Sizes of beams and Columns
Beam = 300 x 400
Column = 350 x 400
o Beam (Reinforced Stone Concrete)
23.6 KN/m3 x 300 mm x 400 mm = 2.832 KN/m
o Column(Reinforced Stone Concrete)
23.6 KN/m3 x 350 mm x 400 mm = 3.304 KN/m
SLAB LOADS
Roof deck loads
Deadload
o Ceiling
Gypsum Board(13 mm) – 0.00 Kpa/mm x 13 = 0.05 KN/m2
o Roof Slab(STONE CONCRETE)
Slab 150 mm – .023 x 150 mm = 3.45 KN/m2
o Electrical and plumming materials assumed: 0.3
o Floor Finishes
Ceramic Quarry Tile( 20 mm on 13 mm mortar bed) = 0.77 KN/m2
o Total: 4.36
o Electrical and plumming materials(assumed)
0.3 kpa
o Parapet walls-
6 “ CHB- Plastered and fully grouted using 21.2 kn/m3(1.5m high) 2.97 x 1.5 =
4.455 KN/m
Plaster- 2(0.24) x 1.5 = 0.72 KN/m
Total: 5.175
4TH FLOOR SLAB LOADS
Deadload
o Ceiling
Acoustic fiber Board(13 mm) – 0.05 Kpa
o Roof Slab
Slab 150 mm – 23.6 KN/m3 x 150 mm = 3.54 KN/m2
o Floor Finishes
Ceramic Quarry Tile( 20 mm on 13 mm mortar bed) = 0.77 KN/m2
Total 4.36
o Outer walls
6 “ CHB- Plastered and fully grouted( using 21.2 kn/m3m high) 2.97 x 3 = 8.91
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 10.35 kn/m
o Wall partitions
4 “ CHB- Plastered and fully grouted using 21.2 kn/3(3m high) 2.84 x 3 = 8.52
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 9.96 kn/m
3rd floor
Deadload
o Ceiling
Acoustic fiber Board(13 mm) – 0.05 Kpa
o Roof Slab
Slab 150 mm – 23.6 KN/m3 x 150 mm = 3.54 KN/m2
o Floor Finishes
Ceramic Quarry Tile( 20 mm on 13 mm mortar bed) = 0.77 KN/m2
Total 4.36
o Outer walls
6 “ CHB- Plastered and fully grouted( using 21.2 kn/m31.5m high) 2.97 x 3 = 8.91
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 10.35 kn/m
o Wall partitions
4 “ CHB- Plastered and fully grouted using 21.2 kn/3(1.5m high) 2.84 x 3 = 8.52
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 9.96 kn/m
2nd floor
Deadload
o Ceiling
Acoustic fiber Board(13 mm) – 0.05 Kpa
o Roof Slab
Slab 150 mm – 23.6 KN/m3 x 150 mm = 3.54 KN/m2
o Floor Finishes
Ceramic Quarry Tile( 20 mm on 13 mm mortar bed) = 0.77 KN/m2
Total 4.36
o Outer walls
6 “ CHB- Plastered and fully grouted( using 21.2 kn/m31.5m high) 2.97 x 3 = 8.91
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 10.35 kn/m
o Wall partitions
4 “ CHB- Plastered and fully grouted using 21.2 kn/3(1.5m high) 2.84 x 3 = 8.52
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 9.96 kn/m
Ground floor
Deadload
o Ceiling
Acoustic fiber Board(13 mm) – 0.05 Kpa
o Roof Slab
Slab 150 mm – 23.6 KN/m3 x 150 mm = 3.54 KN/m2
o Floor Finishes
Ceramic Quarry Tile( 20 mm on 13 mm mortar bed) = 0.77 KN/m2
Total 4.36
o Outer walls
6 “ CHB- Plastered and fully grouted( using 21.2 kn/m31.5m high) 2.97 x 3 = 8.91
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 10.35 kn/m
o Wall partitions
4 “ CHB- Plastered and fully grouted using 21.2 kn/3(1.5m high) 2.84 x 3 = 8.52
KN/m
Plaster- 2(0.24) x 3 = 1.44 KN/m
Total: 9.96 kn/m