Gracefield School Project Handover Report

The Gracefield School Plus Development project, managed by Architect Louis Addo, commenced in June 2023 and is set for completion in December 2024. The report outlines various completed activities including site preparation, substructural and superstructural works, building finishes, landscaping, furniture and appliances installation, and outdoor services. Key components such as plumbing, electrical works, and security installations have also been successfully executed.

Uploaded by

Benjamin Gyamfi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views4 pages

Gracefield School Project Handover Report

The Gracefield School Plus Development project, managed by Architect Louis Addo, commenced in June 2023 and is set for completion in December 2024. The report outlines various completed activities including site preparation, substructural and superstructural works, building finishes, landscaping, furniture and appliances installation, and outdoor services. Key components such as plumbing, electrical works, and security installations have also been successfully executed.

Uploaded by

Benjamin Gyamfi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

PROJECT HANDING OVER REPORT.

PROJECT TITLE: GRACEFIELD SCHOOL PLUS DEVELOPMENT AT GHANAFLAG.


PROJECT MANAGER: ARCHITECT LOUIS ADDO (ARCKAIROS LIMITED)
CLIENT: REV. PATRICK NOMO AND MRS. NICHOLINE NOMO

PROJECT COMMENCED DATE: JUNE ,2023


ACTUAL COMPLETION DATE: DECEMBER, 2024

NO ITEM ACTIVITY HANDING OVER


. STATUS
1 SITE PREPARATION  Clearing of site COMPLETED
 Site investigations
 Setting out
 Excavation of trenches
2 SUBSTRUCTURAL LABORERS/ EXCAVATOR
WORKS  Excavation of foundation trenches
MASONRY
 Casting of blinding
STEELWORKS
 Preparation of reinforced column
mats.
 Installation of reinforcements.
CARPENTRY
 Shuttering of foundation columns, COMPLETED
beams and slab.
MASONRY
 Casting of foundation mass
concrete base and columns.
 Laying of foundation blockwalls.
 Hardcore filing
 Casting of groundfloor slab.
PLUMBING
 Installation of internal foundation
inlet and outlet pipes .
3 SUPERSTRUCTURAL STEEL WORKS
WORKS  Preparation and installation of
rebars for structural columns,
beams and lintels of all floors.
CARPENTRY
 Shuttering of all Floors columns and
beams
MASONRY
 Casting of columns, beams lintels
slabs and staircase.
 Laying of blockwalls for all floors.
CARPENTRY
 Decking of all floor slabs.
 Shuttering of staircase.
PLUMBING WORKS
 Installation of internal PVC and PPR
pipes.
ELECTRICAL WORKS
 Installation of conduit pipes for
walls and ceiling
 Installation of socket, switches and COMPLETED
distribution electrical boxes on
walls.
HVAC WORKS
 Wiring of installation of indoor and
outdoor systems.
CEILING WORKS
 Installation of ceiling grids and
plaster boards.
ROOF WORKS
 Installation of purlins and rafters of
roof frame work.
GLAZING WORKS
 Installation of subframes for
window openings.
CARPENTRY
 Installation of door frames.
WELDERS
 Installation of burglar proofing and
staircase balusters.
4 BUILDING FINISHES MASONRY
 Plastering and dressing of all walls
and openings.
 Screeding of all floors and
staircases.
CARPENTRY WORKS
 Installation of Door leafs,
Architraves , stoppers and Locks.
 Staining of doors.
PAINTING
 Internal and external white wash
finishing .
 Painting of first ,second and third
coat.
CEILING WORKS
 Installation of corner moulds.
 Skimming .
GLAZING WORKS
 Installation of glass balustrade for
balconies. COMPLETED
 Installation of glass shower cabins.
 Installation of glass sliding doors
and windows.
PLUMBING WORKS.
 Installation of plumbing fixtures
and fittings.
ELECTRICAL WORKS
 Installation of Electrical Fixtures.
TILING WORKS
 Installation of Polished Porcelain
tiles on all floors .
 Installation of wall tiles at kitchen
and bathrooms.
WELDING WORKS.
 Spraying of burglar proofs and
staircase balustrade.
5 LANDSCAPING PAVEMENT WORKS
 Installation of pavement blocks. COMPLETED
GARDENING WORKS
 Planting of Grass.

6 FURNITURE & CARPENTRY WORKS


APPLIANCES  Installation of ward drobes.
 Installation of kitchen cabinets with
sink.
APPLIANCES COMPLETED
 Installation of Extractor
 Installation of Refrigerator.
 Installation of Gas cooker.
 Installation of washing machine.
7 OUTDOOR PLUMBING WORKS
SERVICES  Installation of water tank.
 Installation of water pump
 Installation Borehole system.
 Installation of Bombula system.
ELECTRICAL WORKS
 Installation of Street Lights.
 Installation of fence wall mounted COMPLETED
lights.
SECURITY FENCE
 Installation of Razor wire for fence
wall.
CCTV & DOOR BELLS
 Installation of CCTV cameras.
 Installation of wireless doorbell.