0% found this document useful (0 votes)
275 views44 pages

Transportation Engineering II

Question Collection

Uploaded by

Kapil Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
275 views44 pages

Transportation Engineering II

Question Collection

Uploaded by

Kapil Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
"TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Full Marks | 80 Examination Control Division | Programme | BCE Pass Marks | 32 2076 Chaitra Year/Part_[IV/T Time [Bhis._| a Subject: - Transportation Engineering II (CE 703) ‘Candidates are required to give their answers in their own words as far as practicable. Attenipt All questions, The figures in the margin indicate Full Marks, Necessary charts are attached herewith. Assume suitable data if necessary. . SS4A44 Explain different vehicular characteristics that influence trafiic performance, (8) Discuss different types of intersection. Write the advantages and limitations of grade separated intersection. {8} 3. a) The vehicle amivals at the section of road are assumed to be Poission distributed with. an average antival rate of 1 vehicle every 5 minutes. What is the probability of (@ Exactly 3 vebicles arrive in a 15 minute interval i) less than 3 vehicles arrive in a 15 minute interval? + Gii)More than 3 vehicles arrive in a 15 minute intervals? ia) b) Calculate the capacity of rotary with entry and exit width of 8m, the width of non- ‘weaving section is 9m. width of rotary is 12m, length of weaving section is 60m. The ratio of weaving to total traflic in weaving section is 0.7. (4 4, The average normal flow of traffic on the cross roads 1 and 2 during design period are 450 and 350 PCUfhr. The saturation headway on these roads are estimates as 2.5sec and 3.75 see respectively. The all red time required for pedestrian crossing is 15sec. Design ‘two phase signal by Webster's method with neat phase diagram. ‘Take amber time of 2 sec on each phase for clearance and start-up loss time of 2 sec and 3 sec for roads 1 & 2 vo respectively. [8] 5. What are the various factors to be considered in design of flexible pavement and indicate their significance? + [8] 6. A proposed flexible patement design of single lane carriageway consists of 75mm of Asphalt concrete, 120 mm of emulsified stabilized base course and 145mm of granular subbase. The expected commercial traffic volume is 140 evpd. The expected traffic composition is 30% truck. 30% of mini truck and 40% of bus, whose truck factors are 5.6, 0.6 and 0.1 respectively. The expected annual traffic growth rate is 8% for all vehicles, and 18month required for construction to be completed. The CBR test conducted at 7 locations strafing from Ch.0+100 at the interval of 200m distance gave the value of 11,9,7,10,8,6,4. En tse=275 MPa, Loase=S00MPa and Esuriec™2400 MPa. How many years can this pavement last? [8] 7. Define mass haul diagram. Write down the construction procedure of WBM rod. [246] . Describe the construction procedure of Asphalt Concrete including the requirements on materials, plants and equipment and the tests for quality control, (3) ;plain the types of failure & its causes in flexible 9. Define pavement evaluation. E: pavement. 10. Discuss the factors which affect the bridge site selection. List the essential components of bridge with sketches. (3) (8] Full-Depth Asphalt Concrete Subgrade Resilient Modulus, i, MPa nw weed ‘e ot 3 OT BOE Carey Ped 8 eT BNO ear Equlvalent £0 kN Single Axio Load (EAL) TRIBHUVAN UNIVERSITY Exam. INSTITUTE OF ENGINEERING — [Level | BE Full Marks | 80 Examination Control Division |Programme|BCE | Pass Marks |32___| 2075 Chaitra Year/Part_[1V/T {Time Shes | ‘Subject: - Transportation Engineering Il (CE 703) Candidates are required to give their answers in their own words as far as practicable, Attempt All question’: “All questions carry equal marks. ‘Necessary charts and tables are attached herewith, “Assume suitable data if necessary. What are the basic requirements of intersection at grade? Write down the design steps of rotary intersection. . a . 2, Ina field survey of spot speed measurement, the following twenty observations were taken, Find time mean speed, and space mean speed. 50, 40, 60, 54, 45, 31, 72, 58, 43, 52, 46, 56, 43, 65, 33, 69, 34, 51,47, 41. ‘Also, assuming these vehicle speeds are fixed over a half km segment, calculate the corresponding travel times and show that the space mean speed calculated using travel times is equal to the point estimate, What are the causes of accident and how accident can be prevented? Describe briefly the factors influencing street light design. 4, The average normal flow of traffic on cross roads A and B, of width 7m both, during design period are 400 and 250 PCU per hour; the saturation flow values on these roads are estimated as 1250 and 1000 PCU per hour respectively. The all-red time is provided for pedestrian crossing with speed 1 m/sec and initial walk time 6 sec. Design two phase traffic signal. 5. Explain the followings: a) Traffic and loading factors controlling pavement design b) Lane distribution factors and Vehicle damage factors 6. Estimate the thickness of a plain cement concrete pavement for a 7m wide highway following the design procedure recommended by Indian Roads Congress (IRC) wherever applicable, Use given data, IRC load stress charts for edge and comer regions. Design wheel load = 5100 kg. Traffic growth rate = 7.5% Present traflic intensity = 1050 ovpd Design life = 20 years Construction period = 3 years Radius of contact area = 15 em Modulus of elasticity of concrete = 3.0 «10° kg/m” Poisson’s ratio of concrete = 0.15 ‘Modulus of rupture of conerete = 40 kg/om? ‘Thermal expansion of concrete = 10 x 10°/°C Modulus of subgrade reaction = 6 kg/em? Maximum temperature in summer = 50° Maximum temperature in winter = 15°C ‘The temperature differential in slab in the region is 17.3, 19.0 and 20.3 dogree Celsius for thickness of 15, 20 and 25 om respectively. KAKKN ‘What are the various activities involved in road construction? Write the plants and equipment required for bituminous and cement concrete road constructions. 8, Explain construction procedure of water bound macadam road. pavement failures. Explain the maintenance of bituminous surfaces. Describe the typical types of rigid 10, Enumerate the factors to be considered for selecting the bridge site. Why is ventilation important in tunnel? ‘Traffic Design Traffic Intensity at the End ‘Adjustment in Design Thickness Classification of Design Life (CVPD) of CC Payement, (cm) A 0-15 5 B 15-45 5 c 45 -150 2 D 150 - 450 2 ‘ E 450 -1500 0 F 1500 - 4500 Q CG > 4500 #2. ‘Table for Determination of * Coefficient, Ss L B L ivi c itz Cc 1 0,000 i 1.030 = 0.040 8 1.077 = 0.175 i 1.080 Y 4 0.440 10 1,075 = 0.720 i 1,050. 6 0.920 2 1.000 “ONT eam | . Pstoreeien | | “ Feat lead 90-38 as te wsaro® gent ye05 1 1 thd nm 40 Lt kg/cm? 6 | | Tke30 Kg em 8 A—is 1 | as 10 7-4, Edge tood stress, Se kg/cm’ | yu Sy 5 zs 10 S10 T . s u ® = 2 ae ieee gmc eee teh hiclaass, Bem 14 je 18 20 22 8k ‘Slob thickness: h em \ ‘TRIBHUVAN UNIVERSITY Exam. B ., INSTITUTE OF ENGINEERING Level BE Full Marks | 80 Examination Control Division | Programme | BCE Pass Marks | 32 2076 Ashwin Year /Part_|1V7T Time Bhs SAAS ‘Subject: - Transportation Engineering I (CE 703) Candidates are required to give their answers in their own words as far as practicable. Attempt All questions. The figures in the margin indicate Full Marks, Necessary charts are attached herewith. - “Assume suitable data if necessary. A bicycle racer practices everyday in the morning. Her route includes a ride along 800 m bikeway and back. Since she is traflic engineer, she has made it a habit to count the, numbers of cats in lane A that she meets while riding southward, the number of cars in ane A that overtake her while riding northward and the number of cars in lane A that she overtakes while riding northward as shown in table below. Find average traffic flow and time of lane A. “Average Travel speed | Nos. of Vehicle | Nos. of Overtaken |” Nos. of Overtaking (knvht) met Vehicle Vehicle 32 117, 10 74 34 93 25. 41 oraz 30 15 5 33, 70, 18 9 Explain in detail about different physical characteristics of Driver that affect design of traffic facilities. List out the importance of parking and ill effect of illegal parking. Explain about different types of On-Street and Off-street parking facilities with their pros and cons. ‘What are the factors affecting Night Visibility? What are the different types of road [8] [8] {8] marking and traffic island psed to regulate and control traffic flow? Explain. [24343] ‘A 4vlane divided highway is to be. constructed on a new alignment Traffic volume forecasts indicate that the ADT in both directions during the first year of operation will be 12,000 with 50% Passenger cars (5 KN/axle), 33% of two axle single unit trucks (25 KeN/axle) and 17% of three axle single unit trucks (30 kN/axle) = 17%, The vehicle mis is expected to remain the same throughout the design life of the pavement. If the expected annual traffic growth rate is 4% for all vehicles, design pavement with AC of thickness 7.5 cm, base and sub base. CBR of subgrade = 6.5%, Es vue = 275 MP2, Eyac = 500 MPa and Esatace 2400 MPa. Write down the assumption and analysis of Westargard Theory. How the warping stress and ftiction stress are developed in the Rigid pavement? What are the factors affecting soil stabilization? What do you mean by mechanical method of soil stabilization? Write down the procedure of constructing cement soil stabilized road base. (8) (8) 8 8. Write down material selection and construction procedure of double surface treatment . Pavement. [8] 9. Differentiate between Repair and Rehabilitation of highways. Explain about different ‘types of typical rigid pavement failures. Draw a sketches wherever applicable, [8] 10. What are the importance of tunnel? With neat sketch, describe different components of tunnel and tunnel cross sections? 8] ee 03 ‘TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Divisio 2074 Chaitra “Attempt All questions, “All questions carry equal marks. Necessary figures are attached herewith. “Assume suitable data if necessary. KAAAS Candidates are required to give their answers ‘Subject. - Transportation Engineering Il (CE703) . in their own words as far as practicable, 1, Discuss the’ advantages and limitations of rotary intersection. Describe the factors affecting street light design. 2, Deseribe different types of road capacities and exp! level of service. Jain the factors affecting capacity and 3, Speed and delay studies by floating car ‘method were conducted on a stretch of city road of3 km length running north south. The data collected is given below. Find out 3) Average traffic volume 4) Journey speed ii) Ronning speed of the traffic system along either direction No. of Vehicles Zrip_ | Dizection_| Journey. Total no [of Trip. -|insefinin] | Delay fmin} direétion i NS 35 15 4 7 250 z_ |sn 625 1.67 3 5 200" 3 [NS 536 13 5 3 240) 4__ [SN 633 2.25 3 1 230 5 __[NS 5.63 1.16 2 6 230 6 | SN 63 1.33 2 3 250 7___ [NS 333 1.67 2 7 210 8 SN 6.53 1.83 3 2 180. [Ns 3:16 15 2 4 200 4, A traffic stream had a free flow speed of 80 kmph anc Jind density volume for highest level of service possible if the flow is Calculate the spe 4 jam density if 100 veh/km. 90% of capacity flow. Calculate the spacing, headway, gap ‘and clearance when there is capacity flow if the length of vehicle is 6.0m. 5, Design a flexible pavement by using asphalt institute method from the following data of a stretch of existing two lane roads. 3) Curent trafic of 80 KN equivalent single axle load = 0.95%10" BAL/Day. VDF =2.0 ii) Traffic growth rate = 7.5% ; iii) Design period = 15 years jv) Construction period = 16 months ¥) CBR sun grade to be taken = 5% vi) Elastic modulus of asphalt concrete surface course = 2500 Mpa ‘vi) Elastic modulus of granular sub-base course = 125 Mpa ‘Also sketeh the cross section of pavemerit. (Refer attach figure) 6. Discuss westergaart!s concept of temperature stress in concrete pavement. How spacing of different joints is calculated in rigid pavement. 7. List out the techniques of soil stabilization. Explain the design and construction procedure of soil-cement stabilized road. 8, Explain the construction procedure of bituminous conerete road and check needed for quality control. 9. Benkelman Beam deflection studies were carried out on 12 selected points on stretch of flexible pavement during summer season. The deflection values obtained in mm are given below. Ifthe present traffic consists of 600 commercial vehicles per day, determine the = thickness of bituminous concrete overlay required, ifthe pavement temperature during the test was 32°C andthe correction factor for subsequent increase in subgrade moisture ‘content is 1.1. Assume annual rate of growth of traffic as 7.5%, design life as 10 years end the number of years after the last traffic count before the construction of overlay as 2 years and take equivalency factor of 2.0 for bituminous concrete. Adopt IRC guidelines, [1.3 1.42,1.35,1.38, 1.38, 1.58,1.65,1.50, 1.49,1.43,1.53,1.60 mm] Design Traffic (evpd) 150-450_| 450-1500 _[ 1500-4500 Allowable deflection (mm) | 1.5 1.25 1.00 10, Wiite the characteristics if ideal bridge site, Explain briefly the method of tunneling in firm ground. ae Examination Control Division SAAKAN 03 ‘TRIBHUVAN UNIVERSITY [ Exam. INSTITUTE OF ENGINEERING 2075 Ashwin [Year/Part "Subject: - Transportation Engineering 1 (C703) Candidates are required to give their answers in their own words as far as practicable, Attempt All questions. ‘All questions carry equal marks. Necessary figures are attached herewith, ‘Assume suitable data if necessary. “What are the basic requirements of intersection at grade? Mention the importance of street lighting. Explain different types of traffic islands? How accident study is carried out? ‘Two vehicles A and B approaching at right angle. Vehicle A from West and vehicle B from south collides each other. After the collision, vehicle A skids in 49° N of W and vehicle B Skids 27°E of N. The initial skid distance of vehicle A and B are 37 m and 19 m respectively before collision. If weight of vehicle A is 4 tonne and weight of vehicle Bis 6 tonne. The skid distances after collision for vehicle A is 15 m and for vehicle B is 36 m. calculate the initial speeds of vehicles if the average skid fesistance of ‘the pavement is found to be 0.55. ‘A fout-legged right angled intersection is to be signalized with a fixed time 2-phase signal. The design hour flow and saturation flow are as under: z North (N) | South (S) | East (E) | West (W) | Designhour flow |~ 900 300 800 700 Saturation flow | 2500 2000 | 3200__| 3000 The lost time is 2 seconds per phase due to starting delays and amber time for north- south and east-west are 3 seconds and 4 seconds respectively. Determine the optimum cycle time, Allocated the green times to the two phases. Explain the factors that controlled the pavement design? . Design the flexible pavement for 4-lane single carriage way road with the following parameters i) Initial traffic in each direction = 2000 CVPD ii) Design life = 15 years #8) Construction perio iv) Traffic growth rate y) Design CBR value = 6% vi) Modulus of elasticity of asphalt concrete surface course ~ 2500 MPa -vil) Modulus of elasticity of bituminous treated base = 1200 MPa viii) Modulus of elasticity of granular subbase course = 125 MPa ix) Axle load distribution of commercial vehicles on the road is as follows: ‘Axel Load (RN) | No. of Axles (%) 10 15. 30 15 Al 10, Describe the materials required and construction procedure of water Bound Macadam road, Describe the construction steps of cement concrete pavement. Describe briefly maintenance, rehabilitation and reconstruction. Describe the methods of pavement evaluation. Draw a neat sketch of bridge with its components. Explain the methods of river bank protection? tee o4 ‘TRIBHUVAN UNIVERSITY |'Exam. Examination Control Division { 10. INSTITUTE OF ENGINEERING | 2073 Chaitra Candidates are required to give their answers in their own words as far as practicable. Attempt All questions. ‘All questions carry equal marks. ‘Necessary figures and tables are attached herewith, ‘Normal graph paper shaill be provided. : ‘Assume suitable data if necessary. Ae ee . . oe Explain the contributing factors of road accident. Explain how accident rate can be reduced. Design two phase traffic signal using Webster method. The flow on cross road X and Y during design period is 450 PCU/hr and 325 PCU/hr respectively. The capacity of road ¥ and X being 1400 PCU/hr and 1200 PCU/hr respectively. Take amber time as 3 sec, all red condition for pedestrian crossing is 15 sec. ‘An officer commutes daily from his home to his office. On an average the trip one way takes 24 minutes, with a standard deviation of 4 minutes. Assume the distribution of trip times to office to be normally distributed a) What is the probability that the trip will take at least 4 hours? b) If the working hour starts at 9:00 A.M and he leaves his house at 8:45 A.M in the morning, what percentage of the time is he late at work? ‘What are the importance of street lighting? Describe the factors affecting its design. Differentiate between flexible pavement and rigid pavement? Explain the factors which affect pavement design. Design the pavement for a given stretch of a dual three lane carriage way with following data, The result of subgrade soil CBR test at seven locations obtained in that stretch of a road are 11,8,7,6,7.5,4. The existing traffic counted on that stretch of road (ADT) are Traffic categories _| Nos. | Equivalency factors Truck (loaded) 20 | 5.67 Truck (empty) 200.02 Bus (loaded) 40101 _| Mini Truck (empty) [10] 0.001 Mini Truck (loaded) [20 | 0.63 Mini Bus (loaded) [19 | 0.05 Cars 20 [0.0005 ‘ Traffic Growth rate = 7% Design Period = 10 years Construction period from last date of traffic counts = 2 years Explain with mass Haul Diagram the free haul, over haul and economical haul. List various activities in road construction. Define prime coat and tack coat, Write down the construction procedure of Asphalt concrete. Explain the importance of road maintenance. Describe the maintenance of bituminous pavement. Explain the importance and methods of providing tunnel drainage, lighting and ventilation. nee 3 ZFOX Ves oF Examination Control Division 04 TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING 2074 Ashwin v SaaS ansportation Engineering I (CE703) Candidates are required to give their answers in their own words as far as practicable, Attempt All questions. : All questions carry equal marks, Necessary figures are attached herewith. Assume suitable data if necessary. Normal graph paper should be provided. + What are the basic requirements of intersection at grade? Describe grade separated intersection with its advantages and disadvantages, Spot speed observation at a particular link provides the following data, calculate maximum speed limit, minimum speed limit, design speed and modal speed for regulation of traffic. Speed range (kmph) Frequency: 6-10 r 10-14 4 14-18 7 18-22 20 22-26 44 26-30 80 30-34 82 34-38 79 38-42 I 9 42-46 36 46-50 26 50-54 = 34-58 10 38-62 3 Describe highway capacity. Explain the factors which affect capacity and level of service Assuming linear Speed-density relationship of V = 60-0.43K a) Draw V-K, V-Q and Q-K diagram showing critical value ) Find the saturation flow? ©) Find speed and density at flow of 1000veh /hr What are factors affecting pavement design? Write down the steps of IRC design guidelines for rigid pavement. 6. Design a flexible pavement by using asphalt institute method from the following data of a stretch of existing two lane road. a) Current traffic of 80KN equivalent single axle load = 0.95 x 10? EAL/day b) Traffic growth rate = 7.5% ©) Design period = 15 yrs 4) construction period = 16 months ©) CBR of sub-grade to be taken = 5% £) Elastic modulus of asphalt concrete surface course = 2500 MPa 2) Elastic modulus of bituminous treated base = 1200 MPa fh) Elastic modulus of granular sub base course = 125 MPa Also draw the neat sketches of the pavement layers. 7. What is Mass Haul Diagram? What are the equipment and plants needed for the accomplishment of various activities of road construction? 8. What are various types of bituminous pavements? Explain the construction procedure of Asphalt Concrete pavement, 9. What is highway maintenance? Explain the general causes of pavement failures. 10. What are the factors affecting the choice of location of bridge site? Discuss the river bank protection structures. oo 06 “TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Havel | BE _ Examination Control Division | Programme [BCE 2072 Chaitra | Year /Part wit Time Bhs. ___ Subject: - Engineering Il (CE703) Candidates are required to give their answers in their own words 25 far as practicable. Attempt All questions. “All questions carry equal marks. ‘Necessary figures are attached herewith. “Assume suitable data if necessary: Deseribe various types of traffic control devices. Write dovm the advantages and disadvantages of traffic signal. ‘What are the importances of street lighting? Deseribe the factors affecting street light design. “Assuming a linear speed-density relationship, the mean fee speed is observed to be 80 tah near zero density and the corresponding jam density is 130 velvkm. Assume that the average length of vehicles is 6 m. i) Write down the speed-density and flow-density ‘equations ii) Compute speed and density comesponding 1 flow of 1000 velvbr. dit) Compute the average headways, spacing, clearance ‘and gaps when the flow is maximum ‘The following data collected for a section of road 25.5 km 1088 during the floating car nod study. Assuming the equivalency factor of 1,2 and 3 for each ear bus and truck respectively, Caleutate the flow in per/hr journey speed and running speed in both direction of flow. See | Ne aan Vanesa | Min | See | Min | Sec | Car_| Bus | truck Overtaking | Overtaken eee as | eee 3 1 SN + i[n| is | a {253 2 3 NS lo ae eee 4 2 SN 4 )u| i js | 2 |s tt 6 1 NS 4 {a | ' [as] a p31 2 ae ere ties eet 2 2 NS 4 [i2| ' [is | 27 14} 2 5 2 SN Selo [eee eee 1 1 NS Meio | be eis 2 3 SN ae Vege Le | 50 | od eel 4 | 3 NS. + | 50 | ' | 4 | 2 | 1} 3 [o 2 LL sv 4 | 4 T [35 | 25 | 3 13 1 1 5. Differentiate between flexible pavement design and rigid pavement design. Desawve Weatergaad's concept for temperature stresses. 6. A road pavement is to be designed for a stretch of road with the following pavement layers: ‘G) Mittimuin thickness of asphalt concrete on the surface course = $0 mm. (4) Well graded crushed stone aggregate for base course, CBR value = 90% (iii) Fairly graded graved for sub-base course, CBR Vahue=20% iv) Compacted Soil, CBR value = 10% (W) 90% petcentilé sub grade CBR Value = 4% ‘The road has single lane carriage way & caters present ADT of 1200 commercial vehicle per day with annual growth of 6%. The pavement is to be designed for 10 years period. Design the pavement section! using IRC recommendation for CBR method. The road is to be compacted with 6 months from initial traffic count 7. What are the various activities involved in road construction? Explain the construction procedure of otta seal. 8. Describe the materials required and construction procedure of Water Bound Macadam (WBM) road. 9. Describe the causes of failures in flexible pavement. » LO. Explain the methods of river bank protection? Explain the methods of tunneling in hard soil. 03 “TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Division as | 2073 Shrawan ¥e 7 sportation En} v¥ Candidates are required to give their answers in their own words as far as practicable. ¥ Attempt All questions. ‘Al questions carry equal marks. Necessary figures are attached herewith. Jssume suitable data if necessary. KK 1. Define traffic engineering. Explain oad user characteristics and, buman-vehicle environment system. 2. ‘The average normal flow of traffic on crs roads H and F during design petiod are 400 yi 250 PCU per hour, the saturated headway ‘hese roads are estimated 2s 3 sees and ncaos respectively. The all red time required for pedestrian crossing is 15 sees. Design two phase trafic signal by Webster's method. 3, Whats the importance of parking studies? Deseribe different types of parking. AL. Avvebile hits a bridge abutment ate speed setimated by investigations as 20kmpb, Skid i vks of 30 mon the pavement (0.35) a owed by skid marks of 60 m on the gravel Maier approaching the abutment (£0.50), What was ‘he initial speed of vehicle? 5, Explain the concept of cumulative standard axle load, What are the advantages of rigid pavement over flexible pavement? 6, Design a flexible pavement by using Asphalt Insitute Method for a two lane «wo Tt pavement carrying traffic of TSoopeulday with growth rate of traffic 5% Pt annum. The Mrsign life is 15 years. The vehicle damage a aia 23 and CBR value of sub grade soi ger The modulus of asphalt concrete surfare SO ‘bituminous treated base course dd granular sub-base course are 2500MPa, 1200MPa and 125 MPa respectively. Assume ai giruction period of 18 months. Draw a neat sketch of pavement layers. 7. What is surface dressing? Write down the construction procedure of DBSD? ‘What ae the equipment and plants needed for the various activities of road construction? aevexibe prime coat, tack coat and seal coat with their usefulness. 9, Explain te typical failures of flexible pavement with neat sketches? 10, Show the various component parts of bridge with a neat sketch. How drainage and ‘Ventilation problems are managed while tunneling? +e ‘Avva) peor ery ajours ny oB 1ueyeNnbs eres sy @ og sctbamfummémmrreritigt $ ts teste sy og sot ait “Mt “SoInpoy4 wagusey apesBqng sieiouoD yeudey udeguiny 03 TRIBRUVAN UNIVERSITY Examination Control Division || KAAAAY 10. INSTITUTE OF ENGINEERING __2071 Shawan Candidates are required to give their answers in their own words as far as practical Attempt AU questions. The figures in she margin indicare Full Marks, Necessary chart is attached herewith, Normal graph paper should be provided. Assume suitable data if necessary. ‘What are the objectives of conducting speed and delay study? Describe the methods of conducting speed and delay study. [444] Write down the basic requirements of intersection at grade. Draw a neat sketch of full cloverleaf intersection showing all the traffic movement. [444] ‘A van of weight 3 tonne hits a parked car of weight 0.8 tonne and both the vehicles skid together through i) Calculate the initial speed of the van if it does not apply brakes before collision. fi) Caleulate the speeds of van before collision at collision and after collision if it applies brakes and skid through a distance of 2.8 m before collision. ‘An isolated signal with pedestrian indication is to be installed on a right angled intersection with road C of 12 m wide and road D of 9.6 m wide. The volume of traffic pper hour per lane of roads C and D are 450 and 300 respectively. The approach speeds are ‘60:kmph and 40 kmph for roads C and D respectively. Design the timings of traffic and pedestrian signals, assuming amber periods of road C and D as 4 seconds and 3 seconds tance of 4.2 m before coming to stop. 18) respectively. 8 The traffic survey revealed that present ADT of 1200 ev/day (both directions). The annual growth rate of traffic is 8%. The vehicle damage factor is 1.5, The pavement construction of single lane road is to be completed in 3 years from the last traffic count. Design the pavement section by Asphalt Institute method with the following considerations, (8) i) Design period = 10 years fi) CBR test values of sub grade soil Penetration (mm) | Load tke) | Penetration (mm) | Load (kg) 0 3.0 56.5 05 30 40 67.5 1.0 16.2 5.0) 73.2 1s 28.1 75 89.0 20 40 10.0 99.5 aaa 48.5 125 106.5 iii) Elastic modulus of Asphalt concrete surface course = 2800 MPa iv) Elastic modulus of Emulsified stabilized base course = 1500 Mpa ¥) Elastic modulus of Granular sub base (CBR 2 30%) = 120 Mpa Draw the cross section of final pavement layers considering the thickness of Asphalt concrete surface course not less than 5 em. What are the factors affecting pavement design? Write down the steps of rigid pavement design by IRC method, (81 Describe different types of pavement. Explain the construction method of Asphalt conerete pavement, [2+6) List out the soil stabilization methods. Explain the construction process of mechanical soil stabilized road. [26] Differentiate between maintenance and rehabilitation, Explain different types of road maintenance. (2+6] What are the factors to be considered in selecting bridge site? Explain the methods of river bank protection, [44] ‘Sudgrade Resilient Modulus, 8, MPa Full-Depth Asphalt Concrete SGOT He Ad) eg es eGt KN Single Axle Load (EAL) 03 ‘TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Division | P 2070 Chaitra gineering II (CE703) ¥ Candidates are required to give their answers in their own words as far as practicable. Y Attempt All questions. Y All questions carry equal marks ¥ Necessary figures are attached herewith. ¥ Assume suitable data if necessary. 1, List ihe objectives of accident study. Explain ‘ecient. ly causes and preventive measures of 2, Describe channelized intersections with their advantages and disadvantages. 3. The dota collected ater speed and delay studies by floating car method on a stretch of road 3.2 {ami long. are given below. Determine the average values of volume, journey speed and running speed of the traffic stream along either direction, sip | Ditetion | Joumey_ | Tota stopped Rect ——_ oftrip | time (min) | delay (min) | Overtaking | Overtaken | ‘T¢r open Tp ep [60 138 4 7 270 2 | D-c_| 748 17 3 4 250 3 | c-p | 6” 1.62 3 4 300 a_[p-c [782 182 3 3 275; s7[e-p [633 1.40 3 2 295; “6_[ p-¢ [813 2.10 2 a 280 7 [ep [én 173 4 4 300 ¢_|_p-c | 70 185 3 3 230 9 [-c-p | 623 1.60 4 2 275 io] D-¢ | 698 178 2 H 22 4, An isolated signal with pedestrians indication is to be installed on aright angled intersection ‘with toad H of 12 m wide and road F of?.6 m wide, The heaviest volume per hour for each lane of H and F are 475 and 325 respectively. The approach speeds are 60 and 45 kph for road H_ and road F respectively. Design the timings of traffic and pedestrian signals. Assume amber times for road H and road Fas 5 and 4 secs respectively. 5. Explain how design traffic is calculated from the data obtained from traffic surveys. Give at least three different examples in various design methods. 6, Design the pavemtent for an existing two lane single carriageway road with the following details. i a. Initial traffic irboth direction in the year of completion of construction = 5640 CVPD b. Design life = 10 years ©. Design CBR value = 6% Axle load using the road (CV) = 118 KN 7. Define road construction technology. Describe the various activities to be performed for the road construction. 8. Describe the construction procedure of bituminous conerete road and check needed for quality contro 9. Define road maintenance. Explain different measure to be taken for gully coittrol works. 10, What ae the factors to be considered in tunnel lighting? What are the different methods of river bank protection work? Chast for question no. 6 otal Thickness of Pavement, nm —e con 1000. ces 3 a 800 en 700 1% a ot 10% 600 500 6 iene & courosiron "b 30 105 ee ‘Cumulative number of standard axles (rsa) ees ‘Tota al = aie Sg ey eee samc] es | cieny [omen | Et ‘eo _ ee ee r oo [| ane oe 00 "700. 0. a0. iat L Se te te ‘RAFe(nseh 05 ——_TRIBHUVANUMIveRsITY [£xam, INSTITUTE OF ENGINEERING Level BE Fall Marks | 80 Examination Control Division. | Programme | BC ase Marka [32 2071 Chaitra Year /Part_[ IVE Time [3S ‘Subject: - Transportation Engineering II (CE703) Candidates are required to give their answers in their own words as far as practicable. Attempt All questions. ‘All questions carry equal marks. ‘Normal graph paper should be provided. Necessary figures are attached herewith. 7 ‘Assume suitable data if necessary. / ‘ KA4888] Define traffic engineering. Describe road users and vehicular characteristics. ‘What are the uses of origin and destination study? Briefly explain the methods of conducting this study. 3. Average trip time for office is 30 minutes with standard deviation of 5 min, Assuming normal distribution of trip time, calculate the followings: a) Probability of trip time being at least 35 minutes 'b) If the working hour starts at 10:00 AM and trip starts at 9:40 AM what is the probability of being late? <4. An isolated signal with pedestrians indication is to be installed on a right angled intersection with road A 15 m wide and road B 12 m wide. The heaviest volume per hour for each lane of road A and road B are 300 and 250 respectively. The amber times for roads A and B are 3 and 2 seconds respectively. Design the timings of traffic and pedestrian signal. 5. What do you understand by legal axle load and standard axle load? Describe the stresses induced in the rigid pavement slab. How spacing between contraction joints is-calculated in jointed plain concrete pavement? “"®. In the figure below, a pavement system with the resilient moduli, layer coefficient of surface course and drainage coefficients are shown. If predicted ESAL= 15%10°, R = 90%, S. = 0.4 present serviceability index = 4.2 and terminal serviceability index = 2.7, select the thickness of D;, Dz and D3. Ey = 450,000 psi B, = 25,000 psi E, = 15,000 psi 1M, = 5000 psi : 7. Draw a neat sketch of typical pavement structures, Explain in detail the construction methodology of Otta Seal. 8. Explain with a neat diagranp the characteristics of mass haul diagram, including free haul, over haul, economic haul, shrinkage and swelling factor. 9. Define road maintenance, Describe the failures of the flexible pavement. 10. What are the methods of providing tunnel ventilation? Explain the major factors controlling. the selection of bridge sites. Overall standard deviation, So 2 3 io 99 Reliability, R(%) 80 70 60 50 ™~, AAHSTO Flexible Pavement Nomograph = c : 3 tT €= Design serviceability loss, APS! BE 350 8% ce ‘a gd 2% £8 450 BS 0 2s gy 2 238 g me 32 10 wey 83 BS 35 se ° BB = E £2 4; Be oF £2 ee 705 53 as e @ & a 65554535 25 15 Design structural number, SN 06 ©——TRIBHUVAN UNIVERSITY Examination Control Division | Programme | BCE KAKA S BE INSTITUTE OF ENGINEERING 2072 Kartik (Near /Part_[IV/T ~ “Subject. - Transportation Engineering I (C8703) Candidates are required to give their answers in their own words as far as practicable. Attempt All questions. ‘All questions carry equal marks. ‘Normal Graph paper should be provided. ‘Necessary figures are attached herewith, “Assume suitable data if necessary. f Describe the types of traffic | capacity and factors affecting traffic capacity. ‘A two-phase traffic signal is to ‘be installed at’a cross road of two streets N-S and E-W at right angles to each other have design hour and saturation flows of 800, 2400; 400, 2000; 750, 3000 and 1000, 3000: for North; South; ‘East and West arms respectively. Only straight-ahead traffic is permitted. Calculate the optimum cycle time and green times for minimum overall delay. Take time lost per phase due to starting delays of 2 seconds and the amber period of 2 seconds. What are the basic requirements of intersection at grade? M street lighting. ‘Two vehicles P and Q weights 5 tonne and 7 tonne approaching right angle, vehicle P from west and vehicle Q from south collide with each other. After the collision vehicle P skids in a direction 54° north of east and vehicle Q 42° north of east. The skid distances of vehicles P and Q before collision are 20 m and:28 m and the skid distances after Collision are 26m and 30 m respectively. Find out the initial speed of the vehicles, ‘Assume average skid resistance of the pavement is 0.46. What are the factors affecting pavement design? Write down the step by step procedure for determining rigid pavement thickness ‘based on IRC guidelines. = Design the flexible pavement for anew road with following data: the importance of a) Two lane single carriageway road in plain terrain f 4) Initial trafic composition in the year of completion of contruction (sun of botb directions) Vehicle type | No. | VDF : Heavy 3axletnick | 40 [65 Two axle tuck | 100'[ 4:75 ‘Mini truck 120" 1.0 Bus 100 | 0.5 ©) Traffic growth rate is 8% per annum. @) Designed CBR of sub grade soilis6% ) Design life is 12 years Necessary chart is attached. ‘What do you mean by road construction technology? What are the equipment and plants do you need to execute different activities of road ‘construction? 8, What is otta seal? Write the construction procedure of otta seal 10. Define highway maintenance. Write down difference between maintenance, retablitation ‘and reconstruction. Explain types of road maintenance. Weite the characteristics of ideal bridge site. Explain briefly the methods of tunneting in firm ground. Se I CBR SY 3 Pavement Composition unusne | genet | sine Sota | ara |. cumin aa Wearing Binder) Base, mi base, mm Course, mm | Course, mm 1 400, 20 PC. 150 250, 2 450 zopc | s0 DBM 150 250 3 5 zor | 508M 150 215 5 520 soc | 508M 150 280) 10 610 soac | _soDeM 200 310 5 83 00: 400. 200: Thickness & Composition (mm) FREE rem carpet [IIIT] orensar base Granular Sub-base ai ‘| we ss | 1 2 3 3 10 Design Traffic (msa}. [REY Dense Btuminous Macadam (DM) EBB Bruminovs Concrete 00 ‘00 00 20 04 TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Division | Programme | 5 2070 Ashad a ~ Subject: - Transportation Candidates are required to give their answers in their own words as far as practicable. Attempt any Five questions. ‘The figures in the margin indicate Full Marks. Necessary figures are attached herewith. “Assume suitable data if necessary. an | 2) Define the traffic volume and write down the objectives of trafic volume study. {8} b) Road A is 13.5 m wide and road B is 10.5 m wide, An isolated signal with pedestrian indication are to be installed at right angled intersection of these roads. The peak volume per hour for road A is 250 and for road B is 200. The approaching speeds for road A and road B are 60kmph and 45 kmph, the amber periods for road A and road B are 4 seconds and 3 seconds respectively. Design traffic and pedestrian signal timing. [8] 2. a) Write the ill effects of parking and describe the types of off street parking. 13] 'b) vA vehicle of weight 1.4 tonne applies brakes and skids through a distance of 40 m “before colliding with a parked vehicle of weight 1 tonne. After colliding both vehicles kid through a distance of 18 m before stopping. If the coefficient of friction of road is. | 0.43, find the initial speed of the moving vehicle. (8) 3, 2) Describe the design procedure of rigid pavement. is] ') A pavement hes to be designed for a certain length of existing single lane carriage ‘way road from the following considerations: i) Current traffic of S0KN equivelent single axle load = 129 ESAL. i). Design period = 12 years Construction period = 18 months from the iv) Growth rate of traffic = 5% v) 87.5% CBR value of sub grade soil from 7 samples collected = 5% vi) Elastic modulus of asphalt concrete for surface course Eyes ~ 2200 MPa vii) Elastic modulus of emulsified stabilized base Ea = 1200 MPa. -vili) Elastic modulus of granular sub-base (CBR230%) Ex = 130 Mpa. You are required to design the pavement using asphalt institute method. Draw cross section of final pavement layers considering the thickness of asphalt concrete on surface course not less than 50 mm. [3] 4, 8) What is an interface treatment? Write the construction procedure of grouted macadam, [8] b) Explain the maintenance process of bituminous surface. [8] 5. @) List the components of a bridge and discuss the factors to be considered in bridge site selection. [8] b) Explain the different types of failure in flexible pavement, 18] [4x4] 6. Write short notes on: 3 a) Causes of accident +) Construction of WBM roads ¢), Methods of spot speed studies 4) Types of maintenance ane 7 04 TRIBEUVAN UNE URSITY Exam, Ri_alar /Back INSTITUTE OF ENGIREERIN Level BE Full Maris Examination Control Division [Programme | BCE [Pass Marks 2068 Chaitra [Year /Pars_[IV77 ‘Time ss. Subject: - Transportation Engineering Y, Candidates are required to give their answers in their own words as far as practicable, Attempt any Five question. : The figures in the margin indicate Full Marks Y Necessi % Assume sui le data if necessary. Provide normal, ‘graph. : ita are the basic requirements of intersection ‘at grade? Describe ‘channelized sections with their advantages, : [3° 1A diver of a oét spplied bakes aiid avoided hitting the paiked vehile on the Poadway. The car left the skid sharks of 37m, Assuming f= 0.62 and braking efficiency of 90%, determine whether the drive: Was violating the 50 kmph speed dia at tht locaton ifthe driver is travelling () up hill on 3,S-slope i) doonban ox 2.45° slope (il) on the level roadway 2,..®)_ Explain humen-vehicle-environment opetating systent:”—-—— . +). The spot speeds at a particular location are normally distributed with e mean of 51.7 /Nnpk and standard deviation of 8.3 kenph. What is the probability that [8] i) The speed exceeds 65 kmph? i). The speed lies between 40 kamph and 70 kph? 48) What is the 98" percentile speed? : 2-0) pitleenise between flexible end rigid pavements, How the loed is tensferred tothe é layer tndemeath in flexible and rigid pavements? [8] ¥) Design the flexible parament using CBR curve with the help of following data Is} i) . Subgrede soil (soaked) CBR = 5% : t) Laterite sub-base (soacked) CBR = 15% iii) Water bound macadam base CBR = 95% iv) Number of heavy trafic per day in may 2003 = 150 ¥) Design life = 15 years © yi) Annual rate of increase in heavy vehicle = 5% i, The road is purposed to be completed in may 2008, (Use CBR curve for design), 4, oot ‘megs haul diagram with neat sketch end explain the properties of the diagrath [8] BY Distinguish between prime coat and tack coat. Write down the construction procedure Of surface dressing. a BB). 5.9) Bilan the factors that should be cotisidered in selecting the bridge site. What ate different method avéilable for protecting river bank? : 0) PAGE road maintenance. Explain the causes of flexible paveiient failure with sketches, 3 [8] 6. “Write short notes on : (any four) [4x4] X-8)-On street and off street parking ) Pavement evaluation ¢) Define with neat sketch i) Potholes in flexible pavement ii) Mud pumping @) \d coristruction equipments and Plants ar aun of maintenances 3) Qe env Cova per ony as tenes Reg eels terse reel eee Paar ce ga waveeserceen ag) ae a Hn eons epee 6269S: | eyaiouog meudsy mideqtint at) Son sa ne a eat 03 TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Division 2070 Ashad Candidates are required to give their answers in their own words as far as practicable. Attempt All questions. All questions carry equal marks. Necessary charts are attached herewith. Assume suitable data if necessary. RS 1. Describe on - street aud off - strect parking in detail. Where is on - street parking prohibited? 2. Describe road users and vehicular characteristics. 3. What is saturation flow rate? The average normal flow of traffic on cross road A and B during design periods are 375 and 225 peu per hour. The saturation flow values on these roads are estimated as 1135 and 960 pou per hour respectively. The all red time required for pedestrian crossing is 14 sec. Design two phase traffic signal by Webster's method. ‘Assume amber time of 2 sec. each for clearance. 4,. Too vehicles A and B approaching at right angle, A from west and B from south collide with each other. After the collision, vehicle A skids in a direction 50°North of East and vehicle B skids 60°South of East. If the weight of vehicles A and B are 4 tonne and S-tonne respectively, the initial skid distances of vehicles A and B before collision are 3.5 m and 4.2 m and after collision 7.0 m and 8.2 m respectively, calculate the initial speeds of vehicles if the average skid resistance of pavement is 0.61. 5. Design a flexible pavement by using Asphelt Institute method from the following data of a stretch of existing two lane roads. Current traffic of 80 KN equivalent single axel load Traffic growth rate Design period Construction period CBR of sub-grade to be taken Elastic modulus of asphalt concrete surface course Elastic modulus of bituminous treated base Elastic modulus of granular sub base course Draw a neat sketch of the pavement layers. 6. What ate the different factors that affect the pavement design? Compare the flexible and rigid pavements from different criteria. 7. Define road construction technology. Deseribe the various activities to be performed for ‘the road construction. 8. Draw amass haul diagram with neat sketch explaining the properties of the diagram. 9. Define ‘road maintenance. Explain different measures to bev taken for land slide stabilization, 10. Classify the bridge considering span, loading and materials. Describe the different ‘methods of tunneling in soft soils with the help of neat sketch. cory Olerees y © ya) p20 Olea co is NY 08 tuBreAIND ee lesrec » sjesouog yeudsy wided-und Deere s +e eee oct ant “r“sminpoyt yuaitseH opesBans ‘ob 03. TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING Examination Control Division 2069 Chaitra ‘Subject: - Transportation Engineering Il (CE703) ‘Candidates are required to give their answers in their own words as far as practicable. Attempt Al questions. “All questions carry equal marks. ‘Normal graph paper should be provided. Necessary figures are attached herewith. “Assume suitable data if necessary. ‘Desuribe diferent types of taffic capacity and factor affecting trafic capacity. KAAKSA Describe the causes and preventive measures of road accident. A driver travelling at 35 kph, ‘behind another car decides to pass it and accelerate. If the rate of acceleration is given by the relation a. (1.12 - 0.014 V) where v is speed in m/sec and t is time in second. {) Rate of acceleration after 10 secs iy Time taken to attain a speed of 85 kmph (ii) How far will car travel in 210 sees 4. Ataright angled intersection of two roads, road A with a total width of 13.5m and road B ie ee talc volume per hout for road A and B are 325 and 275 respectively. The ber periods of road A and oad B ae 5 sees and 4 ses. Design the timing of traffic and ‘pedestrian signals. 5. Explain the different factors that affect the pavement design. 6. Results of seven tests produced the following subgrade reser! modulus test values TES, 67.3, 683, 58.6, 683, 106.9, 80.0 MPa. The traffic classification at the end of construction is projected as below: “Number of vehicles (both direction) | Truck factor 4000, 0.003 72050. 0.28 1000 1.06 1100 0.62 1200 1.05 Fo oN Design the flexible pavement using Asphalt institute ‘Method for two lane two way road to cater the above traffic with the following details. j) Minimum depth of Asphalt concrete wearing course with modulus of elasticity 2500 MPa = 50mm si) mulated asphalt base course with modulus of elasticity 1250 MPa iy Granola sub-base course with modulus of elasticity 150 MPa jv) Annual growth rate of traffic 65% v) Design period 12 years M2) Use 87.5 percentile resilient modulus value fr the desig, Paw the cross section ofthe pavement layers with your design ovtzt 7, What ig Mass-Haul Diagram? What are the equipment and plants needed for the accomplishment of different activities ‘of road construction? &, Describe prime coat and tack coat. Explain the construction procedure of surface dressing. 9. Explain the importance of road maintenance ‘and methods of road side slope stabilization. 10. Classify the highway bridges. Explain the ‘methods ‘of providing tunnel drainage lighting and ventilation. Subgrade Resilient Modulus, MPa ee not eT BoE Full-Depth Asphalt Concrete {5 OST Tt OPT po SST ww # oer 8 og Ba sere sige a ‘Equlvalen} 80 KN Single Axle-Losd (EAL) ws 8 Taso Examination Control Division | Program AKSKS 04.” TRIBHUVAN UNIVERSITY INSTITUTE OF ENGINEERING 2069 Chaitra ‘Subject. - Transportation Engineering II Candidates are required to give their answers in their own words as far as practicable. Attempt any Five questions. The figures in the margin indicate Full Marks. Necessary figures are attached herewith. ‘Assume suitable data if necessary. a), Describe traffic characteristics. b) Two trucks A and B weight 7 tonne and 12 tonne approaching from west and south direction applied brakes and skid through distances 3.2cm and 1.9 m respectively before collision, After collison truck A was thrown making an angle of 50° from West to North ands skid through a distance of 2.8 m. Truck B skids along a distance of 3.8 m-from North to East making an angle of 60°. Calculate the initisl speeds of approaching vehicles. 2)" Whit is street lighting? Write the importance of street lighting and factors influencing night visibility, b)_ Twenty spit speed observations were taken in kmph were as under: “45; $0, 42, 41, 60, 72, 65, 46, 62, 45, 56, 54, 49, 60, 70, 62, 43, 47, 42 and 40. Calculate: () Time mean speed (ii) Space mean speed (iii) Verify the relation between two. 2) Describe the different factors affecting pavement design. b) Design a flexible pavement by using Asphalt Institute Method for a two lane two way pavement carrying traffic of 1500 ev/day with growth rate of traffic 5% per annum. ‘The design life is 15 years. The vehicle damage factor is 2.5 and CBR velue of sub- grade soil is 59%. The modulus of asphalt concrete surface course, bituminous treated base ‘course and granular sub-base course are 2500 MPa, 1200 MPa and 125 MPa respectively. Assume construction period of 18 months, Draw a net sketch pavement layers. '8) What are the different tools, equipment and plants used in road construction? 1b) What is surface dressing? Write the construction procedure of double bituminous surface dressing. a) Write the importance of road maintenance. Describe the maintenance of rigid pavement. 'b) Write the methods of bridge classification. Write short notes on: a) On- street and off-street parking 7 b) Prime coat and tack coat : ©) Fixed delay and operational delay €). Radius of relative stiffness Bie, (s] (8) 8} {8] [8] [8] (8) (8) [3] [4x4] Subgrade Resilient Modulus, i, MPa Full-Depth Asphalt;Concrete CS eT Hg! 3 48 eres ae “TRIBHOVAN UNIVERSITY [Egaxcersen oe INSTITUTE OF ENGINEERING [Level Tse “3 ~ Examination Control Division | Programme 2068 Badshakh ‘Year /Pari Subject: - Transportation Engineering Ii Y Candidates are required to give ther answers in their own words as far as practicable, . Attempt any Five questions,

You might also like