COMPANY:QatarVinyl Company DATE: 2 8 / 0 1 / 2 0 2 5
Limited(QVC)Q.P.J.S.C.
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.:
IMC-MISC4-ITP-01
[Link]: FIELD ITP FOR STAINLESS STEEL
AIRDUCT MODIFICATION WORKS CONTRACTORJOB NO:E22017
Air Ducting
SN REV DATE OF DOC DESCRIPTION ORIGINATOR REVIEWER APPROVE CHENGDA COMPANY
R
# ISSUE STATUS APPROVR APPROVR
ISSUED FOR
1. 28/01/202 I IMC
5 CONSTRUCTIO
N
COMPANY:QatarVinyl Company Limited(QVC)Q.P.J.S.C. DATE: 2 8 / 0 1 / 2 0 2 5
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.: IMC-MISC4-
ITP-01
[Link]: FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS CONTRACTOR JOB NO:E22017
[Link].
FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS Revision
Stage CONSTRUCTION
DISCIPLINE: SteelStructure PROJECT: QVC PVC PROJECT Date:
Inspection Responsibility
ITP Characteris Reference Verifying
Inspection Acceptance Sub Remarks
No. activity tic Document Criteria Document Contractor Company
Contr
Verified
1 Pre-Construction
Material
Check of Approved Receiving
1.1 incoming MAR, MTC, ASTM A240 316L, H R R
Material receiving
material and Drawings Project specification QVC-IMC-
MTC ASTM A240 001
Verification. 316L
Review of Project Approved
Documents Document Specificatio ASME Sec IX
1.2 WPS/PQR H R R
submission n
(WPS/PQR)
ASME Sec
IX
Qualification
of new Project Approved
Welder Qualification welders by Specificatio ASME Sec IX WQT
1.3 H R S
(WQT) welder n
qualification
test ASME Sec
IX
Visual
Inspection, Approved Approved Drawings, Fit/up
1.4 Dimensional Drawings, WPS Inspectio H S S
Fit/up Inspection
check. WPS n
Verify QVC-IMC-
alignment, 002
root gap etc
COMPANY:QatarVinyl Company Limited(QVC)Q.P.J.S.C. DATE: 28/01/2025
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.: IMC-MISC4-ITP-
01
[Link]: FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS CONTRACTORJOB NO:E22017
Visual
inspectio Approved ASME Sec IX, AWS Weld
1.5 Weld Visual Inspection n of Drawings D1.1 Table 8.1 Visual H S R
finished and WPS. Approved Drawings Inspectio
welds and WPS. n
QVC-IMC-003
Dye 3rd party AWS D1.1 3rd party
NDT (PT NDT NDT
1.6 penetrant H R R
10%) for testing of Procedure report.
newly new welds
by 3rd party
welded
NDT
joints inspector
(By 3rd
party)
Verification Pickling Reference Drawing Pickling /
procedure. passivation
1.7 Pickling and of pickling & H S S
checklist
passivation passivation.
Ensure
cleaning
Visual Project All the finished Request for
1.8 Release From inspection specification, products shall be inspection
Workshop prior to drawings free of defects H S S
release
Checklist No
Checklist Form # Description
Material receiving
QVC-IMC-001
QVC-IMC-002 Fit/up Inspection
QVC-IMC-003 Weld Visual Inspection
QVC-IMC-004 Pickling and passivation checklist
QVC-IMC-005 Release from workshop
REQUEST
FOR
INSPECTION
Project Name: QVC PVC PROJECT
ContractorConstruction Discipline:
RFI No.:
□Construction(C)□Material(M) □Pre-
commissioning(P)
□Civil(CI) □Architecture( □Structure( □Mechanical(M □Electric(E □Instrument(IN) □HVAC(HV)
AR) ST) E) L)
☑Piping(PI) □Insulation(IS) □Painting(PA) □Misc(MI) □Tank(TK) □Pre- □Fire
commissioning(PR) Proofing(FI)
Inspection Date: ITP Ref:
Precise Unit/Location: MS Ref:
Client / ContractorQAQC DWG No:
Name: Date:
Item Description of Point ofinspection
Time
No. Inspection & Test Sub-contr. Contracto Company
Type r
Remarks:
Acknowledgement (see remarks ifany) Results
Sub-Contractor:
Contractor: CNCEC Company:QVC □Accept (Code A)
IMC
□Accept With comments
Name: Name: Name:
-See Punch list (Code B)
Sign: Sign: Sign: □Reject (Code C)
Date: Date: Date:
MATERIAL RECEIVING
INSPECTION
ITP: Project Name: QVC PVC PROJECT CONTRACT
NO.:7000031978
QVC-IMC-001 Date: Report No.:
Equipment/MaterialDescription:
NO. InspectionAttributes Quantity Accept Reject HoldTag No.
Storage Requirements:
Notes/Remarks:
Sub-Contractor:CNCEC13 Contractor:CHENGDA Company:QVC
Name: Name: Name:
Signature: Signature: Signature:
Designation: Designation: Designation:
FIT/UP REPORT
ITP:QV-20-CDS-Y28-00011 Contract No.:7000031978
Project Name: QVC PVC PROJECT
QVC-IMC-002 Location:
Referen GB50205- Date: Report No.:
ce: 2020
Remarks
No. Item
PART1 PART2 WELD DESIGN
THK Accepted
Y/N
Conclusio Accept Accept with Re- Rejected
n: Comments inspection
Comments:
Sub-Contractor: Contractor:CHENGDA Company:QVC
Name: Name: Name:
Signatu Signatu Signatur
re: re: e:
Date: Date: Date:
Visual REPORT
ITP:QV-20-CDS-Y28-00011 Contract No.:7000031978
Project Name: QVC PVC PROJECT
QVC-IMC-003 Location:
Referen GB50205- Date: Report No.:
ce: 2020
PART1 PART2 THK WELD DESIGN Welder No WPS No Remarks
No. Item
Conclusio Accept Accept with Re- Rejected
n: Comments inspection
Comments:
Sub-Contractor: Contractor:CHENGDA Company:QVC
Name: Name: Name:
Signatu Signatu Signatur
re: re: e:
Date: Date: Date:
PICKLING / PASSIVATION
CHECKLIST
ITP: Project Name: QVC PVC PROJECT CONTRACT NO.:7000031978
QVC-IMC-004 Date: Report No.:
Equipment/Material Description:
NO. Check Points Accept Reject Remarks
1 Preparation
2 Surface Cleaning
3 Application of Pickling
solution
4 Rinsing after Pickling
5 Application of Passivation
solution
6 Final Rinsing
7 Final Inspection after
complete process
Inspected Items Details
No. Tag No / Item Mark No Quantity No Tag No / Item Mark No Quantity
Notes / Remarks:
Sub-Contractor: IMC Contractor:CHENGDA Company:QVC
Name: Name: Name:
Signature: Signature: Signature:
Designation: Designation: Designation:
RELEASE NOTE FROM
WORKSHOP
ITP: Project Name: QVC PVC PROJECT CONTRACT NO.:7000031978
QVC-IMC-005 Date: Report No.:
Equipment/Material Description:
NO. Tag No / Item Mark No Quantity Accept Reject Remarks
Notes:
Sub-Contractor:CNCEC13 Contractor:CHENGDA Company:QVC
Name: Name: Name:
Signature: Signature: Signature:
Designation: Designation: Designation: