0% found this document useful (0 votes)
25 views7 pages

Finished Sunday, 8 December 2024, 9:54 PM Monday, 9 December 2024, 1:03 AM 3 Hours 8 Mins Out of 5.00 (%)

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views7 pages

Finished Sunday, 8 December 2024, 9:54 PM Monday, 9 December 2024, 1:03 AM 3 Hours 8 Mins Out of 5.00 (%)

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

M MOHAMMED HAMED HAMDOON AL-NAAMANI

Status Finished
Started Sunday, 8 December 2024, 9:54 PM
Completed Monday, 9 December 2024, 1:03 AM
Duration 3 hours 8 mins
Grade 2.03 out of 5.00 (40.53%)
Question 1

Partially correct

Mark 0.36 out of 2.00


v1 (latest)

The activity details and their predecessors are given below use the PERT method to calculate the expected time (1 Mark) and construct the
network diagram (1 Mark) to find the critical path of the activity (1 Mark) also indicate the project duration (1 Mark) with the standard
deviation (1 Mark).

Activity Predecessors the Optimistic Most likely Pessimistic


expected time time time time

(to) (tm) (tp)


A -- 8 24 20

B -- 6 9 45
C -- 21 15 50

D A 16 16 42
E C 14 15 32
F A 7 14 16

G BDE 12 11 33
Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet
answer in link provided below.

Enter the expected activity time for A. 20.66

One possible correct answer is: 20.666666666667

Enter the expected activity time for B. 14.5

One possible correct answer is: 14.5

Enter the expected activity time for C. 21.83

One possible correct answer is: 21.833333333333

Enter the expected activity time for D. 20.33

One possible correct answer is: 20.333333333333

Enter the expected activity time for E. 17.66

One possible correct answer is: 17.666666666667

Enter the expected activity time for F. 13.16

One possible correct answer is: 13.166666666667

Enter the expected activity time for G. 14.83


One possible correct answer is: 14.833333333333

Find the critical path value for the total project duration? 55.83

One possible correct answer is: 54.333333333333

Standard deviation 9.740

One possible correct answer is: 6.679154969838

In Q3 upload your constructed network diagram and indicate the critical path of the activity, No need to enter any answer in this box.

One possible correct answer is: 0

Your answer is partially correct.

You have correctly answered 6 part(s) of this question.

Response history

Step Time Action State Marks

1 8/12/24, [Link] Started Not yet answered

2 9/12/24, [Link] Saved: 20.666, 14.5, 21.833, 20.333, 17.666, 13.166, 14.833, 55.832, 9.740, Incomplete answer

3 9/12/24, [Link] Attempt finished Partially correct 0.36


Question 2

Partially correct

Mark 1.50 out of 2.00


v1 (latest)

A college bookstore must order books two months before each semester starts. They believe that the number of books that will ultimately be
sold for any particular course is related to the number of students registered for the course when the books are ordered. They would like to
develop a linear regression equation to help plan how many books to order. From past records, the bookstore obtains the number of students
registered, X, and the number of books actually sold for a course, Y, for 9 different semesters. These data are below. Find a regression
equation between students and books ( 1 Mark). Then use the regression equation to find the number of books for 20 students (1 Mark) and
40 students (1 Mark).

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet answer in link
provided below.

Students Books

56 40
28 50

47 50

51 34

34 39

39 45

41 38

68 43

36 37

Enter the average students : 44.44

One possible correct answer is: 44.444444444444

Enter the average books : 41.77

One possible correct answer is: 41.777777777778

Enter the equation constant b value: -0.07

One possible correct answer is: -0.074873554913296

Enter the equation constant a value: 45.06

One possible correct answer is: 45.10549132948

Enter the number of books for 20 students: 43.58

One possible correct answer is: 43.608020231214

Enter the number of books for 40 students : 42.10


One possible correct answer is: 42.110549132948

Your answer is partially correct.


You have correctly answered 5 part(s) of this question.

Response history

Step Time Action State Marks

1 8/12/24, [Link] Started Not yet answered

2 9/12/24, [Link] Saved: 44.444, 41.777, -0.074, 45.065, 43.585, 42.105 Answer saved

3 9/12/24, [Link] Attempt finished Partially correct 1.50


Question 3

Partially correct

Mark 0.17 out of 1.00


v1 (latest)

Demand for the Child Cycle at Best Buy is 1250 units per month. Best Buy incurs a fixed order placement, transportation, and receiving cost of
4310 each time an order is placed. Each cycle costs 600 and the retailer has a holding cost of 36 %. Calculate:

Note: use upto 3 decimal in your answer and also kindly upload your worked out sheet answer in link provided below.

A) Inventory carrying cost. 216

One possible correct answer is: 216

B) Economic Ordering Quantity. 773.7

One possible correct answer is: 223.34784364139

C) Optimum order interval in days. 18.82

One possible correct answer is: 65.217570343286

D) Average inventory at any time. 386.8

One possible correct answer is: 111.6739218207

E) storage cost at any time. 8355

One possible correct answer is: 24121.56711327

F) Minimum total inventory cost per year. 1671

One possible correct answer is: 48243.13422654

Your answer is partially correct.

You have correctly answered 1 part(s) of this question.


Response history
Step Time Action State Marks

1 8/12/24, [Link] Started Not yet answered

2 9/12/24, [Link] Saved: 216, 773.700, 18.827, 386.850, 83559.6, 167119.119 Answer saved

3 9/12/24, [Link] Attempt finished Partially correct 0.17

Question 4
Complete

Not graded
v1 (latest)

upload all your worksheets

in PDF

[Link]

Response history

Step Time Action State Marks

1 8/12/24, [Link] Started Not yet answered

2 9/12/24, [Link] Saved: Attachments: [Link] (388.8 KB) Incomplete answer

3 9/12/24, [Link] Saved: in PDFAttachments: [Link] (388.8 KB) Answer saved

4 9/12/24, [Link] Attempt finished Complete

You might also like