0% found this document useful (0 votes)
61 views1 page

Basement Floor Plan and Drainage System

Uploaded by

Fadi Farse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Basement Floor Plan and Drainage System

Uploaded by

Fadi Farse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

LIFT LIFT

LF-01 LIFTS LOBBY


B3-24 LF-01

D D
LIFT LIFT
B3-19
LF-01

LF-01

SERVICES
B3-02 B3-19 Study, Design and Supervision of
SH-22 SH-25
BASEMENT 3 New North Building The State Audit Bureau
STORE
9600

9600
-12.800 FFL WATER FEATURES A
B3-25 BALANCING TANK
B3-37 NO. 1 B
1:100

TRANSITION
SLOPE 5% D
5

TRANSITION RAMP UP FROM B3A TO B3 L= 3.00m -12.650 FFL E

SLOPE 5% 10% SLOPE


L= 3.00m B3-56 F

B
H

E E J
2

K
1

STORE 11 10 9 8 7 6 5 4 3 2 1
0

B3-26 KEY PLAN

SERVICES
NOTES:

B3-65 1. ALL DIMENSIONS ARE GIVEN IN MILLIMETERS AND LEVELS ARE IN


METERS UNLESS OTHERWISE SPECIFIED.
9600

9600
B3-19
2. DO NOT SCALE FROM THIS DRAWING.
B3-27 3. THIS DRAWING MUST BE READ IN CONJUNCTION WITH
SPECIFICATION WORK FORMATS, SCHEDULES AND ALL
OTHER RELEVANT DRAWINGS.

4. CONTRACTOR MUST REPORT ANY DISCREPANCIES


PRIOR TO EXECUTION OF ANY WORKS.
M-CH LINE ST-02
SERVICES
SH-18
DWG PL-DS-01/A 5. ALL DIMENSIONS MUST BE VERIFIED ON SITE PRIOR TO
B3-63 ORDERING OR MANUFACTURING ANY MATERIALS.

DWG PL-DS-01/B 6. THE CONTRACTOR IS RESPONSIBLE FOR


SH-20

SH-17
SERVICES(HVAC) FULL COORDINATION WITH ALL OTHER ENGINEERING WORKS
VIP DF TO ENSURE PROPER INSTALLATION.

SH-15

SH-35
F LIFT B3-55
F

SH-19
SH-14
LF-04 VIP LOBBY 7. THE CONTRACTOR SHOULD CONFORM TO ON-SITE
FIRE LF-02 B3-28 INSTALLATION REQUIREMENTS AND STANDARDS AS LAID
LOBBY LIFT DOWN BY REGULATORY AUTHORITIES.
FHC

WT-02 SH-16 ST-05 BASEMENT 3 LEGEND:


-12.800 FFL
HVAC MAKE-UP
1:200

SH-21 B3-37
WATER STORAGE
TANK NO. 1
FHC
B3-29
-14.500 FFL
10

9600

9600
-12.650 FFL
B3-19
5
0 1 2 3

STORE WATER FEATURES


B3-30 BALANCING TANK
NO. 2

G B3-19
G
TRANSITION TRANSITION
SLOPE 5% SLOPE 5%
L= 3.00m RAMP DWN FROM B3 TO B3A L= 3.00m
SERVICES 10% SLOPE
B3-01

-14.500 FFL
BASEMENT 3A BASEMENT 3A
-12.650 FFL
9600

9600
-14.650 FFL -14.650 FFL
STORE B3-54
B3-31
B3-37 B3-37

WT-03 SH-12 SH-13


B3-19
HVAC MAKE-UP
WATER STORAGE LIFT LIFT
TANK NO. 2

LF-01 LF-01

H LIFTS LOBBY H
B3-32
LIFT LIFT

LF-01 LF-01
1:250

ST-10
SH-11 SH-10 -12.650 FFL
12.5

B3-54
9600

9600
LOBBY
STORE B3-34 STORE
B3-33 B3-35
B3-19
5
2.5

TO LIFT MOTOR
ROOM
0

B3-36
J B3-19 -12.650 FFL
J
BASEMENT 3A -14.500 FFL BASEMENT 3

-14.650 FFL -12.800 FFL SMOKE


MAKE-UP
B3-37 AIR PLANT
B3-53
SERVICES WP-03
-17.000 FFL RAMP DWN FROM B2A TO B3
9600

9600
TRANSITION
10% SLOPE SLOPE 5%
B3-62 B3-19
L= 3.00m

-14.500 FFL ST-07


SERVICES GOODS LIFT
ARCHIVE WP-01 B3-43 LF-03 ST-06
B3-39
I.T. ROOM SERVICES STORAGE/ARCHIVE
-17.000 FFL
SP-01 B3-40 FHC
SERVICES

B3-60 STORE DF SERVICES -12.650 FFL


B3-42

SH-09
SH-07
K B3-41 B3-49 B3-50 K
SEWAGE WATER SUMP PIT STORE LOBBY
DIMS: 1500X2000X2000 (D) FHC B3-48
B3-44 B3-47
FIRE WITH 2 Nos. 600X600 DOUBLE STORE
1:500

SH-03

SERVICES LIFT B3-46


SEALED COVER AND FRAME, SH-08
SH-04 LF-02
SH-05
FHC
25

LOBBY
B3-59 B3-45 -14.500 FFL -12.650 FFL B3-51
B3-45 B3-48 B3-52
9600

9600
ST-01 REVISION DATE ISSUE
10

SH-01
SH-02

STORE
5

B3-66
THERMAL STORAGE
-17.000 FFL
0

-14.500 FFL STORAGE/ARCHIVE ARCHIVE


B3-61
-12.650 FFL -12.650 FFL Client :-

B3-57 B3-50
L L MINISTRY OF PUBLIC
THERMAL STORAGE WORKS (MPW)
-17.000 FFL
B3-58
Consultant:-
5200

5200
The Associated
Engineering Partnership
Architects, Engineers and Planners
KIPCO Tower-33rd Floor, khalid Bin Al Waleed St.,
Sharq, P.O.Box-3047,Safat-13031,Kuwait.

M M Telephone (965) 2294 3213/4/5/6 , FAX (965) 2406264,


Email: taepku@yahoo.com, www.taepku.com

DRAWING TITLE
3RD BASEMENT FLOOR PLAN
DRAINAGE SYSTEM - PART B
DRAWN BY CHECKED BY DRAWING No.

3600 9600 9600 9600 9600 9600 9600 9600 9600 9600
A0 (1189 X 841 MM)

DATE SCALE PL-DS-01/B


1:100
11 10 9 8 7 6 5 4 3 2 1 AGREEMENT No.

CPA 308 TENDER ISSUE


A
COPYRIGHT

You might also like