8 Installation and Commissioning Checklist

Uploaded by

Mahmud Sazzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
435 views5 pages

8 Installation and Commissioning Checklist

Uploaded by

Mahmud Sazzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Installation and commissioning

General
These check lists are to be filled out for each installation.

WARNING: Where short circuit currents are required, follow AS/NZS 5033 Appendix
D for the steps that shall be undertaken to measure the short circuit current safely.

NOTE: Some projects require that short circuit currents are recorded as part of the
contractual commissioning; otherwise a record of the actual operating current of each
string is sufficient. This could be done by using the meter on the inverter or by using
a clamp meter when the system is operational.

Insulation resistance measurement


WARNING: PV array dc circuits are live during daylight and, unlike a conventional ac
circuit, cannot be isolated before performing this test. Follow AS/NZS 5033 Appendix
D4 for the steps that shall be undertaken to measure the insulation resistance safely.

Installation and commissioning sample


See

Appendix 1 Checks and Certification

Appendix 2 Signage

Appendix 3 Insulation

Solar- Installation and Commissioning checklist Revised 10 February 2018 Page 1 of 5


Appendix 1 Checks and Certification

INSTALLATION DETAILS
Address of installation:

PV module manufacturer and


model number:
Number of modules in series in a Number of strings in
string: parallel in PV array:
Inverter manufacturer and model
number:
Number of inverters: Number of MPPTs:

PV ARRAY
PV array tilt PV array orientation
……………… ………………
……° …°
Array frame is certified to Array frame is installed to
Yes / No Yes / No
AS1170.2 for installation location manufacturer’s instructions
No galvanically dissimilar metals Roof penetrations are suitably
are in contact with the array Yes / No sealed and weatherproofed Yes / No
frames or supports
PV wiring losses are less than 3% Where PV array comprises
at the maximum current output of Yes / No multiple strings, string Yes / No
the array protection has been provided
Wiring is protected from Weatherproof PV array
mechanical damage and is Yes / No isolator mounted Yes / No
appropriately supported adjacent to the array

LV DC and AC INSTALLATION
All low voltage wiring has been All wiring has been tested and
installed by a licensed electrical Yes / No approved by qualified Yes / No
tradesperson electrical tradesperson

INVERTER
PV array isolator mounted Isolator is mounted on output
adjacent to the inverter Yes / No of the inverter (where
Yes / No
(Rating……..V required)
………….Adc)
Lockable AC circuit breaker Inverter is installed as per
mounted within the switchboard to manufacturer’s
act as the inverter main switch for Yes / No specification Yes / No
the PV/inverter system (Rating
………….. A )
Inverter ceases supplying power Inverter does not resume
within two seconds of a loss of AC supplying power until mains
Yes / No Yes / No
mains have been present for more
than 60 seconds.

Solar- Installation and Commissioning checklist Revised 10 February 2018 Page 2 of 5


CONTINUITY CHECK
Circuit checked (record a description of the
______________________________ Yes / No
circuit checked in this column)
Continuity of all string, sub-array and array cables Yes / No
Continuity of all earth connections (including module frame) Yes / No
SYSTEM CHECK
WARNING:
· IF A STRING IS REVERSED AND CONNECTED TO OTHERS, FIRE MAY RESULT.
· IF POLARITY IS REVERSED AT THE INVERTER DAMAGE MAY OCCUR TO THE INVERTER.
Short
Polarity Voltage Circuit Operating Current
Current
String 1 V A A
String 2 V A A
String 3 V A A
String 4 V A A
Sub-arrays where required V A A
PV array at PV array switch-disconnector V A A
Irradiance at time of recording the current W/m2 W/m2

INSULATION RESISTANCE MEASUREMENTS

(see table 12.3.1 for minimum values of insulation resistance)


Array positive to earth MΩ
Array negative to earth MΩ

INSTALLER INFORMATION
CEC Accredited installer’s
name:

CEC Accreditation number:

I verify that the above system has been installed to all relevant standards

Signed: Date:

CEC Accredited Designer’s name:


Licensed electrician’s name:
(where applicable, e.g. LV work)

Electrician’s licence number:

Signed: Date:

Solar- Installation and Commissioning checklist Revised 10 February 2018 Page 3 of 5


Appendix 2 Signage
SIGNAGE (AS4777)
On switchboard to
which inverter is
directly connected
Yes / No

is permanently fixed
at the main switch
Yes / No

is permanently fixed
at the solar main
switch Yes / No

If the solar system is


connected to a
distribution board
then the following
sign is located on Yes / No
main switchboard
and all intermediate
distribution boards
Where the inverter is
not adjacent to the
main switchboard, Yes / No
location information
is provided

SIGNAGE (AS/NZS 5033)


Is permanently fixed
on array junction
boxes Yes / No
(black on yellow)
Fire emergency
information is
permanently fixed on
the main switchboard Yes / No
and/or meter box (if
not installed
together)
PV DC isolation is
clearly identified
Yes / No

Solar- Installation and Commissioning checklist Revised 10 February 2018 Page 4 of 5


Is placed adjacent to
the inverter when
multiple isolation/
disconnection Yes / No
devices are used that
are not
ganged together
Exterior surface of
SOLAR wiring enclosures
labelled ‘SOLAR’
Yes / No

Shutdown procedure is permanently fixed at Any other signage as


inverter and/or on main switchboard required by the local Yes / No
electricity distributor

Appendix 3 Insulation
Minimum insulation resistance

System voltage (Vdc x1.25) Test Voltage Minimum insulation


resistance MΩ
<120 250 0.5
120-500 500 1
>500 1000 1

Solar- Installation and Commissioning checklist Revised 10 February 2018 Page 5 of 5