kwik-ZIP
SIZE TABLE & SETTING GUIDE ®
HD SERIES
Nominal Outside Outside *Suggested Approx
Pipe Size Dia of Dia of Number of Setting
(NPS) Pipe (mm) Pipe Segments Guide
(Inches) Position INERT CENTRALIZER & SPACER SYSTEMS
110 4.33 2 0 FOR THE DRILLING & CIVIL CONSTRUCTION INDUSTRY
4 114.30 4.50 2 15
4.5 127.00 5.00 2 30 CAUTION:
®
INSTALLATION GUIDE
5 141.30 5.563 2 55 kwik-ZIP centralizers
should not be FOR
160 6.30 2 85 exposed to a naked
6 168.27 6.625 3 5 flame or sparks from
welding. Failure to
HD SERIES (HD 30, HD 50, & HD 75)
180 7.09 3 20
shield the product FOR WELL CASING, SCREEN, PUMP RISER, AND
200 7.87 3 40 whilst welding may
8 219.08 8.625 3 65 result in damage to PIPELINE CASED CROSSING APPLICATIONS ETC.
250 9.84 4 25 the centralizer.
10 273.05 10.75 4 45
12 323.85 12.75 4 80
14 355.60 14.00 5 50
16 406.40 16.00 6 35
18 457.20 18.00 6 65
20 508.00 20.00 7 55
24 609.60 24.00 8 65
650 25.59 9 50
710 27.95 9 70
800 31.50 10 75
900 35.43 12 60
1000 39.37 13 65
1200 47.24 17 45
1400 55.12 20 45
1600 62.99 22 50
*Note: For heavy pipe installed in the horizontal
position, (eg. Cased Crossings), it is recommended
that the No. of bows be maximised to support
maximum load per spacer. Use the following
formula to calculate the No. of segments per spacer
for such heavy pipe:
No. of Segments = [Pipe OD (mm) x 3.1428] ÷ 180.
(Round the result down to nearest whole number). IMPORTANT: PLEASE READ
Example of bow configuration on
©2009 Kwik-Zip Marketing Pty Ltd large diameter heavy weight pipe. [Link]
Issue Date: Sept 09
PRODUCT SELECTION GUIDE
The table below details Model details, Part # and maximum operating temperatures:
Step 2. Line the leading edge of each screw housing up with the appropriate
Model & (Bow Height) Part # Max Operating Recommended for
number on the Setting Guide.
Temperature use on Pipe
(Deg C/F) Diameter: Step 3. Once all segments are set, they can be wrapped around the pipe and the
final joints can be fastened. This method allows the centralizer to be made up
HD 30 : (1 3/16” / ~ 30mm) 00992 mostly by hand.
4” Nominal (110mm
HD 50 : (2” / ~ 50mm) 00991 80 C / 176 F A flat screwdriver of approx 6mm (5/16”) is required to tighten the screws once the
OD and above)
HD 75 : (3” / ~ 75mm) 00993 segments are fixed to the pipe.
Important Note:
All HD Series Centralizers / Spacers incorporate rubber grip pads under the collars Do not over tension the screws as this may cause damage to the thread.
to prevent slippage on the pipe.
INSTALLATION INSTRUCTIONS
The chart on the back page of this guide indicates the number of HD series
®
kwik-ZIP centralizer segments required and the approx setting position for
various pipe diameters.
For heavy weight pipe and diameters greater than those listed, the following
formula may be used to calculate the number of segments required. This will
maximise the number of bows supporting the pipe for heavy loads.
Where: D = Outside Diameter of Casing (mm) Note: 1 inch = 25.4 mm
®
N = Number of kwik-ZIP centralizer segments,
For heavy weight pipe: N = [D x (22/7)] ÷ 180
SETTING GUIDE POSITION (REFER SIZE TABLE AND SETTING GUIDE)
Step 1. When you have established the appropriate setting guide position (see
table on rear page), place the segments on a flat surface and insert the male
section of each segment into the screw housing on the next segment as indicated 2 x HD 30 segments installed on
by the arrows in the above diagram. 4” Stainless Steel Pipe.
Issue Date: Sept 09