: 021-4540704
E-MAIL: [email protected]

BOMB DISPOSAL SQUAD

DRAWN BY: NK DESIGNED BY : N.Z.K


CHECKED BY: MS SCALE: AS SHOWN
PROJECT NUMBER: MB-1670
11-07-2019

Approved As Noted
DRAWING TITLE:

BOMB DISPOSAL SQUAD


Letter and Comments attached with these drawings LIST OF DRAWING

(1.5 TSF)
DRAWING NUMBER:

f'c = 28MPA S-BD-LI-1-1


EITHER BE ENCLOSED BY THE STIRRUPS OR PLACED BEHIND ONE
GENERAL NOTES: LAYER OF REINFORCMENT.
GENERAL POURING / AFTER POURING 1
1 . THESE NOTES ARE APPLICABLE TO ALL DRAWINGS UNLESS MENTIONED 31. ALL R.C.C. WORK SHALL BE INTERNALLY VIBRATED THROUGH ELECTRO- TORKHAM-BCP
OTHREWISE. MECANICAL VIBRATOR.
2 . ALL DIMENSIONS ARE IN m - mm UNLESS NOTED OTHERWISE. 32. ALL R.C.C.WORK SHALL BE CONTINUOUSLY MOIST CURED FOR ATLEAST
3 . DO NOT SCALE ANY BAR LENGTH & DIMENSIONS. 14 DAYS.
4 . CO-ORDINATE STRUCTURAL DRAWINGS WITH ARCHITECTURAL DRAWINGS. 33. UNLESS MENTIONED OR AUTHORISED OTHEREWISE FORM WORK FROM
IN CASE OF DISCREPANCY REFER TO ARCHITECT/M&B. R.C.C. WORK SHALL BE REMOVED ACCORDING TO THE MINIMUM TIME
5 . CONTRACTOR SHALL INCLUDE IN HIS RATES THE COST OF FORMWORK, INDICATED BELOW.
LABOUR, EQUIPMENT, STEEL ETC. USED FOR THE CONSTRUCTION OF BEAMS AND COLUMNS (SIDES) .... 48 HOURS OF POURING
TYPICAL INTERIOR PARTITION WALL, EXTERIOR BLOCK WALL AND LEDGE SLABS ........................ 21 DAYS OF POURING
DETAILS IN SHEAR WALL SHOWN IN THIS DRAWING. FOR EXACT LOCATION BEAMS (BOTTOM) ............... 28 DAYS OF POURING
AND SIZES OF THESE ITEMS REFER TO ARCHITECTURAL DRAWINGS. 34. POURING IN COLUMNS AND WALLS MUST BE DONE FROM A MAXIMUM
6 . IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PREPARE OF 1.4m HEIGHT BY PROVIDING SIDE OPENINGS IN THE FORMWORK.
BENDING SCHEDULE FROM STRUCTURAL DRAWINGS. DRAWING NUMBER SYSTEM
7 . IN CASE OF DISCREPANCY BETWEEN B.O.Q. AND DRAWINGS, FOLLOW 35. XY - 01 ← SHEET NOS. OF EACH ELEMENT
DRAWINGS.REFER M&B. ↑________
8 . FIELD LAYOUT DIMENSIONS MUST BE CHECKED BY THE ARCHITECT GN -GENERAL NOTES AND DETAILS
BEFORE CONSTRUCTION COMMENCES. FN -FOUNDATION
9 . THIS AND ALL OTHER DRAWINGS SHOW GENERAL DETAILS, INTENT AND
SCOPE FOR THE TENDER. M&B MAY ISSUE ADDITIONAL DRAWINGS FOR
COL -COLUMN CONSTRUCTION DRAWING
WALL -WALLS
CONSTRUCTION SHOWING FURTHER DETAILS, CLARIFICATION ETC, CL -COL_LAYOUT
WHENEVER NECESSARY. 1 GB & FB -BEAMS
10 . THIS AND ALL THE FOLLOWING DRAWINGS SHALL BE USED FOR GR & FR -FRAMINGS
CONSTRUCTION ONLY IF STAMPED BY M&B AND MARKED AS ISSUED
FOR CONSTRUCTION. DESIGN
ST -STAIRS AL IMAM Enterprises Pvt. Ltd.
CODES 36. STRUCTURE DESIGNED FOR ZONE 3.
11. ALL WORK SHALL BE IN ACCORDANCE WITH RELEVENT ACI / BRITISH 37. DO NOT STORE SAND OR DEBRIS IN ONE ROOM, EXCEEDING DESIGN
STANDARDS UNLESS ANY OTHER DETAIL IS MENTIONED. LIVE LOAD OF 5 KN/m².
12. ACI 318-02 SHALL BE FOLLOWED FOR STRUCTURAL DETAILING,
PLACING REINFORCEMENT, PROVIDING COVER ETC.
13. ACI 350 SHALL BE FOLLOWED FOR WATER RETAINING STRUCTURES
SUCH AS UNDERGROUND WATER TANK AND OVERHEAD WATER TANK ETC. 300
14. CAMBER WHERE REQUIRED IN SLABS & BEAMS TO BE PROVIDED AS PER ACI CODE. TYP.
MATERIAL
(CONCRETE)
15. UNLESS NOTED OTHERWISE IN RELEVENT DRAWING CONCRETE SHALL
HAVE A MINIMUM SPECIFIED STRENGTH MEASURED ON 152.4 mm DIAMETER
304.8 mm HIGH STANDARD CYLINDER, AS FOLLOWS
FOUNDATION .......................... 28 MPA.
SLABS AND BEAMS ..................... 28 MPA.
UGWT ................................ 28 MPA.
OHWT ................................ 28 MPA.
COLUMNS AND SHEAR WALLS ............. 28 MPA.
BASEMENT WALLS ...................... 28 MPA. ELECTRICAL CONSULTANT :

LAP
60Ø
IN ANY CASE SLAB & BEAM STRENGTH SHOULD NOT BE LESS THAN 75%
OF COLUMN STRENGTH. ElekEn Associates
16. COTRACTOR SHALL PREPARE 4 CYLINDERS FOR EACH POUR, 2 CYLINDERS TO BE

1.5m
TESTED FOR 7 DAYS STRENGTH & 2 FOR 28 DAYS. CURING MUST BE MEP Consultants - Project Managers
CONTINUED UNTIL CONSULTANT APPROVE 7 DAYS STRENGTH. 513, R.S.M Square, Plot-E1, Shaheed-e-millat Road,
17. BEAMS & COLUMNS MUST BE COVERED BY JUTE OR EQUIVALENT FOR Karachi-75300, Pakistan
CURING. Tel : +9221-4551602, 4552037, 4325537 Fax : +9221-4380154
EQUAL EQUAL e-mail: [email protected], [email protected]
18. CONCRETE MIX TO BE DESIGNED ON THE BASIS OF ACI 211 OR
TYP. TYP.
EQUIVALENT. TRIAL STRENGTH RESULTS TO BE SUBMITTED BY THE
CONTRACTOR FOR REVIEW AND APPROVAL BEFORE CONCRETING. 225 STRUCTURAL CONSULTANT :
19. CONCRETE MIX FOR ALL MEMBERS SHALL BE DESIGNED PREFERABLY
USING RIVER RUN SAND, ROUNDED OR CRUSHED GRAVEL AND PORTLAND
TYP.
300
Mushtaq and Bilal
CEMENT. CONSULTING ENGINEERS
304, NOOR ESTATE, SHARAE FAISAL KARACHI-75350
EQUAL EQUAL

200
(STEEL) TYP. TYP. TEL: O21-4554153, 021-4554253 FAX: 021-4540704
20. ALL REINFORCING STEEL SHALL BE COLD WORKED DEFORMED BARS OF 300 E-MAIL: [email protected]
MINIMUM SPECIFIED YIELD STRENGTH OF 414 MPA AND TENSILE
STRENGTH OF 621 MPA CONFORMING TO ASTM A615 AND BS 4461. 1
(WATER)

typ.
200

200
21. WATER USED SHALL BE OF DRINKING QUALITY AND FREE FROM SALT,
OILY SUBSTANCES, ACIDS, ALKALIES OR ANY OTHER CONTAMINATION.
BEARING CAPACITY
22. FOOTING SHALL REST AT A DEPTH SPECIFIED IN THE FOUNDATION
DRAWING AT LEVEL -2m BELOW ADJACENT ROAD LEVEL.
NET ALLOWABLE BEARING CAPACITY AT LEVEL OF -2m IS 1.5 TSF
SPECIFIC TO EACH BUILDING.
3
ALL FOUNDATIONS SHALL BEAR ON UNDISTURBED NATURAL SOIL USING
O.P.CEMENT.
23. ABOVE MENTIONED VALUE OF BEARING CAPACITY MUST BE CONFIRMED
AT SITE BY SOIL CONSULTANT BEFORE EXECUTION.
24. FOR CASTING OF ANY FLOOR, LOWER FLOOR MUST BE RE PROPPED.
PLACEMENT
(CONCRETE)
25. CLEAR CONCRETE COVER TO MAIN REINFORCEMENT SHALL BE AS
FOLLOWS.
FOUNDATION BOTTOM .................... 75mm
FOUNDATION TOP ....................... 50mm
BEAMS AND COLUMNS .................... 38mm
SLABS ................................ 19mm
UGWT WALLS (INSIDE / OUTSIDE)......... 50mm
UGWT BOTTOM SLAB (BOT. FACE).......... 75mm
3 3
UGWT BOTTOM SLAB (TOP FACE)........... 50mm
UGWT TOP SLAB (BOT. FACE)............. 25mm
UGWT TOP SLAB (TOP FACE).............. 19mm
3 3
OHWT WALLS (INSIDE) .................. 50mm
OHWT WALLS (OUTSIDE).................. 50mm
OHWT BOTTOM SLAB (BOT. FACE).......... 25mm
OHWT BOTTOM SLAB (TOP FACE)........... 19mm
OHWT TOP SLAB (BOT. FACE)............. 25mm
OHWT TOP SLAB (TOP FACE).............. 19mm
DB
4DB

BASEMENT WALLS (INSIDE) .............. 25mm


°

BASEMENT WALLS (OUTSIDE).............. 50mm


135

(STEEL)

db
22DB R(O
26. ALL HOOKS, BENTS, LAPS IN MAIN REINFORMENTS AND TIES SHALL 4DB UTE
R

8
)=4

ER
HAVE STANDARD DIMENSIONS AS PER ACI 318-02 IN GENERAL AND (63MIN) D B
)
ER

OUT
SPECIALLY CONFORMING SEC. 7 UNLESS MENTIONED OTHERWISE. IN
DB
4DB
OUT

27. LAP LOCATIONS SHALL BE AS FOLLOWS UNLESS MENTIONED OTHERWISE 5 M


(7 R
8mm
BEAM AND SLAB BOTOM BAR ............. AT 2D FROM SUPPORT B TE DRAWN BY: NK DESIGNED BY : N.Z.K
H

6D OU
DB

BEAM AND SLAB TOP BAR ............... BETWEEN SUPPORTS R 3


CHECKED BY: MS SCALE: AS SHOWN
mm
R 4

COLUMN MAIN BAR ................ MID LEVEL OF EACH FLOOR


12DB

38 PROJECT NUMBER:
R(

28. FOR ALL BEAMS OVER 900 PROVIDE 2Ø12 @ 300 c/c MID DEPTH BARS, IF MB-1670
(MIN 150)

DB
(0.75 H)

R
12DB OR

OU

NOT MENTIONED. 11-07-2018


TE

29. LAP LENGTH IN MAIN REINFORCMENT SHALL BE AS FOLLOWS UNLESS


R)

Approved As Noted
MENTIONED OTHERWISE DRAWING TITLE:
=4

COLUMN MAIN BARS ......................... 60 DIA


DB

BEAM MAIN BARS ........................... 60 DIA BAR BENDING DETAIL AT BEAM END STANDARD HOOK DETAILS Ø10 RING DETAIL
SHEAR WALL MAIN BARS ..................... 60 DIA
(CONDUIT) Letter and Comments attached with these drawings GENERAL NOTES
30.
THE OUTSIDE DIAMETER OF EMBEDDED CONDUIT OF OTHER MATERIALS
(P.V.C. OR STEEL ETC) SHALL BE LESS THAN OR EQUAL TO 13 THE 1
150

OVERALL THICKNESS OF SLAB, WALL OR BEAM. THE MINIMUM SPACING 600


1200
200

BETWEEN CONDUIT SHALL BE AT LEAST GREATER THAN OR EQUAL TO


THEIR DIAMETER. IN SLABS, CONDUIT SHALL BE PLACED OVER
BOTTOM REINFORCMENT AND IN BEAMS AND WALLS, CONDUIT SHALL
EITHER BE ENCLOSED BY THE STIRRUPS OR PLACED BEHIND ONE
200
1.5 TSF
DRAWING NUMBER:
LAYER OF REINFORCMENT.

S-XX-GN-0-1
TORKHAM-BCP

WORKING DRAWINGS

AL IMAM Enterprises Pvt. Ltd.

ELECTRICAL CONSULTANT :

ElekEn Associates
MEP Consultants - Project Managers
513, R.S.M Square, Plot-E1, Shaheed-e-millat Road,
Karachi-75300, Pakistan
Tel : +9221-4551602, 4552037, 4325537 Fax : +9221-4380154
e-mail: [email protected], [email protected]

STRUCTURAL CONSULTANT :

Mushtaq and Bilal


CONSULTING ENGINEERS
304, NOOR ESTATE, SHARAE FAISAL KARACHI-75350
TEL: O21-4554153, 021-4554253 FAX: 021-4540704
E-MAIL: [email protected]

IMPORT/EXPORT
1 BOMB DISPOSAL SQUAD

1
1 CONCRETE COMPRESSIVE STRENGTH REVISED.
COLUMN SIZE REVISED. 16-08-2018
ISSUED FOR CONSTRUCTION 13-02-2019

DRAWN BY: NK DESIGNED BY : N.Z.K


CHECKED BY: MS SCALE: -AS SHOWN
PROJECT NUMBER: MB-1670

Approved As Noted
DRAWING TITLE:

BOMB DEFUSING SQUAD UNIT


Letter and Comments attached with these drawings DETAILS

1.5 TSF
DRAWING NUMBER:

S-BD-1-1-1