Implementation Steps
1. Requirement Gathering (1 week)
This is the foundation stage of the project where the focus is on understanding the
client's needs and defining the scope of the project.
- Activities:
- Conduct meetings with the contractor to identify their specific requirements.
- Document the features required for both workers and contractors (e.g., user
registration, job posting).
- Identify technical and functional constraints.
- Finalize deliverables and timelines.
- Outcome: A clear project requirements document outlining all functionalities and
expectations.
2. Wireframing & Prototyping (2 weeks)
This step involves creating blueprints for the platform and simulating its
appearance and functionality.
- Activities:
- Create wireframes (basic sketches) of the website layout and user interface.
- Design a prototype to visualize workflows like job searching, posting, and
profile creation.
- Get feedback from the client and make necessary revisions.
- Outcome: A visual representation of the website’s structure and design, ensuring
client approval before development begins.
3. Development (4 weeks)
This is the core phase where the actual coding of the platform takes place.
- Activities:
- Frontend Development: Build the website’s interface (using technologies like
HTML, CSS, JavaScript).
- Backend Development: Develop the server-side logic (using Python frameworks
like Django or Flask).
- Database Integration: Set up a database (e.g., MySQL, PostgreSQL) to store user
data, job postings, etc.
- API Development: Connect the frontend and backend for smooth communication.
- Outcome: A functional version of the platform with all planned features.
4. Testing (2 weeks)
The platform is rigorously tested to ensure it works correctly and is free from
bugs.
- Activities:
- Functional Testing: Verify that all features (e.g., job postings, profile
creation) work as expected.
- Usability Testing: Ensure the platform is easy to use for both workers and
contractors.
- Performance Testing: Check the website’s speed and responsiveness.
- Bug Fixing: Identify and resolve any issues found during testing.
- Outcome: A stable and reliable platform ready for deployment.
5. Deployment (1 week)
The platform is made live and accessible to the end-users.
- Activities:
- Set up the website on a hosting service (e.g., AWS, Heroku).
- Configure security measures (e.g., SSL certificates, secure databases).
- Perform a final round of testing to ensure the live site works as intended.
- Launch the platform and monitor initial user feedback.
- Outcome: A fully operational platform available to workers and contractors.
Total Time: 10 weeks
By following this structured approach, the project can be delivered efficiently,
ensuring the client’s requirements are met while minimizing risks.