0% found this document useful (0 votes)
76 views1 page

Vopak Terminal Marmara Tank Specifications

Uploaded by

N T
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views1 page

Vopak Terminal Marmara Tank Specifications

Uploaded by

N T
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

© Vopak 2009

STORAGE TANK DATA SHEET (Fixed Roof)


CUSTOMER : VOPAK CEMEA DIVISION REV P
JOB NAME : VOPAK TERMINAL MARMARA BY SaM
JOB NO. : : 32394 CHKD MeN
DOC NO. : : 32394-P-04-0010 APPRD JoA
DATE 11 jun 09

1 Item No. (number of tanks) 1 Service Chemicals


2 Type of Tank Chemical Tank Design Code EN14015
3 DESIGN CONDITIONS
4 Nominal Capacity 2651 m³ Design Specific Gravity 1,0
5 Storage Capacity 2500 m³ Design Pressure +60 / -8,5 mbar
6 Diameter (nominal) 15000 mm Design Temperature 100 °C
7 Height (nominal) 15000 mm Corrosion Allowance:
8 Roof Type Fixed Roof (Note 8) - Bottom and annular ring 2,0 mm
9 Bottom Type Cone Down - Bottom sump 4,0 mm
10 Filling Rate 250 - 400 m³/hr - Shell 1,0 mm
11 Emptying Rate 60 - 80 m³/hr - Roof 0,0 mm
12 Operating Pressure -5 / +30 mbar - External roof support structures 1,0 mm
13 Operating Temperature amb to 40 °C Product Class Class I (highly flammable)
14 Wind Velocity m/s
15 Seismic Factor Note 9
16 Design Rainfall mm/hr
17 Snow Load kg/m2
18 MATERIALS INSPECTION & TESTING
19 Shell / Bottom / Roof Plate SS Radiography EN 14015/EEMUA-159
20 Top Angle/Roof Structure SS Magnetic Particle EN 14015/EEMUA-159
21 Wind Girder SS Dye Penetrant EN 14015/EEMUA-159
22 Nozzle Neck / Manhole Neck SS Hydrotest EEMUA-159
23 Flange / Manhole Flange SS Pneumatic test Bottom: Vaccuumbox 350 mbar
24 Bolting / Nuts SS WPS & PQR EN 288-3
25 Gaskets Non-metallic flat gasket (ASME B16,21) WPQ EN 288-2
26 Supports / Pad Plate SS Mill test certificates EN 10204-3.1
27 INSULATION AND PAINTING
28 Insulation Note 1 Insulation Thickness HOLD mm
29 Painting (Exterior) Note 11 Insulation Support Rings Note 1
30 Lining (Interior) Note 2 Painting tank bottom underside NA
31 SHELL NOZZLES AND CONNECTIONS ROOF NOZZLES (note 10)
32 No Item Qty Size Remarks No Item Qty Size Remarks
33 S-1A/B Manhole 2 24" c/w davit R-1 PV Valve 1 6" Nozzle to be sized for PV

34 R-2 PV Valve 1 6" Nozzle to be sized for PV

35 S-3 Side Suction 1 8" c/w double flg, & 90°Elbow R-3 Emergency vent 1 6" Emergency vent for high pressure tanks

36 S-4 Centre Suction 1 6" c/w double flg & line to sump R-4 Manhole 1 20"
37 S-5 Stripping Line 1 2" c/w double flg & line to sump R-5 Press. Transmitter 1 6" 7) c/w dbl flg

38 S-6 Vent/Thermal relief Line 1 3" c/w double flg. R-6 Level Gauge Nozzle 1 6" Nozzle size to suit gauge type

39 R-7 Temperature probe 1 2" c/w thermowell (multi point temp. probes)

40 R-8 Dip Hatch/Sample point 1 6"


41 R-9 HiHi level Device 1 2" Located on top

42 R-10 N2 Blanket Nozzle 1 2" 5) c/w dbl flg

43 S-11 Heating 2 2" 3) c/w bl.flg & cap R-11 N2 Blanket Sensor 1 2" 5) c/w dbl flg

44 S-12 Heating 2 2" 3) c/w bl.flg & cap R-12 Vapour Connection 1 6" 6) c/w dbl flg

45 S-13 Temperature Pocket 1 3" 3) c/w bl.flg & cap

46

47 S-15 Foam 2 4" Located above HH level and below frangible roof connection

48 S-16 Circulation line 1 4" 4) c/w dbl flg

49

50

51 ACCESSORIES
52 SHELL ROOF
53 Spiral staircase 1 Railing around roof
54 Cage ladders No Railing to centre roof
55 Anchor bolts Roof access stairway
56 Earthing lug 2/3 Sprinkler ring
57 Name Plate 1 Overhead bridge No
58 Wind girder
59 Jack-up lugs
60
NOTES :
1) Design should allow for future insulation. 8) Constructor to specify cone or dome
2) Internal coating is not taken into account at this stage of the project, but might be necessary in the future. 9) Construction according safe shutdown earthquake (SSE)
3) Blinded nozzles for future heating coils shall be foreseen. condition (structure may be damaged, but shall not
4) Blinded nozzle for future jet mixer installation shall be forseen. collapse nor impose serious consequential hazards)
5) Blinded nozzles for future installation of nitrogen blanketing shall be foreseen. 10) ASME B16.5 Class 150
6) Blinded nozzle for future connection to vapour system shall be foreseen. 11) SS parts and welds in- and external to be pickled and passivated
7) Pressure transmitter to be installed when nitrogen blanketing or vapour connection present on tank