Bill Note
Bill Note
NOTE
Name of Work:- “Construction of Bridge over the Nallah crossing between Tugapur
No.8 and Birsha Nagar under Pahalgaon Panchayat under Sub-Division [Link],
NACD, APWD, Mayabunder, North Andaman under CRF during 2016-17”.
The previously sent GST Claim was returned to the contractor with the request to
re-submit the claim with all necessary & autherticated valid document in support of the
claim & as per clarification issued by CPWD vide letter No.
158/SE(TAS)/GST/2020/102 dt:06/02/2020.
NOTE
Ref:- [Link]/3-1(974)/NACD/SE/CC-I/2020-21/1677,1678 dated 13/10/2020.
2. “Construction of Bridge over Nallah situated crossing between Budha Nallah village
to ATR Junction (BudhaNallah) under Pahalgaon Panchayat under Sub-Division [Link],
NACD, APWD, Mayabunder, North Andaman under CRF during 2016-17”.
3. “Construction of Bridge over the Nallah crossing between Tugapur No.8 and Birsha
Nagar under Pahalgaon Panchayat under Sub-Division [Link], NACD, APWD,
Mayabunder, North Andaman under CRF during 2016-17”.
For the above mentioned work, the copies of Market Rate analysis of Schedule
of items considered during justification of tender, received from Executive Engineer
(Plg), CC-I, Port Blair which is forwarded to Drawing Branch, NACD, Mayabunder for
calculation of re-imbursement amount of GST, as claimed by the contractor & sanction
order may be forwarded to Accounts Branch for pass & payment of claim from this end.
Encl: As above
AAO/NACD
HD/NACD
Dated: 23/10/2020
NOTE
Sub:- Reimbursemtn of GST- reg.
Name of Work:- “Construction of Bridge over the Nallah for connectivity from ATR to
Badam Nallah Dera ward No.2 under Basantipur Panchayat under Sub-Division [Link],
NACD, APWD, Mayabunder, North Andaman District under CRF during 2016-17”.
Reimbursemtn of GST claim is received from M/s Ravi Realcon Pvt., Port Blair
vide letter [Link]/P-73/20-21/260 dated 13/10/2020 alongwith supporting document
for pass and payment for the above mentioned work.
The market rate analysis for the above mentioned work has already been
received from the SE`s office, CC-1, APWD , Port Blair vide this office RD NO.6408
dated 19/10/2020 and the same has been forwarded to HD on 21/10/2020.
Encl: As above
Ar-III
AAO/NACD
NOTE
During the scrutiny of 2nd RA Bill of [Link] Singh, Govt. Contractor,
Mayabunder for work “Construction of 01 Anganwadi building at Karmatang-8
with chain link fencing under Sub-Division No.I, NACD, APWD, Mayabunder
(PMJVK)” against Agreement No.113/2019-2020/EE/NACD the following observation
are made.
Hence the 2nd RA Bill alongwith CMB No.293 is refruned to Assistant Engineer,
Sub-Division No.I for necessary correction and re-submit for further action please.
NOTE
The IV RA bill in respect of M/s. Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
NOTE
The V RA bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “Proposed New OPD Block at PHC Billyground under NACD,
APWD, Mayabunder”.
Encl:-
AAO/NACD Ar-III
NOTE
The Ist & Final Bill in respect of M/s. Paul Enterprises, Govt. Contractor,
Betapur received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
AAO/NACD Ar-II
Encl:-
AAO/NACD Ar-II
NOTE
The Ist RA Bill in respect of [Link] Kumari, Govt. Contractor, Tugapur
received from the Assistant Engineer, Sub-Division [Link], Tugapur under NACD,
APWD, Mayabunder for early pass and payment, and the details of the bill is as
under.
Name of Work:- “Repair of toilet block, window doors, kitchen set roof etc. at
Govt. Primary School Tugapur No.7 under Sub-Division [Link],
NACD, APWD, Mayabunder”.
Encl:-
AAO/NACD Ar-II
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/12/2019
NOTE
The Ist RA Bill in respect of Shri Bhagwan Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Chain link fencing and Iron Gate Sub Depot at Tugapur, Sub
Depot Bajota under Sub-Division [Link], NACD, APWD,
Mayabunder.
Encl:-
AAO/NACD Ar-II
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/12/2019
NOTE
The 2nd RA Bill in respect of Shri Ananta Shadhukhan, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/12/2019
NOTE
The 3rd RA Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/12/2019
NOTE
The V RA Bill in respect of M/s. Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/12/2019
NOTE
The 1st & Final Bill in respect of Shri.S.B. Sharma, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 12/12/2019
NOTE
The 1st & Final Bill in respect of M/s. Blue Chip Consultancy Service, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 12/12/2019
NOTE
The IInd & Final Bill in respect of M/s Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 17/12/2019
NOTE
The IV RA Bill in respect of [Link] Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work: - “A/R & M/O Truck under Sub-Division [Link] (E&M), NACD,
APWD, Mayabunder during 2019-20”.
Sub Work:-. “Providing the Service of Mini Cargo Van with feul and driver as
and when required for the Sub-Division [Link], NACD,
Swadeshnagar under NACD, Mayabunder for a period of 01
year”.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 20/12/2019
NOTE
The I RA Bill in respect of [Link], Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 31/12/2019
NOTE
The I RA Bill in respect of [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 01/01/2020
NOTE
The I & Final Bill in respect of M/s. Akabea Infrastructure (P) Ltd., Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-IV
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 01/01/2020
NOTE
The I & Final Bill in respect of M/s. Akabea Infrastructure (P) Ltd., Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-IV
AAO/NACD
Dated: 02/01/2020
NOTE
The 2nd & Final Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Replacement of old G.I. pipeline from source at Tugapur No.8 to
inside village for a length of 4.00 km under Sub-Division [Link],
NACD, Mayabunder (DPC Recommended 2016-17)”.
Encl:-
Ar-II
AAO/NACD
Dated: 02/01/2020
NOTE
The 1st & Final Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Replacement of old G.I. pipeline at Chainpur ward No.2 under sub-
Division [Link], NACD, Mayabunder (DPC recommended 2016-17)”.
Encl:-
Ar-II
AAO/NACD
NOTE
The 1st RA Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The 2nd & Final Bill in respect of Shri. Arun K. Joseph, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
Encl:-
Ar-II
AAO/NACD
Encl:-
Ar-II
AAO/NACD
NOTE
The 2nd & Final Bill in respect of [Link] Tiwari, Govt.
Contractor, Diglipur received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 28/01/2020
NOTE
The VI & Final bill in respect of Shri. K. Thankachan, Govt. Contractor,
Betapur received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work:- Construction of 04 Nos. class rooms and 1 No. toilet for primary
School, Swadeshnagar.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 17/02/2020
NOTE
The VI RA Bill in respect of M/S Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 05/02/2020
NOTE
The III & Final bill in respect of M/s. St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD Ar-I
Dated: 05/02/2020
NOTE
The II RA bill in respect of M/s. St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 12/02/2020
NOTE
The I & Final bill in respect of M/s. Royal Engineering Works, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work:- “Repair & Maintenance of Air Conditioners installed at Dr. R.P.
Hospital, Mayabunder”.
Encl:-
AAO/NACD Ar-IV
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 12/02/2020
NOTE
The I & Final bill in respect of M/s. Royal Engineering Works, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 13/02/2020
NOTE
The I & Final bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 19/02/2020
NOTE
The IV & Final Bill in respect of M/s George Constructions, Govt.
Contractor, Pokkadera, Mayabunder received from the Assistant Engineer, Sub-
Division [Link], Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The 1st RA Bill in respect of [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Installation, Running and Procurement of Lab equipments for Newly
District Laborarty at Tugapur under NACD, APWD, Mayabunder”.
Sub-Work:- “Running Maintenance and cleaning of District lab”.
Encl:-
Ar-II
AAO/NACD
Encl:-
AAO/NACD Ar-IV
NOTE
The IInd & Final Bill in respect of [Link] Kumari, Govt.
Contractor, Tugapur, Mayabunder received from the Assistant Engineer, Sub-
Division [Link], Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work: - “Repair of Toilet Block, window, doors, kitchen set roof etc. at Govt.
Primary School No.7 under Sub-Division [Link], NACD, APWD,
Mayabunder”.
Encl:-
Ar-II
AAO/NACD
NOTE
The 1st RA bill in respect of Shri. Mohamed Salim, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Encl:-
AAO/NACD Ar-I
NOTE
The IInd RA Bill in respect of Shri. Bhagwan Singh, Govt.
Contractor, Rampur, Mayabunder received from the Assistant Engineer, Sub-
Division [Link], Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work: - “Chain link fencing and Iron Gate Sub Depot at Tugapur, sub Depot
Bajota under Sub-Division [Link], NACD, APWD, Mayabunder”.
Encl:-
Ar-II
AAO/NACD
NOTE
The 4th & Final Bill in respect of Smti. Radha Kumari, Govt.
Contractor, Tugapur, Mayabunder received from the Assistant Engineer, Sub-
Division [Link], Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work: - “A/R & M/O Truck under Sub-Division [Link] (E&M), NACD,
APWD, Mayabunder during 2018-19”.
Sub-Work:- “Providing the service of Mini Cargo Van with fuel and driver as
and when required for the Sub-Division [Link] (District Road
Section), Tugapur NACD, APWD, Mayabunder from July 2018
to June 2019”.
Encl:-
Ar-II
AAO/NACD
NOTE
The I & Final bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
NOTE
The I & Final bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
NOTE
The I & Final bill in respect of M/s. Saravana Trading Company, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work:- “A/R & M/O Guest House building under NACD, APWD,
Mayabunder during 2018-19”.
Sub-Work:- “Replacement and providing additional point wiring at APWD
Guest House, Mayabunder”.
Encl:-
AAO/NACD Ar-IV
NOTE
The 2nd & Final Bill in respect of Shri. Joshy P. John, Govt.
Contractor, Tugapur, Mayabunder received from the Assistant Engineer, Sub-
Division [Link], Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work: - “Repair of doors, windows, ceiling and floor for class room for GSS
Chainpur under NACD, Mayabunder”.
Encl:-
Ar-II
AAO/NACD
NOTE
The 6th RA Bill in respect of M/s. Ravi Realcon (P) Ltd. Govt.
Contractor, Haddo, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work: - “Construction of Bridge over the Nallah crossing between Tugapur
No.8 and Birsa Nagar under Pahalgaon Panchayat under Sub-Division
[Link], NACD, APWD, Mayabunder, North Andaman under CRF
during 2016-17”.
Encl:-
Ar-II
AAO/NACD
NOTE
The I & Final bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
AAO/NACD Ar-IV
NOTE
The 3rd & Final Bill in respect of M/s. Andaman Jyothi Tours & Travels,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work: - “A/R & M/O Jeeps under NACD, APWD, Mayabunder during 2017-
18”.
Sub-Work:- “Supply of vehicles such as TATA SUMO (Non-AC) or
equivalent on hire basis for the Assistant Engineer, Sub-Division
[Link], Tugapur w.e.f April 2018 to March 2019”.
Encl:-
Ar-II
AAO/NACD
NOTE
The I & Final bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link]
(E&M), Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
AAO/NACD Ar-IV
NOTE
The II & Final Bill in respect of Shri. Joshy P. John, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
NOTE
The II & Final bill in respect of Shri. [Link], Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
NOTE
The II RA Bill in respect of M/s. K. Thankachan & Sons, Govt. Contractor,
Betapur received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work: - “Construction of Rural road from D.N. Bariragi house towards
Mahindra Baroi House (length 2.00 Km) under Sub-Division [Link],
NACD, APWD, Mayabunder”.
Sub-Work:- “Construction of RCC Bridge of 12 mtrs span”.
Sub-Head:- “Construction of Double cell RCC Box culverts 5 x 5 without
earth cusion”.
Encl:-
NOTE
The II RA Bill in respect of Shri. R. Bagavathi Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Installation, Running and procurement of Lab equipment for Newly
District laboratory at Tugapur under NACD, APWD, Mayabunder”.
Sub-Work:- “Running, Maintenance and cleaning of Disrtict Lab”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 12/03/2020
NOTE
The II & Final bill in respect of M/s. Thirumala Travels, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 13/03/2020
NOTE
The IV RA Bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 13/03/2020
NOTE
The I RA Bill in respect of [Link] P. John, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - “Construction of open community hall (size 15x8 mtr) with steel truss
tin roofing, tiles flooring and 01 mtr height PCC wall with steel grill at
ward No.4 Chainpur Gram Panchayat, Mayabunder Tehsil under
MPLADS 16th Lok Sabha”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 13/03/2020
NOTE
The VI RA bill in respect of Shri. R. Bagavathi Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “A/R & M/O Truck under Sub-Division [Link] (E&M), NACD,
APWD, Mayabunder during 2019-20”.
Sub-Work:- “Providing the service of Mini cargo Van with feul and driver as
and when required for the Sub-Division [Link], NACD,
Swadeshnagar under NACD, Mayabunder for a period of 01
year”.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 13/03/2020
NOTE
The I RA Bill in respect of [Link] P. John, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - “Construction of open community hall (size 15x8 mtr) with steel truss
tin roofing, tiles flooring and 01 mtr height PCC wall with steel grill at
ward No.2 Pudumadurai, Chainpur Gram Panchayat, Mayabunder
Tehsil under MPLADS 16th Lok Sabha”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 16/03/2020
NOTE
The II RA bill in respect of Shri. [Link], Govt. Contractor, Rangat
received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 16/03/2020
NOTE
The II & Final bill in respect of Shri. M. Sudhish, Govt. Contractor,
Dharmapur, Betapur received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 24/03/2020
NOTE
The I & Final bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 05/05/2020
NOTE
The IX RA bill in respect of M/s. Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 20/05/2020
NOTE
The X RA bill in respect of M/s. Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
AAO/NACD Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 20/05/2020
NOTE
The III RA Bill in respect of [Link] Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Installation, Running and Procurement of Lab Equipments for Newly
District Laboratory at Tugapur under NACD, APWD, Mayabunder”.
Sub-Work:- “Running, Maintenacne and cleaning of district lab”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 20/05/2020
NOTE
The II RA Bill in respect of [Link] Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 26/05/2020
NOTE
The II RA Bill in respect of M/s. St. George Construction, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 28/05/2020
NOTE
The V RA Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman Construction
Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 01/06/2020
NOTE
The IInd & Final Bill in respect of [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work: - “Replacement of old [Link] at 2” and 1 1/2” dia from Webi
School to Kharanallah for a length of 2.00 Km under Sub-
Division [Link], NACD, APWD, Mayabunder (DPC
Recommendation 2016-17)”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman Construction
Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 04/06/2020
NOTE
The IVth RA Bill in respect of [Link] Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman Construction
Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 08/06/2020
NOTE
The III RA Bill in respect of M/s. K. Thankachan & Sons, Govt.
Contractor, Betapur received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Construction of Rural Road from D.N. Bairagi house towards
Mahindra Baroi house (L-2.00 km)”.
Sub-Work:- “Construction of RCC Bridge of 12 mtrs. span”.
Sub-Head:- “Construction of Double cell RCC culvert 5 x 5 without earth
cushion”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 24/06/2020
NOTE
The 1st & Final Bill in respect of M/s. Sai Electrical Works, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-IV
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 25/06/2020
NOTE
The 1st & Final bill in respect of M/s. PLS Agency, Govt. Contractor, Rangat
received from the Assistant Engineer, Sub-Division [Link], Tugapur under NACD,
APWD, Mayabunder for early pass and payment, and the details of the bill is as
under.
Name of Work:- “A/R & M/O Water Supply under Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder during 2019-20”.
Sub-Work:- “Providing the Service of water tanker for Raw water supply at
Restcamp and Webi water treatment plant under Sub-Division
[Link] of NACD as and when required for 06 Months till the onset
of Monsoon”.
Encl:-
AAO/NACD Ar-II
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 25/06/2020
NOTE
The 1st & Final bill in respect of M.s. Raja, Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division [Link], Tugapur under NACD,
APWD, Mayabunder for early pass and payment, and the details of the bill is as
under.
Name of Work:- “A/R & M/O Water Supply under Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder during 2019-20”.
Sub-Work:- “Providing the service of water tanker for Raw water supply at
Tugapur No.2 and Tugapur No.6 water treatment plant under
Sub-Division [Link] of NACD as and when required for 06
Months till the onset of Monsoon”.
Encl:-
AAO/NACD Ar-II
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 03/07/2020
NOTE
The 4th & Pre-Final bill in respect of Shri Bhagwan Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “Proposed New OPD Block at PHC Billyground under NACD,
APWD, Mayabunder”.
Encl:-
AAO/NACD
Ar-III
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 03/07/2020
NOTE
The 2nd & Final bill in respect of M/s. PLS Agency, Govt.
Contractor, Rangat received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Water Supply under Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder during 2019-
20”.
Sub-Work:- “Providing the Service of water tanker for drinking water supply
at Mayabunder area under Water Supply Section, Sub-Division
No.I of NACD during 2019-20 as and when required for 06
Months tillthe onset of Monsoon”.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 03/07/2020
NOTE
The 2nd & Final bill in respect of M/s. PLS Agency, Govt.
Contractor, Rangat received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Water Supply under Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder during 2019-
20”.
Sub-Work:- “Providing the Service of water tanker for drinking water supply
at Lucknow area under Lucknow Section, Sub-Division No.I of
NACD during 2019-20 as and when required for 06 Months til
lthe onset of Monsoon”.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 03/07/2020
NOTE
The 3rd & Final bill in respect of Shri. T. Chandra Sekhar, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work:- “Construction of Security Type Compound Wall for Girls Hostel
at GMSSS, Mayabunder”.
Encl:-
AAO/NACD Ar-I
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 07/07/2020
NOTE
The 3rd RA bill in respect of M/s. St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Encl:-
AAO/NACD Ar-I
Dated: 09/07/2020
NOTE
The I & Final Bill in respect of M/s. Sai Electricals, Govt. Contractor, Port
Blair received from the Assistant Engineer, Sub-Division [Link],
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-IV
AAO/NACD
Dated: 13/07/2020
NOTE
The Vth RA bill in respect of Shri. R. Bagavathi Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD Ar-II
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 22/07/2020
NOTE
The 1st RA Bill in respect of M/s. Sundari Tour & Travels, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-IV
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 24/07/2020
NOTE
The 1st & Final Bill in respect of M/s. Akabea Infrastructures (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work: - “Supplying, Installing, Testing and Commissioning of 03 Nos. 1.5 Ton
capacity Air Conditioners and 02 Nos. 2 ton capacity Air Conditioners
in the Office of the Superintendent of Police, District Office, N&M
Andaman, Mayabunder”.
Encl:-
Ar-IV
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 30/07/2020
NOTE
The 1st & Final Bill in respect of [Link], Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work: - “A/R & M/O Water supply under Sub-Division [Link] under NACD,
APWD, Mayabunder during 2020-21”.
Sub-Work:- “Providing the service of water tanker for drinking water supply
at Chainpur village ward No.1, 2, 3 & 4 and the area under Sub-
Division [Link] of NACD during 2020-21”
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 05/08/2020
NOTE
The 1st RA Bill in respect of Shri. Arun Kumar Das, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 06/08/2020
NOTE
The 1st & Final Bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No.I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work: - “Construction of RCC Compound wall i/c Gate for newly allotted land
(03 Hector) at Lucknow, Mayabunder for Court Building under
NACD, APWD, Mayabunder”.
Sub-Work:- “Re-Roofing & Reapir of Residential Quarter for Additional
District Judge at Mayabunder”.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/08/2020
NOTE
The 2nd R/A Bill in respect of [Link] [Link], Govt. Contractor, Tugapur
received from the Assistant Engineer, Sub-Division No.I, Mayabunder under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work: - “C/o road side CC drain along the District Road in Mayabunder under
SD-I, NACD, APWD, Mayabunder under SD-I, NACD, APWD,
Mayabunder in lieu of construction of CC/RCC retaining wall in front
of Zonal Library to corporation at Mayabunder”.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/08/2020
NOTE
The IX RA Bill in respect of [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshanagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “A/R & M/O Truck under Sub-Division [Link] (E&M), NACD,
APWD, Mayabunder”.
Sub-Work:- “Providing the Service of Mini Cargo Van with feul and driver as
and when required for the Sub Division [Link], NACD,
Swadeshnagar under NACD, Mayabunder for a period of 01
year”.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 11/08/2020
NOTE
The XIth RA Bill in respect of M/s Thirumala Travels, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshanagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 01/09/2020
NOTE
The VIth RA Bill in respect of Shri. R. Bagavathi Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 01/09/2020
NOTE
The XI RA Bill in respect of M/s Thirumala Travels, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshanagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 02/09/2020
NOTE
The 1st RA Bill in respect of Shri.M.S. Raja, Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division [Link], Swadeshanagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work:- “A/R & M/O Water Supply under Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder during 2019-
20”.
Sub-Work:- “Providing the service of water tanker for drinking water supply
at swadeshnagar area under Sub-Division [Link] of
NACD, during 2019-20 as and when required for 06 Months
upto starting of Monsoon”.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated:07/09/2020
NOTE
The 2nd & Final Bill in respect of [Link], Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Residential Qtrs. under NACD, APWD,
Mayabunder during 2017-18”.
Sub-Work:- “Providing and laying tiles in various Quarters (Qtr.
[Link]-III/33 & 34, Type-III/29, Type-III/05, Type-II/09 & 10)
under Sub-Division No.I, NACD, APWD, Mayabunder”.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 09/09/2020
NOTE
The 3rd & Final Bill in respect of Shri. Apurba Thakur, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated:10/09/2020
NOTE
The 1st RA Bill in respect of [Link] Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 10/09/2020
NOTE
The 2nd & Final Bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshanagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated:15/09/2020
NOTE
The 1st RA Bill in respect of Shri.R. Bagavathi Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Non-Residential building under SD-I, NACD,
APWD, Mayabunder during 2018-19”.
Sub-Work:- “Painting & polishing of APWD Guest House Mayabunder
under Sub-Division No.I, NACD, APWD, Mayabunder”.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 21/09/2020
NOTE
The Vth R/A bill in respect of Shri Bhagwan Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 24/09/2020
NOTE
The 3rd R/A bill in respect of M/s Satyam Island Transport Service, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 28/09/2020
NOTE
The Vth & Final Bill bill in respect of M/s. St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 29/09/2020
NOTE
The I RA Bill in respect of Shri. [Link], Govt. Contractor, Dharmapur
received from the Assistant Engineer, Sub-Division [Link], Swadeshanagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
…………………………………………………………………………………………….
Dated: 29/09/2020
NOTE
The III & Final Bill in respect of Shri. [Link], Govt. Contractor,
Dharmapur received from the Assistant Engineer, Sub-Division [Link],
Swadeshanagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 06/07/2020
NOTE
The 3rd & Final Bill bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Rampur, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “Chain link fencing and Iron Gate Sub Depot at Tugapur, Sub
Depot Bajota under Sub Division [Link], NACD, APWD,
Mayabunder”.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 07/10/2020
NOTE
The 1st R/A Bill bill in respect of Shri. Ananta SAdhukhan, Govt. Contractor,
Rampur, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “Construction of approach road and Car Shed at Camp Office of
Assistant Commissioner (HQ) at Mayabunder”.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 12/10/2020
NOTE
The VIIth R/A Bill bill in respect of Shri. [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public Works
Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/10/2020
NOTE
The 1st R/A Bill bill in respect of Shri. Apurba Thakur, Govt. Contractor,
Tugapur received from the Assistant Engineer, Sub-Division No. II, Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The 1st R/A Bill bill in respect of M/s Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
Encl:-
Ar-II
AAO/NACD
NOTE
The VII & Final bill in respect of M/s Ravi Realcon (P) Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division
No. II, Tugapur under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The 1st RA bill in respect of Shri. Ananta Sadhukhan, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No.
II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The 3rd & Final bill in respect of M/s. PLS Agency, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Water Supply under Sub-division No.I, Mayabunder
under NACD, APWD, Mayabunder during 2019-20”.
Sub-Work:- “Providing the Service of Water Tanker for drinking water
supply at Mayabunder area under Water Supply Section, Sub-
Division No.I of NACD during 2019-20 as and when required
for 06 Months till the onset of Monsoon”.
Agreement No.:- 107 of 2019-20
Reference of MB No.:- 4662
Encl:-
Ar-I
AAO/NACD
NOTE
The 2nd RA bill in respect of Shri. [Link] Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “Construction of pits for Azolla Cultivation at Govt. Poultry Farm
Basantipur under NACD, APWD, Maybaunder”.
Agreement No.:- 105 of 2018-19
Reference of CMB No.:- 298
Encl:-
Ar-III
AAO/NACD
NOTE
The 5th & Final bill in respect of Shri. Manoranjan Mondal, Govt. Contractor,
Billyground received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “Addition and alteration of Conference Hall to VIP Suit,
construction of wash rooms/ changing room fo ladies and
Gents including construction of 02 Nos glass doors for
Cafeteria/ Restaurent including development of extra space for
parking at Hawks Bill Nest Guest House at RRO Betapur under
NACD APWD Mayabunder including IEI”.
Agreement No.:- 29 of 2017-18
Reference of MB No.:- 4558, 3226, 3571, 3565, 4285 & 3871
Encl:-
Ar-III
AAO/NACD
NOTE
The 1st RA Bill in respect of Shri. Dayal Halder, Govt. Contractor, Nimbutala
received from the Assistant Engineer, Sub-Division [Link], Mayabunder under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work: - “Construction of Shopping Complex (D/S) at Tugapur Satellite
Township under NACD, APWD, Mayabunder ”.
Sub-Work:- “Providing IEI & EEI”.
Encl:-
Ar-IV
AAO/NACD
NOTE
The 2nd RA Bill in respect of M/s. [Link] & Sons, Govt. Contractor,
Betapur received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - “Construction of CC surface in the STS workshop premises at
(Panighat) Lucknow, Maybaunder under Sub-Division No.I,
NACD, APWD, Mayabunder”.
Encl:-
Ar-I
AAO/NACD
NOTE
The 2nd RA Bill in respect of [Link], Govt. Contractor, Danapur,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - “Renovation of 01 Block of Type-I Qtrs. (Qtrs. No.03, 04, 05 &
06) at MGG College at Karmatang”.
Agreement No.:- 119 of 2019-20
Encl:-
Ar-I
AAO/NACD
NOTE
The XII & Final bill in respect of M/s. Thirumala Travels, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
NOTE
The 1st RA bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. III, Swadeshnagar under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Encl:-
Ar-III
AAO/NACD
NOTE
The 1st RA bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work:- “Face lifting of Mayabunder Bazar area i/c renovation of stage of
stadium in connection with Republic Day 2019
Agreement No.:- 80 of 2018-19
Reference of MB No.:- 4679
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-I
AAO/NACD
NOTE
The 2nd RA bill in respect of [Link] Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
NOTE
The 4th RA bill in respect of M/s St. George Construction, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
NOTE
The 3rd RA bill in respect of [Link] Salim, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “A/R & M/O Truck under Sub-Division [Link](E&M), NACD,
APWD, Mayabunder during 2019-20”.
SW:- “Providing the service of Mini Cargo Van with fuel and driver
as and when required for the Sub-Division No.I (JE, Lucknow
Section), NACD, APWD, Mayabunder from December 2019 to
November, 2020”..
Agreement No.:- 102 of 2019-20
Reference of MB No.:- 4763
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-I
AAO/NACD
NOTE
The 4th & Final Bill in respect of M/s St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work:- “A/R & M/O Truck under Sub-Division [Link](E&M), NACD,
APWD, Mayabunder during 2018-19”.
SW:- “Providing the service of Mini Cargo Van with fuel and driver
as and when required for the Sub-Division No.I (JE, Road
Section), NACD, APWD, Mayabunder for a period of 01 (One)
year”.
Agreement No.:- 08 of 2019-20
Reference of MB No.:- 4670
Ar-I
AAO/NACD
NOTE
The VIII RA Bill in respect of Shri. R. Bagavathi Pandian, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The II & Final Bill in respect of Shri. Ajay Manna, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
NOTE
The I & Final Bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
AAO/NACD
NOTE
The 1st & Final Bill in respect of M/s. Sakthi Hardwares Pvt. Ltd., Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No.
I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “A/R & M/O Residential & Non-Residential Building under
NACD, APWD, Mayabunder during 2020-21”.
SubWork:- “Supply of Portland Cement”.
Agreement No.:- 17 of 2020-21
Reference of MB No.:- 4685
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 20/11/2020
NOTE
The 5th & Final Bill in respect of Shri. Bhagwan Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work:- “Construction of RCC Compound wall i/c Gate for newly
allotted land (03 Hector) at Lucknow, Mayabunder for Court
Building under NACD, APWD, Mayabunder”.
Agreement No.:- 10 of 2018-19
Reference of MB No.:- 4506 & CMB No.281
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/11/2020
NOTE
The X & Final Bill in respect of [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. III, Swadesnagar under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under.
Name of Work:- “A/R & M/O Truck under Sub-Division [Link] (E&M),
NACD, APWD, Mayabunder during 2019-20”.
Sub-Work:- “Providing the Service of Mini Cargo Van with feul and driver
as and when required for the Sub-Division [Link],
NACD, Swadeshnagar under NACD, Mayabunder for a period
of 01 Year”.
Agreement No.:- 45 of 2019-20
Reference of MB No.:- 4561 & 4410
Encl:-
Ar-III
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/11/2020
NOTE
The 2nd RA Bill in respect of Shri. [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Encl:-
Ar-I
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/11/2020
NOTE
The 3rd & Final Bill in respect of Shri. [Link] Pandian, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 02/12/2020
NOTE
The 3rd & Final Bill in respect of M/s. Mega Engineer & Builders,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-
Division No. III, Swadesnagar under NACD, APWD, Mayabunder for early pass
and payment, and the details of the bill is as under.
Name of Work:- “Replacement of 8000 mtrs. old pipeline at Betapur under Sub-
Division [Link], NACD, APWD, Mayabunder”.
Agreement No.:- 69 of 2018-19
Reference of CMB No.:- 308
Encl:-
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 02/12/2020
NOTE
The 3rd & Final Bill in respect of Shri. Joshy P. John, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “Construction of road side CC drain along the District road in
Mayabunder under SD-I, NACD, APWD, Mayabunder in lieu of
Construction of CC/RCC retaining wall in front of Zonal Library
to Corporation at Mayabunder”.
Agreement No.:- 91 of 2019-20
Reference of CMB No.:- 292 & 274
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 03/12/2020
NOTE
The 3rd RA Bill in respect of M/s. Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No.
I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 08/12/2020
NOTE
The 2nd & Final Bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under.
Name of Work:- “Construction of Ramp for “Divyang” and staging for water tank for
GPS Mayabunder under Sub-Division No.I, NACD, APWD,
Mayabunder”.
Agreement No.:- 119 of 2017-18
Reference of CMB No.:- 210 & MB No.4324
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 08/12/2020
NOTE
The 2nd RA Bill in respect of M/s. Journey Andaman, Govt. Supplier, Port
Blair received from the Assistant Engineer, Sub-Division No. III, Swadeshnagar
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/11/2020
NOTE
The 2nd & Final Bill in respect of Shri. Joshy P. John, Govt. Contractor,
Tugapur, Mayabunder received from the Assistant Engineer, Sub-Division
No. II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Name of Work:- “Construction of open community hall (Size 15x8 mtr) with steel
truss tin roofing, tiles flooring and 01 mtr height PCC wall
with steel grill at ward No. 4, Chainpur Gram Panchayat,
Mayabunder Teshil under MPLADS 16th Lok Sabha”.
Agreement No.:- 04 of 2019-20
Reference of MB No.:- 4300 & CMB No.310, 248
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/12/2020
NOTE
The 1st RA Bill in respect of Shri.S.B. Sharma, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/12/2020
NOTE
The 1st RA Bill in respect of Shri.S.B. Sharma, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 14/12/2020
NOTE
The 1st RA Bill in respect of Shri.S.B. Sharma, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 14/12/2020
NOTE
The 1st RA Bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Rampur, Mayabunder received from the Assistant Engineer, Sub-Division
No. II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/12/2020
NOTE
The 1st RA Bill in respect of M/s. Kandoika Enterprises, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division No. II, Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/12/2020
NOTE
The 1st RA Bill in respect of M/s. Kandoika Enterprises, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division No. II, Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/12/2020
NOTE
The 1st RA Bill in respect of M/s. Kandoika Enterprises, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division No. II, Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Name of Work:- “Replacement of old GI Pipeline at 2” and 1½” dia from Webi
School to Khara Nallah for a length of 2.00 km under Sub-
Division [Link], NACD, APWD, Mayabunder”.
Sub-Work:- “Supply of pipes & fittings”.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 16/12/2020
NOTE
The 1st RA Bill in respect of Smti. Radha Kumari, Govt. Contractor,
Tugapur, Maybaunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 16/12/2020
NOTE
The 2nd & Final Bill in respect of Shri. Joshy P. John, Govt. Contractor,
Tugapur, Maybaunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- “Construction of open community hall (size 15x8 mtr) steel
truss tin roofing tiles flooring and 01 mtrs. height PCC wall
with steel grill at ward No.2, Pudumadurai Chainpur Gram
Panchayat, Mayabunder Tehsil under MPLADs 16th Lok
Sabha”.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/12/2020
NOTE
The 2nd & Final Bill in respect of The Reef Construction, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated:21/12/2020
NOTE
The 2nd RA Bill in respect of M/s. St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated:22/12/2020
NOTE
The 1st RA Bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated:29/12/2020
NOTE
While scrutinizing the bill of [Link] Singh, Govt. Contractor, 1 st
& Final bill against the Agreement No.110/2019-2020/EE/NACD, the following
errors have been noticed or found Rectify.
2. Calculation error or incorrect at Pg No.06, 11, 15, 25, 27, 32, 34, 37,
40, 46, 48, 63.
After properly checked and if seems no errors, then submit the fair copy
of CMD alongwith other documents to this Division Office.
Dated: 31/12/2020
NOTE
The 2nd RA Bill in respect of Shri. Uttam Kumar Saha, Govt. Contractor,
Diglipur received from the Assistant Engineer, Sub-Division No. II, Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 31/12/2020
NOTE
The 1st & Final Bill in respect of Shri. Joshy [Link], Govt. Contractor,
Tugapur, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 04/01/2021
NOTE
The 2nd RA Bill in respect of Shri. Apurba Thakur, Govt. Contractor,
Tugapur, Mayabunder received from the Assistant Engineer, Sub-Division No. II,
Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 06/01/2021
NOTE
The 1st & Final Bill in respect of Shri. Bhagwan Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 06/01/2021
NOTE
The 2nd RA Bill in respect of Shri. Arun Kumar Das, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Maybaunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/01/2021
NOTE
The 3rd RA Bill in respect of M/s. Journey Andaman, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 19/01/2021
NOTE
The 1st & Final in respect of M/s Kandoika Enterprises, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 19/01/2021
NOTE
The 1st RA Bill in respect of M/s St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/01/2021
NOTE
The 3rd RA Bill in respect of M/s. Journey Andaman, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 20/01/2021
NOTE
The 1st & Final in respect of Shri [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - A/R & M/O Water Supply under Sub – Division No. I, NACD,
APWD, Mayabunder during 2020-21.
Sub-Work:- Changing of Filter Media at Lucknow Water Treatment Plant.
Encl:-
Ar-I
HC
AAO/NACD
Dated: 21/01/2021
NOTE
The 3rd RA Bill in respect of Shri [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 21/01/2021
NOTE
The VIth & Final Bill in respect of Shri. Bhagwan Singh, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 28/01/2021
NOTE
The 2nd RA Bill in respect of Shri [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 28/01/2021
NOTE
The 2nd & Final Bill in respect of Shri T. Chandra Sekhar, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “A/R & M/O State Highway under NACD, APWD,
Mayabunder during 2017-18”.
Sub-Work:- “Construction of 02 Nos. RCC Box Culverts 2x2 mtr at
Rampur”.
Encl:-
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 09/02/2021
NOTE
The 3rd RA Bill in respect of M/s St. George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 10/02/2021
NOTE
The 6th RA Bill in respect of M/s Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/02/2021
NOTE
The IInd & Final Bill in respect of M/S Shipra Construction, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No.
II, Tugapur under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work:- Repair and Painting of Steel Bridge at Webi under Sub-
Division [Link], NACD, APWD, Mayabunder.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/02/2021
NOTE
The 5th & Final Bill in respect of M/S George Construction, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division
No. I, NACD, APWD, Mayabunder for early pass and payment and the details of the
bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/02/2021
NOTE
The 2nd & Final Bill in respect of M/S M Sudhish, Govt. Contractor, Betapur
received from the Assistant Engineer, Sub-Division No. III, NACD, APWD,
Mayabunder for early pass and payment and the details of the bill is as under.
Encl:-
NOTE
The 2nd & Final Bill in respect of M/S Swathi Agency, Govt. Contractor,
Rangat received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - A/R & M/O Water Supply under Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder during 2020-21”.
Sub-Work:- Providing the Service of Water Tanker for drinking water supply
at Mayabunder Water Supply Section, Sub-Division No.I of
NACD during 2020-21 as and when required for 06 months till
the onset of Monsoon”.
Encl:-
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/03/2022
NOTE
The 1st & Final Bill in respect of Shri. [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/03/2022
NOTE
The 3rd R/A Bill in respect of Shri. [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/03/2022
NOTE
The 2nd R/A Bill in respect of [Link] Sekhar, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Name of Work: - “A/R & M/O Truck under SD-IV (E&M), NACD, APWD,
Mayabunder during 2020-21”.
Sub-Work:- “Providing the service of Mini Cargo Van with fuel and driver as
and when required for the SD-I (JE Water Supply Section),
NACD, APWD, Mayabunder for a period of 01 year”.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 17/03/2022
NOTE
The 1st R/A Bill in respect of [Link] Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No. I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 19/03/2022
NOTE
The 3rd & Final Bill in respect of M/s. Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. III,
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 22/03/2022
NOTE
The 2nd & Final Bill in respect of M/s Sharma Trading Company, Govt.
Contractor, Mayabunder received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Name of Work: - “Repair and Renovation of 04 Nos. Type-IV Qtrs (Qtr. No.09, 10,
11 & 12) for Mahatma Gandhi Govt. College Karmatang at
Karmatang”.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/03/2022
NOTE
The 2nd RA Bill in respect of M/s. [Link] & Sons, Govt. Contractor,
Betapur received from the Assistant Engineer, Sub-Division No. III, Swadeshnagar
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 23/03/2022
NOTE
The Vth RA Bill in respect of [Link], Govt. Contractor, Rangat
received from the Assistant Engineer, Sub-Division No. III, Swadeshnagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 24/03/2022
NOTE
The 9th RA Bill in respect of M/s Mega Engineers & Builders, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 24/03/2022
NOTE
The 1st & Final Bill in respect of Shri. Dayal Halder, Govt. Contractor,
Rangat received from the Assistant Engineer, Sub-Division No. IV, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under.
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 26/03/2022
NOTE
The IInd & Final Bill in respect of M/s Sai Electricals Works, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No. IV,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under.
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 06/04/2022
NOTE
The VIth & Final Bill in respect of M/s Group Engineers Corporation, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/07/2022
NOTE
The Ist & Final Bill in respect of Shri Dayal Halder, Govt. Contractor
Nimbutala Rangat received from the Assistant Engineer (E&M) Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/04/2022
NOTE
The Ist & Final Bill in respect of M/s. Neha Builders & Roadways, Govt.
Contractor, Betapur received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under.
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/07/2022
NOTE
The Ist & Final Bill in respect of Shri Dayal Halder, Govt. Contractor
Nimbutala Rangat received from the Assistant Engineer (E&M) Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/07/2022
NOTE
The Ist & Final Bill in respect of M/s G.K. Construction ,Govt. Contractor
Mubarak Store,Aberdeen Bazar, Port Blair received from the Assistant Engineer
(E&M) Sub-Division [Link], Mayabunder under NACD, APWD, Mayabunder for
early pass and payment, and the details of the bill is as under:-
Name of Work: - “Construction of RCC Compound wall i/c gate for newly allotted
land (0.3 Hector) at Lucknow, Mayabunder for court Building
under NACD APWD Mayabunder”.
Sub work:-“Providing illuminated gate lights and repairing of electrical
fittings of District Court Building Mayabunder”.
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 15/07/2022
NOTE
The Ist & Final Bill in respect of M/s Sai Electrical Works, Govt.
Contractor, Port Blair received from the Assistant Engineer (E&M) Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 01/08/2022
NOTE
The IInd & Final Bill in respect of Shri [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 01/08/2022
NOTE
The 5th & Final Bill in respect of Shri [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Encl:-
Ar-I
HC
AAO/NACD
Dated: 01/08/2022
NOTE
The 6th & Final Bill in respect of M/s Sudhir Kumar Gupta, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under:-
Name of Work: - “A/R & M/O Truck under Sub-Division [Link] (E&M), NACD,
APWD, Mayabunder during 2020-21”.
Sub-Work:- “Providing the service of Mini Cargo Van with fuel and driver as
and when required for the Sub-Division No.I (JE, Karmatang
Section) NACD, APWD, mayabunder for a period of 01 year”.
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 08/08/2022
NOTE
The 2nd RA Bill in respect of [Link] Kumar Saha, Govt. Contractor,
Diglipur received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under:-
Name of Work: - “Providing Piped water supply to Hanspuri village under Sub-
Division [Link], NACD, APWD, Mayabunder (2nd Call)
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 10/08/2022
NOTE
The 1st RA Bill in respect of M/s MSS Water Supply, Govt. Contractor,
Port Blair received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under:-
Name of Work: - “A/R & M/O Water Supply under Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder during 221-22”.
Sub-Work:- “Providing the service of water tanker for Raw Water supply at
Tugapur No.2 & Tugapur No.6 Water Treatment Plant under
Sub-Division [Link] of NACD during 221-22”.
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 10/08/2022
NOTE
The 1st RA Bill in respect of M/s [Link], Govt. Contractor, Port
Blair received from the Assistant Engineer, Sub-Division [Link], Tugapur under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under:-
Encl:-
Ar-II
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 11/08/2022
NOTE
The 1st RA Bill in respect of [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 12/08/2022
NOTE
The 1st & Final Bill in respect of M/s. Akabea Infrastructure Pvt. Ltd.,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 12/08/2022
NOTE
The 1st & Final Bill in respect of M/s. Sai Electrical Works, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 22/08/2022
NOTE
The 1st R/A Bill in respect of [Link], Govt. Contractor, Betwpur
received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under:-
Encl:-
Ar-III
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 24/08/2022
NOTE
The 1st & Final R/A Bill in respect of M/s Akabea Infrastructure Pvt. Ltd.,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under:-
Name of Work: - Repair & Renovation of 04 Nos. Type-IV Qtrs. (Qtr. No.9, 10, 11
& 12) for Mahatma Gandhi Govt. College, Mayabunder at
Karmatang.
Sub-Work:- Providing IEI.
Encl:-
Ar-IV
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 25/08/2022
NOTE
The 2nd & Final Bill in respect of Shri. Bhagwan Singh, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Encl:-
Ar-I
HC
AAO/NACD
dk;Zikyd vfÒ;ark dk dk;Zky;
OFFICE OF THE EXECUTIVE ENGINEER
mRrj vaMeku fuekZ.k eaMy /North Andaman
Construction Division
vaMeku yksd fuekZ.k foÒkx /Andaman Public
Works Department
ek;kcanj /MAYABUNDER
………………………………………………………………………………………………..
Dated: 29/08/2022
NOTE
The 3rd & Final Bill in respect of Shri. [Link] Sekhar, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Name of Work:- “A/R & M/O Truck under SD-IV (E&M), NACD, APWD,
Mayabunder during 2020-21”.
Sub Work:- “Providing the service of Mini Cargo Van with fuel and driver as
and when required for the SD-I (JE Water Supply Section),
NACD, APWD, Mayabunder for period of 01 Year”.
Agreement No.:-57/2020-21/EE/NACD
Reference of CMB No.:- 509
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-I
HC
AAO/NACD
NOTE
The 2nd R/A Bill in respect of Shri. Palash Kanti Roy, Govt. Contractor,
Diglipur received from the Assistant Engineer, Sub-Division [Link], Swadeshnagar
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Agreement No.:-38/2021-21/EE/NACD
Reference of CMB No.:- 579 & 580
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-III
HC
AAO/NACD
NOTE
The 1st R/A Bill in respect of Shri. [Link], Govt. Contractor,
Betapurreceived from the Assistant Engineer, Sub-Division No.I, Mayabunder under
NACD, APWD, Mayabunder for early pass and payment, and the details of the bill
is as under:-
Name of Work:- “A/R & M/O Water Supply under Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder during 2021-22”.
SW:- “Providing the service of Water Tanker for drinking water supply
at Lucknow area under Lucknow Section, SD-I of NACD during
2021-22 as and when required for 06 months”.
Encl:-
Ar-I
HC
AAO/NACD
NOTE
The 1st & Final Bill in respect of M/sw Akabea Infrastructure Pvt. Ltd.,
Govt. Contractor, Port Blair received from the Assistant Engineer (E&M), Sub-
Division [Link], Mayabunder under NACD, APWD, Mayabunder for early pass and
payment, and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
NOTE
The 1st & Final Bill in respect of M/s Sai Electrical Works., Govt.
Contractor, Port Blair received from the Assistant Engineer (E&M), Sub-Division
[Link], Mayabunder under NACD, APWD, Mayabunder for early pass and payment,
and the details of the bill is as under:-
Encl:-
Ar-IV
HC
AAO/NACD
NOTE
The 2nd & Final Bill in respect of [Link] Singh, Govt. Contractor,
Rampur, mayabunder received from the Assistant Engineer , Sub-Division No.I,
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under:-
Encl:-
1. Bill in Duplicate with all enclosures.
2. CMB No. 596
3. Steel, Cement and Material Testing Register.
Ar-I
HC
AAO/NACD
NOTE
The 3rd & Final Bill in respect of [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer , Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Encl:-
1. Bill in Duplicate with all enclosures.
2. CMB No. 593
3. Cement and Material Testing Register.
Ar-I
HC
AAO/NACD
NOTE
The 4th & Final Bill in respect of [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer , Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Name of Work:- “Renovation of 01 Block of Type-I Qtrs. (Qtrs. No.03, 04, 05 &
06) at MGG College at Karmatang”.
Encl:-
1. Bill in Duplicate with all enclosures.
2. CMB No. 358 (Pg. 1-19)
3. Cement, MAS, Site Order Book, Steel and Dismantled Register.
Ar-I
HC
AAO/NACD
NOTE
The 5th RA Bill in respect of [Link] Mondal, Govt. Contractor,
Billyground received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Encl:-
1. Bill in Duplicate with all enclosures.
2. CMB No. 603 (Pg. 1-70)
3. Cement, MAS Register & Site Order Book.
Ar-III
HC
AAO/NACD
NOTE
The 7th & Final Bill in respect of M/s. O.P. Kandoi & Company, Govt.
Contractor, Port Blair received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Ar-III
HC
AAO/NACD
NOTE
The Ist & Final Bill in respect of Shri. Biswajit Sarkar, Govt. Contractor,
Mohanpur received from the Assistant Engineer, Sub-Division [Link] (E&M),
Mayabunder under NACD, APWD, Mayabunder for early pass and payment, and the
details of the bill is as under:-
Ar-IV
HC
AAO/NACD
NOTE
The Ist & Final Bill in respect of [Link] P. John, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division No.I, Mayabunder
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Ar-I
HC
AAO/NACD
NOTE
The Ist R/A Bill in respect of Shri,.Ananta Sadhukhan, Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link], Tugapur
under NACD, APWD, Mayabunder for early pass and payment, and the details of
the bill is as under:-
Encl:-
Ar-II
HC
AAO/NACD
NOTE
The IInd & Final Bill in respect of M/s CSE Construction (India) Pvt. Ltd,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Agreement No72/2020-21/EE/NACD
Reference of CMB No.:- 824 & 684.
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
HC/NACD
AAO/NACD
NOTE
The IInd & Final Bill in respect of M/s CSE Construction (India) Pvt. Ltd,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Agreement No72/2020-21/EE/NACD
Reference of CMB No.:- 825 & 694.
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
HC/NACD
AAO/NACD
NOTE
The IInd & Final Bill in respect of M/s CSE Construction (India) Pvt. Ltd,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Agreement No71/2020-21/EE/NACD
Reference of CMB No.:- 822.
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
HC/NACD
AAO/NACD
NOTE
The IIIrd & Final Bill in respect of M/s CSE Construction (India) Pvt. Ltd,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Name of Work:- “Construction of Rural Road under PMGSY-I Scheme, NACD,
APWD for Mayabunder Tehsil. (Group-I)”.
Sub-Work:- “Repair and Maintenance of Rural Road from Tugapur No.8 main
road to Manoranjan Baroi house for a length of 1.00 km (Package
No.AN03 MB 07)”.
Agreement No71/2020-21/EE/NACD
Reference of CMB No.:- 823.
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
HC/NACD
AAO/NACD
NOTE
The IInd & Final Bill in respect of M/s CSE Construction (India) Pvt. Ltd,
Govt. Contractor, Port Blair received from the Assistant Engineer, Sub-Division
[Link], Tugapur under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Name of Work:- “Construction of Rural Road under PMGSY-I Scheme, NACD,
APWD for Mayabunder Tehsil. (Group-I)”.
Sub-Work:- “Construction of Rural Road from Pokkadera Junction to Neemtala
on District Road near Fire Station for a length of 0.825 Km
(Package No.AN03 MB 01)”.
Agreement No71/2020-21/EE/NACD
Reference of CMB No.:- 821.
The bill has been checked/verified arithmetically and found to be in order,
and the same is to be sent to the HD, Drawing Branch for further required
verification of the following documents.
Encl:-
Ar-II
HC/NACD
AAO/NACD
NOTE
The IInd & Final Bill in respect of [Link], Govt. Contractor,
Mayabunder received from the Assistant Engineer, Sub-Division [Link],
Swadeshnagar under NACD, APWD, Mayabunder for early pass and payment, and
the details of the bill is as under:-
Name of Work:- “Renovation and Replacement of roofing of Type-IV & Ty-II Qtrs
at Swadeshnagar APWD Campus under Sub-Division [Link],
NACD, APWD, Mayabunder”.
Encl:-
Ar-III
HC/NACD
AAO/NACD