0% found this document useful (0 votes)
13 views10 pages

Air Duct ITP

This document outlines the Field Inspection Test Plan (ITP) for stainless steel air duct modification works for the Qatar Vinyl Company PVC project, detailing inspection activities, acceptance criteria, and responsibilities. It includes various inspection checklists and reports related to material receiving, fit-up, welding, pickling, and final release from the workshop. The contractor for the project is China Chengda Engineering Co., Ltd.

Uploaded by

Rana Hamza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views10 pages

Air Duct ITP

This document outlines the Field Inspection Test Plan (ITP) for stainless steel air duct modification works for the Qatar Vinyl Company PVC project, detailing inspection activities, acceptance criteria, and responsibilities. It includes various inspection checklists and reports related to material receiving, fit-up, welding, pickling, and final release from the workshop. The contractor for the project is China Chengda Engineering Co., Ltd.

Uploaded by

Rana Hamza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

COMPANY:QatarVinyl Company DATE: 2 8 / 0 1 / 2 0 2 5

Limited(QVC)Q.P.J.S.C.
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.:
IMC-MISC4-ITP-01
[Link]: FIELD ITP FOR STAINLESS STEEL
AIRDUCT MODIFICATION WORKS CONTRACTORJOB NO:E22017

Air Ducting

SN REV DATE OF DOC DESCRIPTION ORIGINATOR REVIEWER APPROVE CHENGDA COMPANY


R
# ISSUE STATUS APPROVR APPROVR

ISSUED FOR
1. 28/01/202 I IMC
5 CONSTRUCTIO
N
COMPANY:QatarVinyl Company Limited(QVC)Q.P.J.S.C. DATE: 2 8 / 0 1 / 2 0 2 5
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.: IMC-MISC4-
ITP-01
[Link]: FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS CONTRACTOR JOB NO:E22017

[Link].
FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS Revision
Stage CONSTRUCTION
DISCIPLINE: SteelStructure PROJECT: QVC PVC PROJECT Date:

Inspection Responsibility
ITP Characteris Reference Verifying
Inspection Acceptance Sub Remarks
No. activity tic Document Criteria Document Contractor Company
Contr
Verified
1 Pre-Construction
Material
Check of Approved Receiving
1.1 incoming MAR, MTC, ASTM A240 316L, H R R
Material receiving
material and Drawings Project specification QVC-IMC-
MTC ASTM A240 001
Verification. 316L

Review of Project Approved


Documents Document Specificatio ASME Sec IX
1.2 WPS/PQR H R R
submission n
(WPS/PQR)
ASME Sec
IX
Qualification
of new Project Approved
Welder Qualification welders by Specificatio ASME Sec IX WQT
1.3 H R S
(WQT) welder n
qualification
test ASME Sec
IX
Visual
Inspection, Approved Approved Drawings, Fit/up
1.4 Dimensional Drawings, WPS Inspectio H S S
Fit/up Inspection
check. WPS n
Verify QVC-IMC-
alignment, 002
root gap etc
COMPANY:QatarVinyl Company Limited(QVC)Q.P.J.S.C. DATE: 28/01/2025
PROJECT:QVC PVC Project [Link].:
CONTRACT NO.: 7000031978 REV: SHEET:
CONTRACTOR: China Chengda Engineering Co.,Ltd. SUBCONTRACTORDOC NO.: IMC-MISC4-ITP-
01
[Link]: FIELD ITP FOR STAINLESS STEEL AIRDUCT MODIFICATION WORKS CONTRACTORJOB NO:E22017

Visual
inspectio Approved ASME Sec IX, AWS Weld
1.5 Weld Visual Inspection n of Drawings D1.1 Table 8.1 Visual H S R
finished and WPS. Approved Drawings Inspectio
welds and WPS. n
QVC-IMC-003

Dye 3rd party AWS D1.1 3rd party


NDT (PT NDT NDT
1.6 penetrant H R R
10%) for testing of Procedure report.
newly new welds
by 3rd party
welded
NDT
joints inspector
(By 3rd
party)

Verification Pickling Reference Drawing Pickling /


procedure. passivation
1.7 Pickling and of pickling & H S S
checklist
passivation passivation.

Ensure
cleaning
Visual Project All the finished Request for
1.8 Release From inspection specification, products shall be inspection
Workshop prior to drawings free of defects H S S
release
Checklist No

Checklist Form # Description

Material receiving
QVC-IMC-001

QVC-IMC-002 Fit/up Inspection

QVC-IMC-003 Weld Visual Inspection

QVC-IMC-004 Pickling and passivation checklist

QVC-IMC-005 Release from workshop


REQUEST
FOR
INSPECTION
Project Name: QVC PVC PROJECT
ContractorConstruction Discipline:
RFI No.:
□Construction(C)□Material(M) □Pre-
commissioning(P)
□Civil(CI) □Architecture( □Structure( □Mechanical(M □Electric(E □Instrument(IN) □HVAC(HV)
AR) ST) E) L)
☑Piping(PI) □Insulation(IS) □Painting(PA) □Misc(MI) □Tank(TK) □Pre- □Fire
commissioning(PR) Proofing(FI)
Inspection Date: ITP Ref:
Precise Unit/Location: MS Ref:
Client / ContractorQAQC DWG No:
Name: Date:
Item Description of Point ofinspection
Time
No. Inspection & Test Sub-contr. Contracto Company
Type r

Remarks:

Acknowledgement (see remarks ifany) Results


Sub-Contractor:
Contractor: CNCEC Company:QVC □Accept (Code A)
IMC
□Accept With comments
Name: Name: Name:
-See Punch list (Code B)

Sign: Sign: Sign: □Reject (Code C)

Date: Date: Date:


MATERIAL RECEIVING
INSPECTION
ITP: Project Name: QVC PVC PROJECT CONTRACT
NO.:7000031978
QVC-IMC-001 Date: Report No.:

Equipment/MaterialDescription:

NO. InspectionAttributes Quantity Accept Reject HoldTag No.

Storage Requirements:

Notes/Remarks:

Sub-Contractor:CNCEC13 Contractor:CHENGDA Company:QVC

Name: Name: Name:

Signature: Signature: Signature:

Designation: Designation: Designation:


FIT/UP REPORT

ITP:QV-20-CDS-Y28-00011 Contract No.:7000031978


Project Name: QVC PVC PROJECT
QVC-IMC-002 Location:
Referen GB50205- Date: Report No.:
ce: 2020

Remarks
No. Item
PART1 PART2 WELD DESIGN
THK Accepted
Y/N

Conclusio Accept Accept with Re- Rejected


n: Comments inspection
Comments:

Sub-Contractor: Contractor:CHENGDA Company:QVC


Name: Name: Name:

Signatu Signatu Signatur


re: re: e:

Date: Date: Date:


Visual REPORT

ITP:QV-20-CDS-Y28-00011 Contract No.:7000031978


Project Name: QVC PVC PROJECT
QVC-IMC-003 Location:
Referen GB50205- Date: Report No.:
ce: 2020

PART1 PART2 THK WELD DESIGN Welder No WPS No Remarks


No. Item

Conclusio Accept Accept with Re- Rejected


n: Comments inspection
Comments:

Sub-Contractor: Contractor:CHENGDA Company:QVC


Name: Name: Name:

Signatu Signatu Signatur


re: re: e:

Date: Date: Date:


PICKLING / PASSIVATION
CHECKLIST

ITP: Project Name: QVC PVC PROJECT CONTRACT NO.:7000031978

QVC-IMC-004 Date: Report No.:

Equipment/Material Description:

NO. Check Points Accept Reject Remarks

1 Preparation

2 Surface Cleaning

3 Application of Pickling
solution
4 Rinsing after Pickling

5 Application of Passivation
solution
6 Final Rinsing

7 Final Inspection after


complete process
Inspected Items Details

No. Tag No / Item Mark No Quantity No Tag No / Item Mark No Quantity

Notes / Remarks:

Sub-Contractor: IMC Contractor:CHENGDA Company:QVC

Name: Name: Name:

Signature: Signature: Signature:

Designation: Designation: Designation:


RELEASE NOTE FROM
WORKSHOP
ITP: Project Name: QVC PVC PROJECT CONTRACT NO.:7000031978

QVC-IMC-005 Date: Report No.:

Equipment/Material Description:

NO. Tag No / Item Mark No Quantity Accept Reject Remarks

Notes:

Sub-Contractor:CNCEC13 Contractor:CHENGDA Company:QVC

Name: Name: Name:

Signature: Signature: Signature:

Designation: Designation: Designation: