0% found this document useful (0 votes)
41 views407 pages

Harga Satuan Bahan Konstruksi 2015

Uploaded by

AswārAɳās
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views407 pages

Harga Satuan Bahan Konstruksi 2015

Uploaded by

AswārAɳās
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

HARGA SATUAN BAHAN

DAFTAR HARGA BAHAN & MATERIAL


KAB. BONE
2015

NO URAIAN KETERANGAN SATUAN

I. BATA, BATU DAN PASIR


1 Bata Merah bh
2 Batako 10x20x5 bh
3 Batu Split Pecah Mesin 1/2 m3
4 Batu Split Pecah Mesin 2/3 m3
5 Batu Split Pecah Mesin 3/5 m3
6 Batu Bataco 6x12x24 cm bh
7 Batu kali/gunung 15/20 m3
8 Batu kali/gunung 10/15 m3
9 Abu batu 5mm m3
10 Sirtu m3
11 Pasir Beton m3
12 Pasir Pasang m3
13 Pasir Urug m3
14 Tanah Urug m3
15 Tanah Timbun/Merah m3
16 Gorong - Gorong D 80 Bh

II BAHAN PEREKAT
1 Portland Cement (PC) 40 Kg Zak
2 Portland Cement (PC) Kg Kg
3 Cement Putih Zak
4 Cement Putih Kg Kg
5 Semen Warna kg
6 Kapur Ayak M3
7 Kapur Pasangan/Hidrasi M3
8 Kapur Karung (3 Kg) Kg
9 Lem Vinyl / Karet Kg
10 Perekat Kaca Kg

III BAHAN BAJA :


1 Besi Beton rata-rata Kg
2 Besi Beton Ulir Kg
3 Wiremesh M5 rata-rata 2,1 x 5,4 m / lbr = 24,14 kg m2
4 Wiremesh M6 rata-rata 2,1 x 5,4 m / lbr = 34,76 kg m2
5 Wiremesh M7 rata-rata 2,1 x 5,4 m / lbr = 47,31 kg m2
6 Wiremesh M8 rata-rata 2,1 x 5,4 m / lbr = 61,79 kg m2
7 Wiremesh M9 rata-rata 2,1 x 5,4 m / lbr = 78,21 kg m2
8 Wiremesh M10 rata-rata 2,1 x 5,4 m / lbr = 96,55 kg m2
9 Mur/baud biasa 4 s/d 6 cm Bh
10 Besi Hollow 40 x 40 x 0.2 mm Btg
11 Besi Hollow 40 x 40 x 0.3 mm Btg
12 Besi Hollow 40 x 40 x 0.5 mm Btg
13 Besi Hollow 40 x 40 x 0.7 mm Btg
14 Besi Hollow 40 x 20 x 0.3 mm Btg
15 Besi Hollow 40 x 20 x 0.5 mm Btg
16 Besi Hollow 40 x 20 x 0.7 mm Btg
17 Seng Spandek 0.75 mm m2
18 Meni Besi Kg

IV BAHAN KAYU
1 Kayu Sungkai
Kaso Kamper Sungkai m3
Balok Kamper Sungkai m3
Papan Kamper Sungkai m3
2 Kayu Meranti
Kaso Meranti uk. 5/7 & 5/10 panjang 3,80 m' m3
Balok Meranti m3
Papan Meranti uk. 3/20 & 3/30 panjang 3,80 m' m3
3 Kayu Borneo Super
Kaso Borneo uk. 5/7 & 5/10 panjang 3,80 m' m3
Balok Borneo uk. 6/12, 6/15, 8/12 & 8/15 panja m3
Papan Borneo uk. 3/20 & 3/30 panjang 3,80 m' m3
7 Kayu Kamper Samarinda
Kaso Kamper Samarinda m3
Balok Kamper Samarinda m3
Papan Kamper Samarinda m3
Dolken dia 5 s/d 7 cm p. 4 m btg
Dolken dia 7 s/d 10 cm p. 4 m btg
Bambu dia 5 s/d 7 cm p. 4 m btg
Kayu Mangga/Kemiri m3

V BAHAN ALMUNIUM
1 Rangka Pintu Alm. PC ex Indal m
2 Rangka Jendela Alm. CA ex Indal m'
3 Kusen Alm. 3'' ex AlexindSilver m'
4 Kusen Alm. 3'' ex AlexindHitam/Coklat m'
5 Kusen Alm. 4'' ex AlexindSilver m'
6 Kusen Alm. 4'' ex AlexindHitam/Coklat m'
7 Pintu besi harmonika m2
8 Lockcase Kunci ex SES unt
9 Lockcase Kunci ex Deckson unt
10 Lockcase Kunci bh
11 Door stoper Gracia Art 601 S bh
12 Engsel Pintu Kuningan bh
13 Engsel Jendela bh
14 Door closer ex Dorma bh
15 Handle Pintu ex Wilka bh
16 Handle Pintu ex Bremen Bh
17 Grendel Kodok ( Kunci Slot) bh
18 Kait Angin bh
19 Sealant clear neutral (300 ml) btl
20 Pintu Kaca tempered unt
21 Pintu geser unt

VI BATU ALAM
1 Batu Slate Random m2
2 Batu Slate 20/20 m2
3 Batu Slate 30/30 m2
4 Batu Tempel Purwakarta m2
5 Batu Andesit 20/20 m2
6 Batu Andesit 30/30 m2
7 Batu Palimanan 15/30 m2
8 Batu Palimanan 20/40 m2
9 Batu Candi 15/30 m2
10 Batu Candi 20/40 m2
11 Batu Alam Kuning 15/20 m2

VII BAHAN PELAPIS :


1 Triplex t. 3 mm Uk 120x240 cm lbr
2 Triplex t. 4 mm Uk 120x240 cm lbr
3 Triplex t. 6 mm lbr
4 Triplex t. 9 mm lbr
5 Triplex t. 12 mm lbr
6 Teakwood t. 3 mm Uk 120x240 cm lbr
7 Teakwood t. 6 mm lbr
8 Multiplex t. 6 mm Uk 120x240 cm lbr
9 Multiplex t. 9 mm Uk 120x240 cm lbr
10 Multiplex t. 12 mm Uk 120x240 cm lbr
11 Multiplex t. 18 mm Uk 120x240 cm lbr
12 Kalsiboard 3.5 mm lbr
13 Kalsiboard 4 mm lbr
14 Kalsiboard 6 mm lbr
15 Kalsiboard 9 mm lbr
16 Kalsiboard 12 mm lbr

VIII BAHAN LANTAI & DINDING KERAMIK


1 Keramik Lantai Platinum Galaxy black, brown, cream, grey m2
2 Keramik Lantai Platinum Cargo, brown, grey, dark brown, m2
3 Keramik Lantai Platinum Ecco grey, brown KW- A m2
4 Keramik Lantai Platinum Gobi cream, grey KW- A m2
5 Keramik Lantai Platinum Cavalli, cream, white KW- A m2
6 Keramik Lantai Mulia 20/ Warna Tua m2
7 Keramik Lantai Mulia 30/ Putih m2
8 Keramik Lantai Mulia 30/ Impresso m2
9 Keramik Lantai Milan 50/ Pure Color m2
10 Keramik Lantai 30/30 cm Unpolished ex Roman m2
11 Keramik Lantai 40/40 cm Polished ex Roman m2
12 Keramik Lantai 40/40 cm Unpolished ex Roman m2
13 Keramik Lantai 60/60 cm Polished ex Roman m2
14 Keramik Lantai Milan 40/ Putih m2
15 Keramik Lantai Milan 40/ Median m2
16 Keramik Lantai Roman 20 25/dos m2
17 Keramik Lantai Roman 30 11/dos m2
18 Keramik Lantai Roman 40 6/dos m2
19 Keramik Lantai Roman 50 4/dos m2
20 Keramik Lantai Roman 60 3/dos m2
21 Keramik Lantai Granito 60220 Ivory, 280 Joyce m2
22 Keramik Lantai Granito 60242 Sara m2
23 Keramik Lantai Granito 60White m2
24 Keramik Lantai Granito 60Granite Black m2
25 Roman 8 x 30 Hospital Ski 30/dos m2
26 Roman 10 x 20 Step Nosin 50/dos m2
27 Roman 10 x 30 Step Nosi 33/dos m2
28 Keramik Dinding Roman 20/20 m2
29 Keramik Dinding Roman 20/25 m2
30 Keramik Dinding Roman 25/25 m2
31 Keramik Dinding Roman 30/30 m2
32 Keramik Dinding Roman 20/40 m2
33 Keramik Dinding Roman 20/60 m2
34 Keramik Dinding Roman 30/60 m2
35 Roster 20x20 cm bh
36 Roster 20x40 cm bh
37 Glass Block bh

IX BAHAN PENUTUP ATAP


1 Steel Sheet Zincalum Econoroof TR 22 t. 0,45 mm ex Hokay m2
2 Genteng Metal 1x4 Merpati uk. 38,5x80cm ex Sakura Roof lbr
3 Genteng Metal 1x4 uk. 38,5x80cm Elang ex Sakura Roof lbr
4 Genteng Metal 1x4 uk. 38,5x80cm Garuda ex Sakura Roof lbr
5 Nok atas 2,5 bh/m bh
6 Nok Metal Type U 5x110c6 bh/m2 m'
7 Nok Steel Sheet Zincalum t. 0,45 mm ex Hokayu m'
8 Skrup 12 x 45 HWTG bh
9 Seng Plat BJLS 30 L. 90 cm m'
10 Seng Gelombang BJLS 25Uk. 80 x 180 cm lbr
11 Metal deck m2
12 Rangka atap baja ringan ex Mart roof m2
13 Baja Ringan Profil C 0.75 mm Btg
14 Baja Ringan Profil W 0.35 mm Btg
15 Karet Pelapis Atap m2

X KAWAT / MESH
1 Kawat Beton Hitam kg
2 Galvanized Lbr
3 Ram Kawat Ayam m2

XI BAHAN KACA :
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m2
3 Kaca Polos 6 mm m2
4 Kaca Polos 8 mm m2
5 Kaca Polos 10 mm m2
6 Kaca Rayben 5 mm m2
7 Kaca Rayben 6 mm m2
8 Kaca Rayben 8 mm m2
9 Kaca Rayben 10 mm m2
10 Kaca Tempered 10 mm m2
11 Kaca Tempered 8 mm m2

XII BAHAN PAKU DAN MUR BAUT :


1 Paku 1 s/d 3 cm kg
2 Paku 4 s/d 7 cm kg
3 Paku 8 s/d 12 cm kg
4 Paku Payung kg
5 Besi Begel Kuda-kuda kg
6 Duk angker kg
7 Mur Baut HTB dia 16 s/d 19 mm p. 5 cm bh
8 Mur Baut Biasa dia 16 s/d 19 mm p. 5 cm bh
9 Wartermur 12 mm bh
10 Klem Alm bh
11 Dynabolt dia.10 / 6 cm bh
dia.10 / 8 cm bh
12 Screw 10x16x20 mm bh
14x14x22 mm bh

XIII BAHAN FINISHING :


A. Cat Besi dan Kayu :
1 Dempul Besi/Kayu Kg
2 Cat Dasar / meni Kg
3 Cat Besi ex SEIV Kg
4 Cat Aviant Ltr
5 Cat Akhir Duco ex Danaglos ICI Kg
6 Cat Synthetic Gloss ex SEIV Kg
7 Thinner Ltr
8 Terpentin Ltr

B. Cat Tembok
1 Metrolite Interior 1 Kg Kg
2 Metrolite Interior 16 Liter Ltr
3 Mowilex Interior 1 Liter Ltr
4 Mowilex Interior 2.5 Liter Ltr
2 Mowilex Interior 20 Liter Ltr
3 Dulux Weather Shield exte2.5 Liter Ltr
4 Dulux Interior 2.5 Liter Ltr
5 Catylac Interior 5 Kg Kg
3 Catylac Interior 25 Kg Kg
4 Dulux Exterior 20 Liter Ltr
5 Mowilex Exterior 20 Liter Ltr
6 Metrolite Exterior 16 Liter Ltr
4 Catylac Exterior 16 Kg Kg
5 Cat Dasar Alkali Resistant Primer Kg
6 Plamir Tembok Kg
7 Plamir Kayu Kg

C. Bahan Pembantu
1 Amplas Kayu / Besi Lbr
2 Kuas Cat rata2 Bh
3 Roll Cat Bh
4 Lem Kayu kg
5 Pintu Kamar Mandi PVC Unit
6 Minyak Bekisting Ltr
7 Sealant Tube

XIV BAHAN SANITARI


1 Kloset Duduk keramik Ina unt
2 Kloset Duduk keramik kom CW 704J/SW 784 JP unt
3 Kloset Duduk keramik kom CW 705/TV 150 NSV7 unt
4 Kloset Duduk keramik kom CW 660 J unt
5 Kloset Duduk keramik kom CW 821 J ex Toto unt
6 Kloset Jongkok ex INA unt
7 Kloset Jongkok Porselin Bh
8 Bak air fibreglass uk. 55 Bak air fibreglass uk. 55x55x60 cm bh
9 Kitchenzink stainless stee Hwaco 1L unt
10 Kitchenzink Stainlees Steel 1 Lubang unt
11 Floordrain TX 1B ex Toto unt
12 Floordrain Stailess Steel 4" unt
13 Toilet Shower TX 403 S PIV ex Toto unt
14 Toilet Shower unt
15 Kran shower Bh
16 Kran Cebok Bh
17 Keran Air 3/4'' Bh
18 Keran Leher Angsa Bh

XV BAHAN PARTISI DINDING /PLAFOND


1 Enternit 4 mm m2
2 Hardplex t. 5 mm uk. 120x240 cm m2
3 Gypsum 120x240 tbl. 6 mm Lbr
4 Gypsum 120x240 tbl. 9 mm Lbr
5 Gypsum 120x240 tbl. 12 mm Lbr
6 Kayu Profil 1" m'
7 Kayu Profil 2" m'
8 Kayu Profil 3" m'
9 Kayu Profil 4" m'

GRC
1 GRC Board t. 6 mm 1220 x 2440 lbr
2 GRC Fibre Flat t. 4 mm 1220 x 2440 lbr
3 GRC Fibre Lux t. 4 mm 1220 x 2440 lbr
4 GRC Super Panel t. 9 mm 1220 x 2440 lbr
5 Superplank 100 mm t. 9 100 x 2440 lbr
6 Superplank 200 mm t. 9 200 x 2440 lbr
7 Superplank 300 mm t. 9 300 x 2440 lbr

XVI BAHAN SALURAN AIR


1 Pipa PVC dia 3/4" D (Panjang 4 m) Btg
2 Pipa PVC dia 1" D (Panjang 4 m) Btg
3 Pipa PVC dia 3" D (Panjang 4 m) Btg
4 Pipa PVC dia 4" D (Panjang 4 m) Btg
5 Sambungan Elbow 3/4" Bh
6 Sambungan Tee 3/4" Bh
7 Sambungan Elbow 3' Bh
8 Sambungan Tee 3' Bh
9 Sambungan Elbow 4" Bh
10 Sambungan Tee 4" Bh
11 Lem pipa tb
12 Seal tape roll

XX LISTRIK / ACSESORIES
1 Philips 3 W Essential Bh
2 Philips 5 W Essential Bh
3 Philips 8 W Essential Bh
4 Philips 14 W Essential Bh
5 Philips 18 W Essential Bh
6 Philips 23 W Essential Bh
7 Stop Kontak Panasonic Bh
8 Saklar tunggal Panasonic Bh
9 Saklar ganda Panasonic Bh
10 Zekring box 1 grup Unit
11 Zekring box 2 grup Unit
12 Zekring box 3 grup Unit
13 Zekring box 4 grup Unit
14 MCB 6 Ampere Unit
15 MCB 8 Ampere Unit
16 MCB 10 Ampere Unit
17 MCB 15 Ampere Unit
18 Kabel NYM 3 x 2,5 mm rol
19 Kabel NYM 2 x 2,5 mm rol
20 Kabel NYM 2 x 1,5 mm rol
21 Instalasi Listrik titik api / Lampu nyala bh
22 Arde Bh
23 Fitting Bh
24 Pipa Listrik Btg

XX UPAH PEKERJA :

A Pengukuran :
Juru Ukur Org/Hari
Pembantu Juru Ukur Org/Hari

B Pembesian :
Tukang Besi Konstruksi Org/Hari
Tukang Besi Tulangan Org/Hari
Kepala Tukang Besi Org/Hari

C Kayu
Tukang Kayu Kasar (Plafond , Kuda/Gording, [Link]) Org/Hari
Tukang Kayu Halus (Kusen) Org/Hari
Kepala Tukang Kayu Org/Hari

D Tembok / batu
Tukang Batu Kasar Tukang Batu Kasar Org/Hari
Tukang Batu Halus Tukang Batu Halus (Bata,Plester,Ac Org/Hari
Kepala Tukang Batu Org/Hari

E Cat:
Tukang Cat Biasa Org/Hari
Tukang Cat Duco Org/Hari
Kepala Tukang Cat Org/Hari

F Lain-Lain :
Pekerja Org/Hari
Tukang Gali Org/Hari
Tukang Kaca Org/Hari
Tukang Railing Org/Hari
Kepala Tukang Railing Org/Hari
Kepala Tukang Kaca Org/Hari
Mandor Org/Hari
Penjaga Malam Org/Hari
Pengemudi Org/Hari
Operator Org/Hari
Pembantu Operator Org/Hari
Operator Alat Berat Org/Hari
Pembantu operator / Mekanik Org/Hari
RIAL

HARGA SATUAN

450.00
2,530.00
234,640.00
229,130.00
214,500.00
4,500.00
134,850.00
143,320.00
138,200.00 72500
137,800.00
200,000.00 200.00
128,350.00
88,000.00
35,000.00
96,000.00
75,000.00

55,000.00
1,600.00
73,000.00
1,460.00
2,310.00
92,400.00
5,800.00
10,780.00
50,380.00
84,150.00

9,850.00
12,820.00
37,300.00
41,400.00
47,800.00
55,400.00
62,100.00
71,250.00
220.00
26,400.00
32,120.00
42,900.00
58,300.00
29,480.00
38,500.00
45,100.00
61,900.00
24,750.00

6,630,000.00
7,020,000.00
7,410,000.00

8,716,000.00
8,028,000.00
8,184,000.00

7,170,000.00
7,404,000.00
7,950,000.00

6,303,000.00
6,590,400.00
6,388,800.00
19,500.00
31,900.00
11,700.00
1,750,000.00

122,000.00
98,070.00
55,000.00
75,000.00
75,000.00
85,000.00
526,500.00
445,770.00
157,500.00
86,300.00
19,980.00
24,500.00
16,800.00
229,410.00
244,080.00
76,500.00
19,200.00
7,250.00
143,910.00
2,643,030.00
1,997,190.00

143,000.00
172,000.00
182,000.00
63,000.00
66,000.00
91,400.00
61,300.00
66,000.00
72,500.00
77,000.00
75,000.00

49,686.00
59,745.00
70,108.00
106,144.00
121,621.00
80,157.00
94,363.00
69,415.00
102,375.00
122,850.00
162,120.00
41,580
54,285
85,575
151,420
201,894

41,500.00
47,500.00
59,500.00
72,000.00
85,300.00
40,500.00
34,500.00
42,000.00
100,500.00
94,180.00
70,392.00
92,452.00
128,148.00
53,500.00
56,000.00
91,000.00
95,000.00
101,000.00
129,500.00
162,000.00
183,000.00
210,000.00
210,000.00
252,000.00
497,000.00
540,000.00
547,400.00
88,000.00
94,500.00
113,800.00
134,000.00
89,600.00
147,000.00
162,000.00
9,670.00
19,340.00
25,600.00

43,100.00
16,200.00
18,800.00
19,600.00
12,330.00
52,100.00
52,221.00
300.00
12,870.00
38,400.00
51,700.00
106,300.00
80,000.00
40,500.00
11,230.00

13,500.00
144,300.00
89,700.00

83,760.00
112,320.00
140,400.00
215,280.00
252,500.00
115,200.00
135,720.00
224,640.00
366,600.00
312,000.00
292,500.00

13,300.00
16,300.00
18,300.00
250.00
12,900.00
12,900.00
200.00
200.00
9,400.00
2,000.00
850.00
1,000.00
135.00
185.00

33,110.00
19,500.00
38,200.00
43,500.00
27,300.00
23,000.00
14,900.00
6,400.00

26,000.00
392,000.00
63,000.00
136,500.00
945,000.00
225,000.00
123,500.00
99,000.00
367,000.00
1,325,000.00
1,310,000.00
290,000.00
295,000.00
8,200.00
1,100.00
18,300.00

3,900.00
7,800.00
17,000.00
18,200.00
230,500.00
8,500.00
22,400.00

937,000.00
2,223,000.00
3,057,600.00
1,669,200.00
3,471,000.00
145,000.00
120,000.00
183,300.00
753,700.00
176,450.00
252,700.00
19,500.00
354,900.00
85,000.00
62,570.00
72,240.00
13,200.00 -
54,500.00
-
-
58,500.00 -
26,500.00 -
59,950.00 -
71,500.00 -
93,500.00 -
6,270.00 -
11,540.00 -
16,810.00 -
21,080.00 -
-
-
84,200.00 -
429,000.00 -
60,600.00 -
156,000.00 -
21,500.00 -
35,900.00 -
51,800.00 -
-
-
12,500.00 -
21,500.00 -
45,500.00 -
75,500.00 -
4,000.00 -
6,000.00 -
11,000.00 -
16,000.00 -
21,000.00 -
27,000.00 -
20,500.00 -
9,400.00 -
-
-
17,500.00 -
23,500.00 -
26,500.00 -
30,000.00 -
35,000.00 -
37,500.00 $5.000
16,800.00
17,500.00
20,000.00
26,620.00
31,350.00
38,500.00
46,200.00
67,760.00
99,220.00
124,300.00
153,200.00
417,000.00
328,000.00
293,000.00
132,275.00
65,000.00
15,000.00
4,500.00

110,000.00
85,000.00

75,000.00
55,000.00
85,000.00
75,000.00
85,000.00
90,000.00

75,000.00
85,000.00
90,000.00

85,000.00
90,000.00
90,000.00

100,000.00
150,000.00
75,000.00
85,000.00
200,000.00
90,000.00
100,000.00
80,000.00
95,000.00
110,000.00
90,000.00
110,000.00
90,000.00
ANALISA
PENGGUNAAN BAHAN DAN
AHSP 2022

Pembuatan 1 m3 Beton Mutu f’c = 14.5 Mpa (K175)


No Uraian Kode
A TENAGA KERJA
Pekerja L.01
Tukang batu L.02
Kepala Tukang L.03
Mandor L.04

B BAHAN
Semen Portland
Pasir Beton
Kerikil (Maks 30mm)
Air

PB
ANALISA
GUNAAN BAHAN DAN UPAH KERJA
AHSP 2022

Satuan Koefisien HARGA SATUAAN

OH 1.65 100,000.00
OH 0.275 150,000.00
OH 0.028 200,000.00
OH 0.083 100,000.00
JUMLAH HARGA TENAGA KERJA

kg 326 1,600.00
kg 760 200.00
kg 1029 200.00
Liter 215
JUMLAH HARGA BAHAN
JUMLAH

165000.00
41250.00
5600.00
8300.00
220150.00

521,600.00
152,000.00
205,800.00

879,400.00

1,099,550.00
ANALISA
PENGGUNAAN BAHAN DAN UPAH KERJA
"PERUMAHAN REZKY GRAHA II"
2018 - 2019

PA 6.4 Pengukuran dan Pemasangan bouplank

6.4.1. Bahan
- Kayu 5/7 0.0 M3 x Rp
- Paku biasa 2" - 5" 0.0 Kg x Rp
- Kayu papan 3/20 0.0 M3 x Rp
Jumlah (1)

PT 6.11. 1 m³ Urugan pasir

6.11.1. Bahan
- Pasir urug 1.2 M³ x Rp.
Jumlah (1)

PT 6.16. 1 m³ Urugan Tanah Didatangkan

6.16.1. Bahan
- Tanah Urug 1.2 M³ x Rp.
Jumlah (1)

PP 6.6. 1 M³ Pasang pondasi batu kali, 1 Pc : 5 Ps

6.6.1. Bahan
- Batu Kali 15/20 cm 1.2 M³ x Rp.
- Semen porland 163.0 Kg x Rp.
- Pasir Pasang 0.5 M³ x Rp.
Jumlah (1)

PP 6.14. 1 M³ Pasang pondasi batu kosong

6.14.1. Bahan
- Batu Kali 10/15 cm 1.2 M³ x Rp.
- Pasir pasang 0.3 M³ x Rp.
Jumlah (1)

0.1
PD 6.10 1 m² Pasangan bata Ringan 60x20x10

6.10.1 Bahan
- Bata Ringan 8,4 Bh x Rp.
- Mortar siap pakai 0,063 Kg x Rp.

PPL 6.2. 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm

6.2.1. Bahan
- Semen portland 6.5 Kg x Rp.
- Pasir pasang 0.0 M³ x Rp.
Jumlah (1)

PPL 6.35. 1 M² Pekerjaan Acian

6.35.1. Bahan
- Semen portland 0.0 Zak x Rp.
Jumlah (1)

PB 6.13. 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr

6.13.1. Bahan
- Semen portland 326.0 Kg x Rp.
- Pasir beton 760.0 Kg x Rp.
- Koral beton/batu pecah 2/3 0.7 M³ x Rp.
Jumlah (1)

PB 6.25 1 Kg Pembesian dengan Besi polos

6.25.1 Bahan
Besi beton polos 1.1 Kg x Rp.
Kawat beton 0.0 Kg x Rp.
Jumlah (1)

PB 6.28 1 M² Pasang bekisting untuk pondasi

6.28.1 Bahan
Kayu sembarang 0.0 M³ x Rp.
Paku biasa 2" - 5" 0.3 Kg x Rp.
Minyak bekisting 0.1 Ltr x Rp.
Jumlah (1)

PB 6.29. 1 M² Pasang bekisting untuk sloof

6.29.1. Bahan
- Kayu sembarang 0.0 M³ x Rp.
- Paku biasa 2' - 5" 0.3 Kg x Rp.
- Minyak bekisting 0.1 Lt x Rp.
Jumlah (1)

PB 6.30. 1 M² Pasang bekisting untuk kolom

6.30.1. Bahan
- Kayu sembarang 0.0 M³ x Rp.
- Paku biasa 2' - 5" 0.4 Kg x Rp.
- Minyak bekisting 0.2 Lt x Rp.
- Balok kayu sembarang 0.0 M³ x Rp.
- Plywood tebal 9 mm 0.4 Lbr x Rp.
- Kayu dolken/Laut Ø 3"-4"/4 m 2.0 Btg x Rp.
Jumlah (1)
PPL 6.10 1 M² Pasang lantai ubin ukuran 30 x 30 cm

6.10.1 Bahan
- Ubin 30 x 30 cm 11.9 Bh x Rp.
- Semen portland 10.0 Kg x Rp.
- Pasir pasang 0.0 M³ x Rp.
- Semen warna 1.5 Kg x Rp.
Jumlah (1)

PC 6.14 1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup

6.14.1 Bahan
- Plamir 0.1 Kg x Rp.
- Cat dasar 0.1 Kg x Rp.
- Cat tembok 2 x 0.1 Kg x Rp.
Jumlah (1)

PLL 6.24A 1 M² Langit - langit gypsum board, tebal 4 mm + Rangka Hollow

6.24.1 Bahan
- Gypsum board (120 x 240 x 6) mm 0.4 Lbr x Rp.
- Paku sekrup 0.1 Kg x Rp.
- Hollow 0.9 Btg x Rp.
Jumlah (1)

PLL 6.19 1 M' List Langit - langit Kayu profil 3"

6.19.1 Bahan
- List Profil Gypsum 1.1 M' x Rp.
- Paku 0.0 Kg x Rp.
Jumlah (1)
PPA 6.32 1 M² Pasang atap seng gelombang

6.32.1 Bahan
- Atap seng 1.0 Bh x Rp.
- Paku 0.1 Kg x Rp.
Jumlah (1)

PBA 6.1 1 M2 Pasang rangka atap baja

6.1.1 Bahan
- Main Truss C 1.0 m' x Rp.
- Roof Bottom/ Reng 1.0 m' x Rp.
- Self Driling Screw Truss Screw 6x20 mm 12.0 Bh x Rp.
- Self Driling Screw Roof Bottom 4x16 mm 14.0 Bh x Rp.
- Dynabold 12x120 mm 1.0 Bh x Rp.
Jumlah (1)

PK 6.53. 1 M´ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti :

6.53.1. Bahan
- Kayu meranti,papan 0.0 M³ x Rp.
- Paku biasa 2" - 5" 0.1 Kg x Rp.
Jumlah (1)
6.53.2. Tenaga
- Pekerja 0.1 Oh x Rp.
- Tukang kayu 0.1 Oh x Rp.
- Kepala tukang 0.0 Oh x Rp.
- Mandor 0.1 Oh x Rp.
Jumlah (2)
Jumlah (1) +(2)
A
DAN UPAH KERJA
Y GRAHA II"
19

1,400,000 = Rp
16,300 = Rp
1,400,000 = Rp
Jumlah (1) = Rp 0.00

88,000 = Rp. 105,600.00


Jumlah (1) = Rp. 105,600.00 105,600.00

35,000 = Rp. 42,000.00


Jumlah (1) = Rp. 42,000.00 42,000.00

134,850 = Rp. 161820


1,600 = Rp. 260,800.00
128,350 = Rp. 69,822.40
Jumlah (1) = Rp. 492,442.40 492,442.40

0.00
143,320 = Rp. 171,984.00
128,350 = Rp. 38,505.00
Jumlah (1) = Rp. 210,489.00 210,489.00

= Rp
= Rp
Jumlah (1) = Rp 0.00

#REF! = Rp.
#REF! = Rp.
Jumlah (1) = Rp. 0.00

55,000 = Rp.
Jumlah (1) = Rp. 0.00

#REF! = Rp.
151,000 = Rp.
229,130 = Rp.
Jumlah (1) = Rp. 0.00

12,820 = Rp. 13,461.00


13,500 = Rp.
Jumlah (1) = Rp. 0.00

1,750,000 = Rp.
16,300 = Rp.
8,500 = Rp.
Jumlah (1) = Rp. 0.00

1,750,000 = Rp.
16,300 = Rp.
8,500 = Rp.
Jumlah (1) = Rp. 0.00

1,750,000 = Rp.
16,300 = Rp.
8,500 = Rp.
1,750,000 = Rp.
106,144 = Rp.
19,500 = Rp.
Jumlah (1) = Rp. 0.00
3,167 = Rp.
#REF! = Rp.
#REF! = Rp.
#REF! = Rp.
Jumlah (1) = Rp. 0.00

t dasar, 2 lapis cat penutup ) Luar

1,100 = Rp.
36,250 = Rp.
36,250 = Rp.
Jumlah (1) = Rp. 0.00

59,950 = Rp.
18,300 = Rp.
42,900 = Rp.
Jumlah (1) = Rp. 0.00

16,810 = Rp.
12,100 = Rp.
Jumlah (1) = Rp. 0.00
18,800 = Rp.
12,100 = Rp.
Jumlah (1) = Rp. 0.00

13,333 = Rp.
6,750 = Rp.
375 = Rp.
300 = Rp.
1,500 = Rp.
Jumlah (1) = Rp. 0.00

8,028,000 = Rp.
16,300 = Rp.
Jumlah (1) = Rp. 0.00

#REF! = Rp.
#REF! = Rp.
#REF! = Rp.
#REF! = Rp.
Jumlah (2) = Rp. 0.00
Jumlah (1) +(2) = Rp.

Jumlah (1) +(2) = Rp.


PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN RUMUS PANJANG LEBAR TINGGI UNIT SATUAN VOLUME KET
1 Pondasi Batu Belah/Gunung 21 0.5125 0.5125 m3 5.51578125
2 Pondasi Batu Kosong 21 0.8 0.2 m3 3.36
3 Urugan Tanah Bawah Lantai 5 5 0.6 m3 15
4 Urugan Pasir Bawah Pondasi 21 0.8 0.05 m3 0.84
5
6 Pek. Pembesian Sloef 15/20 21 4 84
7 Pek. Pembesian BEGEL 0.6 140 84
8 Pek. Pembesian Kolom 15/15
9
10 Pek. Pembesian Ringbalk 15/20
11
12 Pek. Bekisting Sloef 15/20 21 0.2 2 8.4
13 Pek. Bekisting Kolom 15/15
14 Pek. Bekisting Ring Balk 15/15
15 Pek. Beton Sloef 15/20 [Link]
16 Pek. Beton Kolom 15/15 [Link]
17 Pek. Beton Ring Balk 15/15 [Link]
18
19
pengecoran 1 25 19.7 0.12 m3 59.1
18.4 18.4 0.12 40.6272
18.1 5 0.12 10.86
25 5 0.12 15
RENCANA ANGGARAN BIAYA BETON COR( RAB )
GUDANG
No. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA
BOBOT
( Rp ) ( Rp )
1 2 3 4 5 6 ###

I PEKERJAAN PENGECORAN
1 Pengecoran Gudang 1 59.10 1,099,550.00 ###
64,983,405.00
2 Pegecoran Gudang 2 40.63 1,099,550.00 ###
44,671,637.76
3 Pengecoran Samping Gudang 15.00 1,099,550.00 16,493,250.00
4 Pengecoran Depan WC 10.86 1,099,550.00 ###
11,941,113.00
###
138,089,405.76
DAFTAR ANALISA SNI 2022

Pembuatan1 m2 Steger/Perancah dari Bambu sd Tinggi 6 meter

Harga Satuan
Uraian Kode Satuan Koefisien
(Rp)
TENAGA KERJA
Pekerja L.01 OH 1 130.000,00
Tukang Kayu L.02 OH 2,00 150.000,00
Kepala Tukang
Mandor L.04 OH 0,05 300.000,00

BAHAN

Tali Ijuk Harga Satuan


Kode Satuan Koefisien
(Rp)

JUMLAH HARGA BAHAN


PERALATAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)
Biaya Umum dan Keuntungan (Maks 15%) 10%
Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: Pembuatan steger/perancah secara sewa dapat menggunakan analisis bidang SDA.

Pemasangan 1m2 Pagar BRC Galvanis


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,042
Tukang L.02 OH 0,004
Kepala Tukang L.03 OH 0,002
Mandor L.04 OH 0,042
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kawat Jaring Lbr 0,1434
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Panel Beton Pracetak 50x50x240cm untuk Pagar


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,375
Tukang L.02 OH 0,125
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,019
JUMLAH HARGA TENAGA KERJA
B BAHAN
Panel Beton
Lbr 0,986
Pracetak
Kolom Beton
Batang 0,525
Pracetak
Semen Portland Kg 50
Pasir Beton m3 0,074
Kerikil m3 0,146
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN TANAH


Catatan: Tanah hasil galian disimpan dekat lubang galian
Pemasangan 1 m2 Lapisan Ijuk Tebal 10cm untuk Bidang Resapan
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ijuk kg 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.3.1.1. Harga…
[Link]

HARGA SATUAN PEKERJAAN PONDASI


Pemasangan 1 m3 Batu Kosong (Aanstamping) untuk Pondasi Gedung
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,78
Tukang batu L.02 OH 0,39
Kepala Tukang L.03 OH 0,039
Mandor L.04 OH 0,039
JUMLAH HARGA TENAGA KERJA
B BAHAN
Batu Belah m3 1,2
Pasir Urug m3 0,432
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKEJAAN BETON


Catatan:
Bobot isi pasir : 1400 kg/m3. bulking factor pasir : 20%
Bobot isi Kerikil : 1350 kg/m3

Pembuatan 1 m3 Beton Mutu f’c = 7.4 Mpa (K100)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 247
Pasir Beton kg 869
Kerikil (Maks
kg 999
30mm)

Air Liter 215


JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: Mutu beton mengacu ke tabel A.4.a. bidang umum.
A.[Link]. Pembuatan…
[Link]

Pembuatan 1 m3 Beton Mutu f’c = 9.8 Mpa (K125)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 276
Pasir Beton kg 828
Kerikil (Maks
kg 1012
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m3 Beton Mutu f’c = 12.2 Mpa (K150)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 299
Pasir Beton kg 799
Kerikil (Maks
kg 1017
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m3 Beton Mutu f’c = 14.5 Mpa (K175)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 326
Pasir Beton kg 760
Kerikil (Maks
kg 1029
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

cangkul JUMLAH HARGA ALAT


sekop
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m3 Beton Mutu f’c = 16.9 Mpa (K200)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 352
Pasir Beton kg 731
Kerikil (Maks
kg 1031
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN
cangkul
sekop JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]
Pembuatan 1 m3 Beton Mutu f’c = 19.3 Mpa (K225)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 371
Pasir Beton m3 698
Kerikil (Maks
kg 1047
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

cangkul JUMLAH HARGA ALAT


sekop
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m3 Beton Mutu f’c = 21.7 Mpa (K250)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJ
B BAHAN
Semen Portland kg 384
Pasir Beton kg 692
Kerikil (Maks
kg 1039
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN 150000
cangkul 1 145000
sekop 1 JUMLAH HARGA ALAT

D Jumlah (A+B+C)
175722447,2
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m3 Beton Mutu f’c = 24.0 Mpa (K275)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 406
Pasir Beton kg 684
Kerikil (Maks
kg 1026
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pembuatan 1 m3 Beton Mutu f’c = 26.4 Mpa (K300)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,65
Tukang batu L.02 OH 0,275
Kepala Tukang L.03 OH 0,028
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 413
Pasir Beton kg 681
Kerikil (Maks
kg 1021
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m3 Beton Kedap Air dengan Aditif Kedap Air


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 2,1
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,105
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland kg 400
Pasir Beton m3 0,48
Kerikil (2cm/3cm) m3 0,8
Strorox – 100 kg 1,2
Air Liter 210
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: Semen yang digunakan di AHSP ini. jenis OPC. Direkomendasikan semen yang
digunakan adalah jenis PCC.

Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- M8


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,0025
Tukang besi L.02 OH 0,0025
Kepala Tukang L.03 OH 0,0025
Mandor L.04 OH 0,0001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Jaring Anyaman Tulangan Tunggal M6-M kg 1,02
Kawat benrad kg 0,005
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Bekisting untuk Pondasi Telapak Beton Bangunan


Gedung
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,52
Tukang Kayu L.02 OH 0,26
Kepala Tukang L.03 OH 0,026
Mandor L.04 OH 0,026
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu kelas
m3 0,04
III
Paku 5 – 10 cm kg 0,3
Minyak bekisting Liter 0,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: Semua Pekerjaan bekisting termasuk pembongkarannya

Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,52
Tukang Kayu L.02 OH 0,26
Kepala Tukang L.03 OH 0,026
Mandor L.04 OH 0,026
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu kelas
m3 0,045
III
Paku 5 cm – 10 cm kg 0,3
Minyak bekisting Liter 0,1
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,66
Tukang Kayu L.02 OH 0,33
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,033
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu kelas
m3 0,04
III
Paku 5 cm – 12 cm kg 0,4
Minyak bekisting Liter 0,2
Balok kayu kelas II m3 0,015
Plywood tebal 9 mm Lbr 0,35
Dolken Kayu
Batang 2
8/10cm Panjang 4m
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,66
Tukang Kayu L.02 OH 0,33
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,033
JUMLAH HARGA TENAGA KERJA
B BAHAN

Kayu kelas III m3 0,04


Paku 5 cm – 12 cm kg 0,4
Minyak bekisting Liter 0,2
Balok kayu kelas II m3 0,018
Plywood tebal 9 mm Lbr 0,35
Dolken Kayu 8/10cm Panjang 4m Batang 2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Bekisting untuk Plat lantai Beton Bangunan Gedung


No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,66


Tukang Kayu L.02 OH 0,33
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,033
JUMLAH HARGA TENAGA KERJA
B BAHAN

Kayu kelas III m3 0,04


Paku 5 cm – 12 cm kg 0,4
Minyak bekisting Liter 0,2
Balok kayu kelas II m3 0,015
Plywood tebal 9 mm Lbr 0,35
Dolken Kayu 8/10cm
Panjang 4m
Batang 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Bekisting untuk Dinding Sheerwall


No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,66


Tukang Kayu L.02 OH 0,33
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,033
JUMLAH HARGA TENAGA KERJA
B BAHAN

Kayu kelas III m3 0,03


Paku 5 cm – 12 cm kg 0,4
Minyak bekisting Liter 0,2
Balok kayu kelas II m3 0,02
Plywood tebal 9 mm Lbr 0,35
Dolken Kayu 8/10cm
Panjang 4m
Batang 3
Penjaga jarak bekisting/spacer Buah 4
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]
Pemasangan 1 m2 Bekisting untuk Tangga Beton Bangunan Gedung
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,66
Tukang Kayu L.02 OH 0,33
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,033
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu kelas III m3 0,03
Paku 5 cm – 12 cm kg 0,4
Minyak bekisting Liter 0,15
Balok kayu kelas II m3 0,015
Plywood tebal 9 mm Lbr 0,35
Dolken Kayu
Batang 2
8/10cm Panjang 4m
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan bekisting 1 m2 Jembatan untuk Pengecoran Beton


No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,15


Tukang Kayu L.02 OH 0,05
Kepala Tukang L.03 OH 0,005
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN

Kayu kelas III (papan) m3 0,0264


Paku 5 cm – 12 cm kg 0,6
Dolken Kayu 8/10cm
Panjang 4m
Batang 0,5

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.1.2. Harga...
[Link]

Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast in place).
HARGA SATUAN PEKERJAAN BETON PRACETAK

Indeks yang ada dalam pedoman ini hanya untuk Pekerjaan produksi yang dilakukan di lapangan.
Terutama untuk analisa cetakan (bekisting) pracetak baik untuk komponen kolom. balok dan pelat.

Pembuatan 1 m2 Bekisting untuk Pelat Beton Pracetak Komponen Modular Bangunan Gedung (5 kali paka

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,007
Tukang Kayu L.02 OH 0,076
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Lantai kerja t=10cm m3 0,008
Besi hollow (50 x 50 x 3) mm Kg 9,394
Kayu kaso 5/7 (lebar 5 cm. tinggi 7 cm) m3 0,005
PheNol film 12mm Lbr 0,08
Minyak Cetakan (Bekisting) L 0,2
Dinabolt Ø 12mm
buah 3,882
(10 s.d.15cm)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m2 Bekisting untuk Balok Beton Pracetak (10-12 kali pakai)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,004
Tukang Kayu L.02 OH 0,038
Kepala Tukang L.03 OH 0,004
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu kaso 5/7
(lebar m3 0,005
5 cm. tinggi 7 cm)
PheNol film 12mm Lbr 0,043
Minyak Cetakan (Bekisting) L 0,2
Paku (5 s.d.7) cm kg 0,046
Dinabolt Ø12mm
buah 0,693
(10 s.d.15cm)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m2 Bekisting untuk Kolom Beton Pracetak (10-12 Kali Pakai)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,004
Tukang Kayu L.02 OH 0,038
Kepala Tukang L.03 OH 0,004
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu kaso 5/7
(lebar m3 0,004
5 cm. tinggi 7 cm)
PheNol film 12mm Lbr 0,048
Minyak Cetakan (Bekisting) L 0,2
Paku (5 s.d.7)cm Kg 0,046
Dinabolt Ø12mm
buah 0,693
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan dan Membuka Cetakan 1 Buah Komponen Pelat Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,053
Tukang Kayu L.02 OH 0,018
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan dan Membuka Cetakan 1 Buah Komponen Balok Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,089
Tukang Kayu L.02 OH 0,03
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan dan Membuka Cetakan 1 Buah Komponen Kolom Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,071
Tukang Kayu L.02 OH 0,024
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Penuangan/Menebar Beton 1 m3 untuk Pelat Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,064
Tukang batu L.02 OH 0,244
Tukang vibrator L.02 OH 0,128
Kepala Tukang L.03 OH 0,034
Mandor L.04 OH 0,073
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Penuangan…
[Link]

Penuangan/Menebar Beton 1 m3 untuk Balok Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,069
Tukang batu L.02 OH 0,242
Tukang vibrator L.02 OH 0,138
Kepala Tukang L.03 OH 0,037
Mandor L.04 OH 0,073
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Penuangan/Menebar Beton 1 m3 untuk Kolom Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,061
Tukang batu L.02 OH 0,213
Tukang vibrator L.02 OH 0,122
Kepala Tukang L.03 OH 0,033
Mandor L.04 OH 0,073
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 buah Komponen untuk Pelat Beton Pracetak Beserta


Indeks Kenaikan Lantai Ereksi Pelat Hingga 24 Lantai

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Operator Crane L.08 OH 0,067
Pembantu Operator
L.09 OH 0,067
Crane
Pekerja L.01 OH 0,067
Tukang batu L.02 OH 0,067
Tukang ereksi L.02 OH 0,134
Kepala Tukang L.03 OH 0,067
Mandor L.04 OH 0,067
JUMLAH HARGA TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Sewa Crane unit hari 0,067
Sewa pipe support buah hari 1,1
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: spesifikasi crane disesuaikan dengan kebutuhan

Indeks Pengali Menurut Tingkat Lantai Pemasangan Komponen untuk Pelat


Pracetak
Indeks kenaikan lantai ereksi pelat
Lantai 1,000
2 1,000
3 1,000
4 1,000
5 1,000
6 1,000
7 1,000
8 1,018
9 1,037
10 1,055
11 1,075
12 1,094
Indeks kenaikan
Lantai
lantai ereksi pelat
13 1,114
14 1,134
15 1,155
16 1,176
17 1,197
18 1,219
19 1,241
20 1,264
21 1,287
22 1,31
23 1,334
24 1,358

A.[Link]. Pemasangan…
[Link]

Pemasangan 1 buah Komponen Balok Pracetak Beserta Indeks Kenaikan Lantai Ereksi Balok Hingga 24 Lantai

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Operator Crane L.08 OH 0,061
Pembantu Operator
L.09 OH 0,061
Crane
Pekerja L.01 OH 0,061
Tukang batu L.02 OH 0,061
Tukang ereksi L.02 OH 0,122
Kepala Tukang L.03 OH 0,061
Mandor L.04 OH 0,061
JUMLAH HARGA TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Sewa crane unit hari 0,061
Sewa scaffolding unit hari 1,1
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Indeks Pengali Menurut Tingkat Lantai Pemasangan Komponen untuk Balok


Pracetak
Lantai Indeks kenaikan lantai ereksi balok
13 1,068
14 1,08
15 1,092
16 1,104
17 1,116
18 1,129
19 1,141
20 1,154
21 1,166
22 1,179
23 1,192
24 1,206
Lantai Indeks kenaikan lantai ereksi balok
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1,011
9 1,022
10 1,034
11 1,045
12 1,057
A.[Link]. Pemindahan...
[Link]

Pemindahan 1 buah Komponen untuk Pelat Pracetak (± 20 m)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,019
Tukang batu L.02 OH 0,038
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0,02
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemindahan 1 buah Komponen untuk Balok Pracetak ( ± 20 m)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,019
Tukang batu L.02 OH 0,038
JUMLAH HARGA TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Sewa crane unit hari 0,019
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemindahan…
[Link]

Pemindahan 1 buah Komponen untuk Kolom Pracetak ( ± 20 m)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,019
Tukang batu L.02 OH 0,038
JUMLAH HARGA TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Sewa crane unit hari 0,019
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Upah 1 titik Pekerjaan Grout pada Joint Beton Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Tukang batu L.02 OH 0,367
Kepala Tukang L.03 OH 0,074
Mandor L.04 OH 0,037
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 titik Bekisting Joint Pracetak


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,147
Tukang Kayu L.02 OH 0,147
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu kaso 5/7
(lebar
m3 0,012
5 cm. tinggi 7
cm)
Papan cor m3 0,004
Paku (5 s.d.7) cm Kg 0,264
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Upah 1 titik Joint dengan Sling


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,22
Tukang Kayu L.02 OH 0,022
Tukang besi L.02 OH 0,22
Mandor L.04 OH 0,011
JUMLAH HARGA TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1. Harga…
[Link]
HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

Pembuatan 1 kg Baja Profil


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,06
Tukang las 0,06
L.02 OH
konstruksi
Kepala Tukang L.03 OH 0,006

Mandor L.04 OH 0,003

Pekerja L.01 OH 0,06

JUMLAH HARGA TENAGA KERJA


B BAHAN
Baja Profil Kg 1,15

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Pintu Rolling Door Besi


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,2

Tukang las L.02 OH 1,2

Kepala Tukang L.03 OH 0,12

Mandor L.04 OH 0,006

JUMLAH HARGA TENAGA KERJA


B BAHAN
Pintu gulung besi m2 1

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m2 Rolling door Aluminium


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang Alumunium L.02 OH 1
Kepala Tukang L.03 OH 0,1
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Rolling door
m2 1
aluminium
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Pintu Lipat (Folding Door) BAHAN Plastik/PVC


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,44
Tukang L.02 OH 0,44
Kepala Tukang L.03 OH 0,044
Mandor L.04 OH 0,022
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pintu lipat m2 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Sunscreen Aluminium


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,08
Tukang L.02 OH 0,8
Kepala Tukang L.03 OH 0,08
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Sunscreen
m2 1
aluminium
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Teralis Besi strip (20 x 3) mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,67
Tukang las L.02 OH 1,67
Kepala Tukang L.03 OH 0,167
Mandor L.04 OH 0,083
JUMLAH HARGA TENAGA KERJA
B BAHAN
Besi strip kg 6,177
Pengelasan cm 27,08
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Kawat Nyamuk


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1,1
Pengelasan cm 11,11
Baja Strip 0.2x2cm kg 1,716
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Jendela Nako dan Tralis


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,2
Tukang L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Jendela nako
(rangka + kaca 5 m2 1,1
mm.
Paku lebar
skrup15 cm)
buah 10
1 cm – 2.5 cm
Besi strip m 7
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Talang Datar/Jurai Seng bjls 28 Lebar 90cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,2
Tukang L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Seng pelat m 1,05
Paku 1 cm – 2.5 cm kg 0,015
Papan kayu kelas II
m3 0,019
atau III
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m Talang ½ Lingkaran D-15cm. Seng Pelat bjls 30


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang L.02 OH 0,3
Kepala Tukang L.03 OH 0,03
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Seng pelat m 1,05
Paku 1 cm – 2.5 cm kg 0,01
Besi strip kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x120cm. untuk Partisi
No Uraian Kode Satuan Koefisien

A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang besi L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Rangka metal
hollow m’ 3500
40.40
Assesoris
Ls 1
(perkuatan. las dll)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x60cm. untuk Plafond
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,35
Tukang besi L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Rangka metal
hollow m’ 4000
40.40
Assesoris
Ls 1
(perkuatan. las dll)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) Profil C75
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,734
Tukang besi L.02 OH 0,734
Kepala Tukang L.03 OH 0,073
Mandor L.04 OH 0,037
JUMLAH HARGA TENAGA KERJA
B BAHAN
Baja Ringan Canai Dingin C75 btg 0,873
JUMLAH HARGA BAHAN
C PERALATAN
Aksesoris % 10%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai Dingin) Profil C75
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7604
Tukang besi L.02 OH 0,7604
Kepala Tukang L.03 OH 0,076
Mandor L.04 OH 0,038
JUMLAH HARGA TENAGA KERJA
B BAHAN
Baja Ringan Canai Dingin C75 btg 0.873
JUMLAH HARGA BAHAN
C PERALATAN
Aksesoris % ( BAHAN) 10%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m Kusen Aluminium


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,043
Tukang Alumunium L.02 OH 0,043
Kepala Tukang L.03 OH 0,0043
Mandor L.04 OH 0,0021
JUMLAH HARGA TENAGA KERJA
B BAHAN
Profil aluminium 4
m 1,1
inch
Skrup fixer buah 2
Sealant Tube 0,06
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Pintu Aluminium Strip Lebar 8 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,085
Tukang Alumunium L.02 OH 0,085
Kepala Tukang L.03 OH 0,0085
Mandor L.04 OH 0,0042
JUMLAH HARGA TENAGA KERJA
B BAHAN
Profil aluminium m 4,4
Aluminium Strip m 14,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Pintu kaca Rangka Aluminium


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,085
Tukang Alumunium L.02 OH 0,085
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pintu aluminium m 4,4
Profil kaca m 4,5
Sealant Tube 0,27
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Venetions Blinds dan Vertical Blinds


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,35
Tukang L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Venetions Blinds dan Vertical Blinds (Tira m2 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.4.1. Harga...
[Link]

HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu
dengan Mortar tipe [Link]’ 17. 2 Mpa ( Setara Campuran 1SP : 2PP).
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang batu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
BAHAN
Bata Merah buah 140
Semen Portland Kg 43,5
Pasir Pasang m3 0,08
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu


dengan Mortar tipe [Link]’ 12. 5 Mpa ( Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang batu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 140
Semen Portland Kg 32,95
Pasir Pasang m3 0,091
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan


Mortar tipe [Link]’ 5.2 Mpa ( Setara Campuran 1SP : 4PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang batu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 140
Semen Portland Kg 26,55
Pasir Pasang m3 0,093
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan


Mortar tipe O. fc’ 2.4 Mpa ( Setara Campuran 1SP : 5PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang batu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 140
Semen Portland Kg 22,2
Pasir Pasang m3 0,102
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu


Campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang batu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 140
Semen Portland Kg 18,5
Pasir Pasang m3 0,122
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan


Mortar tipe [Link]’ 17. 7 Mpa ( Setara Campuran 1SP : 2PP).

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 70
Semen Portland Kg 18,95
Pasir Pasang m3 0,038
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan


Mortar tipe S. fc’ 12. 5 Mpa ( Setara Campuran 1SP : 3PP).

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 70
Semen Portland Kg 14,37
Pasir Pasang m3 0,04
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan


Mortar tipe [Link]’ 5.2 Mpa ( Setara Campuran 1SP : 4PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 70
Semen Portland Kg 11,5
Pasir Pasang m3 0,043
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm Tebal ½ Batu dengan


Mortar tipe O. fc’ 2.4 Mpa ( Setara Campuran 1SP : 5PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 70
Semen Portland Kg 9,68
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm tebal ½ Batu


Campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 70
Semen Portland Kg 8,32
Pasir Pasang m3 0,049
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Dinding Conblock HB20 dengan Mortar Tipe [Link]’ 12.
5 Mpa ( Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,35

Tukang batu L.02 OH 0,15

Kepala Tukang L.03 OH 0,015

Mandor L.04 OH 0,018

JUMLAH HARGA TENAGA KERJA


B BAHAN
HB-20 buah 12,5

Semen Portland Kg 30,32

Pasir Pasang m3 0,728


Besi angker 0,28
Kg
diameter 8
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
HB20 : Hollow Block tebal 20cm

Pemasangan 1m2 Dinding Conblock HB20 Campuran1SP :4PP dengan


Mortar Tipe [Link]’ 5.2 Mpa ( Setara Campuran 1SP : 4PP)

No Uraian Kod e Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,35

Tukang batu L.02 OH 0,15

Kepala Tukang L.03 OH 0,015

Mandor L.04 OH 0,018

JUMLAH HARGA TENAGA KERJA


B BAHAN
HB-20 buah 12,5

Semen Portland Kg 24,26

Pasir Pasang m3 0,772


Besi angker 0,28
Kg
diameter 8
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
HB20 : Hollow Block tebal 20cm
A.[Link]. Pemasangan…
[Link]

Pemasangan 1m2 Dinding Conblock HB15 dengan Mortar Tipe S. fc’ 12.
5 Mpa ( Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,32
Tukang batu L.02 OH 0,12

Kepala Tukang L.03 OH 0,012

Mandor L.04 OH 0,016

JUMLAH HARGA TENAGA KERJA


B BAHAN
HB-15 buah 12,5

Semen Portland Kg 22,74

Pasir Pasang m3 0,55


Besi angker 0,28
Kg
diameter 8
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
HB15: Hollow Block tebal 15cm

Pemasangan 1 m2 Dinding Conblock HB15 dengan Mortar Tipe N. fc’


5.2 Mpa ( Setara Campuran 1SP : 4PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA

Pekerja L.01 OH 0,32


Tukang batu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,016
JUMLAH HARGA TENAGA KERJA
B BAHAN

HB-15 buah 12,5


Semen Portland Kg 18,2
Pasir Pasang m3 0,582
Besi angker diameter
8
Kg 0,28
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
HB15 : Hollow Block tebal 15cm
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe S. fc’ 12.


5 Mpa (Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
HB-10 buah 12,5
Semen Portland Kg 15,16
Pasir Pasang m3 0,364
Besi angker
Kg 0,28
diameter 8
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Hb10 : Hollow Block tebal 10cm

Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe N. fc’


5.2 Mpa (Setara Campuran 1SP : 4PP)
Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe N. fc’
5.2 Mpa (Setara Campuran 1SP : 4PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA

Pekerja L.01 OH 0,3


Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN

HB-10 buah 12,5


Semen Portland Kg 12,13
Pasir Pasang m3 0,388
Besi angker diameter
8
Kg 0,28
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
HB10 : Hollow Block tebal 10cm
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan


Mortar Tipe [Link]’ 12. 5 Mpa ( Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA

Pekerja L.01 OH 0,3


Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata rooster buah 30
Semen Portland Kg 11
Pasir Pasang m3 0,035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan Mortar


Tipe [Link]’ 5.2 Mpa ( Setara Campuran 1SP : 4PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA

Pekerja L.01 OH 0,3


Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN

Bata Terawang buah 30


Semen Portland Kg 11
Pasir Pasang m3 0,035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]
Pemasangan 1 m2 Dinding bata Berongga Ekspose 12x11x24 dengan
Mortar Tipe [Link]’ 12. 5 Mpa ( Setara Campuran 1SP : 3PP)

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Berongga buah 70
Semen Portland Kg 14
Pasir Pasang m3 0,032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Bata Ringan Tebal 7.5cm dengan Mortar Siap Pakai
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,67
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata ringan tebal
buah 8,4
7.5cm
Mortar Siap Pakai
Kg 0,473
(semen instan)
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 15%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,671
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata ringan tebal
buah 8,4
10cm
Mortar Siap Pakai
Kg 0,063
(Semen Instan)
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 15%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 m2 Berapen 1SP : 5PP Tebal 15 mm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang batu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN

Semen Portland Kg 5,184


Pasir Pasang m3 0,026
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plesteran Skoning 1SP : 3PP Lebar 10 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,08
Tukang batu L.02 OH 0,4
Kepala Tukang L.03 OH 0,04
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 0,5
Pasir Pasang m3 0,013
JUMLAH HARGA BAHAN
C PERALATAN
cetok
raskam besi JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan1 m2 Plesteran Granit 1SP : 2 granit Tebal 10 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,45
Tukang batu L.02 OH 0,225
Kepala Tukang L.03 OH 0,023
Mandor L.04 OH 0,023
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 10
Serbuk Batu granit Kg 15
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan1 m2 Plesteran Traso 1SP : 2 Traso Tebal 10 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,45
Tukang batu L.02 OH 0,225
Kepala Tukang L.03 OH 0,023
Mandor L.04 OH 0,023
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 10
Serbuk Batu Traso Kg 15
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan1 m2 Plesteran Ciprat (Kamprotan)1SP : 2PP


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 4,32
Pasir Pasang Kg 0,006
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan Finishing 1 m2 Dinding Siar Pasangan Bata Merah


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang batu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 3,108
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan Finishing 1m2 Dinding Siar Pasangan Conblock Ekspose


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,07
Tukang batu L.02 OH 0,035
Kepala Tukang L.03 OH 0,004
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 1,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1m2 Finishing Siar Pasangan Batu Kali. Campuran


1SP : 2PP
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Semen Portland Kg 6,34
Pasir Pasang m3 0,012
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


Pemasangan 1m2 lantai ubin PC Abu-abu Ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25

Tukang batu L.02 OH 0,125

Kepala Tukang L.03 OH 0,013

Mandor L.04 OH 0,013

JUMLAH HARGA TENAGA KERJA


B BAHAN
Ubin Abu-abu buah 6,63
Semen Portland kg 9,8

Pasir Pasang m3 0,045

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Ubin PC Abu-abu Ukuran 30cm x 30 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Abu-abu Bh 11,87
Semen Portland kg 10
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai ubin PC Abu-abu Ukuran 20cm x 20 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,27
Tukang batu L.02 OH 0,135
Kepala Tukang L.03 OH 0,014
Mandor L.04 OH 0,014
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Abu-abu buah 26,5
Semen Portland kg 10,4
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai ubin Warna Ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,26
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Warna Bh 11,87
Semen Portland kg 10
Semen Warna Kg 0,6
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai ubin Warna Ukuran 20cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,27
Tukang batu L.02 OH 0,135
Kepala Tukang L.03 OH 0,014
Mandor L.04 OH 0,014
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Warna Bh 26,5
Semen Portland kg 10,4
Semen Warna Kg 1
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Ubin Teraso Ukuran 40cm x 40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Teraso Bh 6,63
Semen Portland kg 9,8
Semen Warna Kg 1,3
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Ubin Teraso Ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,26
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin teraso Bh 11,87
Semen Portland kg 10
Semen Warna Kg 1,5
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Ubin Granit Ukuran 40cm x 40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin granit Bh 6,63
Semen Portland kg 9,8
Semen Warna Kg 1,3
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Ubin Granit Ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,26
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Granit Bh 11,87
Semen Portland kg 10
Semen Warna Kg 1,5
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Ubin Teralux Ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,26
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Teralux Bh 11,87
Semen Portland kg 10
Semen Warna Kg 1,5
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,24
Tukang batu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,012
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Teralux
Bh 3,1
Marmer
Semen Portland kg 9,6
Semen Warna Kg 1,5
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 40cm x40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Teralux
Bh 6,63
Marmer
Semen Portland kg 9,8
Semen Warna Kg 1,3
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,26
Tukang batu L.02 OH 0,13
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Teralux
Bh 11,87
Marmer
Semen Portland kg 10
Semen Warna Kg 1,5
Pasir Pasang m3 0,045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 20 s.d. <30 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin PC Bh 5,3
Semen Portland kg 1,65
Pasir Pasang m3 0,004
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 30 s.d. <40 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin PC Bh 3,53
Semen Portland kg 1,24
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 40 s.d. <50 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang Batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin PC Bh 2,65
Semen Portland kg 1,24
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin Warna Ukuran 20 s.d. <30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin warna Bh 5,3
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin Warna Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin warna Bh 3,53
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin Warna Ukuran 40 s.d. <50 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin warna Bh 2,65
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin Teraso Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin teraso Bh 3,53
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin Teraso Ukuran 40 s.d. <50 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin teraso Bh 2,65
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin Granit Ukuran 30 s.d. <40 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin granit Bh 3,53
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ Plint Ubin Granit Ukuran 40 s.d. <50cm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Ubin granit Bh 2,65
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Teralux kerang Bh 3,53
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 40 s.d. <50cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Teralux kerang Bh 2,63
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan..
[Link]
Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 30 s.d. <40cm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Teralux
Bh 3,53
marmer
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 40 s.d. <50cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Teralux
Bh 2,65
marmer
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Teralux
Bh 1,7
marmer
Semen Portland kg 1,14
Semen Warna Kg 0,1
Pasir Pasang m3 0,003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Teraso Cor di Tempat. Tebal 3cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,36
Tukang batu L.02 OH 0,18
Kepala Tukang L.03 OH 0,018
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Teraso Cor m3 0,036
Semen Warna Kg 0,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan..
[Link]

Pemasangan 1m2 Lantai Keramik Artistik 10 s.d. <20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Keramik Bh 106
Semen Portland Kg 8,19
Pasir Pasang m3 0,045
Semen Warna Kg 3,2
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Keramik Artistik Ukuran 20 s.d. <30 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Keramik Bh 53
Semen Portland Kg 8,19
Pasir Pasang m3 0,045
Semen Warna Kg 2,75
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Keramik Ukuran 20 s.d. <30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Keramik Dus 1,05
Semen Portland Kg 10,4
Pasir Pasang m3 0,045
Semen Warna Kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Keramik Dus 1,05
Semen Portland Kg 10
Pasir Pasang m3 0,045
Semen Warna Kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40 cm untuk


Variasi/border
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,05
Tukang batu L.02 OH 0,525
Kepala Tukang L.03 OH 0,053
Mandor L.04 OH 0,053
JUMLAH HARGA TENAGA KERJA
B BAHAN
Ubin Keramik Bh 33
Semen Portland Kg 9,8
Pasir Pasang m3 0,045
Semen Warna Kg 4,37
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Keramik Bh 10,6
Semen Portland Kg 1,14
Pasir Pasang m3 0,003
Semen Warna Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m’ Plint Keramik Ukuran 20 s.d. <30 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,09
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Plint Keramik Bh 5,3
Semen Portland Kg 1,14
Pasir Pasang m3 0,003
Semen Warna Kg 0,025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Internal Cove Artistik 5cm x 5cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,75
Tukang batu L.02 OH 0,75
Kepala Tukang L.03 OH 0,075
Mandor L.04 OH 0,038
JUMLAH HARGA TENAGA KERJA
B BAHAN
Internal Cove Bh 5,3
Semen Portland Kg 1,14
Pasir Pasang m3 0,003
Semen Warna Kg 0,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Lantai Marmer Ukuran 100cm x 100cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Marmer buah 1,06
Semen Portland Kg 8,19
Pasir Pasang m3 0,045
Semen Warna Kg 0,134
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Lantai Karpet


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,17
Tukang Kayu L.02 OH 0,17
Kepala Tukang L.03 OH 0,017
Mandor L.04 OH 0,009
JUMLAH HARGA TENAGA KERJA
B BAHAN
Karpet m2 1,05
Lem Karet Kg 0,35
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan…
[Link]

Pemasangan 1 m2 Underlayer (Pelapis Bawah Karpet)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang Kayu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Underlayer m2 1,05
Lem Karet Kg 0,35
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Lantai Parquet Kayu Solid


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang Kayu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Parquet kayu m2 1,05
Lem kayu Kg 0,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Lantai Kayu Gymfloor


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang Kayu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Parquet gymfloor m2 1,05
Lem Kayu Kg 0,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Porselen 11cm x 11cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Porslen buah 1,05
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Porselen 10cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Porslen buah 53
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 2,75
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Porselen 20cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Porslen buah 26
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 1,94
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Keramik Artistik 10cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Keramik Artistik buah 52
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 2,75
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Keramik Artistik 5cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Keramik Artistik buah 104
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 2,9
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Keramik 10cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Keramik buah 52
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 2,75
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Keramik 20cm x 20cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,9
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,045
JUMLAH HARGA TENAGA KERJA
B BAHAN
Keramik buah 26
Semen Portland Kg 9,3
Pasir Pasang m3 0,018
Semen Warna Kg 1,94
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Marmer 100cm x 100cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,3
Tukang batu L.02 OH 0,65
Kepala Tukang L.03 OH 0,065
Mandor L.04 OH 0,065
JUMLAH HARGA TENAGA KERJA
B BAHAN
Marmer buah 1,06
Semen Portland Kg 12,44
Pasir Pasang m3 0,025
Semen Warna Kg 0,65
Paku 12cm buah 3,03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Bata Pelapis (Super) 3cm x 7cm x 24cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Pelapis buah 63
Semen Portland Kg 12,44
Pasir Pasang m3 0,025
Semen Warna Kg 2,75
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Batu Paras


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Batu paras Buah 1,1
Semen Portland Kg 11,75
Pasir Pasang m3 0,035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Batu Tempel Hitam


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang batu L.02 OH 0,35
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Batu Tempel hitam Buah 1,1
Semen Portland Kg 11,75
Pasir Pasang m3 0,035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Lantai Vynil Ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang batu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Vynil buah 11,87
Lem Karet Kg 0,35
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Wallpaper lebar 50 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,35
Tukang batu L.02 OH 0,175
Kepala Tukang L.03 OH 0,017
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Wallpaper m’ 2,2
Lem Karet Kg 0,25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1m2 Floor Harderner


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang batu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Floor harderner Kg 5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Plint Vynil 15cm x 30cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,08
Tukang batu L.02 OH 0,08
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Vynil buah 3,1
Lem Karet Kg 0,08
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Plint Kayu Tebal 2 cm Lebar 10cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang batu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu kelas 1 m3 0,003
Paku/skrup 5cm Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pavingblock 6cm m2 1,01
Pasir Beton m3 0,05
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 10%
JUMLAH HARGA ALAT

Catatan: untuk Pekerjaan BM. dipersyaratkan mutu beton. fc’ 15 Mpa


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

[Link]

Pemasangan 1 m2 Pavingblock (Blok Beton) Natural tebal 8cm


A.[Link]. Pemasangan...
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,5
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pavingblock 8cm
m2 1,01
natural
Pasir Beton m3 0,08
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 10%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Paving Block ( Blok Beton) Berwarna Tebal 6cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pavingblock 6cm
m2 1,01
berwarna
Pasir Beton m3 0,05
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 10%
JUMLAH HARGA ALAT
Catatan: untuk Pekerjaan BM. dipersyaratkan mutu beton. fc’ 15 Mpa
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

[Link]

Pemasangan 1 m2 Pavingblock (Blok Beton) Berwarna Tebal 8cm


A.[Link].
No Pemasangan...
Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,5
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pavingblock8cm
m2 1,01
berwarna
Pasir Beton m3 0,08
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 10%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFON)


Pemasangan1 m2 Langit-Langit Serat Semen. Tebal 4 mm. 5 mm. dan 6 mm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,03
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen m2 1,1
Paku tripleks kg 0,01
JUMLAH HARGA BAHAN
C PERALATAN
PERALATAN % 10%
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 30 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang Kayu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Akustik Lembar 12

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 60 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang Kayu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Akustik Lembar 5,8
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Langit-Langit Akustik Ukuran 60 x 120 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,100
Tukang Kayu L.02 OH 0,100
Kepala Tukang L.03 OH 0,010
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Akustik Lembar 1,50

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Langit-Langit Kayu Lapis. Tebal 3 mm. 4 mm dan 6


mm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,100
Tukang Kayu L.02 OH 0,100
Kepala Tukang L.03 OH 0,010
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu Lapis Lembar 0,375
Paku tripleks kg 0,030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Langit-Langit Lambrisering Kayu. tebal 9 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,800
Tukang Kayu L.02 OH 0,800
Kepala Tukang L.03 OH 0,080
Mandor L.04 OH 0,040
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu papan m3 0,015
Paku tripleks kg 0,010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Langit-Langit Papan Gipsum. Tebal 9 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,100
Tukang Kayu L.02 OH 0,050
Kepala Tukang L.03 OH 0,005
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Gipsum
Lembar 0,364
120x240 cm
Paku sekrup kg 0,110
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ List Langit-Langit Kayu profil


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,050
Tukang Kayu L.02 OH 0,050
Kepala Tukang L.03 OH 0,005
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
List Kayu profil m 1,05
Paku kg 0,01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

A.[Link]. Pemasangan 1 m2 Rangka Langit-langit Besi hollow 40.40

Lihat pada kelompok Pekerjaan Besi dan Aluminium (A.[Link])

Pemasangan 1 m2 Langit-langit Akustik Uk. 60x120cm Berikut Rangka Aluminium


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,5
Tukang besi L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,025
JUMLAH HARGA TENAGA KERJA
B BAHAN
Profil Alum”T” m 3,6
Kawat Ø4 mm kg 0,15
Ramset Buah 1,05
Akustik 60 x 120 Lembar 1,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.5.2. Harga...
[Link]

HARGA SATUAN PEKERJAAN PENUTUP ATAP


Pemasangan 1 m2 Atap genteng Palentong Kecil
No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,15


Tukang Kayu L.02 OH 0,075
Kepala Tukang L.03 OH 0,0075
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN

Genteng palentong buah 25

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan1 m2 Atap Genteng Kodok Glazuur


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng kodok buah 25,00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan1 m2 Atap Genteng Palentong Besar/Morando


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15

Tukang Kayu L.02 OH 0,075

Kepala Tukang L.03 OH 0,008

Mandor L.04 OH 0,008

JUMLAH HARGA TENAGA KERJA


B BAHAN
Genteng Palentong Besar (Morando) buah 12

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Bubung Genteng Palentong Kecil


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,4
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng Bubung Buah 5
Semen Portland Kg 8
Pasir Pasang m3 0,032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Bubung Genteng Kodok Glazuur


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,4
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng Bubung buah 5
Semen Portland Kg 8
Pasir Pasang m3 0,032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Bubung Genteng Palentong Besar


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,4
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng Bubung buah 4
Semen Portland Kg 8
Pasir Pasang m3 0,032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Roof Light Fibreglass 90cm x180cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,067
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Rooflight 90x180 Lbr 0,6
Paku biasa ½”-1” Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 250cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,5
92x250
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 225cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat Semen Gel
Lbr 0,6
92x2.25
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 200cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14

Tukang Kayu L.02 OH 0,07

Kepala Tukang L.03 OH 0,007

Mandor L.04 OH 0,007

JUMLAH HARGA TENAGA KERJA


B BAHAN
Serat semen gel Lbr 0,6
92x200
Paku pancing 6x23 Kg 0,12

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 180cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,75
92x180
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 300cm x 5 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14

Tukang Kayu L.02 OH 0,07

Kepala Tukang L.03 OH 0,007

Mandor L.04 OH 0,007

JUMLAH HARGA TENAGA KERJA


B BAHAN
Serat semen gel 0,35
Lbr
105x300
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 240cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,44
105x240
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 210cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat Semen Gel
Lbr 0,51
105x210
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 150cm x 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,8
105x150
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 300cm x 6mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,37
108x300
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 270cm x 6mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,38
108x270
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 240cm x 6mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat Semen gel
Lbr 0,46
108x240
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 210cm x 6mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat Semen gel
Lbr 0,49
108x210
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 180cm x 6mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,57
108x180
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Setel Gelombang 92 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bubung Setel gel. Lbr 2,4
Paku skrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Setel Gelombang 105 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bubung setel gel. Lbr 2,1
Paku skrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Setel Gelombang 108 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bubung setel gel. Lbr 2
Paku skrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 92 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok Paten 92cm Lbr 1,1
sekrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 105cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok Paten 105cm Lbr 1,2
sekrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Paten(Permanen) 108 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok Paten 108cm Lbr 1,2
sekrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Setel Rata 92cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok setel rata
Lbr 1,1
92cm
sekrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Setel Rata 105 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,084
Tukang Kayu L.02 OH 0,125
Kepala Tukang L.03 OH 0,013
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok Setel rata
Lbr 1,1
105cm
sekrup 3.5” buah 6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Genteng Beton


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,2
Tukang Kayu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,01
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng Beton buah 11
Paku biasa 2”-5” Kg 0,03
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Genteng Aspal 80x100cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,2
Tukang Kayu L.02 OH 0,3
Kepala Tukang L.03 OH 0,003
Mandor L.04 OH 0,01
JUMLAH HARGA TENAGA KERJA
B BAHAN
Genteng aspal
Buah 1,5
Ukuran 0.8x1m
Plywood 6mm Lbr 0,35
Paku biasa ½”-1” Kg 0,03
Plastik aerator buah 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Atap Sirap Kayu


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,166
Tukang Kayu L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Sirap kayu buah 30
Paku biasa ½”-1” Kg 0,2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Genteng Beton


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,4
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,02
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok Genteng beton buah 3,5
Paku biasa ½”-1” Kg 0,05
Semen Portland Kg 10,8
Pasir Pasang m3 0,032
Semen Warna Kg 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Genteng Aspal


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,125
Tukang Kayu L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok genteng aspal buah 2
Paku biasa ½”-1” Kg 0,05
Kayu balok borneo m3 0,0035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Nok/Bubung Genteng Metal


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,25
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Nok genteng metal panjang 100cm buah 1,1
Paku skrup ½”-1” Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Atap Sirap


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,125
Tukang Kayu L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Seng pelat 3’ x 6’
Lbr 0,4
90cmx180cm
Paku biasa ½”-1”
Kg 0,05
1.5cm -2.5cm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Seng Gelombang 105cm x180cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang Kayu L.02 OH 0,06
Kepala Tukang L.03 OH 0,006
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Seng gel 3”x6” Lbr 0,7
Paku biasa ½”-1” Kg 0,02
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Atap Seng


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Seng pelat
Lbr 0,3
3”x6”bjls28
Paku biasa ½”-1” Kg 0,04
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Atap Aluminium Gelombang 95cm x 180cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,75
Kepala Tukang L.03 OH 0,08
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Aluminium Gelombang Uk. 95x180cm Lbr 0,75
Paku pancing Kg 0,02
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Nok/Bubung Atap Aluminium Gelombang


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1

Tukang Kayu L.02 OH 1

Kepala Tukang L.03 OH 0,1

Mandor L.04 OH 0,05

JUMLAH HARGA TENAGA KERJA


B BAHAN
Nok standar buah 1,2

Paku pancing Kg 0,02

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Lapisan Aluminium Foil


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,05
Kepala Tukang L.03 OH 0,005
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Aluminium Foil m2 1,05
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 270cm x 4mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang Kayu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Serat semen gel
Lbr 0,42
105x270
Paku pancing 6x23 Kg 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN KAYU


Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela. Kayu Kelas I
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 7
Tukang Kayu L.02 OH 21
Kepala Tukang L.03 OH 2,1
Mandor L.04 OH 0,35
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok Kayu m3 1,1
Paku 10 cm Kg 1,25
Lem kayu Kg 1
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link] Pembuatan...
[Link]

Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela Kayu Kelas II atau III
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 6
Tukang Kayu L.02 OH 18
Kepala Tukang L.03 OH 1,8
Mandor L.04 OH 0,3
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok kayu m3 1,2
Paku 10 cm Kg 1,25
Lem kayu Kg 1
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan dan Pemasangan 1 m2 Pintu Klamp Standar Kayu Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,35
Tukang Kayu L.02 OH 1,05
Kepala Tukang L.03 OH 0,105
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,04
Paku 5 – 7 cm Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan dan Pemasangan 1 m2 Pintu Klamp Sederhana Kayu Kelas III


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,35
Tukang Kayu L.02 OH
Kepala Tukang L.03 OH 0,105
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,04
Paku 5 – 7 cm Kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m2 Daun Pintu Panel. Kayu Kelas I atau II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang Kayu L.02 OH 3
Kepala Tukang L.03 OH 0,3
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,04
Lem kayu Kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m2 Pintu dan Jendela Kaca. Kayu Kelas I atau II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,8
Tukang Kayu L.02 OH 2,4
Kepala Tukang L.03 OH 0,24
Mandor L.04 OH 0,04
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,024
Lem kayu Kg 0,3
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m2 Pintu dan Jendela Jalusi Kayu Kelas I atau II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang Kayu L.02 OH 3
Kepala Tukang L.03 OH 0,3
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,064
Lem kayu Kg 0,5
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan 1 m2 Daun pintu Plywood Rangkap. Rangka Kayu Kelas II Tertutup (Lebar Sampai 90cm)
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,7
Tukang Kayu L.02 OH 2,1
Kepala Tukang L.03 OH 0,21
Mandor L.04 OH 0,035
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu m3 0,025
Paku 1 cm – 2.5 cm kg 0,03
Lem kayu kg 0,5
Plywood 4mm
Lembar 1
90x220cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1m2 Pintu Plywood Rangkap. Rangka Expose Kayu Kelas I atau II
No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,8


Tukang Kayu L.02 OH 2,4
Kepala Tukang L.03 OH 0,24
Mandor L.04 OH 0,04
JUMLAH HARGA TENAGA KERJA
B BAHAN

Papan Kayu m3 0,0256


Paku 1 cm – 2.5 cm kg 0,03
Lem kayu kg 0,5
Plywood 4mm
90x220cm
Lembar 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pembuatan...
[Link]

Pembuatan dan Pemasangan 1 m2 Jalusi Kusen Kayu Kelas I atau II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,67
Tukang Kayu L.02 OH 2
Kepala Tukang L.03 OH 0,2
Mandor L.04 OH 0,335
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu m3 0,06
Paku 1 – 2.5 cm kg 0,15
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m2 Teakwood Rangkap. Rangka Expose Kayu Kelas I


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,8
Tukang Kayu L.02 OH 2,4
Kepala Tukang L.03 OH 0,24
Mandor L.04 OH 0,04
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,025
Paku 1 – 2.5 cm kg 0,03
Lem kayu kg 0,3
Teakwood 4 mm
Lembar 1
90 x 220 cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pembuatan...
[Link]

Pembuatan 1 m2 Teakwood Rangkap Lapis Formika. Rangka Expose Kayu Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,85
Tukang Kayu L.02 OH 2,55
Kepala Tukang L.03 OH 0,255
Mandor L.04 OH 0,043
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,025
Paku 1 – 2.5 cm kg 0,03
Lem kayu kg 0,8
Teakwood 4 mm
Lembar 1
90 x 220 cm
Formika 120x240 Lembar 0,5
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional. Kayu Kelas I.


II dan III Bentang Sampai Dengan 6 Meter

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 4
Tukang Kayu L.02 OH 12
Kepala Tukang L.03 OH 1,2
Mandor L.04 OH 0,2
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok Kayu m3 1,1
Besi Strip tebal
kg 15
5mm
Paku 12 cm kg 5,6
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m3 Konstruksi Kuda-kuda Expose. Kayu Kelas I


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 6,7
Tukang Kayu L.02 OH 20,1
Kepala Tukang L.03 OH 2,01
Mandor L.04 OH 0,335
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok Kayu m3 1,2
Besi Strip tebal
kg 15
5mm
Paku 12 cm kg 5,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m3 Konstruksi Gordeng. Kayu kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 2,4
Tukang Kayu L.02 OH 7,2
Kepala Tukang L.03 OH 0,72
Mandor L.04 OH 0,12
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok kayu m3 1,1
Besi strip tebal 5
kg 15
mm
Paku 12 cm kg 3
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Rangka Atap Genteng Keramik. Kayu kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,1


Tukang Kayu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN

Kaso-kaso 5 x 7cm m3 0,014


Reng 2 x 3 cm m3 0,0036
Paku 5 dan 10 cm kg 0,25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Rangka Atap Genteng Beton Kayu Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0,014
Reng (3 x 4) cm m3 0,0057
Paku 5 dan 10 cm kg 0,25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m2 Rangka Atap Sirap. Kayu Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,12
Tukang Kayu L.02 OH 0,12
Kepala Tukang L.03 OH 0,012
Mandor L.04 OH 0,006
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kayu Kelas II m3 0,165
Paku 5 - 10 cm m3 0,2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Rangka Langit-Langit 50x100cm. Kayu kelas II atau III


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,3
Kepala Tukang L.03 OH 0,03
Mandor L.04 OH 0,075
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0,0154
Paku 7 cm – 10 cm kg 0,2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Rangka Langit-Langit 60x60cm. Kayu Kelas II atau III


No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 0,2


Tukang Kayu L.02 OH 0,3
Kepala Tukang L.03 OH 0,03
Mandor L.04 OH 0,01
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaso-kaso
5 x 7 cm
m3 0,0163
Paku 7 – 10 cm kg 0,25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Lisplank Ukuran 3x20cm. Kayu Kelas I atau Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan kayu m3 0,0108
Paku 5 dan 7 cm kg 0,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m’ Lisplank Ukuran 3x30cm. Kayu Kelas I atau Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu m3 0,011
Paku 5 dan 7 cm kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Rangka Dinding Pemisah 60x120cm Kayu kelas II atau III


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok Kayu m3 0,028
Paku 5 dan 7 cm kg 0,15
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Kelas II


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,15
Tukang Kayu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Balok kayu. 6 x 12 m3 0,028
Paku 5 dan 10 kg 0,15
Plywood 4mm
Lembar 0,86
120x240cm
Lem kayu kg 0,56
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Lambrisering dari Papan Kayu Kelas I


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,6
Tukang Kayu L.02 OH 1,8
Kepala Tukang L.03 OH 0,18
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Papan Kayu m3 0,007
Paku 5 cm dan
kg 0,1
10 cm
Paku sekrup 10 cm kg 0,15
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Dinding Lambrisering dari Plywood (Kayu Lapis) Ukuran 120x240cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,025
Tukang Kayu L.02 OH 0,075
Kepala Tukang L.03 OH 0,008
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
kayu lapis 4 mm lembar 0,4
Paku 1 dan 2.5 kg 0,05
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Dinding Bilik. Rangka Kayu Kelas III atau IV


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,05
Kepala Tukang L.03 OH 0,005
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bilik bambu m2 1,5
Kaso-kaso 5 cm x 7
m3 0,014
cm
Paku kg 0,012
List kayu 2cmx4xm m3 0,003

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.4.6.2. Harga....
[Link]

HARGA SATUAN PEKERJAAN KUNCI DAN KACA


Pemasangan 1 Buah Kunci Tanam Antik
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,06
Tukang Kayu L.02 OH 0,6
Kepala Tukang L.03 OH 0,06
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Kunci Tanam Biasa


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,01
Tukang Kayu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci tanam biasa buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Kunci Tanam Kamar Mandi


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,005
Tukang Kayu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci tanam KM buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Kunci Tanam Silinder


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,005
Tukang Kayu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci silinder buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Engsel Pintu


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,0008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Engsel pintu buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Engsel Jendela Kupu-Kupu


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,01
Tukang Kayu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,0005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Engsel buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Engsel Angin


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,1
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,0005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Engsel angin buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Spring Knip untuk Jendela


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Spring knip buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]
Pemasangan 1 Buah Kait Angin
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kait angin buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Doorcloser


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,05
Tukang Kayu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Door closer set 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Kunci Slot (Grendel) untuk Jendela


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,02
Tukang Kayu L.02 OH 0,2
Kepala Tukang L.03 OH 0,02
Mandor L.04 OH 0,001
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci slot buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Doorholder


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,05
Tukang Kayu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Door holder buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Doorstop


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,01
Tukang Kayu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Door stop buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Rel Pintu Dorong


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,06
Tukang Kayu L.02 OH 0,6
Kepala Tukang L.03 OH 0,06
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 Buah Kunci Lemari


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,025
Tukang Kayu L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kunci lemari Set 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Kaca Polos Tebal 3 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,0008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca Tebal 3mm m2 1,1
Silicone Sealant
Tube 0,05
300 ml
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Kaca Polos Tebal 5 mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,0008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1,1
Silicone Sealant
Tube 0,05
300 ml
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Kaca Polos Tebal 8mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,017
Tukang L.02 OH 0,17
Kepala Tukang L.03 OH 0,017
Mandor L.04 OH 0,0009
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1,1
Silicone Sealant
Tube 0,07
300 ml
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Kaca Buram Tebal 12mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,025
Tukang Kayu L.02 OH 0,25
Kepala Tukang L.03 OH 0,025
Mandor L.04 OH 0,0013
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1,1
Silicone Sealant
Tube 0,07
300 ml
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Kaca Cermin Tebal 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Catatan: tidak termasuk frame
A.[Link].Pemasangan...
[Link]
Pemasangan 1 m2 Kaca Cermin Tebal 8mm
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,017
Tukang Kayu L.02 OH 0,17
Kepala Tukang L.03 OH 0,017
Mandor L.04 OH 0,009
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca cermin 8 mm m2 1,1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
Catatan:F tidak termasuk frame
Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 Kaca Wireglassed Tebal 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,015
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,008
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca wireglassed 5
m2 1,1
mm
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link].Pemasangan...
[Link]

Pemasangan 1 m2 Kaca Patri Tebal 5mm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,075
Tukang Kayu L.02 OH 0,15
Kepala Tukang L.03 OH 0,015
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1,1
Silicone Sealant
Tube 0,05
300 ml
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PENGECATAN


Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Terakhir
No Uraian Kode Satuan Koefisien
A plafond
Pekerja L.01 OH 0,4
Tukang cat L.02 OH 0,7
Kepala Tukang L.03 OH 0,07
Mandor L.04 OH 0,02
JUMLAH HARGA TENAGA KERJA
B BAHAN
Cat dasar Kg 0,3
Pengencer L 0,01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
[Link]...
[Link]

HARGA SATUAN PEKERJAAN SANITASI DAN PERPIPAAN DALAM GEDUNG


Pemasangan 1 Buah Closet Duduk/MoNoblock
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,5
Tukang batu L.02 OH 1,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,16
JUMLAH HARGA TENAGA KERJA
B BAHAN
Closet duduk Unit 1
Perlengkapan Ls 0,06
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Closet Jongkok Porselen


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang batu L.02 OH 1,5
Kepala Tukang L.03 OH 0,15
Mandor L.04 OH 0,16
JUMLAH HARGA TENAGA KERJA
B BAHAN
Closet jongkok Unit 1
Pasangan bata
m2 0,036
1PC:3PS
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 Buah Closet Jongkok Teraso


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang batu L.02 OH 1,5
Kepala Tukang L.03 OH 0,15
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
Closet jongkok Unit 1
Pas. Bata 1PC:PS m2 0,036
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah UriNoir


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1
Tukang batu L.02 OH 1
Kepala Tukang L.03 OH 0,1
Mandor L.04 OH 0,05
JUMLAH HARGA TENAGA KERJA
B BAHAN
UriNoir Lengkap Unit 1
Semen Portland Kg 6
Pasir Pasang m3 0,01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 Buah Wastafel


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 1,2
Tukang batu L.02 OH 1,45
Kepala Tukang L.03 OH 0,15
Mandor L.04 OH 0,06
JUMLAH HARGA TENAGA KERJA
B BAHAN
Wastafel Lengkap Unit 1,2
Semen Portland Kg 6
Pasir Pasang m3 0,01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Buah Bak Mandi Teraso Volume 0.30 m3


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 3
Tukang batu L.02 OH 4,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,9
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bak Teraso Unit 1
Perlengkapan Ls 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 Buah Bak Fibreglass Volume 0.3 m3


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 3
Tukang batu L.02 OH 4,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,9
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bak Air Fibreglass Unit 1
Perlengkapan Ls 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1buah Bak Mandi Pasangan Bata Volume 0.30 m3


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 6
Tukang batu L.02 OH 3
Kepala Tukang L.03 OH 0,3
Mandor L.04 OH 0,03
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 150
Semen Portland Kg 120
Pasir Pasang m3 0,3
Porselen 11x11 bh 360

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 Buah Bathtub Porselen


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,075
Tukang batu L.02 OH 0,75
Kepala Tukang L.03 OH 0,075
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bathtub Unit 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah Bak Beton volume 1 m3
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 3,5
Tukang batu L.02 OH 4,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,018
JUMLAH HARGA TENAGA KERJA
B BAHAN
Beton [Link] m3 0,9
Baja Tulangan Kg 180
Kayu bekisting m2 8
Ubin porselen
buah 500
20x20cm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 Buah Bak Air Fibreglass Volume 1 m3


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,3
Tukang batu L.02 OH 0,45
Kepala Tukang L.03 OH 0,045
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bak Air Fibreglass Unit 1
Perlengkapan Ls 0,12
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 buah Bak Kontrol Pasangan Bata 30x30cm Tinggi 35cm dengan Tutup Beton
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 2,16
Tukang batu L.02 OH 0,72
Kepala Tukang L.03 OH 0,072
Mandor L.04 OH 0,011
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bata Merah buah 40
Semen Portland Kg 44
Pasir Pasang m3 0,07
Pasir Beton m3 0,06
Kerikil m3 0,07
Baja Tulangan Kg 1,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]
Pemasangan 1 buah Bak Kontrol Pasangan Bata 45cm x 45cm tinggi 50cm dengan Tutup Beton
No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 3,2


Tukang batu L.02 OH 1,15
Kepala Tukang L.03 OH 0,011
Mandor L.04 OH 0,016
JUMLAH HARGA TENAGA KERJA
B BAHAN

Bata Merah buah 70


Semen Portland Kg 77
Pasir Pasang m3 0,13
Pasir Beton m3 0,09
Kerikil m3 0,02
Baja Tulangan Kg 2,6
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 buah Bak Kontrol Pasangan Bata 60cm x 60cm Tinggi 65cm dengan Tutup Beton
No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Pekerja L.01 OH 3,2


Tukang batu L.02 OH 1,15
Kepala Tukang L.03 OH 0,011
Mandor L.04 OH 0,016
JUMLAH HARGA TENAGA KERJA
B BAHAN

Bata Merah buah 123


Semen Portland Kg 114
Pasir Pasang m3 0,184
Pasir Beton m3 0,12
Kerikil m3 0,033
Baja Tulangan Kg 4,85
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa Galvanis Diameter ½”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,054
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,027
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis ½” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ Pipa Galvanis Diameter ¾ ”
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,054
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,027
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa Galvanis Diameter 1”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,054
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,027
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis 1” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa Galvanis Diameter 1 ½”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,108
Tukang batu L.02 OH 0,18
Kepala Tukang L.03 OH 0,018
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa Galvanis Diameter 3”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,135
Tukang batu L.02 OH 0,225
Kepala Tukang L.03 OH 0,023
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis 3” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa Galvanis Diameter 4”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,135
Tukang batu L.02 OH 0,225
Kepala Tukang L.03 OH 0,023
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa galvanis 4” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]
Pemasangan 1 m’ Pipa PVC tipe AW Diameter ½”
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,036
Tukang batu L.02 OH 0,06
Kepala Tukang L.03 OH 0,006
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 1/2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa PVC tipe AW Diameter ¾ ”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,036
Tukang batu L.02 OH 0,06
Kepala Tukang L.03 OH 0,006
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 1/2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,036
Tukang batu L.02 OH 0,06
Kepala Tukang L.03 OH 0,006
Mandor L.04 OH 0,002
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 1” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1½”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,054
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 11/2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,054
Tukang batu L.02 OH 0,09
Kepala Tukang L.03 OH 0,009
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2½”
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,081
Tukang batu L.02 OH 0,135
Kepala Tukang L.03 OH 0,0135
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 21/2” m 1,2
Perlengkapan Ls 35%
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,081
Tukang batu L.02 OH 0,135
Kepala Tukang L.03 OH 0,0135
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 3” m 1,2
Perlengkapan Ls 0,35
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,081
Tukang batu L.02 OH 0,135
Kepala Tukang L.03 OH 0,0135
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa PVC 3” m 1,2
Perlengkapan Ls 0,35
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 buah Bak Cuci Piring Stainlessteel


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,03
Tukang batu L.02 OH 0,3
Kepala Tukang L.03 OH 0,03
Mandor L.04 OH 0,015
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bak Cuci Piring Unit 1
Waterdrain buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 buah Bak Cuci Piring Teraso


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,05
Tukang batu L.02 OH 0,5
Kepala Tukang L.03 OH 0,05
Mandor L.04 OH 0,025
JUMLAH HARGA TENAGA KERJA
B BAHAN
Bak Cuci Piring Unit 1
Waterdrain buah 1
Semen Portland Kg 20
Pasir Pasang m3 0,05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 buah Kran Diameter ½” atau ¾ ”


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,01
Tukang batu L.02 OH 0,4
Kepala Tukang L.03 OH 0,04
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Kran Air Buah 1
Sealtape Buah 0,025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 buah Floor Drain


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,01
Tukang batu L.02 OH 0,1
Kepala Tukang L.03 OH 0,01
Mandor L.04 OH 0,005
JUMLAH HARGA TENAGA KERJA
B BAHAN
Floor drain Unit 1
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah Ǿ 20 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,08
Tukang batu L.02 OH 0,04
Kepala Tukang L.03 OH 0,004
Mandor L.04 OH 0,004
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa Tanah m1 1,6
Semen Portland Kg 35
Pasir Pasang m3 0,014
Pasir Urug m3 0,014
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah diameter 15 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,06
Tukang batu L.02 OH 0,03
Kepala Tukang L.03 OH 0,003
Mandor L.04 OH 0,003
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa Tanah dia 15 Per m’ 1,6
Semen Portland Kg 0,93
Pasir Pasang m3 0,013
Pasir Urug m3 0,011
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.[Link]. Pemasangan...
[Link]

Pemasangan 1 m’ Pipa Beton Diameter 15 – 20 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,14
Tukang batu L.02 OH 0,07
Kepala Tukang L.03 OH 0,007
Mandor L.04 OH 0,007
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa Tanah dia 15 buah 1,1
Bata Merah m3 0,027
Semen Portland Kg 0,93
Pasir Pasang m3 0,056
Pasir Urug m3 0,024
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ Pipa Beton Diameter 30 – 100 cm


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0,38
Tukang batu L.02 OH 0,19
Kepala Tukang L.03 OH 0,019
Mandor L.04 OH 0,019
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa Tanah dia 15 buah 1,1
Bata Merah m3 0,55
Semen Portland Kg 10,3
Pasir Pasang m3 0,061
Pasir Urug m3 0,069
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
A.6.1.1. Harga...
[Link]

HARGA SATUAN PEKERJAAN SISTEM DISTRIBUSI JARINGAN LISTRIK


Pemasangan 1 buah MCCB
No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Upah % 100
JUMLAH HARGA TENAGA KERJA
B BAHAN
Pipa listrik 5/8” btg 3
Kabel m 15
T Dus buah 1
L Bow buah 2
Klem biasa buah 24
MCCB (Boks
buah 1
MCB)
MCB buah 2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN SISTEM PENCAHAYAAN


Pemasangan 1 Buah Titik Lampu
No Uraian Kode Satuan Koefisien
A TENAGA KERJA

Upah % 100%

JUMLAH HARGA TENAGA KERJA


B BAHAN

Pipa listrik 5/8” btg 3


Kabel m 5
T Dus buah 3
L Bow buah 4
Las Dop buah 3
Klem buah 24
Mongkok buah 1
Saklar buah 1
Fitting buah 1
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)

MENTERI PEKERJAAN UMUM

DAN PERUMAHAN RAKYAT. ttd

M. BASUKI HADIMULJONo

[Link]
2

482

No
A

-
C

- D
- E
- F

AH HARGA ALAT

10%

sis bidang SDA.

A.[Link]
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

400.002,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

400.002,00
400.001,00
1.300,00
425.000,00
400.000,00
AH HARGA BAHAN
AH HARGA ALAT

15%

A.1.5.1

A.[Link]
Harga Satuan
(Rp)

100.000,00
300.000,00
AH HARGA TENAGA KERJA

400.001,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.3.1.1
A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

400.000,00
150.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.4.1.1

A.[Link]
Harga Satuan
(Rp)

100.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

1.300,00
425.000,00
400.000,00

1,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

1.300,00
425.000,00
400.000,00
1,00
AH HARGA BAHAN

50.000,00
AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

1.300,00
425.000,00
400.000,00
1,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.500,00
410,71

407,41
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
250.000,00
AH HARGA TENAGA KERJA

6.500,00
410,71
407,41
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.500,00
410,71
407,41
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJ750.000,00

85.000,00
550,71
600,41
1,00
AH HARGA BAHAN 86.250.000,00

AH HARGA ALAT 295.000,00

87.295.000,00

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.500,00
410,71
407,41
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%
A.[Link].
Harga Satuan
(Rp)

110.000,00
120.000,00

AH HARGA TENAGA KERJA

6.500,00
410,71
407,41
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.500,00
425.000,00
400.000,00
-
1,00
AH HARGA BAHAN

AH HARGA ALAT

15%

emen yang

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

-
25.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

5.800.004,00
25.005,00
200.002,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

5.800.004,00
25.007,00
200.002,00
AH HARGA BAHAN
AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

5.800.003,00
25.008,00
200.002,00
4.500.000,00
-
20.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

4.500.003,00
25.008,00
200.002,00
4.500.000,00
-
20.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

4.500.003,00
25.008,00
200.002,00
4.500.000,00
-
20.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

4.500.003,00
25.008,00
200.002,00
4.500.000,00
-
20.000,00
-
AH HARGA BAHAN

AH HARGA ALAT

15%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

4.500.003,00
25.008,00
200.002,00
4.500.000,00
-
20.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

4.500.004,00
25.008,00
20.000,00

AH HARGA BAHAN

AH HARGA ALAT

15%

pangan (cast in place). A.4.1.2

ng dilakukan di lapangan.
en kolom. balok dan pelat.

A.[Link].
ular Bangunan Gedung (5 kali pakai)
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

3.500.000,00
18.000,00
4.500.000,00
-
200.003,00
5.000,00
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

5.800.001,00
-
200.003,00
20.001,00
5.001,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

5.800.001,00
-
200.003,00
20.002,00
2.500,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
.
Harga Satuan
(Rp)
165.000,00
185.000,00
150.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
150.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
150.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

9,00
11,00
165.000,00
185.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA
AH HARGA BAHAN

2,00
1,00
AH HARGA ALAT

10%
ai Ereksi Balok Hingga 24 Lantai A.[Link].

Harga Satuan
(Rp)

9,00
11,00
165.000,00
185.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

2,00
3,00
AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
AH HARGA TENAGA KERJA
AH HARGA BAHAN

2,00
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

2,00
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
AH HARGA TENAGA KERJA
AH HARGA BAHAN

2,00
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
185.000,00
250.000,00
AH HARGA TENAGA KERJA

AH HARGA BAHAN

AH HARGA ALAT

10%
A.4.2.1.
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00

AH HARGA TENAGA KERJA

1.457,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00

AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
160.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

500,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

130,00
100,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
15%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
untuk Partisi A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

50.000,00
50.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

untuk Plafond A.[Link].


Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

50.000,00
50.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

130.000,00
AH HARGA BAHAN

130.000,00
AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

140.000,00
AH HARGA BAHAN

140.000,00
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
158.700,00
-
185.000,00
AH HARGA TENAGA KERJA

135.000,00
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
160.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
160.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.4.4.1
A.[Link].

Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

850,00
1.540,00
150.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link]

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#ERROR!
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

1.500,00
6.500,00
400.000,00
AH HARGA BAHAN

AH HARGA ALAT
15%

A.[Link]

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA
12.000,00
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].

Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#N/A
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A. [Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.000,00
20.000,00
AH HARGA BAHAN
#REF!
AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

7.000,00
20.000,00
AH HARGA BAHAN

#REF!
AH HARGA ALAT

15%

A.4.4.2
A.[Link].
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

6.500,00
350.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00.
AH HARGA TENAGA KERJA

6.500,00
400.000,00
AH HARGA BAHAN

AH HARGA ALAT
15%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
-
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.4.4.3
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

6.000,00
1.300,00
350.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

-
1.450,00
13.000,00
300.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
205.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

#REF!
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
#REF!
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

#REF!
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

#REF!
AH HARGA ALAT

10%

A.4.5.1
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

#REF!
AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

50.000,00
35.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.4.5.2.
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link]
.
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.4.6.1
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

15%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
p (Lebar Sampai 90cm) A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
.
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].

Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)
165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?

AH HARGA BAHAN

AH HARGA ALAT

10%

A.4.6.2
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link]
.
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.4.7.1
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

10.000,00
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

ALAM GEDUNG A.5.1.1


A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT
10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA
#NAME?
#NAME?
#NAME?
#NAME?

AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
.
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

n Tutup Beton A.[Link].


Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
ngan Tutup Beton A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

ngan Tutup Beton A.[Link].


Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

425.000,00
425.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

30.000,00
30.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

80.000,00
80.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

130.000,00
130.000,00
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

210.000,00
210.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

300.000,00
100.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%
A.[Link].
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
300.000,00
AH HARGA TENAGA KERJA

76.000,00
4.000,00
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link]
Harga Satuan
(Rp)

130.000,00
150.000,00
170.000,00
250.000,00
AH HARGA TENAGA KERJA

30.000,00
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN
AH HARGA ALAT

10%

A.[Link].
Harga Satuan
(Rp)

165.000,00
185.000,00
205.000,00
250.000,00
AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

AN LISTRIK A.6.1.1
A.[Link].
Harga Satuan
(Rp)

AH HARGA TENAGA KERJA

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AH HARGA BAHAN

AH HARGA ALAT

10%

A.6.2.1
A.[Link]
Harga Satuan
(Rp)

150.000,00
AH HARGA TENAGA KERJA

10.000,00
10.000,00
3.000,00
1.000,00
-
500,00
-
30.000,00
70.000,00
AH HARGA BAHAN

AH HARGA ALAT

15%
HARGA
No Uraian Kode Satuan Koefisien SATUAAN JUMLAH

TENAGA
A
KERJA

Pekerja L.01 OH 1,65 - #VALUE!

Tukang Org/Hari
L.02 OH 0,275
batu
Kepala -
L.03 OH 0,028
Tukang

Mandor L.04 OH 0,083 Org/Hari

JUMLAH HARGA TENAGA KERJA

B BAHAN
Semen
kg 326
Portland
Pasir
kg 760
Beton
Kerikil
(Maks kg 1029
30mm)
Air Liter 215
JUMLAH HARGA BAHAN
PERALAT
C
AN

cangkul JUMLAH HARGA ALAT


sekop
Jumlah
D
(A+B+C)
E Biaya Umum dan Keuntungan (Maks 15%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan (Rp)

130.000,00

150.000,00
1.65 5 8.25
170.000,00

300.000,00

6.500,00

410,71

407,41

1,00

15%