ESFR Sprinkler Installation Guide

The document outlines the design specifications for the sprinkler system at Godrej & Boyce Mfg. Co. Ltd. in Haridwar, detailing installation instructions, pipe sizes, and structural support requirements. It includes dimensions in millimeters and emphasizes the importance of adhering to relevant IS codes. The drawing is proprietary and cannot be copied or shared without permission from Nayak, Nayak's & Associates.

Uploaded by

rao umar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

ESFR Sprinkler Installation Guide

The document outlines the design specifications for the sprinkler system at Godrej & Boyce Mfg. Co. Ltd. in Haridwar, detailing installation instructions, pipe sizes, and structural support requirements. It includes dimensions in millimeters and emphasizes the importance of adhering to relevant IS codes. The drawing is proprietary and cannot be copied or shared without permission from Nayak, Nayak's & Associates.

Uploaded by

rao umar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT:

DESIGN OF GODREJ & BOYCE Mfg. Co. Ltd.


AT SIDCUL, HARIDWAR

18000 K 25.2 ESFR


UPRIGHT

1500
PRESSURE
GAUGE
PRESSURE
GAUGE
SPRINKLER
PG PG
MAX.
DISTANCE
400 MM.
3000 3000 1500

3000

NOTE : ALL DIMENSIONS IN MM

INSTALLATION INSTRUCTION:-
18000
1. Type of sprinkler:-
ESFR-K-25.2 (68*C) UP RIGHT UL LISTED are to be
SECTION used.
2. The deflector (top of the Sprinkler) shall be 400
mm from the bottom of the ceiling.
3. The main water header shall be of 150 mm
internal diameter pipe.(heavy duty)

36000
4. The branch water line shall of 100 mm internal
diameter pipe (heavy duty).
5. The BUILT STR. DESIGN/TRUSSES ETC. BE
CHECKED FOR SUPPORT OF THE PIPE LINE. THE
DWG. ONLY SHOWS SIZE AND LOCATION OF
THE PIPE LINE . ADD. STR. SUPPORT MAY BE
PROVIDED AS REQ.

MAX. DISTANCE 400 MM. DEFLECTOR SHOULD BE 6. Hangers for supporting pipes to be placed at a
distance of 1.0 m center to center.
PARALLEL TO THE FLOOR 7. In case of any doubt or discrepancy in drawing,
execution agency may discuss the consultant
before actual execution.

PIPE nayak, nayak's & associates,


7- Bhagirathi kunj Roorkee
LINE
THIS DRAWING IS THE PROPERTY OF NAYAK, NAYAKS & ASSOCIATES IT SHALL
NOT BE COPIED OR USED WITHOUT THEIR WRITTEN PERMISSION NOR MADE
KNOWN TO A THIRD PARTY.
THE INFORMATION IS ISSUED ON THE UNDERSTANDING THAT NO PART THEREOF
SHALL BE DUPLICATED FOR THE PURPOSE OTHER THAN THE EXPRESSED
PURPOSE.
CERTIFIED THAT STRUCTURAL DRAWING IS IN ACCORDANCE WITH ALL THE
RELEVANT IS CODE AND SUBSEQUENT REVISION

CLIENT GODREJ & BOYCE Mfg. Co. Ltd.

THIS DRAWING IS BASED ON ARCHITECTURAL DETAILS

REVISION STATUS AND DETAILS


NO DATE REVISION

CEILING PLAN FLOOR


ARRANGEMENT OF SPRINKLER SYSTEM FOR SHED-4
CEILING PLAN

12.04.2018

SPRINKLER DETAIL