NDT Request
Client : CHENGDA Contract No. 7000031978 Date : 2025/1/28
QVC-CNCEC13-ISBL-
Job No. Project Title : QVC PVC PROJECT Req. No. : PIPE RACK NDT-0019
Scope of
Item Des.: RT(Gray & X ray) / MT / PT / HT / PMI / FE Contact Name & PUYUTONG
Work :
Mobile No 71046112
Procedure Ref.: Acceptance Ref.:
Please Carryout the examination on the following mentioned items in accordance with the above procedure and standards.
Welding
S/N Drawing number Joint No. Material Welder No Dia/Sch (mm) Class Remarks
Process
00-42-0500-26-DW10B- ALD12
1 FW 32 SS WP-143 8 3.76 GTAW 10%
113002-002 2
00-42-0500-26-DW10B- CHECK ON ALD12
2 FW 34 SS 8 3.76 GTAW 10%
113002-002 SITE 2
00-42-0500-26-DW10B- ALD12
3 SW 16 SS WP-022 3 3.05 GTAW 10%
161001-002 2
00-42-0500-26-DW10B- ALD12
4 FW 17 SS WP-091 3 3.05 GTAW 10%
161001-002 2
00-42-0500-26-DW10B- ALD12
5 SW 18 SS WP-022 3 3.05 GTAW 10%
161001-002 2
00-42-0500-26-DW10B- ALD12
6 FW 21 SS WP-015 3 3.05 GTAW 10%
162001-003 2
00-42-0500-26-DW10B- ALD12
7 FW 24 SS WP-091 3 3.05 GTAW 10%
162001-003 2
00-42-0500-26-DW10B- ALD12
8 FW 26 SS WP-091 3 3.05 GTAW 10%
162001-003 2
00-42-0500-26-HW-113004- GTAW+SMA ACD11
9 SW 28 SS WP-018 10 9.27 10%
002 W 4
page1 of 3
NDT Request
Client : CHENGDA Contract No. 7000031978 Date : 2025/1/28
QVC-CNCEC13-ISBL-
Job No. Project Title : QVC PVC PROJECT Req. No. : PIPE RACK NDT-0019
Scope of
Item Des.: RT(Gray & X ray) / MT / PT / HT / PMI / FE Contact Name & PUYUTONG
Work :
Mobile No 71046112
Procedure Ref.: Acceptance Ref.:
Please Carryout the examination on the following mentioned items in accordance with the above procedure and standards.
Welding
S/N Drawing number Joint No. Material Welder No Dia/Sch (mm) Class Remarks
Process
00-42-0500-26-HW-113004- GTAW+SMA ACD11
10 SW 32 SS WP-015 10 9.27 10%
002 W 4
00-42-0500-26-HW-113004- GTAW+SMA ACD11
11 SW 34 SS WP-011 10 9.27 10%
002 W 4
00-42-0500-26-HW-113004- GTAW+SMA ACD11
12 SW 35 SS WP-011 10 9.27 10%
002 W 4
00-42-0500-26-SHP-113003- ACD11
13 FW 22 SS WP-091 3 3.05 GTAW 10%
003 4
00-42-0500-26-SHP-113003- ACD11
14 FW 23 SS WP-091 3 3.05 GTAW 10%
003 4
00-42-0500-26-SHP-113003- ACD11
15 SW 22A SS WP-013 3 3.05 GTAW 10%
003 4
00-42-0500-26-TW10B- ALD12
16 FW 36B SS WP-067 6 3.4 GTAW 10%
171001-003 2
00-42-0500-26-TW20B- GTAW+SMA ACD11
17 SW 11A SS WP-034 6 7.11 10%
173001-002 W 4
00-42-0500-26-WW-133002- ALA31
18 FW 23 CS WP-091 3 5.49 GTAW 5%
002 2
page2 of 3
NDT Request
Client : CHENGDA Contract No. 7000031978 Date : 2025/1/28
QVC-CNCEC13-ISBL-
Job No. Project Title : QVC PVC PROJECT Req. No. : PIPE RACK NDT-0019
Scope of
Item Des.: RT(Gray & X ray) / MT / PT / HT / PMI / FE Contact Name & PUYUTONG
Work :
Mobile No 71046112
Procedure Ref.: Acceptance Ref.:
Please Carryout the examination on the following mentioned items in accordance with the above procedure and standards.
Welding
S/N Drawing number Joint No. Material Welder No Dia/Sch (mm) Class Remarks
Process
Special Notes :
Name:PUYUTONG Name:
Requested By: Received By :
Signature: Signature:
CNCEC13 CHENGDA
Date:2025/1/28 Date:
page3 of 3