NOTES:
CONTACTOR DOWNSTREAM EXCHANGERS T-95 (SK-203) 1 CUT AND TAPE SHIELD AT INSTRUMENT END.
CONNECT SHIELD TO JB TERMINAL ISOLATED FROM
GROUND.
5923G-AJ-1808
2
SHIELDED CABLE TO BE GROUNDED AT THE
SINGLE-SOURCE END UNLESS OTHERWISE SPECIFIED
7 2 3 ESD/FGS CONTROL PANEL ON THE DRAWING. OVERALL SHIELD OF THE
HOMERUN CABLE WILL BE GROUNDED AT PCS/ESD
IJB-E-203 100-CP-9002 PANEL TO INSTRUMENT GROUND. OVERALL SHIELD
1 NC(RED) IJBE203-C3 4PR 18 AWG OS
EZS-9500 2Pr 18 AWG OS TS2 TB: IJBE203-C3 OF THE INSTRUMENT CABLE AT JB END WILL BE
EZSL-9500 2 COM(BLK) EZSL9500-1 EZSL9500-1 EZSL9500-1 EZSL9500-1
1 1 GROUNDED AT JB ISOLATED GROUND BAR AND
3 NO(BLU) EZSL9500-2 EZSL9500-2 EZSL9500-2 PR#1 EZSL9500-2 FROM BAR TO GROUND.
DWG. No.
ESV-9500 Valve Closed 2 2
3
4 NC(RED) 3 ALL HOMERUN CABLES TO BE SUPPLIED BY TDE AND
5 COM(BLK) EZSH9500-1 EZSH9500-1 EZSH9500-1 EZSH9500-1 WIRED AT SITE BY EPC CONTRACTOR.
EZSH-9500 3 4
ESV-9500 Valve Open 6 NO(BLU) EZSH9500-2 EZSH9500-2 EZSH9500-2 PR#2 EZSH9500-2
4 5 4 CABLE INFORMATION/TYPE/SIZE SEE CABLE
SCHEDULE DOC.#WRE-000-EL-LI-0005
6
(5923G-GL-E-LS-5034).
CABLES CONNECTING INSTRUMENTS TO PCS JB AND
EY-9500 1Pr 18 AWG OS MULTIPAIR CABLES FROM IJB TO PCS CONTROL
9 EY9500-1 EY9500-1 EY9500-1 EY9500-1 PANEL SHALL BE FLAME RETARDANT.
EY-9500 5 7 CABLES CONNECTING INSTRUMENTS TO ESD JB AND
ESV-9500 Valve Solenoid 10 EY9500-2 EY9500-2 EY9500-2 PR#3 EY9500-2
6 8 MULTIPAIR CABLES FROM IJB TO ESD/FGS CONTROL
9 PANEL SHALL BE FIRE RESISTANT.
SPARE SPARE 5 REFERENCE DRAWINGS:
7 10 SEE IN TITLE BLOCK.
SPARE PR#4 SPARE
8 11
6 INSTRUMENTS FOR OFF SKID EQUIPMENT SHIPPED
12 LOOSE AND REINSTALLED AT SITE BY EPC
9 CONTRACTOR. THESE INSTRUMENTS WIRED TO SKID
10 JB. FOR SHIPPING PURPOSIS CABLES ARE
DISCONNECTED FROM INSTRUMENT AND ROLLED AT
JB END.
11 7 20% OR MORE SPARE TERMINALS ARE PROVIDED..
12
SPARE
13
14
15
16
17
18
19
IJBE203-C1 OS
20 Instrument clean
IJBE203-C2 OS ground bar
21
IJBE203-C3 OS
22
CONTROLLED
RELEASE
08/17/2021
SIGNED: Ella Zabrovska
THERMO DESIGN ENGINEERING LTD.
OIL & GAS PRODUCTION EQUIPMENT
DESIGN * FABRICATION * INSTALLATION
EDMONTON, ALBERTA, CANADA
APEGA PERMIT NUMBER: P2800
TDE DOCUMENT NO.
WRE-203-CN-DR-0004 2 CADFILE No: 5923GJ1808
OCT 10 2005 11:55
NOTES REFERENCE DRAWINGS INSTRUMENT JUNCTION BOX WIRING DIAGRAM
1. 5923C-AJ-1785 - WRE-203-CN-DR-0003-1 IJB-E-203
INSTRUMENT JUNCTION BOX LAYOUT IJB-E-203; FAREGH PHASE 1 UPGRADE
2. FP-5923G-J2-003 - WRE-000-CN-VD-0001
ESD/FGS CONTROL SYSTEM - 100-CP-9002. 0 Aug 12/21 ISSUED FOR CONSTRUCTION RG TF SO JB AT WAHA OIL COMPANY SCALE PROJECT NO SHEET SIZE & SHEET NUMBER
(CONC.-FIELD) CRAFT DESIGN
REV.
NO. DATE REVISION BY CHK.ENG. APP. APP. 5923G AJ 1808 0