MG Brochure

Uploaded by

shkhlabeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views11 pages

MG Brochure

Uploaded by

shkhlabeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Solution for all your MAINTAINENCE,

breakdowns. ERECTION, TESTING &


COMMISSIONING OF ALL
ELECTRICAL EQUIPMENTS
& SWITCHYARDS

You Can Contact with us :


E-mail: [email protected]
Whatsapp : +91 7990214597
+91 7830392020
Website: www.MGengineers.com
WORKING PAN INDIA.
WELCOME TO
OUR COMPANY
Mayank Electrical Work & Global Engineers was born in Year
“2018”. We introduce our self as a Govt. Approved Electrical
Licensed Contractor in Uttarakhand & Uttar Pradesh as well as
“Udyog Aadhar Registered” firm Under the MSME (MINISTRY
OF MICRO, SMALL & MEDIUM ENTERPRISES) GOVT. OF INDIA.
We undertake Supply, Installation, and Testing & Commissioning
of all kinds of Electrical Installations (HT as well as LT Systems.)
on a pan-India basis. With a growing list of clientele including
some of the topmost Indian companies, we are setting new
milestones every few months.
WHAT WE DO?
MG Engineers as an experienced Maintenance Testing &
Commissioning team to ensure that projects are delivered on time.
Ethics, Efficiency & Transparency are the virtues that have brought us
to this level. We stand by these virtues at all times. MG the best
people resources (Vendors), system and service in the industry to
deliver and occupy the best to your needs

Maintenance of Equipment’s upto 765Kv

Erection of Equipment’s upto 765Kv

Testing of Equipment’s upto 765Kv

Commissioning of Equipment’s upto 765Kv

Proper guidance for equipment’s life


WHAT WE DO
BETTER FROM OTHERS
MG Engineers accompanies the best people resources (Vendors),
system and service in the industry to deliver and occupy the best to
your needs
1.Variety of high quality/ Calibrated electrical Testing equipment
under one roof.
1.Personalized and customized services.
2.Expertise in Testing, Commissioning & Maintenance of HV / EHV /
UHV Switchyard.
3.We have fully equipped tools & tackles for execution of projects.
4.Extensive dealer network.
5.Good clientele in India.
6.We are constantly enhancing our services with quality & safety.
7.We also deal in HT & LT system Supply, installation, Testing &
Commissioning.
OUR SERVICES
THE SUCCESS OF ANY POWER PROJECT IS ATTRIBUTABLE TO THE EFFECTIVE &
QUALITY TESTING OF THE ENTIRE PROJECT. IT IS BECAUSE THE TIME AND COST
FACTORS HAVE A SIGNIFICANT ROLE IN THESE PROJECTS AND THE SUCCESS RELIES
UPON THE OPTIMUM UTILIZATION OF THE RESOURCES WITHOUT CAUSING ANY
SAFETY HAZARDS.

WE AT MG ARE COMMITTED TO PROVIDE A STRATEGICALLY PLANNED PROCESS FOR THE


TESTING AND COMMISSIONING OF THE POWER PROJECTS WITHOUT
ANY DELAY OR ADDITIONAL COST. TO ACCOMPLISH THE TASK, WE ARE EQUIPPED WITH TEST
INSTRUMENTS WHICH ARE BEST IN ACCURACY CLASS, RELIABILITY, REPEATABILITY.

Power Transformer Testing.


• Pre- Erection Tests
• Tan- Delta Test of Bushing.
• Turret CT Testing. Ratio of Turret CT. Polarity of Turret CT.
• Winding resistance of Turret CT.
• Insulation Resistance Test of Turret CT & core frame.
• Pre- Commissioning Tests
• Sweep Frequency Response Analyzer (SFRA) Test. Tan-
Delta Test of Bushing & Winding.
• Magnetic Core Balance Test.
• Magnetic Current Test.
• Short Circuit Impedance Test. Vector Group Test.
• Winding Resistance Measurement (WRM) Test. Voltage
Ratio Test.
• Insulation resistance & Polarization Index Test.
Switchyard’s Equipments upto 765Kv.

Vacuum/ SF6 Circuit


Current Transformer
Breaker Testing

DCRM(Dynamic Contact Tan- Delta Test.


resistance measurement)
Timing Test. Ratio Test.
Contact Resistance Polarity Test.
measurement. Continuity Test.
Insulation Resistance Winding resistance Test.
Test. Insulation Resistance
CVT(Capacitor voltage
Potential Transformer
Transformer)
Tan- Delta Test. Ratio Test. Polarity Test.
Ratio Test. Continuity Test.
Polarity Test. Continuity Winding resistance Test.
Test. Insulation Resistance
Winding resistance Test. Test.
Insulation Resistance
Test.

Lightning Arrestor Isolators


Tan- Delta Test.
Leakage Current Contact Resistance
Measurement. Measurement.
Insulation Resistance Insulation Resistance
Test. Test.
ABOUT OUR
SPECIAL FEATURES
MG Engineers will plan and design, select and install, commission, test, report,
maintain, fault find and repair systems to a high standard. Most electrical accidents
result due to improper/ Unsafe installations at various sites. Our company provides
experienced manpower for handling/ to cater these types of critical works. Erection
& commissioning of LT/HT Power Supply, Retrofitting of old relays, Earthing,
Installation & Testing of DG Set Transformer, P.C.C. Panel Industrial & Domestic wiring
and other electrical work & also capable for Loading, Unloading, Shifting & Erection
of all type of industrial machineries. Cable Laying and Bus bar duct works.

Work organization and self-management, communication and interpersonal skills,


problem solving, flexibility and a deep body of knowledge are the universal
attributes of our Team/ co- workers.

Technical Guidance with


accurate reports.

As Protection Engineers we are


ready to move like fire fighters.
OUR SATISFIED CLIENTS

Authorised Partner
Solution for all your breakdowns.

Contact Us
+91-7830392020 +91-7990214597
+91-9084469909 +91-8077227207
mayankelectricalworks@g
mail.com upmayank8077@gm
Shivdaspur (Urf Teliwala) ail.com
Dhanauri, Distt. Haridwar 279 Sihawali, chharra
(U.K) rafatpur, Dist. Aligarh (U.P