0% found this document useful (0 votes)
87 views16 pages

EBOM Checklist

Uploaded by

Ramya Samuel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views16 pages

EBOM Checklist

Uploaded by

Ramya Samuel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

LEED V4 EB O+M PROJECT

Sl.No CREDIT CATEGORY

1 LOCATION AND TRANSPORATION


1.1 Transporation Performance

2 SUSTAINABLE SITES
2.1 Rainwater Management
2.2 Heat Island Reduction
2.3 Light Pollution Reduction
2.4 Site Management

3 WATER EFFICIENCY
3.1 Water Performance

4 ENERGY AND ATMOSPHERE


4.1 Energy Efficiency Best Management Pratic
4.2 Fundamental Refrigerant Management
4.3 Energy Performance
4.4 Enhanced Refrigerant Management
4.5 Grid Harmonization

5 MATERIAL AND RESOURCES


5.1 Purchasing Policy
5.2 Facility Maintenance and Renovations Poli
5.3 Waste Performance
5.4 Purchasing

6 INDOOR ENVIRONMENTAL QUALITY


6.1 Minimum Indoor Air Quality
6.2 Environmental Tobacco Smoke Control
6.3 Green Cleaning Policy
6.4 Indoor Environmental Quality Performance
6.5 Green Cleaning
6.6 Integrated Pest Management

7 INNOVATION
7.1 Innovation

Total Points
LEED V4 EB O+M PROJECT CHECK LIST

PREREQUISITE/CREDIT POINTS STATUS REMARKS

14
Prerequisite 14 (6)

4
Credit 1
Credit 1
Credit 1
Credit 1

15
Prerequisite 15 (6)

35
Prerequisite Required
Prerequisite Required
Prerequisite 33 (13)
Credit 1
Credit 1

9
Prerequisite Required
Prerequisite Required
Prerequisite 8 (0)
Credit 1

9
Prerequisite Required
Prerequisite Required
Prerequisite Required
Prerequisite 20 (8)
Credit 3
Credit 1

1
Credit 1

100
PROJECT NAME / ID

S.NO CREDIT
1

3
DRAWINGS

6 ARC Data

7 WEp Water Performance

8 EAp Energy Performance

9 MRp Waste Performance

EQp Indoor Environmental Quality


10
Performance

11 SSc Site Management


12 SSc Rainwater Management

13 SSc Heat Island Reduction

14 SSc Light pollution reduction

EAp Energy Efficiency Best Management


15
Practices

16 EAp Fundamental Refrigerant Management

17 EAp Enhanced Refrigerant Management

18 EAc Grid Harmonization

19 MRp Purchasing Policy


19 MRp Purchasing Policy

MRp Facility Maintenance and Renovations


20
Policy
21 MRc Purchasing

22 IEQp Minimum Indoor Air Quality

23 IEQp Environmental Tobacco Smoke Control

24 IEQp Green Cleaning Policy

25 IEQc Green Cleaning

26 IEQc Integrated Pest Management

27 INc Innovation
DOCUMENT REQUIRED
Project Narrative

Floor Plan

Site Plan with area classification

Site Plan with LEED Scope

Representive Photos of Site

1. instruction tab, 2. Building Settings Tab

Arc Specification - Water Declaration

Arc Specification - Energy Declaration

Arc Specification - Waste Declaration

Arc Specification - IEQ Declaration

Site management log


Site Assessment Report
Site management narrative
Site management plan
Rainwater Inspection Checklist

Rainwater Management Narrative

Rainfall event calculator

Site plan indicating LID Strategies

Narrative
Roof Plan showing heat island reduction
Site plan showing heat island reduction
Narrative
Exterior ligthing layout

ASHRAE Level 1 Audit report

System Narrative
Sequence of Operation
Preventive Maintenance Plan
Building Operating Plan
CFC Based Refrigerent
Narrative
Checklist for refrigerent used system
(commercial refrigerent)
Refrigerent equipment schedule
(commercial refrigerent)
Refrigerent management calcultor (option
2)
VRF Specification
Narrative (case 1,2,3)
Performance plan for DR Plan
Action plan for DR program
CFR and O+M Indiacting DR program
Declaration for DR Program (case 1)
Purchasing calculator
Purchasing Narrative
Purchasing Invoice
Technical specifications
Facility Maintenance and Rennovation
Purchasing Narrative
Purchase Invoice
Techinical specification
Ventilation layout
Ventilation fan maintenance checklist
Indoor Air Quality Narrative
Minimum IAQ Performace Calculator
Mecahnical schedule
Fresh Air fan checklist
Exhaust fan checklist
Exhaust calculation
Area and occupancy clarification
Site plan with exterior no smoking signage
No smoking policy
Location of interior no smoking signage
Environmental tobocco smoke control
Green cleaning policy
Green cleaning Narrative
Entryway mat location
Entry mat cleaning log
IPM Tracking tool
IPM narrative
Integrated Pest mangement Policy
Technical specifications
Building Operation + Maintenance
Green Building education guided tour narra
Green Building education guided tour

Case study
To be Checked StatusRemarks
Overall Area and Floor
Project Title
Drawing Title
Orientation
Gross Floor Area
Project Title
Drawing Title
Orientation
Site Area
Project Title
Drawing Title
Orientation
Check Site area and Project Building alone
highlighted
Check Site visit Photos
1. Unit of measurement, Year Built
2. Space name, Usage type, GFA, Weekly
Operating Hours, Regular occupants, Visitors. The
above Details Consistent with Arc Skoru Plartform,
Effective Date,
Fuel Source, Unit of Measurement, Start and End
date, period consumption and unit consistent with
declaration, Performance Period is consistent with
declaration,
Fuel Source, Unit of Measurement, Start and End
date, period consumption and unit consistent with
declaration, Performance Period is consistent with
declaration,
Fuel Source, Unit of Measurement, Start and End
date, period consumption and unit consistent with
declaration, Performance Period is consistent with
declaration, waste diverted in %,
Meter source, unit of measurement, Location,
Audit Number, Date, Start & End Time, TVOC &
CO2readings is consistent with declaration,
Refresh Summary
Month and Year
Assessment date and photos
Issue date, Manager Name
Site Plan diagram with landscape highlighted
Cleaning equipment details
project Logo, Facility name, Inspector name,
Anticipated date of all maintenance completed,
Date of Inspection, Checklist name, Signature &
Seal
Project name, ID, Logo, Location, Rating System,
Date & Reference, Refer Attachment (Documents
name), Surface type, Area, Runoff coefficient,
Storm water runoff, LID Strategies (Area, Depth,
Runoff Volume), Rainwater tank capacity, Total
stormwater runoff managed at site by using LID
Strategies
Unit of Measurement,10 years rainfall data, LID
Strategies(runoff volume managed in cu ft),
Runoff Volume Required to be Managed onsite (cu
ft),
Project name, Orientation, Drawing title, Logo,
Legend, Are Low Impact Development (LID)
strategies mentioned?
Non roof and Roof area
Paving Material date sheet to be highlighted
Heat Island
Calculations
Issue date, Manager Name

Building characterstics - Area, name


Ventilation Count
Energy Index
Target Index with Energy Calculator
Ventilation details
Project ID, Name, Date
Project ID, Name, Date
Weekly operating hours
Issue date, Manager Name

Project Name /ID

Drawing title

Unit of measurement and area of the space


Check the unit mentioned
Cross check with Calculations

Refer Project Area Summary


Site Plan - Drawing Title
Issue date, Manager Name
Floor Plan - Drawing Title
Project ID, Name, Date
Issue date, Manager Name
Project ID, Name, Date
Check the mat location in all entry way (10 feet),
Drawing Title
Date of Cleaning
Site visit dates
Project ID, Name, Date
Issue date, Manager Name

Validity year
Site plan with Route Number
Tour Date
Site area and Floor Area in Square Feet
Number of Floors
Area to be entered
Area of Non roof Measures

Area of Roof Measures

Total Area of Measures


Requirement
SR Weighted Area
0.47 0 Min SR 0.33
SRI
112 0 Min SRI 82

0 >= 0
Prerequisite Completed Yes
Credit Yet to complete No
Not Attempted

You might also like