Job Safety Analysis
Nature of job: Painting at height
JSA Ref No. AOL004
Type of Risk Medium Risk / High Risk Date: [Link].2024
Sequence of basic job steps Potential Hazards Recommended Control Measures
[Link] procedure should be followed.
[Link] trained personnel and competent personnel shall
be allowed to do the job.
[Link] required PPE's shall be worn by concerned
personnel for the job.
[Link] involved departments and contactor shall have a
[Link] labour.
joint inspection and a meeting prior to start of the job.
Planning and Site preparation [Link],slip and falls.
[Link] work area and address safe work
[Link] injury
method,hazards and precautions.
[Link] must be followed and to be explained to all
employees during Tool Box Talk prior to start of
activities and it must be made available at the site.
[Link] signs and barricades shall be provided around
the working area.
[Link] scaffolding is erected by certified personnel.
[Link] a pre-use inspection to check the stability
and condition of the scaffold.
[Link] guardrails, toe boards, and stable platforms
are in place.
[Link] the scaffold is on a solid and level base.
[Link] proper weight limits on the scaffolding.
[Link] fall protection gear such as safety harnesses with
[Link] from height. appropriate anchorage.
[Link] collapse. [Link] workers are trained in fall prevention and
[Link], trip, and fall. scaffold use.
Working at height and on scaffolding
[Link] objects. [Link] hard hats to prevent injuries from falling
[Link] issues. objects.
[Link] of fumes. [Link] tools and materials to prevent them from
falling.
[Link] tool belts or holders to keep tools accessible
without needing to reach or bend over the edge of
scaffolding.
[Link] for emergency rescue in case of a fall or scaffold
failure.
[Link] should ensure all control measures are in
place and followed.
Required PPE's : Safety shoe, Safety helmet,safety belt,Googles,Rubber hand gloves,Filter mask.
Prepared by : Abhishek k j Reviewed by :