0% found this document useful (0 votes)
51 views52 pages

School Improvement Plan Guide

The School Improvement Plan (SIP) for Nueva Era Elementary School outlines the school's vision, mission, and current situation, including enrollment statistics, nutritional status, and teacher professional development. The plan emphasizes the need for improved resources, funding, and community engagement to enhance educational quality and address challenges posed by the COVID-19 pandemic. It also includes performance indicators and strategies for monitoring and evaluation to ensure continuous improvement from 2022 to 2024.

Uploaded by

heizelannabellar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views52 pages

School Improvement Plan Guide

The School Improvement Plan (SIP) for Nueva Era Elementary School outlines the school's vision, mission, and current situation, including enrollment statistics, nutritional status, and teacher professional development. The plan emphasizes the need for improved resources, funding, and community engagement to enhance educational quality and address challenges posed by the COVID-19 pandemic. It also includes performance indicators and strategies for monitoring and evaluation to ensure continuous improvement from 2022 to 2024.

Uploaded by

heizelannabellar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Republic of the Philippines

Department of Education
Caraga Administrative Region
Division of Agusan del Sur
Bunawan District II

NUEVA ERA ELEMENTARY SCHOOL


131659

SCHOOL
IMPROVEMENT
PLAN
(SIP)
C.Y. 2022-2024

Prepared by:

SALVADOR N. PEÑOL JR.

Head Teacher-I

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Table of Contents
Title Page
I- Department of Education Vision
Department of Education Mission
Department of Education Core Value
II- School’s Current Situation
A. Brief Description of the School
B. School Profile
B.1 Pupils’ Enrolment
B.2 Nutritional Status
B.3 Learner’s Materials
B.4 Teacher’s Professional Development
B.5 Funding Sources
B.6 Awards and Recognitions
III- Performance Indicators
A. Access
A.1 Number and Dropout Rates
B. Quality
B.1 Percentage of Learners who Completed the School Year
B. 2. School MPS
B.3 Literacy Level
C. Governnce
C.1 SBM Assessment Level
C.2 Child-Friendly School Survey Result
C.3 Stakeholders Participation
C.4 Learner-Teacher Ratio
C.5 Learner-Classroom Ratio
C.6 Learner- Toilet Ratio
C.7 Learner-Seat Ratio
IV- School Improvement Planning
A. Planning Worksheet
B. Project Design
C. Annual Improvement Plan
D. Project Procurement and Management Plan
E. Monthly Cash Program
F. Annual Procurement Plan
G. Annual Procurement Plan (DBM)
V- Monitoring and Evaluation
VI - School Report Card
VII- School Planning Team
VIII- Minutes and Pictorials in Crafting the ESIP

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Department of
Education
MISSION
VISION
CORE VALUES

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
VISION

We dream of Filipinos who


passionately love their country and
whose values and competencies
enable them to realize their full
potential & contribute meaningfully to
building the nation. As a learner-
centred public institution, the
Department of Education continuously
improves itself to better serve its
stakeholders.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
MISSION

To protect & promote the right of every


Filipino to quality, equitable culture-base and
complete basic education where:
Students learn in a child-friendly, gender-
sensitive, safe and motivating environment.
Teachers facilitate learning & constantly
nurture every learner.
Administrators & staff as stewards of the
institution, ensure an enabling and supportive
environment for effective learning to happen.
Family, community & other stakeholders are
actively engaged in developing life-long learners.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
CORE VALUES

Maka-Diyos
Makatao
Makakalikasan
Makabansa

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
II- School's
Current
Situation

A. Brief Description of the School


NUEVA ERA ELEMENTARY SCHOOL is the farthest school in the western part
of Bunawan District II. It is the boundary school between the municipality of Bunawan &
Veruela. It can also be found without difficulty all the way through the internet by its
school identification number 131659.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Geographically, the school is situated at Camp 4, Nueva Era, Bunawan, Agusan del
Sur; Bunawan District II, Division of Agusan del Sur, Caraga Region. The School is
situated in a low-lying area and is part of the Agusan Marsh where the famous crocodile
“LOLONG” was captured. The school is accessible by a 50-minute ride of any
transportation from the District Office of Bunawan II. The school site has an area of
16,218 sq. meters with an open space for children to play and rich land suitable for
agriculture.

With the newly-constructed six-classroom two-story building and another three-


classroom building, Nueva Era Elementary School serves the educational needs of 174
children in the Barangay.

Despite “extraordinarily challenging school year” due to the COVID-19 pandemic,


Nueva Era Elementary School is one with the Department of Education’s vision to
continue education despite the challenging school year that we are facing.
To address this unprecedented time we are facing, the usual “new normal” set up
was intensified by the school. Classrooms of every teachers-adviser were accustomed
for easier access of modules since the school will implement the Printed-Modular
learning modality for this school year. Signage, floor markings, sanitizers, foot bath,
hand washing facility and COVID-19 related information posters were posted within the
school for constant awareness of the health protocols.
With the plans and projects that are presented in this School Improvement Plan,
Nueva Era Elementary School Faculty and Staff together with the Parents and
stakeholders school continuously plan and prepare all the necessary elements to fill in
the gaps and address the challenges that we met to be able to serve excellent and
quality education to every learner.

B. School Profile
1. Pupils' Enrolment
The pupils’ enrolment has decreased for the past three years for about
5.60% due to the transfer of residence of some pupils. Based on the latest enrolment

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
data from the Learner Information System (LIS), there are 174 pupils enrolled for the
S.Y. 2021-2022 in which 79 are males and 86 are females.

2. Nutritional Status
A number of pupils with nutritional health problem were identified during the
regular weighing of the pupils. There were 15 total number of wasted pupils among
Kindergarten to Grade III learners and 10 severely wasted pupils among Kindergarten to
Grade VI learners. Several feeding program implemented in the school in addressing the
malnourished children.

3. Learners' Materials
In Grade I, the five subjects such as Mother Tongue, Mathematics, Filipino, EsP
& Araling Panlipunan have a total of 36 learner-textbook per subject which indicates
that learner- textbook ratio is 1:1, but English subject has no textbook yet. For Grade II
the learner textbook ratio is 3:1. while Grade VI has 46 learner-textbook in Mathematics
a ratio of 1:2 & 120 learners-textbook in EsP for a ratio of 1:5, while other subjects has
none.

There are only 386 learners-textbook in all subject areas in Grades I, II & VI level.
This data implies that there’s a need of more textbook for these grade levels. While
Grades III, IV & V the learner-textbook ratio is 1:1.

4. Teachers Professional Development


The K-3 teachers had attended the DAP-ELLN division & district training &
seminar workshop while 4-6 teachers attended the PRIMALS training & seminars.

Due to the COVID-19 Pandemic where seminars are restricted or limited, the
teachers are prompted to attend webinars or virtual seminars where it was safer and
more convenient to attend without gathering with the crowd. The Department of

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Education continuously provides professional development for teachers despite the
pandemic we are facing.

Teachers are encouraged to attend trainings in order to enhance and develop


their professional attributes so that they improve their teaching strategies.

5. Funding Sources
For the past school year, the school has received funds from different sources
which in one way or another, contribute effectively on the school’s progress. Sources of
funds includes from MOOE, SEF from LGU and PTA. The school canteen also
generates funding for the school as well as the Gulayan sa Paaralan Projects

Moreover, the rice field of the school provides supplemental funding for the
school’s projects and activities during harvest season..

Though there were funds from different sources, the data however implicates that
the school’s funds are insufficient to accommodate all expenses of the school projects
and activities.

6. Awards and Recognition


The activities /contests participated by the pupils in the district are as follows;

Mathematics No. of Participant No. of awardee Award won

1. SUDUKO 2 1 1st place


2. DAMATH 1 1 2 nd place

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
3. MATH QUIZ 3 0 2 nd place
4. QUIZ BOWL(MATH) 3 0 NONE

Science

1. Science Quiz 3 0
2. Science Processes 3 0
3. Quiz Bowl 3 0

English

1. Story Telling 1 0

BSP

1. Municipal Boys Scouting 1

Sports & Athletics Activities

1. Volleyball 5
2. Running 2
3. Chess 2

DAGAST

1. Solo (Kundiman song) 1 3rd placer

Festival of Talent

[Link]. & Ms. Technolympic s 1 3rd placer

This data implies that the pupils need financial support & training to enhance the
pupils’ mental & physical ability and to increase the participation rate of the school.

PERFORMANCE INDICATORS

ACCESS
a. Number and Rate of Drop outs By Cause
Nueva Era Elementary School
131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
For the past three consecutive school years, Nueva Era Elementary School have
maintained the zero drop-out rate.
However, due to the pandemic and the “new normal” set up of the mode of
learning, the enrolment as of this school year is lesser compared to the enrolment of
the pas years.
This implies that there is a need to maintain the intervention made to maintain the
zero drop-out rate. Some reason pupils dropped from school are the insufficient family
income and transfer of residence because the place is a low lying area & easily got
flooded.

QUALITY

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
a. Percentage of Learners who completed the
school Year (Promotion Rate)

The data of promotion in the year 2018-2019 was 97% for male and 99% for
female, a total of 98%. However, on S.Y. 2019-2020, the promotion rate suddenly
decreased to 93% due to the retention of pupils on Grades 4 and 6. Last S.Y. 2020-
2021, the school have the promotion rate was 99%

b. QUARTERLY MPS OF THE SCHOOL


In consonance with the result of the School Mean Percentage Score (MPS) reached
to 79.00 % in the school year 2017-2018. Filipino 6 has the lowest MPS compared to the
other academic subjects with 76.83% in the school year 2017-2018.

c. Literacy Level
In the Literacy level, the data shows the increasing number of Independent
Readers from Grade 2 to Grade 6 in the current year. Intervention of the school was
conducted to every least-learned competencies during post-test evaluation.

GOVERNANCE
a. School-Based Management Assessment Level

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
During the SBM Assessment conducted last June, 2021, the school was
assessed as Level 1- Developing by the panel of evaluators.

This implies that the school needs to improve its SBM Practices to reach the Level
2.

SBM Level 1- SBM Level 2


Developing

b. Child-Friendly School Survey Result


Based on the results of the evaluation being conducted from the Child-Friendly
School survey of the 7 goals, we found out that our school belongs to a Child-Friendly
School, which earned 20 points.

c. Stakeholders' Participation
Out of 110 parents of the school, 101 parents have participated the Brigada
Eskwela and other school activities. The percentage of participation of parents was
about 93% of the total parent population.

d. Learner-Teacher Ratio
The learner-teacher ratio for the S.Y. 2021-2022 was 29:1. This is because the enrolment
in this year is 174 and the school has 6 permanent teachers. All grade levels have one
permanent teaher assigned.

e. Learner-Classroom Ratio
Nueva Era Elementary School
131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
The learner-Classroom ratio of the school is 24:1. The school has a two-story
building with six classrooms for Grade 1 to Grade Six learners. The school has also 1
building with three classrooms used for Kindergarten learners, library and computer
room. However, this building needs immediate repair because it is already hazardous for
the pupils to use.

f. Learner- Toilet Ratio


Nueva Era Elementary School has three available communal toilets for the
learners. The learner – toilet ratio is 58:1 which implies that the school needs additional
toilets for the pupils.

g. Learner-Seat Ratio
The learner-seat ratio is 1:1. This indicates that there are sufficient armchairs to
be used by the learners.

Status of School
Projects
a. Status of Continuous
Improvement Projects
Nueva Era Elementary School
131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
The school is grateful for the accomplishments of the projects that were prioritized for
the last three years of the SIP 2019-2021. These include repainting of the school
perimeter fence, repair of the reading center, construction of 5 spans of concrete
perimeter fence, and other projects through the MOOE funds.
The school’s continuous improvement project in academic is the monitoring of
pupils reading ability through different reading programs and projects that is
continuously implemented by the teachers to monitor the progress of pupils’ reading
ability by remediating daily & other reading related activities.

b. Other Stakeholders'
Accomplishments

The school is very grateful for having an active and supportive GPTA. The school
continuously held its annual Lakan at Lakambini every August during the Buwan ng
Wika as a Fund raising activity. Through their participation in this activity in the month
of August “Buwan Ng Wika” celebration, the parents have purchase 3 snare drum & 3
lyres for the school’s drum & lyre. The school had also put up a school entrance gate
from this income generated activity.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Proj
ect

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Desi
gn
A. ACCESS
1. Project Title: FSSP (Free School Supplies for Pupils)
Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 Most of the learners have incomplete school supplies such as
notebooks, paper, pen and pencils which affects their learning.
Project Objective Statement:
 To purchase school supplies for all learners
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget Source


Implementati Responsi
on ble
Procurement of School supplies for the Learners
Canvassing Canvassed the January 2022 NONE NONE
for the price price of every SH,
quotation of item Teachers ,
the school
supplies

Procurement Procured June 2022 SH, Php 6,000 MOOE


of school school supplies Teachers
supplies for for the learners
the learners

Prepared By:

ADELAIDA O. BALSIMO
Project Leader

REYLEN G. TAMPON RUXAN N. RAMIREZ


Asst. Team Leader Secretary

Project Title: ASLS (Assistance for Sickly Learners and other


Staff)
Problem Statement:
 There are learners who got simple illness that only needs over the
counter medicines. The school shall provide over the counter

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
medicines and other medical/ dental supplies that is a necessity
during the pandemic.
Project Objective Statement:
 To purchase medicines and medical supplies for the learners
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget Source


Implementa Responsible
tion
Procurement of medicines and medical supplies for the Learners
Canvassing Canvassed the
for the price price of every April 2022 SH, NONE NONE
quotation of item Teachers ,
the
medicines
and medical/
dental
supplies
Procurement Procured April 2022 SH, Php MOOE
of medicines medicines and Teachers 17, 875.00.
and school school health
health essentials and
essentials supplies for
and the learners
supplies for
the learners

Prepared By:

REYLEN G. TAMPON
Project Leader

MARY JOY P. ABATAYO RUXAN N. RAMIREZ


Asst. Team Leader Secretary

[Link] Title : FBLS ( Flower Box and Landscaping of School


Ground)
Problem Statement: There is no flower box structured in the school.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective: To beautify the school ground through landscaping
and flower boxes.
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Conduct February 2022-


Minutes of Teachers,
GPTA December NONE NONE
the meeting School Head
Meeting 2024
Make February 2022-
Program of Teachers,
Program of December NONE NONE
Works School Head
Works 2024
Constructio Constructed
n of Flower Flower box Teachers,
April 2022-
box and and School Head, Php
December MOOE
landscaping landscaping Parents 45,000
of school of school 2024
ground ground

Prepared By:

JINKY M. RAMIREZ
Project Leader

ARLEN T. CAMONGGAY ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

4. Project Title: SSFP (Standard School Flag Pole)


Problem Statement:
 The school flag pole is very small and not suitable to the standard size and
structure of DepEd. .

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective Statement:
 To enhance the school flag pole to standard size and structure.
Root Cause: Limited funds

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget Source


Impleme Respons
ntation ible
School Flag Pole
Teachers,
Consultative
School
school May 2022-
Minutes of Head.
planning December NONE NONE
meeting. 2024 School
team
Planning
meeting.
Team
Prepare NONE NONE
necessary Program of May 2022- School
documents Works. December Head,
such as 2024 Teachers
Program of
Works.
Start of the
enhancement June Php
Rehabilitati Teachers/ MOOE
and 2022- 30,000
on of school School PTA
rehabilitation December 15,000
flag pole head LGU
of the school 2024 15,000
flag pole

Prepared By:

SALVDOR N. PEÑOL, JR.


Project Leader

MARYJOY P. ABATAYO REYLEN G. TAMPON


Asst. Team Leader Secretary

5 . Project Title: PF (School Perimeter Fence)


Problem Statement:
 Loitering and cutting classes of the pupils during recess are observed due
to lack of perimeter fence.
Project Objective Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 To construct 6 spans concrete perimeter fence
Root Cause: Limited funds

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget


Implemen Responsibl Source
tation e
Construction of 6-span Perimeter fence
Consultative school Minutes of the July SH, NONE NONE
planning team meeting. meeting. 2022- Teachers,
December parents,
2024 barangay
council

Prepare a letter of Letter request SH, None None


request or solicitation for were available & July 2022- Teachers
the allocation of funds for handed to the December
the purchase of needed donors. 2024
equipment and materials.
Prepare a Program of Program of July 2022- SH, None MOOE
works for the project. works is December Teachers
available. 2024

Contact knowledgeable Knowledgeable & SH, Teacher, NONE NONE


and skilled personnel for skilled personnel July 2022- parents
the construction of the were contacted & December
perimeter fence. hired. 2024

Construction of 6 spans of August SH, Teacher, Php


perimeter fence. perimeter fence 2022- parents, 30, 000 MOOE
were December 30,000 LGU
constructed. 2024

Prepared By:

MARYJOY P. ABATAYO
Project Leader

EMALINE M. GUIAMOLOD REYLEN G. TAMPON


Asst. Team Leader Secretary

6. Project Title: RMC (Repair and Maintenance of School Building)


Problem Statement:
 The old MINSSAD building’s flooring need immediate repair
Project Objective:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 To repair the old Grade Two classroom’s flooring in the MINSSAD
building
Root Cause: Insufficient school budget.

Project Work Plan and Budget Matrix


Date of Person Budget
Activity Output Implementation
Budget
Responsible Source
Repair of old Grade 2 classroom
July 2023 SH, Teachers, NONE
Consultative school NONE
Minutes of the parents,
planning team meeting.
meeting. barangay
council
Letter request
Prepare a letter of
were available
request or solicitation
& handed to
for the allocation of SH, Teachers
the donors. None None
funds for the purchase
July 2023
of needed equipment
and materials.
Program of
Prepare a Program of
works is August 2023 SH, Teachers None MOOE
works for the project.
available.
Knowledgeabl SH, Teacher,
Contact knowledgeable
e & skilled parents
and skilled personnel
personnel NONE NONE
for the repair of the August 2023
were contacted
flooring.
& hired.

Repaired SH, Teacher,


Repair of the flooring of August 2023 Php
flooring of the parents, PTA
old Grade 2 classroom. 10,000
classroom

Prepared By:

JINKY M. RAMIREZ
Project Leader

ADELAIDA O. BALSIMO REYLEN G. TAMPON


Asst. Team Leader Secretary

7. Project Title: ESP (Enhanced School Pathway


Problem Statement:
 The school pathway is very narrow and needs enhancement.
Project Objective Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 To enhance the school pathway.
Root Cause: Limited funds

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget


Impleme Responsible Source
ntation
Consultative school Minutes of the January SH, Teachers, NONE NONE
planning team meeting. meeting. 2022- parents,
December barangay
2024 council

Prepare a letter of Letter request January SH, Teachers None None


request or solicitation for were available 2022-
the allocation of funds for & handed to the December
the purchase of needed donors. 2024
equipment and materials.
Prepare a Program of Program of January SH, Teachers None MOOE
works for the project. works is 2022-
available. December
2024
Contact knowledgeable Knowledgeable & January SH, Teacher, NONE NONE
and skilled personnel for skilled personnel 2022- parents
the enhancement of were contacted & December
school pathway hired. 2024

Start of the Enhanced January SH, Teacher, Php


reconstruction and school pathway 2022- parents, 30, 000 MOOE
enhancement of school December 50,000 LGU
pathway 2024

Prepared By:

MARYJOY P. ABATAYO
Project Leader

EMALINE M. GUIAMOLOD REYLEN G. TAMPON


Asst. Team Leader Secretary

8. Project Title: Project LE (Limestone Embankment)


Problem Statement:
 The school ground needs embankment because it becomes very
muddy during rainy season

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective:
 To embank the school ground with limestone
Root Cause: Insufficient school budget.

Project Work Plan and Budget Matrix


Activity Output Date of Person Budget Budget
Implementation Responsible Source
Limestone Embankment of School ground
Consultative school Minutes of the August 2022- SH, Teachers, NONE NONE
planning team meeting. December 2024 parents,
meeting. barangay
council

Prepare a letter of Letter request SH, Teachers None None


request or solicitation were
for the allocation of available & September 2022-
funds for the purchase handed to the December 2024
of needed equipment donors.
and materials.

Prepare a Program of Program of September SH, Teachers None MOOE


works for the project. works is 2022-
available. December 2024
Contact Knowledgeabl SH, Teacher, NONE NONE
knowledgeable and e & skilled September 2022- parents
skilled personnel for personnel December 2024
the embankment of were
the school ground contacted &
hired.
Embankment of the School SH, Teacher, 30,000 MOOE
school ground with ground was October 2022- parents,
limestone embanked December 2024 30,000 PTA
with limestone

Prepared By:

SALVADOR N. PEÑOL, JR
Project Leader

ADELAIDA O. BALSIMO REYLEN G. TAMPON


Asst. Team Leader Secretary

9. Project Title: RC (Repainting of Classrooms)


Problem Statement:
 The classroom needs repainting.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective:
 To enhance the appearance and repaint the classroom walls.
Root Cause: Insufficient school budget.

Project Work Plan and Budget Matrix


Date of Person
Budget
Implementati Responsi
Activity Output Budget Source
on ble
SH,
NONE
Consultative school January 2022- Teachers, NONE
Minutes of the
planning team meeting. December 2024 parents,
meeting.
barangay
council
Letter request
Prepare a letter of
were available & SH,
request or solicitation
handed to the Teachers
for the allocation of
donors. January 2022- None None
funds for the purchase December 2024
of needed equipment
and materials.

Program of
Prepare a Program of January 2022- SH,
works is None MOOE
works for the project. December 2024 Teachers
available.
Knowledgeable SH,
Contact knowledgeable
& skilled Teacher,
and skilled personnel for January 2022-
personnel were parents NONE NONE
the repainting of the December 2024
contacted &
classrooms.
hired.
SH,
10,000 MOOE
January 2022- Teacher,
Repainting of the Repainted December 2024 parents,
classrooms classrooms.

Prepared By:

JINKY M. RAMIREZ
Project Leader

ADELAIDA O. BALSIMO REYLEN G. TAMPON


Asst. Team Leader Secretary

10. Project Title: BCSG (Brush Cutting of School Ground)


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 The school ground is covered with grass to avoid being muddy during rainy
seasons and for more suitable for learners to play with. In this reason, the school
ground needs brush cutting maintenance every other month.
Project Objective:
 To maintain the cleanliness of the school ground
Root Cause: Insufficient school budget.

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Implementation Budget
Responsible Source

January 2022- NONE


Consultative school SH, Teachers, NONE
Minutes of the December 2024
planning team meeting. parents, barangay
meeting.
council

Letter request
were available &
SH, Teachers
Allocation of funds for the handed to the January 2022-
purchase of needed donors. December 2024 None None
equipment and materials.

SH, Teacher,
Maintained the January 2022- Php
Brush cutting of the parents,
cleanliness of the December 2024 39,960 MOOE
school ground.
school ground 18,000 PTA

Prepared By:

ADELAIDA O. BALSIMO
Project Leader

ARLEN T. CAMONGGAY RUXAN N. RAMIREZ


Asst. Team Leader Secretary

11. Project Title: MCIS (Maintaining Cleanliness in School)


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
The school needs trash bins to maintain the cleanliness of the school.
Project Objective Statement:
To purchase trash bins for all grade level.
Root Cause: Insufficient budget

Project Work Plan and Budget Matrix


Date of Person Budget
Activity Output Budget
Implementation Responsible Source

Canvassing for
the price of trash Canvassed the January 2022-
bins price of every December 2024 Sch. Head,
None None
item teachers

Procurement of Procured the


materials / trash materials/ trash
bins bins January 2022- Sch. Head, Php MOOE
December 2024 teachers 5,000.00

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ MARYJOY P. ABATAYO


Asst. Team Leader Secretary

[Link] Title: SSP(Standard School Pergola )


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
The school needs to construct new pergola for the second gate.
Project Objective Statement:
To construct and enhance the school pergola.
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix

Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Request
allocation of
funds from Letter of
School Head ,
SEF/ LGU for Request was January 2022-
GPTA Officials, None None
the submitted to December 2024
Teachers
construction LGU
of school
pergola
Prepare a Program of January 2022- SH, Teachers None MOOE
Program of works is December 2024
works for the available.
project.
Contact Knowledgeable January 2022- SH, Teacher,
knowledgeabl & skilled December 2024 parents NONE NONE
e and skilled personnel were
personnel for contacted &
the hired.
construction
of school
pergola.
January 2022- SH, Teacher,
Construction Constructed December 2024 parents, Php 30,000 MOOE
of school school pergola. 50,000 LGU
pergola.

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

[Link] Title: SSG(Standard School Gate)


Problem Statement:
The school needs to construct new school gate for the school entrance.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective Statement:
To construct and enhance the school gate
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Request
allocation of
funds from Letter of
School Head ,
SEF/ LGU Request was January 2022-
GPTA Officials, None None
for the submitted to December 2024
Teachers
constructio LGU
n of school
gate
Prepare a Program of January 2022- SH, Teachers None MOOE
Program of works is December 2024
works for the available.
project.
Contact Knowledgeable January 2022- SH, Teacher,
knowledgeabl & skilled December 2024 parents NONE NONE
e and skilled personnel were
personnel for contacted &
the hired.
construction
of school
gate.
January 2022- SH, Teacher,
Construction Constructed December 2024 parents, 30,000 MOOE
of school school gate. 30,000 LGU
gate

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

[Link] Title: GFW (Grills for the Windows)


Problem Statement:
The school needs to secure the office and classroom windows with grills.

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Project Objective Statement:
To put up window grills in office and classrooms.
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix


Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Request
allocation of Letter of
School Head ,
funds from Request was January 2022-
GPTA Officials, None None
SEF/ LGU for submitted to December 2024
Teachers
the putting LGU
up of grills
Prepare a Program of January 2022- SH, Teachers None MOOE
Program of works is December 2024
works for the available.
project.
Contact Knowledgeable January 2022- SH, Teacher,
knowledgeabl & skilled December 2024 parents NONE NONE
e and skilled personnel were
personnel for contacted &
the put up hired.
window grills
January 2022- SH, Teacher,
Installation Window grills December 2024 parents, 30,000 MOOE
of window were put up. 30,000 LGU
grills

Prepared By:

ADELAIDA O. BALSIMO
Project Leader

ARLEN T. CAMONGGAY MARY JOY N. PUYONG


Asst. Team Leader Secretary

B. QUALITY AND RELEVANCE


15. Project Title: PAC (“Pupils’ Assistance During Competitions”)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: Low participation of pupils in district, division
conducted
Project Objective Statement: To increase pupils participation in school,
district & division activities conducted from 10 to 45..
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix


Activity Output Date of Person Budget Budget
Implement Responsible Source
ation
Identify the Pupils who will NONE NONE
pupils to participate in July 2022 SH, Teachers ,
participate in different activities pupils
different were identified.
activities.

Train the pupils Year round SH, Teachers , None None


Pupils were pupils
trained ,

Acquire budget Budget allocated July 2022 Sch. Head, Php 6,000 MOOE
for August teachers,
transportation or 2022 pupils
internet August
connection for 2022 –
virtual December
competitions 2024

Prepared By:

SALVADOR N. PEÑOL JR.


Project Leader

ADELAIDA O. BALSIMO MARYJOY P. ABATAYO


Asst. Team Leader Secretary

16. Project Title: PAMEP (“Pupils’ Awards to Motivate and Enrich Performance”)
Problem Statement:
 Pupils need more extrinsic motivation to strive more with their performance by
giving them awards.
Project Objective Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 To increase pupils participation and performance in school by giving extrinsic
awards.
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix


Date of Person Budget Budget
Implementation Responsible
Activity Output Source
Identify the Pupils with 90% June 2022 NONE NONE
pupils who and above November SH,
have qualified average were 2022- Teachers ,
and reached identified. December 2024 pupils
required
average grade
for awards and
recognition.

Giving of
awards and Qualified pupils June 2022 SH,
recognition to were recognized November Teachers , Php 3,000 MOOE
the qualified and were 2022-Decemner pupils
pupils awarded 2024

Prepared By:

EMALINE M. GUIAMOLOD
Project Leader

REYLEN G. TAMPON RUXAN N. RAMIREZ


Asst. Team Leader Secretary

17. Project Title: ASL (Activity Sheets for Learners)


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 Due to COVID-19 pandemic, face to face classes are suspended and
learners used the Printed modular instruction that requires Activity
sheets and modules
 Teacher need to have instructional materials that are long-lasting and
durable
Project Objective Statement:
 To have a complete copy of learner’s activity sheets by grade level
 To purchase laminating machine
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix


Date of Person Budget Budget
Activity Output Implementat Responsible Source
ion
Reproduction of Learners’ Activity Sheets
Identify the Lacking Learner’s January NONE NONE
lacking Activity Sheets in 2022 SH, Teachers
activity every subject per -December ,
sheets by grade level were 2024
subject in identified
every grade
level .

Printing of The school has February SH, Teachers Php


Learner’s complete set of 2022 48,000 MOOE
Activity Activity sheets / April 2022
Sheets by modules in every August 2022
quarter/ subject. June 2022 –
Purchasing December 21,000 MOOE
of master roll Purchased 2024
Purchasing Laminating
of machine
Laminating
machine

Prepared By:

JINKY M. RAMIREZ
Project Leader

ARLEN T. CAMONGGAY MARY JOY P. ABATAYO


Asst. Team Leader Secretary
18. Project Title: LMS (Learning Materials and Supplies)
Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 The school needs office supplies and equipment, common janitorial supplies and
forms that are a necessity to keep the operation of the school.
Project Objective Statement:
 To purchase office supplies and equipment, common janitorial supplies and forms
Root Cause: Insufficient funds.

Project Work Plan and Budget Matrix


Activity Output Date of Person Budget Budget
Implementation Responsible Source
Procurement of office supplies and equipment
Canvassing Canvassed
for the price the price of April 2022 SH, NONE NONE
quotation of every item Teachers ,
the office
supplies and
equipment
Procurement Procured April 2022 SH, Teachers Php MOOE
of officeoffice March 2022 73,080.00
supplies and supplies June 2022
equipment and September 2022
equipment
Procurement of Common Janitorial supplies
Canvassing Canvassed
for the price the price of April 2022 SH, NONE NONE
quotation of every item Teachers ,
the common
janitorial
supplies
Procurement Procured May 2022 SH, Teachers Php 2,000 MOOE
of medicines medicines July 2022
and medical/ and
dental medical
supplies for supplies
the learners for the
learners

Activity Output Date of Person Budget Budget


Implementatio Responsible Source
n

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Procurement of office supplies and equipment
Canvassing Canvassed the
for the price price of every April 2022 SH, Teachers NONE NONE
quotation of item ,
school forms

Procurement Procured April 2022 SH, Teachers Php 1,600 MOOE


of school school forms May 2022
forms (Form 138/
Form 137)

Prepared By:

JINKY M. RAMIREZ
Project Leader

ARLEN T. CAMONGGAY ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

19. Project Title: PIM (Printer for Instructional Materials)


Project Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 Teachers lack printer for printing instructional materials and other
forms for activity sheets
Project Objective Statement:
 To purchase printer for printing instructional materials
Root Cause: Insufficient budget.

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget


Impleme Responsi Source
ntation
ble
Procurement of printer for printing instructional materials
Canvassing Canvassed the January NONE NONE
for the price price of every item 2022 SH,
quotation of Teachers ,
printer

Procuremen Procured printer for January SH, Php MOOE


t of printer instructional 2022 Teachers 15,000
materials

Prepared By:

RUXAN N. RAMIREZ
Project Leader

REYLEN G. TAMPON ARLENT. CAMONGGAY


Asst. Team Leader Secretary

20. Project Title: PMDPM (Printing Machine/Duplo Machines for Printing


Modules)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement:
 Due to COVID-19 pandemic, face to face classes are suspended and learners
used the Printed modular instruction that requires Activity sheets and modules
Project Objective Statement:
 To have a Duplo Machine to be used for printing modules and learner’s activity
sheets.
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix


Date of Person Budget Budget
Activity Output Implement Responsible Source
ation

January
Consultative school 2022- SH, Teachers,
NONE
planning team Minutes of the December parents, NONE
meeting. meeting. 2024 barangay
council

Letter request
Allocation of funds January SH, Teachers
were available &
for the purchase of 2022-
needed equipment
handed to the None None
December
and materials. donors.
2024

Letter request
Prepare a letter of were available &
request or handed to the SH, Teachers
solicitation for the January
donors and
allocation of funds 2022- None None
for the purchase of NGOs. NGOs
December
needed equipment 2024
and materials.

January
Purchased/
2022-
Purchasing of Duplo Solicited Duplo SH, Teachers Php NGOs
Machine
December
Machine from NGOs 100, 000 LGU
2024
donors/NGOs.

Prepared By:

EMALINE M. GUIAMOLOD
Project Leader

REYLEN G. TAMPON MARY JOY P. ABATAYO


Asst. Team Leader Secretary

21. Project Title: BOW (Budget for Online Information through Wifi
/Cellphone Load)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: To fast tract the pupils record in the system, internet
connection is needed in our school. Virtual seminars are in demand this
time of pandemic and wifi/ internet connection.
Project Objective Statement: To have a budget for internet connection for
the teachers
Root Cause: Insufficient budget

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Fastest
Canvass and School Head,
network and
bid the fastest School
the lowest January 2022 None NONE
internet network Planning
bidder
provider. Officer
identified.

Purchase load Purchased


for the internet / load for
January 2022- School Head,
wifi connection internet / wifi Php.12,000 MOOE
December 2022 Teachers
and connection in
communication school.

Prepared By:

JINKY M. RAMIREZ
Project Leader

REYLEN G. TAMPON MARYJOY P. ABATAYO


Asst. Team Leader Secretary

C. MANAGEMENT AND ADMINISTRATION

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
22. Project Title: STS (School Head’s and Teachers’ Supplies and
Travelling Expenses)
Problem Statement: Teachers and school head need funding for traveling
expenses during the canvassing and procurement of supplies.
Project Objective Statement: To have a budget for travelling expenses
and procurement of supplies
Root Cause: Insufficient budget

Project Work Plan and Budget Matrix


Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Secure Secured
travel order travel order
from the from the
January 2022- School Head,
Division Division None None
December 2022 Teachers
Office / Office /
District District
Office. Office.
Canvassed
Canvassing the lowest
and and quality January 2022- School Head, Php
MOOE
Procuremen maintenance December 2022 Teachers 12,000
t of supplies service
provider.

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ MARYJOY P. ABATAYO


Asst. Team Leader Secretary

23. Project Title: ICT – RAM (ICT Repair and Maintenance)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: The school has units of computers and printers that
need constant maintenance to ensure avoid further damage.
Project Objective Statement: To have a budget for the printer and
computer maintenance and repair
Root Cause: Insufficient budget

Project Work Plan and Budget Matrix


Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Identified the
Check the computer/
units of the
laptop and printer units School
computer/
that need immediate January 2022 Head, None None
laptops and
repair and Teachers
printers that
maintenance.
need repair.
Canvassed
Canvass for the lowest the lowest
School
and quality and quality
January 2022 Head, None NONE
maintenance service maintenance
Teachers
provider. service
provider.
January 2022
Repaired March 2022
May 2022 School
Repair the computer computer
July 2022 Head, Php.3,000 MOOE
and printer units. and printer
September 2022 Teachers
units. October 2022

Prepared By:

REYLEN G. TAMPON
Project Leader

JINKY M. RAMIREZ MARYJOY P. ABATAYO


Asst. Team Leader Secretary

[Link] Title: EBill (Payment for Electricity Bill)


Nueva Era Elementary School
131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: The school needs budget for the payment
of monthly electricity consumption.
Project Objective Statement: Paid monthly electric bills
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget


Implementati Responsible Source
on

Consultative
Minutes of January Teachers,
school planning NONE NONE
meeting. 2022 School Head
team meeting.

Allocate funds on Payment of January 2022 School Head, NONE NONE


MOOE Budget Electric bill was Teachers
through SIP specified on SIP
formulation.

Funds January
Approved Teacher,
available. 2022- Php
allotted budget School Head,
Updated December 12,000 MOOE
for electric bill SPT and PTA
payment of 2022
payment. Officers
electric bill

Prepared By:

ADELAIDA O. BALSIMO
Project Leader

ARLEN T. CAMONGGAY EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

25. Project Title: FB (Payment for Fidelity Bond)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: The school needs to ensure Fidelity Bond
for the MOOE funds.
Project Objective Statement: Ensure Fidelity Bond
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix

Activity Output Date of Person Budget Budget


Implementa Responsible Source
tion

Consultative
Minutes of September Teachers,
school planning NONE NONE
meeting. 2022 School Head
team meeting.

Allocate funds on Payment of September School Head, NONE NONE


MOOE Budget Fidelity Bond 2022 Teachers
through SIP was specified
formulation. on SIP

Funds
Approved
available and October Php
allotted budget Teacher,
ensured 2022 1,125.00 MOOE
for Fidelity School Head
fidelity
Bond
bonding

Prepared By:

SALVADOR . PEÑOL
Project Leader

ARLEN T. CAMONGGAY EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

26. Project Title: NEESNT (Nueva Era ES Needs Teachers)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: There were only 7 regular teachers in the
school including the school head.
Project Objective Statement:
Request 2 teacher items from the Division Office.
Request fund from LGU / SEF to have a budget for volunteer
teachers.
Root Cause: Lack of teachers’ item

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Request 2
Letter of
teacher
Request was
items from January 2022 –
submitted to School Head None None
the December 2024
De[Ed
Division
Division Office
Office

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
27. Project Title: SSFLGU (Sustain Support from LGU)
Problem Statement: There were only 5 LGU Paid volunteer
teachers in school.
Project Objective Statement:
Request sustainment of the LGU funds to continue support to the
Locally paid teachers
Root Cause: Lack of teachers’ item

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Request
allocation
of funds Letter of
School Head ,
from SEF/ Request was January 2022 –
GPTA Officials, None None
LGU to submitted to December 2024
Teachers
provide LGU
volunteer
teachers
LGU has hired
Hiring of qualified 5
Qualified volunteer January 2022 – School Head , Php
LGU
Volunteer teachers to be December 2024 Teachers 1,260,000
teachers deployed in
the school

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

27. Project Title: MASTPU (Maintain Assistance for Learning School Through
Parents’ Unity Meetings)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: Among 150 parents in the school, only 100 parents were active
during meetings and assemblies, graduation and brigada eskwela activity and early
enrolment
Project Objective Statement: To encouraged parents for the participation in meetings ,
assemblies , graduation, brigade eskwela and early enrolment activities.
Root Cause: Lack of information campaign

Project Work Plan and Budget Matrix


Date of Person Budget
Activity Output Budget
Implementation Responsible Source

Canvassing for Canvassed the


the price tarpaulin price of every
and other supplies item Sch. Head,
May 2022 None None
for Graduation teachers
and moving up
ceremonies
Procurement of Procured
Tarpaulin for and tarpaulin other
Sch. Head, Php
other supplies for supplies for June 2022 MOOE
teachers 5,000.00
Graduation Graduation
Ceremony Ceremony

Procurement of Procured MOOE


Sch. Head,
Tarpaulin for tarpaulin for August 2022 Php 500.00
teachers
Buwan ng Wika Buwan ng Wika

Procurement of Procured MOOE


Sch. Head,
Tarpaulin for Early Tarpaulin for January 2022 Php 500.00
teachers
Enrolment Early Enrolment

Prepared By:

JINKY M. RAMIREZ
Project Leader

ADELAIDA O. BALSIMO EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

28. Project Title: SGAD (School Guard Always on Duty)


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
The school needs Security Guard on duty for security of
school properties and premises.
Project Objective Statement:
Request 1 security Guard from the LGU fund.
Root Cause: Lack of teachers’ item

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Budget
Implementation Responsible Source

Request
allocation
of funds
Letter of
from SEF/ School Head ,
Request was January 2022 –
LGU to GPTA Officials, None None
submitted to December 2024
provide Teachers
LGU
security
guard in
school
LGU has hired
Hiring of qualified
January 2022 – School Head , Php
Qualified personnel to LGU
December 2024 Teachers 216,000.00
Personnel be deployed
in the school

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

29. Project Title: Project JS (Project Janitorial Services)


Problem Statement:

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
 The school ground is covered with grass to avoid being muddy during rainy
seasons and for more suitable for learners to play with. In this reason, the school
ground needs brush cutting maintenance every other month.
Project Objective:
 To hire qualifies personnel to maintain the cleanliness of the school ground
Root Cause: Insufficient school budget.

Project Work Plan and Budget Matrix

Date of Person Budget


Activity Output Implementation Budget
Responsible Source

Knowledgeable & SH, Teacher,


Hire knowledgeable and
skilled personnel parents
skilled personnel for the January 2022 NONE NONE
were contacted &
labor for brush cutting
hired.

SH, Teacher,
Maintained the January 2022- MOOE
Brush cutting of the parents,
cleanliness of the December 2022 18,000
school ground.
school ground

Prepared By:

SALVADOR N. PEÑOL, JR
Project Leader

EMALINE M. GUIAMOLOD ADELAIDA O. BALSIMO


Asst. Team Leader Secretary

30. Project Title:VTB (Visible Transparency Board)

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
Problem Statement: The school needs to enhance and repair the
transparency board to make it more visible to all.
Project Objective Statement:
To repair and enhance the school transparency board
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix


Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Request
allocation of
funds from Letter of
School Head ,
SEF/ LGU to Request was
January 2022 GPTA Officials, None None
provide submitted to
Teachers
repair for the LGU
transparency
board
Prepare a Program of January 2022 SH, Teachers None MOOE
Program of works is
works for the available.
project.
Contact Knowledgeabl January 2022 SH, Teacher,
knowledgeable e & skilled parents NONE NONE
and skilled personnel
personnel for were contacted
the repair of & hired.
transparency
board.
SH, Teacher,
Repairing of Enhancement January 2022 parents, 10,000 LGU
transparency of
board Transparency
board

Prepared By:

SALVADOR . PEÑOL
Project Leader

JINKY M. RAMIREZ EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]
30. Project Title:SGPP (Sustaining Gulayan sa Paaralan
Project)
Problem Statement: The school needs to enhance and maintain
the Gulayan sa Paaralan.
Project Objective Statement:
To enhance and maintain the Gulayan sa Paaralan Project.
Root Cause: Insufficient funds

Project Work Plan and Budget Matrix


Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Prepare a Program of June 2022 SH, Teachers None MOOE
Program of works is
works for the available.
project.
Contact Knowledgeabl July 2022 SH, Teacher,
knowledgeable e & skilled parents NONE NONE
and skilled personnel
personnel were contacted
enhancement & hired.
of the GPP
Enhancement SH, Teacher,
Enhancement and sustaining August 2022 parents, 2,000 LGU
and sustaining of GPP
of GPP

Prepared By:

ADELAIDA O. BALSIMO
Project Leader

JINKY M. RAMIREZ EMALINE M. GUIAMOLOD


Asst. Team Leader Secretary

131659 Sc
Nueva Era Elementary School

Campo 4, Nueva Era, Bunawan


Agusan del Sur
131659@[Link]
hool

SALVADOR N. PEÑOL, JR.


Team

HON. JOEL T. LARGO HON. LIWAYWAY B.


LABRILLAZO
Barangay EDCOM

GINEBIL B. MAHINAY JINKY [Link]


GPTA President Faculty

MARICEL C. LUCEÑO LIZA JANE MILLENDEZ

Parent Representative Child Protection Committee


Chairman

ADELAIDA O. BALSIMO DAISY M. DUHINO


School DRR Pupils’ Representative
Coordinator

Accepted:

MINERVA T. ALBIS,
PH.D.
Schools Division
Superintendent

Nueva Era Elementary School


131659
Campo 4, Nueva Era, Bunawan
Agusan del Sur
131659@[Link]

You might also like