0% found this document useful (0 votes)
67 views8 pages

WH Specification

Uploaded by

Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views8 pages

WH Specification

Uploaded by

Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Grade A

Location Specifications
Property Compliance Free from any encumbrance,
Land Use & NOC/OC Lessor Need to Provide
Site Plan Fully Approved Site Plan
Electricity Board Load
Sanctions/ Earthing 70 KVA

Fire NOC Mandatory

Type of Structure PEB with 4 meters high Precast Wall from finished floor level for added
security to the warehouse building.

Peripheral Walls 3 meters high Precast Wall with barbed wire


Washrooms By Gender, by Staff -6, by 3PL- Labourers -12
Driver & Security Room Drivers rest room with toilet
Pantry/ Canteen In premises
FM2 compliant 150 mm thick RCC Trimix VDF floor with steel fibres,
glass fibers, non metallic hardeners, Ashford for densification,
Flooring - controlled joints, construction joints, isolation joints, etc. as per global
standards
Floor Load 8-10 Tons /SQM
Roof and cladding is insulated with aluminum foil bubble insulation to
Insulation achieve maximum temperature difference of 6-8 degrees inside the
warehouse
No. of Dock Doors 15-20 with Rolling Shutters

Dock Levellers 10 No. of Loading docks should be fitted with hydraulic dock levellers

1.2 m above Ground level, Docking platforms with 5 to 6.5 m Canopy,


Platform 25 to 30 m set back on docking side

Fire Saferty Fire Hydrant system with Sprinklers, Water storage Tanks of 1 lacs
lieters
12 meters Eaves height below the rafter and approximately 15 meters
Clear Hight ridge height.
Signage's Should be Allowed

Periphery, Parking &


other Infra 18 meters wide RCC road in front of loading docks to cater long body
vehicles with Ample Parking space for Staff and commercial vehicles
Air Circulation Air changers with Ridge Monitor

Lighting - Natural 5 % of roof area with sky lights with 1 meter translucent sheet on the
cladding on periphery of building for natural light
Lighting - Electric Yes
RF Towers / Electrical
earthling Should have proper earthling and permission for putting RF Towers

10 feet high RCC compound wall with 2 feet of concertina wire fencing,
Gate for Compound 3 tier security arrangements for the entire park

Roofing Standing seam roofing system with 360 degrees seaming to avoid rain
water dripping inside the warehouse
Office Space Dedicated plug & play office space and Structure
MHE Charging Area Separate MHE Charging Area
Access Road 25 meter wide primary RCC excess road for the complex.

CLASSIFICATION | PUBLIC
Rain Water Rain water harvesting pits for natural recharge of the ground
Security CCTV cameras for the external of the park.
Compound Lighting LED High bay lamps in the warehouse to achieve 150 lux level light
Lease Period 3 -9 Years
Rent Free Period for 60-90 Days
Fitment

Proposed Monthly Rent Rs. 17-19/ SFT

Notice Period Not > =6 Months from Our Side, 6 Months from Landlord side

Increase 15% / 3 Years


Outside Warehouse , so that after closing we could switch off the
Main Power Switch main power

Security Deposit NIL, followed by Corporate Guarantee or Bank Guarnatee

Municipality Charges Lessor

Description of Soli Garvels and Sandy Gravels- K Value (k/NM^2-0.082)

CLASSIFICATION | PUBLIC
Grade B Grade C
Specifications 2 Specifications 3
Free from any encumbrance, Free from any encumbrance,
Lessor Need to Provide Lessor Need to Provide
Fully Approved Site Plan Fully Approved Site Plan

50 KVA Basis requirement


Mandatory Optional
PEB with 4 meters high Precast Wall from
PEB with 4 meters high Precast Wall from finished floor level for finished floor level for added security to the
added security to the warehouse building. warehouse building.
2-3 meters high Brick/ Precast Wall Optional
By Gender, by Staff -6, by 3PL- Labourers -12 By Gender, by Staff -6, by 3PL- Labourers -12
Optional Optional
Optional Optional
FM2 compliant 150 mm thick RCC Trimix VDF floor with steel fibres,
glass fibers, non metallic hardeners, Ashford for densification,
controlled joints, construction joints, isolation joints, etc. as per PCC
global standards
6-7Tons /SQM Not Defined
Roof and cladding is insulated with aluminum foil bubble insulation
to achieve maximum temperature difference of 6-8 degrees inside Optional
the warehouse
10-12 with Rolling Shutters 4-6 with Rolling Shutters
2 No. of Loading docks should be fitted with
6 No. of Loading docks should be fitted with hydraulic dock levellers hydraulic dock levellers

Fire Hydrant with Water storage Tanks of 1 lacs lieters


Optional
10 meters Eaves height below the rafter and approximately 12 8 meters Eaves height below the rafter and
meters ridge height. approximately 12 meters ridge height.
Should be Allowed Should be Allowed

15 meters wide RCC road in front of loading docks to cater long 12 meters wide RCC road in front of loading docks
body vehicles with Ample Parking space for Staff and commercial to cater long body vehicles with Ample Parking
vehicles space for Staff and commercial vehicles
Air changers with Ridge Monitor Louvers
5 % of roof area with sky lights with 1 meter translucent sheet on
the cladding on periphery of building for natural light Optional
Yes Yes
Should have proper earthling and permission for
Should have proper earthling and permission for putting RF Towers putting RF Towers
8 feet high RCC compound wall with 2 feet of concertina wire
fencing, Optional
Standing seam roofing system with 360 degrees seaming to avoid Standing seam roofing
rain water dripping inside the warehouse
Dedicated plug & play office space and Structure Bareshell offie
Separate MHE Charging Area Optional
12-15 meter wide primary RCC excess road for the complex. Worhwhile for 32Ft Vehicle movement

CLASSIFICATION | PUBLIC
Rain water harvesting pits for natural recharge of the ground Optional
CCTV cameras for the external of the park. Optiona'
Lighting bay lamps in the warehouse Optional
3 -9 Years 1-3 Years
60-90 Days
30-45 Days
Rs. 14-17/ SFT Rs. 10-14/ SFT

Not > =3 Months from Our Side, 3 Months from


Not > =3 Months from Our Side, 3 Months from Landlord side Landlord side
15% / 3 Years 10% / 3 Years
Outside Warehouse , so that after closing we could switch off the Outside Warehouse , so that after closing we
main power could switch off the main power
NIL, followed by Corporate Guarantee or Bank
NIL, followed by Corporate Guarantee or Bank Guarnatee Guarnatee
Lessor Lessor
Sands/ Gavelly Sand, Silty Sands,Clayey Lands - K Value( N/M^2
=0.052) Sands, Silty Sans - K Value( N/M^2 =0.0272)

CLASSIFICATION | PUBLIC
Free Mov
Floor Class Origins

FM1 TR34 4th Edition

FM2 TR34 4th Edition

FM3 TR34 4th Edition

FM4 TR34 4th Edition

FM2 Special TR34 3rd Edition


Free Movement Classifications
Typical Floor Use
Where very high levels of flatness and levelness are
required, sometimes called a ‘superflat floor’. Used
where forklift trucks are lifting over 13 meters high,
also where high accuracy scientific equipment is used.

Where high levels of flatness and levelness are


required. Used where forklift trucks are lifting between
8 and 13 meters high. Most warehouses are now laid to
this.
Where high levels of flatness and levelness are
required. Used where forklift trucks are lifting up to 8
meters high. Also used where retail or manufacturing
floors are recieving either no covering or a a very thin
layer covering
Where low levels of flatness and levelness are
required . Used where forklift trucks are lifting less than
4 meters high. Used where floor is to take additional
layers of screed, insulation, tiles ect. Also for workshops
and manufacturing floors
Where high levels of flatness and levelness are required
initially, but where areas of the floor may be converted
to having even higher level tolerance areas later in its
life.
ement Classifications
Additional

All points should be within +/- 15mm


from Datum

All points should be within +/- 15mm


from Datum

All points should be within +/- 15mm


from Datum

All points should be within +/- 15mm


from Datum

All points should be within +/- 15mm


from Datum
Typical Type of Laying Method

Long, narrow eg. 5m strip construction with very


accurate shuttering or permanent joints

Laser Screed or Screed Rail construction with very


accurate shuttering or permanent joints

Laser Screed or Screed Rail construction with very


accurate shuttering or permanent joints

Traditional Handlay method is sufficient, usually


checked with laser level during pour

Laser Screed or Screed Rail construction with very


accurate shuttering or permanent joints