0% found this document useful (0 votes)
44 views6 pages

Haripur Road Repair Bill of Quantities 2024

Test

Uploaded by

JUNIOR ENGINEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views6 pages

Haripur Road Repair Bill of Quantities 2024

Test

Uploaded by

JUNIOR ENGINEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Communication and Works Department

Government of Khyber Pakhtunkhwa

BILL OF QUANTITIES
Estimated 22.6650 Refrence #: REF-6979031 Print Date: 31-10-2024
Cost:
MRS Year: 2024 - 1st Qtr Area Factor: 1.000 Tax Factor 0.000
Work AOM&R / Emergency Nature work to all roads in District Haripur during the year (2024-25)
Name: PACKAGE-II i- Repair / Rehabilitation of Dolni Road U/C Rehana-I. ii- Repair / Rehabilitation of
Qazi Maira road. iii- Repair / Rehabilitation of Main road Dartian U/C Najafpur. iv- Repair /
Rehabilitation of Dhuyian Khushki road U/C Pind Kamal Khan.

General Abstract of Cost

S.No. Description Amount


1 Schedule Amount 22.6650

2 Non Schedule Amount 0.0000

Total 22.6650 Millions


General Abstract of Cost (Head Wise)
S.No. Description Amount
1 AOM&R / Emergency Nature work to all roads 22,664,999.3568
in District Haripur during the year (2024-25)
PACKAGE-II i- Repair / Rehabilitation of Dolni
Road U/C Rehana-I. ii- Repair / Rehabilitation
of Qazi Maira road. iii- Repair / Rehabilitation of
Main road Dartian U/C Najafpur. iv- Repair /
Rehabilitation of Dhuyian Khushki road U/C
Pind Kamal Khan.

Sub Total: 22.6650 Millions


Grand Total with 22.6650 Millions
Area Factor: 1.000
Tax Factor: 0.000
General Abstract of Cost (Sub Head Wise)

S.No. Description Amount


1 AOM&R / Emergency Nature work to all roads 22,664,999.3568
in District Haripur during the year (2024-25)
PACKAGE-II i- Repair / Rehabilitation of Dolni
Road U/C Rehana-I. ii- Repair / Rehabilitation
of Qazi Maira road. iii- Repair / Rehabilitation of
Main road Dartian U/C Najafpur. iv- Repair /
Rehabilitation of Dhuyian Khushki road U/C
Pind Kamal Khan.

Sub Total: 22.6650 Millions


Grand Total with 22.6650 Millions
Area Factor: 1.000
Tax Factor: 0.000
BILL OF QUANTITIES (B.O.Q)

Item
S.No. Code Item Name Unit Qty Price Total
AOM&R / Emergency Nature work to all roads in District
Haripur during the year (2024-25) PACKAGE-II i- Repair /
Rehabilitation of Dolni Road U/C Rehana-I. ii- Repair /
Rehabilitation of Qazi Maira road. iii- Repair / Rehabilitation
of Main road Dartian U/C Najafpur. iv- Repair /
Rehabilitation of Dhuyian Khushki road U/C Pind Kamal
Khan.
1 16-05-b Water Bound Macadam Base Course m3 365.41 4,236.0700 1547902.3387

2 16-09-a Bitumenous Prime Coat m2 2251.29 257.7700 580315.0233

3 16-14-b Asphaltic Wearing Course (Asphalt m3 121.70 35,026.9100 4262774.947


Batch Plant Hot Mixed) i/c
Transportation and Finishing complete

4 06-05-f Plain Cement Concrete including m3 120.03 15,436.8700 1852887.5061


placing, compacting, finishing & curing
(Ratio 1:2:4)

5 16-75-a Pavement marking in reflective m 1333.67 161.9800 216027.8666


thermoplast paint with glass beads for
line 15 cm width.

6 16-25- Reflectorized Plastic Pavement Stud Each 1794.00 441.6400 792302.16


c-11 (Flushed Profile Type - Double)

7 03-25-b Excavation in foundation of building, m3 77.86 333.1000 25935.166


bridges etc complete : in ordinary soil

8 06-05-i Plain Cement Concrete including m3 12.79 11,471.9600 146726.3684


placing, compacting, finishing & curing
(Ratio 1:4:8)

9 08-01- Random rubble masonry in foundn. & m3 53.76 10,631.0700 571526.3232


d-03 plinth in cement, sand mortar : Ratio 1:6

10 ns - REPAIR / REHABILITATION OF QAZI 0 0.00 0.0000 0


114855 MAIRA ROAD.
Item
S.No. Code Item Name Unit Qty Price Total
11 03-70-c Formation of Embankment from m3 40.43 892.8100 36096.3083
Borrow Excavation in Common
Material including compaction
Modified AASHTO 90% by power roller.

12 06-05-f Plain Cement Concrete including m3 40.75 15,436.8700 629052.4525


placing, compacting, finishing & curing
(Ratio 1:2:4)

13 ns - REPAIR / REHABILITATION OF MAIN 0 0.00 0.0000 0


114854 ROAD DARTIAN U/C NAJAFPUR.

14 03-70-c Formation of Embankment from m3 169.30 892.8100 151152.733


Borrow Excavation in Common
Material including compaction
Modified AASHTO 90% by power roller.

15 06-05-f Plain Cement Concrete including m3 591.09 15,436.8700 9124579.4883


placing, compacting, finishing & curing
(Ratio 1:2:4)

16 03-25-b Excavation in foundation of building, m3 17.84 333.1000 5942.504


bridges etc complete : in ordinary soil

17 06-05-i Plain Cement Concrete including m3 2.93 11,471.9600 33612.8428


placing, compacting, finishing & curing
(Ratio 1:4:8)

18 08-01- Random rubble masonry in foundn. & m3 64.41 10,631.0700 684747.2187


d-03 plinth in cement, sand mortar : Ratio 1:6

19 ns - REPAIR / REHABILITATION OF 0 0.00 0.0000 0


114853 DHUYIAN KHUSHKI ROAD U/C PIND
KAMAL KHAN.

20 16-71 Grooving in existing BT road of size 4x4 m2 787.25 83.0600 65388.985


cm @ 2 meter c/c.

21 16-09-b Bitumenous Tack Coat m2 787.25 96.2300 75757.0675

22 16-05-b Water Bound Macadam Base Course m3 21.94 4,236.0700 92939.3758

23 16-09-a Bitumenous Prime Coat m2 159.14 257.7700 41021.5178

24 16-14-b Asphaltic Wearing Course (Asphalt m3 47.32 35,026.9100 1657473.3812


Batch Plant Hot Mixed) i/c
Transportation and Finishing complete
Item
S.No. Code Item Name Unit Qty Price Total
25 03-25-b Excavation in foundation of building, m3 12.46 333.1000 4150.426
bridges etc complete : in ordinary soil

26 06-05-f Plain Cement Concrete including m3 4.32 15,436.8700 66687.2784


placing, compacting, finishing & curing
(Ratio 1:2:4)

Sub Total: 22.6650


Millions
Grand Total with 22.6650
Area Factor: 1.000 Millions
Tax Factor: 0.000