0% found this document useful (0 votes)
30 views84 pages

IPC # 8 Engineering Store

Uploaded by

Muhammad Ramzan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views84 pages

IPC # 8 Engineering Store

Uploaded by

Muhammad Ramzan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

ABSTRACT OF COST

SINACO ENGINEERS (PVT) LTD


12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Site Preparatory Works


Leveling & Dressing of Site around the new plant area
buildings, yards, road etc. including the cost of removal
of surplus earth from site to a place outside ICI Plant
designated by Contractor, and backfilling down areas
to maintain the ground elevations as shown on
drawings, described in Specification and as directed by
1 the Engineer Incharge. SM 2572 75/- 192,900/- 2139.131 5708.437 7847.568 160,435 428,133

Dismantling, Earthwork, Backfilling and Termite


Control -

Structural excavation for foundation trenches etc. in


any type of soil, including separating and stacking of
required suitable materials at site for back filling
trenches in foundation, plinth and under floor of all
lead & lift as directed by the Engineer, backfilling with
approved suitable excavated material in layer not
2 exceeding 150mm in depth, watering and compacting CM 19646 550/- 10,805,300/- 20739.240 503.855 21243.095 11,406,582 277,120
to 95% modified AASHTO density, and disposal of
surplus un-suitable material to a place outside ICI
Plant designated by Contractor, including shoring &
strutting where required. Complete all as per drawings,
specifications and as directed by the Engineer
Incharge.

Prepared By Checked By
1/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Backfill with selected granular material up to 6 CBR


value of borrow material, in layer not exceeding
150mm thick, watering and compacting to 95%
3 CM 14224 750/- 10,668,000/- 5315.946 2251.657 7567.603 3,986,960 1,688,742
modified AASHTO density. Complete all as per
drawings, specifications and as directed by the
Engineer Incharge.

Providing and filling sand under floor including leveling,


dressing, watering and mechanically compacting to
4 CM 883 1,595/- 1,408,385/- 0.000 -
95% MPD as per specification and as directed by
Engineer Incharge.
-

Providing and laying Soil Improvement Material, 35mm


down sound gravel compacted to at least 75% relative
5 CM 65 3,240/- 210,600/- 0.000 -
dry density, as per drawings, specifications and as
directed by Engineer Incharge.
-

Providing and carrying out termite proofing under &


sides of foundations, and floors using BIFLEX or
equivalent as per manufacturer's recommendations,
with a 10 bar pressure ensuring at least 75mm
penetration in the soil of the area to be treated. The
Contractor will provide a guarantee for a period of ten
6 years against infestation of termite in the shape and SM
130 85/- 11,050/- 0.000 -
mode approved by the Engineer Incharge, stating that
in case of infestation, additional treatment will be
provided by the contractor at no extra cost to the Owner
(horizontal & vertical). Complete all as per drawings,
specifications and as directed by the Engineer
Incharge.
(actual treated area will be measured for payment)
-

Prepared By Checked By
2/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Dismantling existing plastered/un-plastered brickwork


in cement sand mortar, serviceable bricks are to be
7 handed over to ICI and disposal of unserviceable CM 84 2,650/- 222,600/- 89.941 10.078 100.019 238,344 26,707
material and debris outside ICI Plant area designated
by Contractor, as directed by Engineer Incharge.

Dismantling of RCC works (Floors, Dike walls,


Foundations, Stubs etc.) including disposal of
8 unserviceable material and debris outside ICI Plant CM 60 7,750/- 465,000/- 111.983 79.466 191.449 867,868 615,864
area designated by Contractor, as directed by Engineer
Incharge.

Concrete and Formwork -

Providing, Mixing, handling and pouring Plain Cement


Concrete (PCC) using OPC Cement under Foundation,
floors, plinth protection etc. using graded crushed
stone as coarse aggregate (ASTM C-33 Class 67)
9 including screening and washing of aggregates,
-
mechanical mixing, lifting, placing and curing to all
depths and height and to exact dimensions shown on
the drawings, and using proper formwork. Complete all
as per drawings, specifications and as directed by the
Engineer Incharge.

a) PCC 1:6:12 CM 200 5,540/- 1,108,000/- 0.000 - -


b) PCC 1:4:8 CM 649 5,725/- 3,715,525/- 3190.163 69.201 3259.364 18,263,683 396,174

Prepared By Checked By
3/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing, Mixing, handling, pouring, finishing & curing


etc., straight or curved cast-in place designed mix
reinforced structural cement concrete with min
cylinder strength at 28 days as noted below, using
Ordinary Portland Cement for all work, unless specified
otherwise, Lawrencepur sand and Margalla crushed
10 stone including vibrating through electro mechanical -
vibrator, placing of all pipes, sleeves PVC conduits &
fittings, with necessary arrangements where required
and other embedded items before concreting complete
in all respects as per drawings, specifications and as
approved by the Engineer Incharge.

a) Foundations ,Pads & Footing Beams / Plinth Beams CM


4000 psi 3651 8,910/- 32,530,410/- 2798.215 177.876 2976.091 24,932,096 1,584,879

b) Slab on Grade/RCC Floor 3000 psi CM 500 8,840/- 4,420,000/- 609.113 186.665 795.778 5,384,559 1,650,116
c) Slab, Beams, Brackets, Parapets, Stair case (waist
CM 1485 9,315/- 13,832,775/- 1795.283 18.814 1814.097 16,723,061 175,252
slab, intermediate landing and steps) 3000 psi
d) RCC walls 3000 psi CM 217 9,315/- 2,021,355/- 355.811 81.699 437.510 3,314,379 761,026
e) RCC Columns/Pedestal 4000 psi CM 1360 9,865/- 13,416,400/- 1274.204 39.115 1313.319 12,570,022 385,873

f) Chimney walls and Corbel Beams thorough


CM 280 57,786/- 16,180,080/- 296.660 0.000 296.660 17,142,795 -
slipforming 3000 psi (including cost slipform work)

Supply, fabricate and fix formwork fabricated from


12 Steel Plates complete in all respect as per - -
specifications and as directed by Engineer Incharge:

a) Column Foundations SM 1656 550/- 910,800/- 4516.135 289.348 4805.483 2,483,874 159,141

b) Column/Pedestal in foundation and superstructure SM 9295 750/- 6,971,250/- 7143.370 256.740 7400.110 5,357,528 192,555

c) Foundation/Plinth Beams SM 972 650/- 631,800/- 1991.746 0.000 1991.746 1,294,635 -

c) Slab, Beams, Brackets, Parapets, Stair case (waist


SM 10562 750/- 7,921,500/- 9851.515 268.418 10119.933 7,388,636 201,313
slab, intermediate landing and steps) above ground

Prepared By Checked By
4/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current
d) Machine and Equipment foundations SM 2176 650/- 1,414,400/- 602.178 0.000 602.178 391,416 -
e) RCC walls SM 5915 675/- 3,992,625/- 2874.554 843.201 3717.755 1,940,324 569,161

13 Providing and Laying Anchor Bolt pockets (without


- -
grouting)
a) 0.000 to 0.500 mm depth No. 260 550/- 143,000/- 203.000 0.000 203.000 111,650 -
b) 0.500 to 1.000 mm depth No. 1040 1,050/- 1,092,000/- 280.000 0.000 280.000 294,000 -
c) 1.000 to 1.500 mm depth No. 260 1,950/- 507,000/- 38.000 28.000 66.000 74,100 54,600
Steel Reinforcement 0.000 - -

Providing Cutting, fabricating and fixing in position Mild


Steel deformed reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of 60,000 psi
including all cost of cleaning, straightening, cutting,
14 bending, binding with 16 SWG annealed binding wire, M.Ton
1300 26,000/- 33,800,000/- 1290.117 36.454 1326.571 33,543,042 947,817
wastage and such overlaps as are not shown in
drawings, using precast concrete spacer blocks and
steel chairs for formwork cover etc. Complete all as per
drawings, specifications and as directed by the
Engineer Incharge.

Water Proofing and Roof Treatment - -

Furnish and Apply Waterproofing with Primer Coat and


2 Coats of Cold Bitumen including 500 gauge single
16 layer polythene sheet on vertical surface as per SM
3250 425/- 1,381,250/- 7792.873 0.000 7792.873 3,311,971 (0)
directions of the manufacturer (Sika or equivalant).
Complete all as per drawings, specifications and as
directed by the Engineer Incharge.

Supply, mix and apply food grade 1.5mm thick a


flexible 2-part cementitious water proofing system with
K11 flex of M/S DAVCO or equal and approved to
18 concrete surface of water structures in four essential SM
1138 705/- 802,290/- 280.500 0.000 280.500 197,753 -
steps inclusive of preparation of surface, repairing with
corrosion barrier mortar complete as shown on drawing
and in accordance with the Manufacturer's written
instructions and as directed by the Engineer Incharge.

Surface Rendering and Flooring Works - -

Prepared By Checked By
5/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing and laying cement plaster in 1:5 cement:


sand at various levels, including curing, scaffolding, etc.
20 0.000 - -
as shown in the drawings as per specification and as
directed by Engineer Incharge.

a) Internal sides SM 4500 425/- 1,912,500/- 4656.328 379.469 5035.797 1,978,939 161,274

b) External sides SM 1000 500/- 500,000/- 1197.346 99.852 1297.198 598,673 49,926

Deep Struck Pointing 1:2 Cement: Sand mortar at any


height and thickness, complete in all respect as per
21 SM 4500 500/- 2,250,000/- 1085.052 1302.405 2387.457 542,526 651,203
drawings, specifications and as directed by Engineer
Incharge.

Supply and apply M/S ICI Dulux Paints and approved


make and shade in three coats consisting one priming
coat of lime wash including sand papering, preparation
of surfaces, one coat of Dulux primer and two coats as
22 paint as mentioned below in sub-items as specified in SM 6000 275/- 1,650,000/- 789.372 0.000 789.372 217,077 (0)
the selected system as shown on finishing
Schedules/Drawings in approved color, texture, shade
and pattern complete in all respect. Vinyl Emulsion to
Plastered Walls, Ceiling or Concrete Surface

Providing, Mixing, handling and pouring Plain Cement


Concrete in floor slabs ,using graded crushed stone as
23 coarse aggregate (ASTM C-33 Class 67)as per given - -
below ratio.
Using Chenab sand
a) 1:2:4 PCC 100mm thick SM 150 725/- 108,750/- 96.310 403.900 500.210 69,825 292,828
a) 1:2:4 PCC 75mm thick SM 650 595/- 386,750/- 0.000 0.000 - -
a) 1:2:4 PCC 50mm thick SM 1600 435/- 696,000/- 4.802 0.000 4.802 2,089 -

Prepared By Checked By
6/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Supply and install Ceramic tiles in approved pattern,


design and shape including 1:3 C.S. mortar, pigments,
grouting with matching color, pointing, cleaning,
24 0.000 - -
scaffolding and its removal complete with all necessary
material and accessories in accordance with the
Specifications and as shown on Drawings.

a) Non-Skid Tiles in Toilet & Bath Room Floor with


basic Cost of Rs. 850/m² of Approved Size, Color and SM 1250 1,825/- 2,281,250/- 287.975 50.685 338.660 525,554 92,500
Shade by the Engineer.
Doors, Windows and Ventilators - -

Supply and install shop fabricated painted steel hollow


metal doors with 5mm thick clear plain local glass (in
upper panels only)using 50x50x4mm MS box section
for frames, locking rail 100x50x4mm thick, 16 BG MS
sheet covering, reinforced to ensure the dimensional
27 stability against applicable load and forces, locking SM
100 11,925/- 1,192,500/- 100.618 60.624 161.242 1,199,870 722,936
arrangement, stainless aldrops and other hardware,
fitting and fixing accessories as per hardware schedule
and finished in industrial enamel paint of approved
color, shades, pattern in accordance with the
Specification, as shown on Drawings and to the
approval of the Engineer.

Providing & fixing steel windows and Ventilators with


openable glazed panels, using beam section for frame
(40x25x16x3mm), Z-section for leaves
(20x25x20x3mm), T-section sashes (25x25x3mm), glass
panes, wooden screed for glazing embedded over a
28 SM 170 9,495/- 1,614,150/- 12.600 0.000 12.600 119,637 -
thin layer of putty duly screwed with leaved, brass
fittings, holdfast, duly painted, complete in all respects,
in cluding all cost of material and labour, etc. including
Providing
5mm Clear and fixing
Glass as shop and
per deign fabricated anodized
as directed by the
corrosion resistant Aluminum Door (Champaign) by an
Engineer-in-charge.
approved manufacturer, comprising of 3.2 x 100mm
outer tubular sections with 2mm thick open able
tubular section and mullions, sash members. Including
glass (5mm) and glazing accessories. Consisting of
29 SM 80 11,985/- 958,800/- 21.240 26.370 47.610 254,561 316,044
corrosion resistant hardware, all aluminum and glass
fitting and fixing accessories, Sealed with UV resistant
building grade sealants, All doors to be designed for
resisting 150 Km/Hr wind pressure, complete in all
respects, in accordance with specifications, as shown
on drawings and to the approval of the Engineer.
Prepared By Checked By
7/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Supply and fix champaign color or as approved by


Engineer Aluminum Extrusions Sliding Windows,
consisting of corrosion resistance, and not less than 1.6
mm thick at any location for main frame and sash
members, frames, angles, channels, cover jointed,
30 SM 90 7,990/- 719,100/- 110.304 320.280 430.584 881,329 2,559,037
mullions including single glazing and glass
(5mm)accessories, mastic pointing sealant, fly screens,
applicable hardware fittings and fixing accessories
complete in all respect in accordance with the
Specifications and as Shown on Drawings.

Structural Steel and other Metal Works 0.000 - -

Supply of Anchor/Embedded Plates, Angles and


Channels, pipe penetrations, frames complete in all
33 Kg 28000 120/- 3,360,000/- 24740.381 10525.480 35265.861 2,968,846 1,263,058
respect, as per drawings, specifications and as directed
by the Engineer Incharge.

Fixing Anchor/Embedded Plates, Angles and Channels,


pipe penetrations, frames in any type of RCC member
34 at any height & location, complete in all respect, as per Kg 28000 65/- 1,820,000/- 36753.334 11250.855 48004.189 2,388,967 731,306
drawings, specifications and as directed by the
Engineer Incharge.

Supply of Structural steel work , using I-beams, Angles


and Channels, welding & bolting, painting etc.
35 Kg 2000 130/- 260,000/- 2844.758 374.950 3219.708 369,819 48,744
complete in all respect, as per drawings, specifications
and as directed by the Engineer Incharge.

Fabrication of Structural steel work , using I-beams,


Angles and Channels, welding & bolting, painting etc.
36 Kg 2000 65/- 130,000/- 3135.477 419.421 3554.898 203,806 27,262
complete in all respect, as per drawings, specifications
and as directed by the Engineer Incharge.

Road and Drainage Works - -

Preparation and compaction upto 90% modified


39 AASHTO of natural ground upto a depth of 200mm in SM 920 80/- 73,600/- 2736.084 -45.311 2690.773 218,887 (3,625)
ordinary soil.

Prepared By Checked By
8/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Excavation or cutting to a required grade, camber and


side slopes including dressing top and sides and
40 disposal of excavated material to a place outside ICI CM 920 375/- 345,000/- 1323.724 -194.912 1128.812 496,397 (73,092)
Plant designated by Contractor, as per drawings,
specifications and as directed by Engineer Incharge.

Making earthen embankment with earth taken from


approved borrow pits including cost of excavation,
41 placing in layers not exceeding 225mm in depth CM
1400 575/- 805,000/- 644.077 -66.801 577.276 370,344 (38,411)
including dressing top and sides of the bank, complete
in all respect as per drawings, specifications and as
directed by Engineer Incharge.

Compaction of earthen embankments to full depth and


width below sub-grade level by mechanical means in
layers not exceeding 200mm in depth at optimum
42 moisture content including watering and mixing by CM 1400 325/- 455,000/- 461.298 -66.801 394.497 149,922 (21,710)
mechanical means. The sub-grade embankments shall
be compacted to at least 95% modified AASHTO
maximum dry density for their full depth and width.

Preparation of sub-grade over bottom of excavation


with required dressing to required grade, camber and
side slopes including cutting to required depth and
breaking clods, watering and consolidation with
43 suitable mechanical means to attain maximum density SM 920 75/- 69,000/- 1075.300 -1075.300 0.000 80,648 (80,648)
of 95% modified AASHTO for top 150mm layer
including disposal of surplus earth to a place outside
ICI Plant designated by Contractor, as per drawing,
specification and as directed by Engineer Incharge.

Prepared By Checked By
9/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing and laying Granular sub base of any


thickness to required grade and camber including
44 CM 230 3,150/- 724,500/- 215.060 162.777 377.837 677,439 512,746
compacting with road roller watering with all lead and
lift. (compacted thickness to be measured).

Providing and laying graded Sargodha Crushed


aggregate base course conforming to AASHTO
specification upto any thickness in required grade and
45 camber and compacting to the required density by CM 230 3,525/- 810,750/- 502.657 502.657 - 1,771,865
approved mechanical means including watering with
all lead and lift (compacted depth to be considered for
payment)

Providing and laying Precast Road kerb stone 450 x 150


x 300 mm (Izhar made or equivalent) using crushed
aggregate, formwork and its removal, compacting and
curing laid in cement mortar 1:4 & cement plaster 1:4
46 RM 960 1,360/- 1,305,600/- 0.000 - -
neatly finished including cost of excavation, backfilling
of excavated stuff, concrete bedding & haunching,
complete as per drawings, specification and as directed
by Engineer Incharge.

Prepared By Checked By
10/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing, Mixing, handling, pouring, finishing & curing


etc., at height ,straight or curved cast-in place designed
mix reinforced Structural cement concrete with min
3000 cylinder strength at 28 days for Drain (walls and
bed), using Ordinary Portland Cement unless specified
otherwise Lawrencepur sand and Margalla crushed
47 stone including vibrating through electro mechanical CM 228 13,535/- 3,085,980/- 0.000 - -
vibrator, Steel form work and its removal, placing of all
pipes, sleeves PVC conduits & fittings, with necessary
arrangements where required and other embedded
items before concreting complete in all respects as per
drawings, specifications and as approved by the
Engineer Incharge. (Excluding The reinforcement cost)

Providing and laying cement concrete paving stone 60


mm thick (Izhar or equivalent) in grey colour in foot
48 path, any pattern / shape (hydraulically compressed) SM 263 1,145/- 301,135/- 0.000 - -
strength 7000 psi laid & jointed in sand. Including 50
mm sand cushion approved manufacturer.

Miscellaneous Works 0.000 - -

Providing and Fixing Pre-cast 75mm thick slab (Izhar


made or equivalent) 1m to 1.5m & 0.5m to 0.75m
49 SM 98 1,750/- 171,500/- 0.000 - -
width jointed with 1:4 Cement Sand mortar complete
in all respect.

Providing bitumen filler of approved proprietary brand


in Expansion joints 25mm wide upto depth of 200mm
using 90lbs of bitumen, 0.2lbs of cement and 0.8cu.ft of
50 sand per cu.ft (1442 kg of bitumen, 3.2kg of cement RM 130 450/- 58,500/- 0.000 - -
and 0.8cu.m. per cu.m.) of filler and fixing in position in
an approved manner and complete as per drawings
and as directed by the Engineer Incharge.

Prepared By Checked By
11/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing and filling Dummy joint 6mm wide and 25 to


40mm deep in floors etc. using 90lbs of bitumen,
0.2lbs of cement and 0.8cu.ft of sand per cu.ft (1442 kg
51 of bitumen, 3.2kg of cement and 0.8cu.m. per cu.m.) of RM 4550 75/- 341,250/- 0.000 - -
filler and fixing in position in an approved manner
complete as per drawings and as directed by the
Engineer Incharge.

Providing and filling isolation joint 10mm wide and 100


to 150mm deep in floors etc. using 90lbs of bitumen,
0.2lbs of cement and 0.8cu.ft of sand per cu.ft (1442 kg
52 of bitumen, 3.2kg of cement and 0.8cu.m. per cu.m.) of RM 130 275/- 35,750/- 0.000 - -
filler and fixing in position in an approved manner
complete as per drawings and as directed by the
Engineer Incharge

Chain link wire fabric fencing 1200mm height with L


50x50x6mm iron posts, including door openings,
53 complete in all respect as per drawing & as directed by RM 39 3,250/- 126,750/- 0.000 - -
the Engineer Incharge .
Excluding the cost of foundation

Providing and Laying first class burnt brick masonry in


sub structure and plinth with 1:5 (Cement : Sand)
54 CM 228 6,825/- 1,556,100/- 13.835 0.000 13.835 94,424 -
mortar, complete in all respect as per drawings,
specifications and as directed by Engineer Incharge.

Prepared By Checked By
12/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current

Providing and laying first class burnt brick masonry at


any height , straight or curve in any thickness set in
(1:4) cement sand mortar in superstructure, placing
wall ties with R.C.C. members with 1/4" dia. M.S.
55 CM 1000 9,345/- 9,345,000/- 930.390 60.608 990.99800 8,694,495 566,382
round bars including curing finishing and racking out
joints, scaffolding, lifting, hoisting, etc., complete in all
respects as per specifications, drawings and as directed
by the Engineer.

Providing, fixing, cutting, jointing and testing uPVC


Piping conforming to ISO 3633: including uPVC fittings
with solvent cement jointing Dadex make "Nikasi Type
56 B" or approved equal, rates include cost of ,clamping RM 500 1,950/- 975,000/- 0.000 - -
to walls supports, and providing other necessary pipe
fittings of the rain water down comers 100mm dia
pipe:

57 Installation of Anchor Bolts of any dia./length Kg 6000 100/- 600,000/- 0.000 - -

Providing and finishing Non shrink Cement grout, as


58 per drawings, specifications and as directed by CM 30 122,750/- 3,682,500/- 3.977 7.640 11.617 488,177 937,775
Engineer Incharge

Providing and finishing Non shrink Epoxy grout as per


59 drawings, specifications and as directed by Engineer CM 0 1,145,750/- /- 0.000 - -
Incharge.

Providing and laying R.C.C. pipes and collar of class "B"


including excavation of all types of soil to required
gradient cutting fixing and joining with Asphalt
composition and cement mortar (1:1) and testing with
60 0.000 - -
water to a head of Five feet above the top of the
highest pipe complete in all respect. Also including the
cost of providing and laying 300x300x150 (1:3:6)
concrete below the joints.

a) 300mm dia. RM 100 2,125/- 212,500/- 0.000 - -

Prepared By Checked By
13/84
Q.S ICI
ABSTRACT OF COST
SINACO ENGINEERS (PVT) LTD
12-G Model Town, Lahore. 547000

Project: 18 MW CFB-3&4 Power Plant Khewra


IPC# 7 Date: 11-4-2016
Quantities Amount=Rs.
Item B.O.Q
Description Unit Rate Amount
No. Qty. Previous Current Total Previous Current
b) 600mm dia. RM 70 4,025/- 281,750/- 0.000 - -

Supply & Installation of Fire Resistant (3 hour fire


rated) gypsum Suspended False Ceiling 600x600mm
61 SM 500 1,225/- 612,500/- 355.545 66.393 421.938 435,543 81,331
size panels 19mm th., for control rooms complete in all
respects.

Total 227,136,285/- 195,407,503/- 20,683,206/-

Prepared By Checked By
14/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

588,568

11,683,702

Prepared By Checked By
15/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

5,675,702

Prepared By Checked By
16/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

265,050

1,483,732

-
18,659,858

Prepared By Checked By
17/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

26,516,975

7,034,675

16,898,314

4,075,406
12,955,895

17,142,795

2,643,015

5,550,083

1,294,635

7,589,950

Prepared By Checked By
18/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total
391,416
2,509,485

111,650
294,000
128,700
-

34,490,859

3,311,971

197,753

Prepared By Checked By
19/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

2,140,214

648,599

1,193,729

217,077

362,652
-
2,089

Prepared By Checked By
20/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

618,055

1,922,806

119,637

570,606

Prepared By Checked By
21/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

3,440,366

4,231,903

3,120,272

418,562

231,068

215,262

Prepared By Checked By
22/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

423,304

331,934

128,212

Prepared By Checked By
23/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

1,190,185

1,771,865

Prepared By Checked By
24/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

Prepared By Checked By
25/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

94,424

Prepared By Checked By
26/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total

9,260,876

1,425,952

Prepared By Checked By
27/84
Q.S ICI
STRACT OF COST
Date: 11-4-2016
Amount=Rs.
Total
-

516,874

216,090,709/-

Prepared By Checked By
28/84
Q.S ICI
SINACO ENGINEERS (PVT) LTD Abstract of cost
12-G Model Town Lahore IPC # 8
Project Name:- CFB 3&4 ICI Khewra Jehlum. Engineering Store ( BOQ ITEMS ) Date :- April 11, 2016

B.O.Q. Quantity Amount (Rs.)


Item No
Description of Item Unit Rate Remarks
Previous Current Total Previous Current Total
Site Preparatory Works
Leveling & Dressing of Site including the cost of removal of
1 surplus earth from site to a place outside ICI Plant designated
by Contractor, and backfilling down areas to maintain the -
ground elevations as shown on drawings, described in
Dismantling, Earthwork, Backfilling and Termite Control

Structural excavation for foundation trenches etc. in any type


of soil, including separating and stacking of required suitable
2 materials at site for back filling trenches in foundation, plinth
and under floor of all lead & lift as directed by the Engineer,
backfilling with approved suitable excavated material in layer 445.486 40.765 486.251 Cum 550 245,017 22,421 267,438
not exceeding 150mm in depth, watering and compacting to
Dismantling
Dismantling of RCC works (Floors, Dike walls, Foundations,
8 Stubs etc.) including disposal of unserviceable material and 3.531 - 3.531 Cum 7,750 27,365 0 27,365
debris outside ICI Plant area designated by Contractor, as
Concrete and Formwork
directed by Engineer Incharge.
Providing, Mixing, handling and pouring Plain Cement
9 Concrete (PCC) using OPC Cement under Foundation, floors,
plinth protection etc. using graded crushed stone as coarse
aggregate
b) PCC 1:4:8(ASTM C-33 Class 67) including screening and 10.048 36.300 46.348 Cum 5,725 57,525 207,818 265,342
Providing, Mixing, handling, pouring, finishing & curing etc.,
10 straight or curved cast-in place designed mix reinforced
structural cement concrete with min cylinder strength at 28
a) Foundations
days ,Pads &
as noted below, Footing
using Beams
Ordinary / PlinthCement
Portland Beamsfor
4000
all
psi 81.200 - 81.200 Cum 8,910 723,492 0 723,492
b) Slab on Grade/RCC Floor 3000 psi 23.901 23.901 Cum 8,840 0 211,285 211,285
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) 3000 psi 3.315 3.315 Cum 9,315 0 30,879 30,879
e) RCC Columns/Pedestal 4000 psi 35.094 - 35.094 Cum 9,865 346,202 0 346,202
Supply, fabricate and fix formwork fabricated from Steel
12 Plates complete in all respect as per specifications and as
directed by Engineer Incharge:

a) Columns Foundations 144.928 16.350 161.278 Sqm 550 79,710 8,993 88,703
b) Columns/Pedestal in foundation and superstructure 230.308 - 230.308 Sqm 750 172,731 0 172,731
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) above ground 13.636 13.636 SM 750 0 10,227 10,227
Steel Reinforcement
Providing Cutting, fabricating and fixing in position Mild Steel
14 deformed reinforcement rebar grade 60 as per ASTM
A615,with minimum 12.641 4.158 16.799 M.Ton 26,000 328,666 108,108 436,774
Providing and laying strength of 60,000
cement plaster psi including
in 1:5 all cost
cement: sand at
of
various levels, including curing, scaffolding, etc. as shown 16
cleaning, straightening, cutting, bending, binding with in
20
the drawings as per specification and as directed by Engineer 0
Incharge.
a) Internal sides 974.042 974.042 SM 425 0 413,968 413,968
b) External sides - SM 500 0 0 0
Deep Struck Pointing 1:2 Cement: Sand mortar at any height
21 Supply and applycomplete
and thickness, M/S ICI Dulux
in all Paints
respectandasapproved make
per drawings,
and shade in three
specifications and ascoats consisting
directed one priming
by Engineer Incharge.coat of lime
wash including sand papering, preparation of surfaces, one 1,037.294 1,037.294 SM 500 0 518,647 518,647
coat of Dulux primer and two coats as paint as mentioned
22
below in sub-items as specified in the selected system as 952.644 952.644 SM 275 0 261,977 261,977
shown on with
DPC(1:2:4) finishing Schedules/Drawings
two coats in approved
of Bitumen & Polythene Sheetcolor,
one
26 texture,
layer shade and pattern complete in all respect. Vinyl
Emulsion to Plastered Walls, Ceiling or Concrete Surface 81.377 81.377 Sqm 753 0 61,316 61,316
Providing and fixing shop fabricated anodized corrosion
Supply
resistantandAluminum
install shop fabricated
Door painted steel
(Champaign) by an hollow metal
approved
27 doors with 5mm thick clear plain local glass (in upper panels
manufacturer, comprising of 3.2 x 100mm outer tubular 7.432 7.432 SM 11,925 0 88,627 88,627
only)using
sections with50x50x4mm
2mm thick MS box
open section
able for frames,
tubular lockingand
section rail
100x50x4mm
mullions, sashthick, 16 BGIncluding
members. MS sheetglass covering,
(5mm)reinforced
and glazing to
29 accessories. Consisting of corrosion resistant hardware, all
Supply
aluminumandandfix glass
champaign colorfixing
fitting and or asaccessories,
approved by Engineer
Sealed with
Aluminum Extrusions
UV resistant building gradeSliding
sealants,Windows,
All doors to consisting
be designed of 11.38 11.381 SM 11,985 0 136,401 136,401
corrosion resistance,
for resisting 150 Km/Hr and notwindlesspressure,
than 1.6 mm thick at
complete in any
all
location
respects,forin main frame and
accordance withsash members, frames,
specifications, as shownangles,
on
30 channels, cover
drawings and to jointed, mullions
the approval of theincluding
Engineer.single glazing and
glass (5mm)accessories, mastic pointing sealant, fly screens,
applicable hardware fittings and fixing accessories complete - - SM 7,990 0 0 0
33 in all respect
Supply in accordance with
of Anchor/Embedded the Angles
Plates, Specifications and as
and Channels,
Shown on Drawings.frames complete in all respect, as per
pipe penetrations,
drawings, specifications and as directed by the Engineer
Incharge.
- - - Kg 120 0 0
34 Fixing Anchor/Embedded Plates, Angles and Channels, pipe
penetrations, frames in any type of RCC member at any
height & location, complete in all respect, as per drawings, - - - Kg 65 0 0
specifications and as directed by the Engineer Incharge.
Providing and Laying first class burnt brick masonry in sub
structure and plinth with 1:5 (Cement : Sand) mortar,
54
complete in all respect as per drawings, specifications and as
directed by Engineer Incharge. 31.000 31.000 CM 6,825 211,575 211,575
Providing and laying first class burnt brick masonry at any
height , straight or curve in any thickness set in (1:4) cement
sand mortar in superstructure, placing wall ties with R.C.C.
55 members with 1/4" dia. M.S. round bars including curing
finishing and racking out joints, scaffolding, lifting, hoisting, 247.669 247.669 CM 9,345 2,314,467 2,314,467
etc., complete in all respects as per specifications, drawings
and as directed by the Engineer.
58
Providing and finishing Non shrink Cement grout, as per
drawings, specifications and as directed by Engineer Incharge 0.330 0.330 CM 122,750 0 40,508 40,508

Additional Items/ Non BOQ

NBOQ-1 Galvanized anchor Bolt


144.000 144.000 Nos 1,084 156,096 156,096

Total Amount Rs. 1,980,709 4,803,311 6,784,020


SINACO ENGINEERS (PVT) LTD
Measurement Sheet
12-G Model Town, Lahore. 547000 Sheet # :- IPC#7
Project Name:- CFB 3&4 ICI Khewra Jehlum. ENGINEERING STORE (BOQ Items) Date:- ###

BOQ Length Width H/D


Item DESCRIPTION OF ITEM No Contents Remarks
# (M) (M) (M)

Leveling & Dressing of Site around the


Circulating pump house including the cost
1 of removal of surplus earth from site to a
place outside ICI Plant designated by
Contractor, and backfilling down areas to 1 1 128.00 40.00 5120.00
5120.000 Cft
Total Qty 144.960 Cu.m
Dismantling, Earthwork, Backfilling and
Termite Control
Structural excavation for foundation
trenches etc. in any type of soil, including
2 separating and stacking of required
suitable materials at site for back filling
trenches in foundation, plinth and under 14
Footing F-1 1 6.330 6.330 9.000 5048.68
floor of all lead & lift as directed by the
Footing
Engineer,F-2 backfilling with approved 22 1 8.330 8.330 7.000 10685.89
suitable
Excavationexcavated material in layer not
for Brick work
exceeding 150mm in depth, watering and
Grid 1 & 9/A-D
compacting to 95% modified AASHTO 3 2 5.33 3.00 3.00 287.82
density,
Grid A&Dand/1-9 disposal of surplus un- 8 2 8.00 3.00 3.00 1152.00
suitable material to a place outside ICI 17174.392 Cft
Plant designated by Contractor, including
shoring & strutting where required. Total Qty 486.251 Cu.m
Complete all as per drawings,
specifications
Back Filling withand the
as directed by the
same Excavated
Engineer Incharge.
Material above G.L / Rate not available
3

Floor area back filling with same


excavated material 1 1 128.00 40.00 0.84 4300.80

4300.800 Cft

Total Qty 121.767 Cu.m

Dismantling of RCC works (Floors, Dike


walls, Foundations, Stubs etc.) including
disposal of unserviceable material and
8
debris outside ICI Plant area designated
by Contractor, as directed by Engineer
Incharge.

Columns at F-1 Foundations 4 1 2.000 2.000 1.500 24.000


Columns at F-2 Foundations 7 1 2.000 2.000 1.500 42.000
Columns at F-2 Foundations 4 1 2.000 2.000 3.670 58.720
124.720 Cft
Total Qty 3.531 Cu.m
Providing, Mixing, handling and pouring
9 Plain Cement Concrete (PCC) using OPC
Cement under Foundation, floors, plinth
protection etc. using graded crushed
B- P.C.C (1:4:8)
Footing F-1 14 1 6.330 6.330 0.170 95.36
Footing F-2 22 1 8.330 8.330 0.170 259.51
pcc under Brick work
Grid 1 & 9/A-D 3 2 11.33 3.00 0.50 101.97
Grid A&D /1-9 8 2 14.00 3.00 0.50 336.00
New Eng. Hall PCC 1 1 127.68 39.67 0.167 844.18

1637.03 Cft
Total Qty 46.348 Cu.m
Providing, Mixing, handling, pouring,
finishing & curing etc., straight or curved
10 cast-in place designed mix reinforced
structural cement concrete with min
cylinder strength at 28 days as noted
a) Foundations
Footing F-1 14 1 6.000 6.000 1.500 756.000
Footing F-2 22 1 8.000 8.000 1.500 2112.000
2868.000 Cft
Total Qty 81.200 Cu.m
New b) Slab on Grade/RCC Floor 3000 psi
New Eng. Hall PCC 1 1 127.68 39.67 0.167 844.18

844.178 Cft
Total Qty 23.901 Cu.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi
Grid A-D/1 & 9
El.+0.00 to El.+28.75

Window W4 Lental 2 1 7.50 0.75 0.75 8.44


Window W6 Lental 6 1 7.50 0.75 0.75 25.31

Grid A,D/1 -9
El.+0.00 to El.+29.50
Door D2 Lental 2 1 5.00 0.75 0.50 3.75
Window W6 Lental 15 1 7.50 0.75 0.75 63.28
Issu -Section Office (15.5 x12.83)
Hor wall
D-2 3.5x7
lintel 1 1 4.50 0.375 0.50 0.84
w-3(8.5 x4) -1 1 8.50 0.375 4.00
lintel 1 1 10.00 0.375 0.75 2.81
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 12.00 0.375 0.75 3.38
Store Supervisor Room 10.5x12.83
Hor wall
D-2 3.5x7
lintel 1 1 4.50 0.375 0.50 0.84
w-5(4.5 x4) -1 1 4.50 0.375 4.00
lintel 1 1 5.50 0.375 0.50 1.03
Receiving Office 20.66x12.83
Hor wall 1 1 20.66 0.375 9.50
W-1 12.33x 4 -1 1 12.33 0.375 4.00
lintel 1 1 14.33 0.375 0.75 4.03
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 12.00 0.375 0.75 3.38
0.00
117.09 Cft
Total Qty 3.315 Cu.m
e) RCC Columns/Pedestal

Columns at F-1 Foundations 14 1 2.000 2.000 9.830 550.480


Columns at F-2 Foundations 22 1 2.000 2.000 7.830 689.040
1239.520 Cft
Total Qty 35.094 Cu.m
Supply, fabricate and fix formwork
fabricated from Steel Plates complete in
12 all respect as per specifications and as
directed by Engineer Incharge:

a) Foundations/Raft
Footing F-1 14 4 6.000 1.500 504.000
Footing F-2 22 4 8.000 1.500 1056.000
DPC Area where Form work was
Practically necessary
Grid 1 & 9/A-D 3 4 8.00 0.50 48.00
Grid A&D /1-9 8 4 8.00 0.50 128.00

1736.000 sft
Total Qty 161.278 Sqm
b) Column/Pedestal in foundation and
superstructure
Column's 2'x2' at F-1 Foundations 14 4 2.000 9.830 1100.960
Column's 2'x2' at F-2 Foundations 22 4 2.000 7.830 1378.080
2479.040 sft
Total Qty 230.308 Sq.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi
Grid A-D/1 & 9
El.+0.00 to El.+28.75

Window W4 Lental 2 1 6.00 0.75 9.00


2 2 7.50 0.75 22.50
Window W6 Lental 6 1 6.00 0.75 27.00
6 2 7.50 0.75 67.50
Grid A,D/1 -9
El.+0.00 to El.+29.50
Door D2 Lental 2 1 3.50 0.75 5.25
2 2 4.50 0.50 9.00
Window W6 Lental 15 1 6.00 0.75 67.50
15 2 7.50 0.75 168.75
Issu -Section Office (15.5 x12.83)
Hor wall
D-2 3.5x7
lintel 1 1 3.50 0.375 1.31
1 2 4.50 0.50 4.50
w-3(8.5 x4) -1 1 8.50 0.375 4.00
lintel 1 1 8.50 0.375 3.19
1 2 10.00 0.75 15.00
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 10.00 0.375 3.75
1 2 11.50 0.75 17.25
Store Supervisor Room 10.5x12.83
Hor wall
D-2 3.5x7
lintel 1 1 3.50 0.375 1.31
1 2 4.50 0.50 4.50
w-5(4.5 x4) -1 1 4.50 0.375 4.00
lintel 1 1 4.50 0.375 1.69
1 2 5.50 0.50 5.50
Receiving Office 20.66x12.83
Hor wall 1 1 20.66 0.375 9.50
W-1 12.33x 4 -1 1 12.33 0.375 4.00
lintel 1 1 12.33 0.375 4.62
1 2 13.83 0.75 20.75
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 10.00 0.375 3.75
1 2 12.00 0.75 18.00
0.00
481.62 Cft
Total Qty 13.636 Cu.m

Providing, Cutting, fabricating and fixing


in position Mild Steel deformed
reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of
60,000 psi including all cost of cleaning,
straightening, cutting, bending, binding
14 with 16 SWG annealed binding wire,
wastage and such overlaps as are not
shown in drawings, using precast
concrete spacer blocks and steel chairs
for formwork cover etc. Complete all as
per drawings, specifications and as
directed by the Engineer Incharge.

As per attached BBS


Engineering Store Foundation 1 1 12.610 12.610 M.Ton
Engineering Store Lintels 1 1 0.384 0.384 M.Ton
Engineering Store Floor 1 1 3.805 3.805 M.Ton

Total 16.799 M.Ton


Providing and laying cement plaster in 1:5
cement: sand at various levels, including
20 curing, scaffolding, etc. as shown in the
drawings as per specification and as
directed by Engineer Incharge.
a)Internal Plaster
Grid A-D/1 & 9
El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Issu -Section Office (15.5 x12.83)
Hor wall 2 1 15.875 9.50 301.63
D-2 3.5x7 -1 1 3.50 7.00 -24.50
w-3(8.5 x4) -1 1 8.50 4.00 -34.00
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -1 1 10.00 4.00 -40.00
Store Supervisor Room 10.5x12.83
Hor wall 2 1 10.88 9.50 206.63
D-2 3.5x7 -1 1 3.50 7.00 -24.50
w-5(4.5 x4) -1 1 4.50 4.00 -18.00
Ver wall 2 1 12.83 9.50 243.77
Receiving Office 20.66x12.83 0.00
Hor wall 2 1 20.66 9.50 392.54
W-1 12.33x 4 -1 1 12.33 4.00 -49.32
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -1 1 10.00 4.00 -40.00
0.00
10484.59 sft
Total Qty 974.042 Sqm
Deep Struck Pointing 1:2 Cement: Sand
mortar at any height and thickness,
21 complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
Grid A-D/1 & 9
El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00
Side columns 2 2 2.75 28.50 313.50
2 4 0.375 28.50 85.50
Cornor Columns 4 1 2.75 27.25 299.75
4 1 2.00 27.25 218.00
4 2 0.38 27.25 81.75

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Side columns 14 1 2.75 0.75 29.50 851.81
14 2 0.38 0.75 29.50 232.31
0.00
11165.43 sft
Total Qty 1,037.294 Sqm
Supply and apply M/S ICI Dulux Paints
and approved make and shade in three
coats consisting one priming coat of lime
wash including sand papering,
preparation of surfaces, one coat of
Dulux primer and two coats as paint as
22 mentioned below in sub-items as
specified in the selected system as shown
on finishing Schedules/Drawings in
approved color,
a)Internal Sides onlytexture, shade and
pattern complete in all respect. Vinyl
Grid A-D/1to
Emulsion & 9Plastered Walls, Ceiling or
Concrete Surface El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Issu -Section Office (15.5 x12.83)
Hor wall 2 1 15.875 9.50 301.63
D-2 3.5x7 -2 1 3.50 7.00 -49.00
w-3(8.5 x4) -2 1 8.50 4.00 -68.00
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -2 1 10.00 4.00 -80.00
Store Supervisor Room 10.5x12.83
Hor wall 2 1 10.88 9.50 206.63
D-2 3.5x7 -2 1 3.50 7.00 -49.00
w-5(4.5 x4) -2 1 4.50 4.00 -36.00
Ver wall 2 1 12.83 9.50 243.77
Receiving Office 20.66x12.83 0.00
Hor wall 2 1 20.66 9.50 392.54
W-1 12.33x 4 -2 1 12.33 4.00 -98.64
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -2 1 10.00 4.00 -80.00
0.00
10254.27 Sft
Total Qty 952.644 Sqm
DPC(1:2:4) with two coats of Bitumen &
26 Polythene Sheet one layer

Grid 1/A-D 3 4 11.33 0.75 101.97


A/1-9,D/1-9 8 4 14.00 0.75 336.00
Vertical DPC
Grid 1/A-D 3 2 11.33 1.50 101.97
A/1-9,D/1-9 8 2 14.00 1.50 336.00

875.940 Sft
Total Qty 81.377 Sqm
Supply and install shop fabricated painted
steel hollow metal doors with 5mm thick
27 clear plain local glass (in upper panels
only)using 50x50x4mm MS box section
for frames, locking rail 100x50x4mm thick,
D-1 (8 x10) Steel Sliding door
1 1 8 10 80.00
80.00 Sft

Providing and fixing shop fabricated Total Qty 7.432 Sqm


anodized corrosion resistant Aluminum
Door (Champaign) by an approved
manufacturer, comprising of 3.2 x
100mm outer tubular sections with 2mm
thick open able tubular section and
mullions, sash members. Including glass
(5mm) and glazing accessories. Consisting
29 of corrosion resistant hardware, all
aluminum and glass fitting and fixing
accessories, Sealed with UV resistant
building grade sealants, All doors to be
D-2 (3.5 x7) Aluminum Door Single
designed
Glazed
for resisting 150 Km/Hr wind 5 1 3.5 7 122.50
pressure, complete in all respects, in
accordance with specifications, as shown
on drawings and to the approval of the
Supply
Engineer. and fix champaign color or as
approved by Engineer Aluminum 122.50 Sft
Extrusions Sliding Windows, consisting of
corrosion resistance, and not less than Total Qty 11.381 Sqm
1.6 mm thick at any location for main
frame and sash members, frames,
30 angles, channels, cover jointed, mullions
including single glazing and glass
(5mm)accessories, mastic pointing
sealant, fly screens, applicable hardware
W-1 1 1 12 4
fittings and fixing accessories complete in
all respect in accordance with W-2 the 2 1 10 4
Specifications and as Shown on Drawings.
W-3 1 1 8.5 4

W-4 2 1 6 4

W-5 1 1 4.5 4

W-6 21 1 6 4

0.00

0.00 Sft

Total Qty - Sqm

Providing and Laying first class burnt


brick masonry in sub structure and plinth
with 1:5 (Cement : Sand) mortar,
complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
54
El: upt o +0.00
Grid A-D/1 & 9
1st Step 3 2 11.33 2.25 0.25 38.24
2 Step
nd
3 2 11.33 1.88 0.25 31.87
3 Step
rd
3 2 11.33 1.50 0.25 25.49
4 Step
th
3 2 11.33 1.13 0.25 19.12
9" wall up to FFL 3 2 11.33 0.75 2.75 140.21

Grid A,D/1 -9
1st Step 8 2 14.00 2.25 0.25 126.00
2 Step
nd
8 2 14.00 1.88 0.25 105.00
3rd Step 8 2 14.00 1.50 0.25 84.00
4 Step
th
8 2 14.00 1.13 0.25 63.00
9" wall 8 2 14.00 0.75 2.75 462.00

Providing and laying first class burnt brick 1094.93 Cft


masonry at any height , straight or curve
in any thickness set in (1:4) cement sand Total Qty 31.000 Cu.m
mortar in superstructure, placing wall ties
with R.C.C. members with 1/4" dia. M.S.
55
round bars including curing finishing and
racking out joints, scaffolding, lifting,
hoisting,
Grid A-D/1etc.,
& 9complete in all respects as
per specifications, drawings and as
El.+0.00 to El.+28.75
directed by the Engineer. 6 1 13.33 0.75 28.00 1679.58
Deductions
-1 1 11.33 0.75 9.50 -80.73
Window W4 -2 1 6.00 0.75 4.00 -36.00
Window W4 Lental -2 1 7.50 0.75 0.75 -8.44
Window W6 -6 1 6.00 0.75 4.00 -108.00
Window W6 Lental -6 1 7.50 0.75 0.75 -25.31
Side columns 2 2 2.75 0.75 28.50 235.13
2 4 0.375 0.75 28.50 64.13
Cornor Columns 4 1 2.75 0.75 27.25 224.81
4 1 2.00 0.75 27.25 163.50
4 2 0.38 0.75 27.25 61.31
Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 0.75 29.50 5664.00
Deductions
Door D2 -2 1 3.50 0.75 7.00 -36.75
Door D2 Lental -2 1 5.00 0.75 0.50 -3.75
Window W6 -15 1 6.00 0.75 4.00 -270.00
Window W6 Lental -15 1 7.50 0.75 0.75 -63.28
Side columns 14 1 2.75 0.75 29.50 851.81
14 2 0.38 0.75 29.50 232.31
Issu -Section Office (15.5 x12.83)
Hor wall 1 1 15.875 0.375 9.50 56.55
D-2 3.5x7 -1 1 3.50 0.375 7.00 -9.19
lintel -1 1 4.50 0.375 0.50 -0.84
w-3(8.5 x4) -1 1 8.50 0.375 4.00 -12.75
lintel -1 1 10.00 0.375 0.75 -2.81
Ver wall 1 1 12.83 0.375 9.50 45.71
W-2 10x4 -1 1 10.00 0.375 4.00 -15.00
lintel -1 1 12.00 0.375 0.75 -3.38
Store Supervisor Room 10.5x12.83
Hor wall 1 1 10.88 0.375 9.50 38.74
D-2 3.5x7 -1 1 3.50 0.375 7.00 -9.19
lintel -1 1 4.50 0.375 0.50 -0.84
w-5(4.5 x4) -1 1 4.50 0.375 4.00 -6.75
lintel -1 1 5.50 0.375 0.50 -1.03
Ver wall 1 1 12.83 0.375 9.50 45.71
Receiving Office 20.66x12.83 0.00
Hor wall 1 1 20.66 0.375 9.50 73.60
W-1 12.33x 4 -1 1 12.33 0.375 4.00 -18.50
lintel -1 1 14.33 0.375 0.75 -4.03
Ver wall 1 1 12.83 0.375 9.50 45.71
W-2 10x4 -1 1 10.00 0.375 4.00 -15.00
lintel -1 1 12.00 0.375 0.75 -3.38
0.00
0.00
0.00
8747.66 Cft
Total Qty 247.669 Cu.m

Providing and finishing Non shrink


58 Cement grout, as per drawings,
specifications and as directed by Engineer
Incharge
Colum Footing F-1 & F-2 9 4 2 2 0.08 11.52
11.52 Cft
Total Qty 0.330 Cu.m

NBO
Galvanized anchor Bolt
Q-1
36 4 144.00
Total Qty 144.000 Nos
SINACO ENGINEERS (PVT) LTD
Measurement Sheet
12-G Model Town, Lahore. 547000 Sheet # :- IPC#7
Project Name:- CFB 3&4 ICI Khewra Jehlum. ENGINEERING STORE (BOQ Items) Date:- ###

BOQ Length Width H/D


Item DESCRIPTION OF ITEM No Contents Remarks
# (M) (M) (M)

Leveling & Dressing of Site around the


Circulating pump house including the cost
1 of removal of surplus earth from site to a
place outside ICI Plant designated by
Contractor, and backfilling down areas to 1 1 128.00 40.00 5120.00
5120.000 Cft
Total Qty 144.960 Cu.m
Dismantling, Earthwork, Backfilling and
Termite Control
Structural excavation for foundation
trenches etc. in any type of soil, including
2 separating and stacking of required
suitable materials at site for back filling
trenches
Footing F-1in foundation, plinth and under 14 1 6.330 6.330 9.000 5048.68
floor of all lead & lift as directed by the
Footing
Engineer,F-2 backfilling with approved 22 1 8.330 8.330 7.000 10685.89
suitable
Excavationexcavated material in layer not
for Brick work
exceeding 150mm in depth, watering and
Grid 1 & 9/A-D
compacting to 95% modified AASHTO 3 2 5.33 3.00 3.00 287.82
density,
Grid A&Dand/1-9 disposal of surplus un- 8 2 8.00 3.00 3.00 1152.00
suitable material to a place outside ICI 17174.392 Cft
Plant designated by Contractor, including
shoring & strutting where required. Total Qty 486.251 Cu.m
Complete all as per drawings,
specifications
Filling with theandsameasExcavated
directed Material
by the
Engineer Incharge.
above G.L / Rate not available
3

Qty of Excavatin As par item-2 17174.39 Cft


Deduction of PCC -1637.03
Deuction of RCC -2868.00
Column Padestal
e) RCC Columns/Pedestal
Columns at F-1 Foundations -14 1 2.000 2.000 6.750 -378.000
Columns at F-2 Foundations -22 1 2.000 2.000 6.750 -594.000
Brick work deduction(up to G.L)
Grid A-D/1 & 9
1st Step -3 2 11.33 2.25 0.25 -38.24
2 Step
nd
-3 2 11.33 1.88 0.25 -31.87
3 Step
rd
-3 2 11.33 1.50 0.25 -25.49
4 Stepth
-3 2 11.33 1.13 0.25 -19.12
9" wall up to FFL -3 2 11.33 0.75 1.50 -76.48

Grid A,D/1 -9
1st Step -8 2 14.00 2.25 0.25 -126.00
2 Step
nd
-8 2 14.00 1.88 0.25 -105.00
3 Step
rd
-8 2 14.00 1.50 0.25 -84.00
4 Step
th
-8 2 14.00 1.13 0.25 -63.00
9" wall -8 2 14.00 0.75 1.50 -252.00
10876.172 Cft
Total Qty 307.932 Cu.m

Dismantling of RCC works (Floors, Dike


walls, Foundations, Stubs etc.) including
disposal of unserviceable material and
8
debris outside ICI Plant area designated
by Contractor, as directed by Engineer
Incharge.

Columns at F-1 Foundations 4 1 2.000 2.000 1.500 24.000


Columns at F-2 Foundations 7 1 2.000 2.000 1.500 42.000
Columns at F-2 Foundations 4 1 2.000 2.000 3.670 58.720
124.720 Cft
Total Qty 3.531 Cu.m
Providing, Mixing, handling and pouring
9 Plain Cement Concrete (PCC) using OPC
Cement under Foundation, floors, plinth
protection etc. using graded crushed
B- P.C.C (1:4:8)
Footing F-1 14 1 6.330 6.330 0.170 95.36
Footing F-2 22 1 8.330 8.330 0.170 259.51
pcc under Brick work
Grid 1 & 9/A-D 3 2 11.33 3.00 0.50 101.97
Grid A&D /1-9 8 2 14.00 3.00 0.50 336.00
New Eng. Hall PCC 1 1 127.68 39.67 0.167 844.18

1637.03 Cft
Total Qty 46.348 Cu.m
Providing, Mixing, handling, pouring,
finishing & curing etc., straight or curved
10 cast-in place designed mix reinforced
structural cement concrete with min
cylinder strength at 28 days as noted
a) Foundations
Footing F-1 14 1 6.000 6.000 1.500 756.000
Footing F-2 22 1 8.000 8.000 1.500 2112.000
2868.000 Cft
Total Qty 81.200 Cu.m
New b) Slab on Grade/RCC Floor 3000 psi
New Eng. Hall PCC 1 1 127.68 39.67 0.167 844.18

844.178 Cft
Total Qty 23.901 Cu.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi
Grid A-D/1 & 9
El.+0.00 to El.+28.75

Window W4 Lental 2 1 7.50 0.75 0.75 8.44


Window W6 Lental 6 1 7.50 0.75 0.75 25.31

Grid A,D/1 -9
El.+0.00 to El.+29.50
Door D2 Lental 2 1 5.00 0.75 0.50 3.75
Window W6 Lental 15 1 7.50 0.75 0.75 63.28
Issu -Section Office (15.5 x12.83)
Hor wall
D-2 3.5x7
lintel 1 1 4.50 0.375 0.50 0.84
w-3(8.5 x4) -1 1 8.50 0.375 4.00
lintel 1 1 10.00 0.375 0.75 2.81
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 12.00 0.375 0.75 3.38
Store Supervisor Room 10.5x12.83
Hor wall
D-2 3.5x7
lintel 1 1 4.50 0.375 0.50 0.84
w-5(4.5 x4) -1 1 4.50 0.375 4.00
lintel 1 1 5.50 0.375 0.50 1.03
Receiving Office 20.66x12.83
Hor wall 1 1 20.66 0.375 9.50
W-1 12.33x 4 -1 1 12.33 0.375 4.00
lintel 1 1 14.33 0.375 0.75 4.03
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 12.00 0.375 0.75 3.38
0.00
117.09 Cft
Total Qty 3.315 Cu.m
e) RCC Columns/Pedestal

Columns at F-1 Foundations 14 1 2.000 2.000 9.830 550.480


Columns at F-2 Foundations 22 1 2.000 2.000 7.830 689.040
1239.520 Cft
Total Qty 35.094 Cu.m
Supply, fabricate and fix formwork
fabricated from Steel Plates complete in
12 all respect as per specifications and as
directed by Engineer Incharge:

a) Foundations/Raft
Footing F-1 14 4 6.000 1.500 504.000
Footing F-2 22 4 8.000 1.500 1056.000
DPC Area where Form work was
Practically necessary
Grid 1 & 9/A-D 3 4 8.00 0.50 48.00
Grid A&D /1-9 8 4 8.00 0.50 128.00

1736.000 sft
Total Qty 161.278 Sqm
b) Column/Pedestal in foundation and
superstructure
Column's 2'x2' at F-1 Foundations 14 4 2.000 9.830 1100.960
Column's 2'x2' at F-2 Foundations 22 4 2.000 7.830 1378.080
2479.040 sft
Total Qty 230.308 Sq.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi
Grid A-D/1 & 9
El.+0.00 to El.+28.75

Window W4 Lental 2 1 6.00 0.75 9.00


2 2 7.50 0.75 22.50
Window W6 Lental 6 1 6.00 0.75 27.00
6 2 7.50 0.75 67.50
Grid A,D/1 -9
El.+0.00 to El.+29.50
Door D2 Lental 2 1 3.50 0.75 5.25
2 2 4.50 0.50 9.00
Window W6 Lental 15 1 6.00 0.75 67.50
15 2 7.50 0.75 168.75
Issu -Section Office (15.5 x12.83)
Hor wall
D-2 3.5x7
lintel 1 1 3.50 0.375 1.31
1 2 4.50 0.50 4.50
w-3(8.5 x4) -1 1 8.50 0.375 4.00
lintel 1 1 8.50 0.375 3.19
1 2 10.00 0.75 15.00
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 10.00 0.375 3.75
1 2 11.50 0.75 17.25
Store Supervisor Room 10.5x12.83
Hor wall
D-2 3.5x7
lintel 1 1 3.50 0.375 1.31
1 2 4.50 0.50 4.50
w-5(4.5 x4) -1 1 4.50 0.375 4.00
lintel 1 1 4.50 0.375 1.69
1 2 5.50 0.50 5.50
Receiving Office 20.66x12.83
Hor wall 1 1 20.66 0.375 9.50
W-1 12.33x 4 -1 1 12.33 0.375 4.00
lintel 1 1 12.33 0.375 4.62
1 2 13.83 0.75 20.75
Ver wall 1 1 12.83 0.375 9.50
W-2 10x4 -1 1 10.00 0.375 4.00
lintel 1 1 10.00 0.375 3.75
1 2 12.00 0.75 18.00
0.00
481.62 Cft
Total Qty 13.636 Cu.m
Providing, Cutting, fabricating and fixing
in position Mild Steel deformed
reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of
60,000 psi including all cost of cleaning,
straightening, cutting, bending, binding
14 with 16 SWG annealed binding wire,
wastage and such overlaps as are not
shown in drawings, using precast
concrete spacer blocks and steel chairs
for formwork cover etc. Complete all as
per drawings, specifications and as
directed by the Engineer Incharge.

As per attached BBS


Engineering Store Foundation 1 1 12.610 12.610 M.Ton
Engineering Store Lintels 1 1 0.384 0.384 M.Ton
Engineering Store Floor 1 1 3.805 3.805 M.Ton

Total 16.799 M.Ton


Providing and laying cement plaster in 1:5
cement: sand at various levels, including
20 curing, scaffolding, etc. as shown in the
drawings as per specification and as
directed by Engineer Incharge.
a)Internal Plaster
Grid A-D/1 & 9
El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Issu -Section Office (15.5 x12.83)
Hor wall 2 1 15.875 9.50 301.63
D-2 3.5x7 -1 1 3.50 7.00 -24.50
w-3(8.5 x4) -1 1 8.50 4.00 -34.00
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -1 1 10.00 4.00 -40.00
Store Supervisor Room 10.5x12.83
Hor wall 2 1 10.88 9.50 206.63
D-2 3.5x7 -1 1 3.50 7.00 -24.50
w-5(4.5 x4) -1 1 4.50 4.00 -18.00
Ver wall 2 1 12.83 9.50 243.77
Receiving Office 20.66x12.83 0.00
Hor wall 2 1 20.66 9.50 392.54
W-1 12.33x 4 -1 1 12.33 4.00 -49.32
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -1 1 10.00 4.00 -40.00
0.00
10484.59 sft
Total Qty 974.042 Sqm
Deep Struck Pointing 1:2 Cement: Sand
mortar at any height and thickness,
21 complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
Grid A-D/1 & 9
El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00
Side columns 2 2 2.75 28.50 313.50
2 4 0.375 28.50 85.50
Cornor Columns 4 1 2.75 27.25 299.75
4 1 2.00 27.25 218.00
4 2 0.38 27.25 81.75

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Side columns 14 1 2.75 0.75 29.50 851.81
14 2 0.38 0.75 29.50 232.31
Supply and apply M/S ICI Dulux Paints
0.00
and approved make and shade in three
coats consisting one priming coat of lime 11165.43 sft
wash including sand papering, Total Qty 1,037.294 Sqm
preparation of surfaces, one coat of
Dulux primer and two coats as paint as
22 mentioned below in sub-items as
specified in the selected system as shown
on finishing Schedules/Drawings in
approved color,
a)Internal Sides onlytexture, shade and
pattern complete in all respect. Vinyl
Grid A-D/1to
Emulsion & 9Plastered Walls, Ceiling or
Concrete Surface El.+0.00 to El.+28.75 6 1 13.33 28.00 2239.44
Deductions
-1 1 11.33 9.50 -107.64
Window W4 -2 1 6.00 4.00 -48.00
Window W6 -6 1 6.00 4.00 -144.00

Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 29.50 7552.00
Deductions
Door D2 -2 1 3.50 7.00 -49.00
Window W6 -15 1 6.00 4.00 -360.00
Issu -Section Office (15.5 x12.83)
Hor wall 2 1 15.875 9.50 301.63
D-2 3.5x7 -2 1 3.50 7.00 -49.00
w-3(8.5 x4) -2 1 8.50 4.00 -68.00
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -2 1 10.00 4.00 -80.00
Store Supervisor Room 10.5x12.83
Hor wall 2 1 10.88 9.50 206.63
D-2 3.5x7 -2 1 3.50 7.00 -49.00
w-5(4.5 x4) -2 1 4.50 4.00 -36.00
Ver wall 2 1 12.83 9.50 243.77
Receiving Office 20.66x12.83 0.00
Hor wall 2 1 20.66 9.50 392.54
W-1 12.33x 4 -2 1 12.33 4.00 -98.64
Ver wall 2 1 12.83 9.50 243.77
W-2 10x4 -2 1 10.00 4.00 -80.00
0.00
10254.27 Sft
Total Qty 952.644 Sqm
DPC(1:2:4) with two coats of Bitumen &
26 Polythene Sheet one layer

Grid 1/A-D 3 4 11.33 0.75 101.97


A/1-9,D/1-9 8 4 14.00 0.75 336.00
Vertical DPC
Grid 1/A-D 3 2 11.33 1.50 101.97
A/1-9,D/1-9 8 2 14.00 1.50 336.00

875.940 Sft
Total Qty 81.377 Sqm
Supply and install shop fabricated painted
steel hollow metal doors with 5mm thick
27 clear plain local glass (in upper panels
only)using 50x50x4mm MS box section
for frames, locking rail 100x50x4mm thick,
D-1 (8 x10) Steel Sliding door
1 1 8 10 80.00

80.00 Sft

Providing and fixing shop fabricated Total Qty 7.432 Sqm


anodized corrosion resistant Aluminum
Door (Champaign) by an approved
manufacturer, comprising of 3.2 x
100mm outer tubular sections with 2mm
thick open able tubular section and
mullions, sash members. Including glass
(5mm) and glazing accessories. Consisting
29 of corrosion resistant hardware, all
aluminum and glass fitting and fixing
accessories, Sealed with UV resistant
building grade sealants, All doors to be
D-2 (3.5 x7) Aluminum Door Single
designed
Glazed
for resisting 150 Km/Hr wind 5 1 3.5 7 122.50
pressure, complete in all respects, in
accordance with specifications, as shown
on drawings and to the approval of the
Supply
Engineer. and fix champaign color or as
approved by Engineer Aluminum 122.50 Sft
Extrusions Sliding Windows, consisting of
corrosion resistance, and not less than Total Qty 11.381 Sqm
1.6 mm thick at any location for main
frame and sash members, frames,
30 angles, channels, cover jointed, mullions
including single glazing and glass
(5mm)accessories, mastic pointing
sealant, fly screens, applicable hardware
W-1 1 1 12 4
fittings and fixing accessories complete in
all respect in accordance with W-2 the 2 1 10 4
Specifications and as Shown on Drawings.
W-3 1 1 8.5 4

W-4 2 1 6 4
W-5 1 1 4.5 4

W-6 21 1 6 4

0.00

0.00 Sft

Total Qty - Sqm

Providing and Laying first class burnt


brick masonry in sub structure and plinth
with 1:5 (Cement : Sand) mortar,
complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
54
El: upt o +0.00
Grid A-D/1 & 9
1st Step 3 2 11.33 2.25 0.25 38.24
2 Step
nd
3 2 11.33 1.88 0.25 31.87
3rd Step 3 2 11.33 1.50 0.25 25.49
4th Step 3 2 11.33 1.13 0.25 19.12
9" wall up to FFL 3 2 11.33 0.75 2.75 140.21

Grid A,D/1 -9
1st Step 8 2 14.00 2.25 0.25 126.00
2 Step
nd
8 2 14.00 1.88 0.25 105.00
3rd Step 8 2 14.00 1.50 0.25 84.00
4th Step 8 2 14.00 1.13 0.25 63.00
9" wall 8 2 14.00 0.75 2.75 462.00

Providing and laying first class burnt brick 1094.93 Cft


masonry at any height , straight or curve
in any thickness set in (1:4) cement sand Total Qty 31.000 Cu.m
mortar in superstructure, placing wall ties
with R.C.C. members with 1/4" dia. M.S.
55
round bars including curing finishing and
racking out joints, scaffolding, lifting,
hoisting,
Grid A-D/1etc.,
& 9complete in all respects as
per specifications, drawings and as
El.+0.00 to El.+28.75
directed by the Engineer. 6 1 13.33 0.75 28.00 1679.58
Deductions
-1 1 11.33 0.75 9.50 -80.73
Window W4 -2 1 6.00 0.75 4.00 -36.00
Window W4 Lental -2 1 7.50 0.75 0.75 -8.44
Window W6 -6 1 6.00 0.75 4.00 -108.00
Window W6 Lental -6 1 7.50 0.75 0.75 -25.31
Side columns 2 2 2.75 0.75 28.50 235.13
2 4 0.375 0.75 28.50 64.13
Cornor Columns 4 1 2.75 0.75 27.25 224.81
4 1 2.00 0.75 27.25 163.50
4 2 0.38 0.75 27.25 61.31
Grid A,D/1 -9
El.+0.00 to El.+29.50 16 1 16.00 0.75 29.50 5664.00
Deductions
Door D2 -2 1 3.50 0.75 7.00 -36.75
Door D2 Lental -2 1 5.00 0.75 0.50 -3.75
Window W6 -15 1 6.00 0.75 4.00 -270.00
Window W6 Lental -15 1 7.50 0.75 0.75 -63.28
Side columns 14 1 2.75 0.75 29.50 851.81
14 2 0.38 0.75 29.50 232.31
Issu -Section Office (15.5 x12.83)
Hor wall 1 1 15.875 0.375 9.50 56.55
D-2 3.5x7 -1 1 3.50 0.375 7.00 -9.19
lintel -1 1 4.50 0.375 0.50 -0.84
w-3(8.5 x4) -1 1 8.50 0.375 4.00 -12.75
lintel -1 1 10.00 0.375 0.75 -2.81
Ver wall 1 1 12.83 0.375 9.50 45.71
W-2 10x4 -1 1 10.00 0.375 4.00 -15.00
lintel -1 1 12.00 0.375 0.75 -3.38
Store Supervisor Room 10.5x12.83
Hor wall 1 1 10.88 0.375 9.50 38.74
D-2 3.5x7 -1 1 3.50 0.375 7.00 -9.19
lintel -1 1 4.50 0.375 0.50 -0.84
w-5(4.5 x4) -1 1 4.50 0.375 4.00 -6.75
lintel -1 1 5.50 0.375 0.50 -1.03
Ver wall 1 1 12.83 0.375 9.50 45.71
Receiving Office 20.66x12.83 0.00
Hor wall 1 1 20.66 0.375 9.50 73.60
W-1 12.33x 4 -1 1 12.33 0.375 4.00 -18.50
lintel -1 1 14.33 0.375 0.75 -4.03
Ver wall 1 1 12.83 0.375 9.50 45.71
W-2 10x4 -1 1 10.00 0.375 4.00 -15.00
lintel -1 1 12.00 0.375 0.75 -3.38
0.00
0.00
0.00
8747.66 Cft
Total Qty 247.669 Cu.m

Providing and finishing Non shrink


58 Cement grout, as per drawings,
specifications and as directed by Engineer
Incharge
Colum Footing F-1 & F-2 9 4 2 2 0.08 11.52
11.52 Cft
Total Qty 0.330 Cu.m

NBO
Galvanized anchor Bolt
Q-1
36 4 144.00
Total Qty 144.000 Nos
SINACO ENGINEERS (PVT) LTD Abstract of cost
12-G Model Town Lahore IPC # 8
Project Name:- CFB 3&4 ICI Khewra Jehlum. Store #3,AC &Rubber Store with toilets etc ( BOQ ITEMS ) Date :- June 16, 2016

B.O.Q. Quantity Amount (Rs.)


Item No
Description of Item Unit Rate Remarks
Previous Current Total Previous Current Total
Site Preparatory Works
Leveling & Dressing of Site around the Circulating pump
house including the cost of removal of surplus earth from site
to a place outside ICI Plant designated by Contractor, and
backfilling down areas to maintain the ground elevations as
1 shown on drawings, described in Specification and as
directed by the Engineer Incharge.

- Sft 7 0 0 0

Dismantling, Earthwork, Backfilling and Termite Control

Structural excavation for foundation trenches etc. in any type


of soil, including separating and stacking of required suitable
materials at site for back filling trenches in foundation, plinth
and under floor of all lead & lift as directed by the Engineer,
backfilling with approved suitable excavated material in layer
not exceeding 150mm in depth, watering and compacting to
95% modified AASHTO density, and disposal of surplus un-
suitable material to a place outside ICI Plant designated by
2 Contractor, including shoring & strutting where required.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

282.110 282.110 Cum 550 0 155,161 155,161


Dismantling
Dismantling of RCC works (Floors, Dike walls, Foundations,
Stubs etc.) including disposal of unserviceable material and
debris outside ICI Plant area designated by Contractor, as
8 directed by Engineer Incharge.

- Cum 7,750 0 0 0
Concrete and Formwork
Providing, Mixing, handling and pouring Plain Cement
Concrete (PCC) using OPC Cement under Foundation, floors,
plinth protection etc. using graded crushed stone as coarse
aggregate (ASTM C-33 Class 67) including screening and
washing of aggregates, mechanical mixing, lifting, placing and
curing to all depths and height and to exact dimensions
9 shown on the drawings, and using proper formwork.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

b) PCC 1:4:8 24.232 24.232 Cum 5,725 0 138,728 138,728


Providing, Mixing, handling, pouring, finishing & curing etc.,
straight or curved cast-in place designed mix reinforced
structural cement concrete with min cylinder strength at 28
days as noted below, using Ordinary Portland Cement for all
work, unless specified otherwise, Lawrencepur sand and
Margalla crushed stone including vibrating through electro
mechanical vibrator, placing of all pipes, sleeves PVC conduits
& fittings, with necessary arrangements where required and
10 other embedded items before concreting complete in all
respects as per drawings, specifications and as approved by
the Engineer Incharge.

a) Foundations ,Pads & Footing Beams / Plinth Beams 4000


psi - Cum 8,910 0 0 0
b) Slab on Grade/RCC Floor 3000 psi 27.123 27.123 Cum 8,840 0 239,767 239,767
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) 3000 psi 1.412 1.412 Cum 9,315 0 13,153 13,153
e) RCC Columns/Pedestal 4000 psi - Cum 9,865 0 0 0
Supply, fabricate and fix formwork fabricated from Steel
12 Plates complete in all respect as per specifications and as
directed by Engineer Incharge:

a) Columns Foundations - Sqm 550 0 0 0


b) Columns/Pedestal in foundation and superstructure - Sqm 750 0 0 0
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) above ground 7.993 7.993 SM 750 0 5,995 5,995
Steel Reinforcement
Providing Cutting, fabricating and fixing in position Mild Steel
deformed reinforcement rebar grade 60 as per ASTM
A615,with minimum strength of 60,000 psi including all cost
of cleaning, straightening, cutting, bending, binding with 16
SWG annealed binding wire, wastage and such overlaps as
are not shown in drawings, using precast concrete spacer
14 blocks and steel chairs for formwork cover etc. Complete all
as per drawings, specifications and as directed by the
Engineer Incharge.

2.161 2.161 M.Ton 26,000 0 56,186 56,186


Providing and laying cement plaster in 1:5 cement: sand at
various levels, including curing, scaffolding, etc. as shown in
20
the drawings as per specification and as directed by Engineer
Incharge.
0
a) Internal sides 374.525 374.525 SM 425 0 159,173 159,173
b) External sides - SM 500 0 0 0

Deep Struck Pointing 1:2 Cement: Sand mortar at any height


21 and thickness, complete in all respect as per drawings,
specifications and as directed by Engineer Incharge.
268.162 268.162 SM 500 0 134,081 134,081

Supply and apply M/S ICI Dulux Paints and approved make
and shade in three coats consisting one priming coat of lime
wash including sand papering, preparation of surfaces, one
coat of Dulux primer and two coats as paint as mentioned
22
below in sub-items as specified in the selected system as
shown on finishing Schedules/Drawings in approved color,
texture, shade and pattern complete in all respect. Vinyl
Emulsion to Plastered Walls, Ceiling or Concrete Surface

353.956 353.956 SM 275 0 97,338 97,338


DPC(1:2:4) with two coats of Bitumen & Polythene Sheet one
26 layer 24.204 24.204 Sqm 753 0 18,237 18,237
Supply and install shop fabricated painted steel hollow metal
doors with 5mm thick clear plain local glass (in upper panels
only)using 50x50x4mm MS box section for frames, locking rail
100x50x4mm thick, 16 BG MS sheet covering, reinforced to
ensure the dimensional stability against applicable load and
forces, locking arrangement, stainless aldrops and other
27 hardware, fitting and fixing accessories as per hardware
schedule and finished in industrial enamel paint of approved
color, shades, pattern in accordance with the Specification, as
shown on Drawings and to the approval of the Engineer.

18.116 18.116 SM 11,925 0 216,033 216,033

Providing and fixing shop fabricated anodized corrosion


resistant Aluminum Door (Champaign) by an approved
manufacturer, comprising of 3.2 x 100mm outer tubular
sections with 2mm thick open able tubular section and
mullions, sash members. Including glass (5mm) and glazing
29 accessories. Consisting of corrosion resistant hardware, all
aluminum and glass fitting and fixing accessories, Sealed with
UV resistant building grade sealants, All doors to be designed
for resisting 150 Km/Hr wind pressure, complete in all
respects, in accordance with specifications, as shown on
drawings and to the approval of the Engineer.

- SM 11,985 0 0 0

Supply and fix champaign color or as approved by Engineer


Aluminum Extrusions Sliding Windows, consisting of
corrosion resistance, and not less than 1.6 mm thick at any
location for main frame and sash members, frames, angles,
30 channels, cover jointed, mullions including single glazing and
glass (5mm)accessories, mastic pointing sealant, fly screens,
applicable hardware fittings and fixing accessories complete
in all respect in accordance with the Specifications and as
Shown on Drawings.

- - SM 7,990 0 0 0
33 Supply of Anchor/Embedded Plates, Angles and Channels,
pipe penetrations, frames complete in all respect, as per
drawings, specifications and as directed by the Engineer
Incharge.
- - Kg 120 0 0
34 Fixing Anchor/Embedded Plates, Angles and Channels, pipe
penetrations, frames in any type of RCC member at any
height & location, complete in all respect, as per drawings,
specifications and as directed by the Engineer Incharge.

- - Kg 65 0 0
49 Providing and Fixing Pre-cast 75mm thick slab (Izhar made or
equivalent) 1m to 1.5m & 0.5m to 0.75m width jointed with
1:4 Cement Sand mortar complete in all respect.

282.243 282.243 SM 1,750 493,925 493,925


Providing and Laying first class burnt brick masonry in sub
structure and plinth with 1:5 (Cement : Sand) mortar,
54
complete in all respect as per drawings, specifications and as
directed by Engineer Incharge.
33.521 33.521 CM 6,825 228,781 228,781

Providing and laying first class burnt brick masonry at any


height , straight or curve in any thickness set in (1:4) cement
sand mortar in superstructure, placing wall ties with R.C.C.
55 members with 1/4" dia. M.S. round bars including curing
finishing and racking out joints, scaffolding, lifting, hoisting,
etc., complete in all respects as per specifications, drawings
and as directed by the Engineer.
67.585 67.585 CM 9,345 631,582 631,582

58
Providing and finishing Non shrink Cement grout, as per
drawings, specifications and as directed by Engineer Incharge - CM 122,750 0 0 0

Additional Items/ Non BOQ

NBOQ-1 Galvanized anchor Bolt


0.000 Nos 1,084 0 0

NBOQ-2 Filling of Stone in soakage pit


3.000 3.000 Truk 0 0
Total Amount Rs. 0 2,588,140 2,588,140
SINACO ENGINEERS (PVT) LTD
Measurement Sheet
12-G Model Town, Lahore. 547000 Sheet # :- IPC#7
Project Name:- CFB 3&4 ICI Khewra Jehlum. ENGINEERING STORE (BOQ Items) Date:- ###

BOQ Length Width H/D


Item DESCRIPTION OF ITEM No Contents Remarks
# (M) (M) (M)
Leveling & Dressing of Site around the
Circulating pump house including the cost
1 of removal of surplus earth from site to a
place outside ICI Plant designated by
Contractor, and backfilling down areas to
Store #3 1 1 56.250 24.00 1350.00

AC Store 1 1 49.250 24.00 1182.00

Rubber Store 1 1 14.250 24.00 342.00

2874.000 Cft

Total Qty 81.370 Cu.m


Dismantling, Earthwork, Backfilling and
Termite Control
Structural excavation for foundation
trenches etc. in any type of soil, including
2 separating and stacking of required
suitable materials at site for back filling
trenches
Long Wallinatfoundation,
West Side plinth and under 1 1 124.25 3.75 3.75 1747.27 Cft
floor of all lead & lift as directed by the
Short Walls backfilling
Engineer, & centre walls
with approved 4 1 22.50 3.75 3.75 1265.63
suitable
Bath Room excavated
North Sidematerial in layer not
Long Wall 1 1 15.38 3.75 3.50 201.80
exceeding 150mm in depth, watering and
East and west wall 2 1 3.50 3.75 3.92 102.90
compacting to 95% modified AASHTO
Bath Room
density, andPartition Wall
disposal of surplus un- 1 1 3.50 1.13 2.50 9.84
suitable material to a place outside ICI
Plant designated by Contractor, including
shoring & strutting where required.
Sokage Pit(dia=3,
Complete all with
as 6 "per
working Space)
drawings, 1 1 0.786 16.00 11.00 138.34
specifications and as directed by the
Rectangular Brick work in Soakage
Engineer Incharge.
pit(2x2x2) 2 1 2.375 0.38 2.00
2 1 2.000 0.38 2.00

Saptic Tank 1 1 11.000 9.50 9.00 940.50


Excavation of Store #3 have been
Deleted as per mail 6665.000
9964.14 Cft
Total Qty 282.110 Cu.m

Back Filling with the same Excavated


Material above G.L / Rate not available

Floor area back filling with same


excavated material

Store #3 1 1 56.250 24.00 0.83 1120.50

AC Store 1 1 49.250 24.00 0.83 981.06

Rubber Store 1 1 14.250 24.00 0.83 283.86

2385.420 Cft

Total Qty 67.537 Cu.m


9 PCC
Long Wall at West Side 1 1 124.25 3.00 0.50 186.38 Cft
Short Walls & centre walls 4 1 22.50 3.00 0.50 135.00
Bath Room North Side Long Wall 1 1 15.38 3.00 0.50 23.06
East and west wall 2 1 3.50 3.00 0.50 10.50
Bath Room Partition Wall 1 1 5.00 1.50 0.50 3.75

Rectangular Brick work in Soakage


pit(2x2x2) 2 1 2.375 0.50 2.38
2 1 2.000 0.50 2.00

Saptic Tank 1 1 8.500 5.50 0.50 23.38

Store #3 1 1 56.250 24.00 0.16 216.00

AC Store 1 1 49.250 24.00 0.16 189.12

Rubber Store 1 1 14.250 24.00 0.16 54.72

Toilet 1 2 6.000 5.00 0.16 9.60

0.00

855.88 Cft
Total Qty 24.232 Cu.m
Providing, Mixing, handling, pouring,
finishing & curing etc., straight or curved
cast-in place designed mix reinforced
10 structural cement concrete with min
cylinder strength at 28 days as noted
below, using Ordinary Portland Cement
for all work, unless specified otherwise,
Lawrencepur sand and Margalla crushed
b) Slab on Grade/RCC Floor 3000 psi

Store #3 1 1 56.250 24.00 0.33 450.00

AC Store 1 1 49.250 24.00 0.33 394.00

Rubber Store 1 1 14.250 24.00 0.33 114.00

958.000 Cft
Total Qty 27.123 Cu.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi

Door Lintel Store #3 1 1 9.50 0.75 0.75 5.34 Cft


Ventilator Lintel Store#3 1 1 6.50 0.75 0.75 3.66

Door Lintel AC Store 1 1 6.50 0.75 0.75 3.66


Door Lintel Rubber Store 1 1 6.50 0.75 0.75 3.66
Ventilator Lintel Rubber Store 1 1 6.50 0.75 0.75 3.66
Wash Room Doors Lintel 2 1 4.00 0.75 0.50 3.00
Septic tank slab 1 1 8.500 5.500 0.50 23.38
Soakage pit slab 1 1 0.786 9.000 0.50 3.54
0.00
49.88 Cft
Total Qty 1.412 Cu.m

Supply, fabricate and fix formwork


fabricated from Steel Plates complete in
12 all respect as per specifications and as
directed by Engineer Incharge:

c) Slab, Beams, Brackets, Parapets, Stair


case (waist slab, intermediate landing
and steps) 3000 psi
Door Lintel Store #3 1 1 8.00 0.75 6.00 Sft
1 2 9.50 0.75 14.25
Ventilator Lintel Store#3 1 1 5.00 0.75 3.75
1 2 6.50 0.75 9.75
Door Lintel AC Store 1 1 5.00 0.75 3.75
1 2 6.50 0.75 9.75
Door Lintel Rubber Store 1 1 5.00 0.75 3.75
1 2 6.50 0.75 9.75
Ventilator Lintel Rubber Store 1 1 5.00 0.75 3.75
1 2 6.50 0.75 9.75
Wash Room Doors Lintel 2 1 2.50 0.75 3.75
2 2 4.00 0.50 8.00
0.00
86.00 Sft
Total Qty 7.993 Sq.m

Providing, Cutting, fabricating and fixing


in position Mild Steel deformed
reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of
60,000 psi including all cost of cleaning,
straightening, cutting, bending, binding
14 with 16 SWG annealed binding wire,
wastage and such overlaps as are not
shown in drawings, using precast
concrete spacer blocks and steel chairs
for formwork cover etc. Complete all as
per drawings, specifications and as
directed by the Engineer Incharge.

As per attached BBS


Soakage Pit +Septic tank 1 1 0.162 0.162 M.Ton
Store#3, Ac & Rubber Store 1 1 1.999 1.999 M.Ton

Total 2.161 M.Ton


Providing and laying cement plaster in 1:5
cement: sand at various levels, including
20 curing, scaffolding, etc. as shown in the
drawings as per specification and as
directed by Engineer Incharge.
a)Internal Plaster
Long Wall at West Side
FFL to bottom of Roof 1 1 122.75 14.83 1820.38 Sft
Center Short Walls
FFL to bottom of Roof 6 1 24.00 14.83 2135.52
Dedutions
Door Store # 3 -1 1 8.00 10.00 -80.00
Ventilator Store # 3 -1 1 5.000 2.000 -10.00
Door AC Store -1 1 5.00 8.00 -40.00
Door Rubber Store -1 1 5.00 8.00 -40.00
Ventilator Rubber Store -1 1 5.000 2.000 -10.00
Bath Room North Side Long Wall
FFL to bottom of Roof 1 1 13.88 8.50 117.98
East and west wall
FFL to bottom of Roof 2 1 5.00 8.50 85.00
Bath Room Partition Wall
FFL to bottom of Roof 1 2 5.00 8.50 85.00
Wash Room Doors -2 1 2.500 6.500 -32.50

4031.38 sft
Total Qty 374.525 Sqm
Deep Struck Pointing 1:2 Cement: Sand
mortar at any height and thickness,
21 complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
a)Pointing out Side
Long Wall at West Side
FFL to bottom of Roof 1 1 122.75 15.50 1902.63 Sft
Center Short Walls
FFL to bottom of Roof 2 1 24.00 15.50 744.00
Bath Room North Side Long Wall
FFL to bottom of Roof 1 1 13.88 10.00 138.80
East and west wall
FFL to bottom of Roof 2 1 5.00 10.00 100.00
Supply and apply M/S ICI Dulux Paints
and approved make and shade in three
coats consisting one priming coat of lime 2885.43 sft
wash including sand papering, Total Qty 268.162 Sqm
preparation of surfaces, one coat of
Dulux primer and two coats as paint as
22 mentioned below in sub-items as
specified in the selected system as shown
on finishing Schedules/Drawings in
approved color,
a)Internal Sides onlytexture, shade and
pattern complete in all respect. Vinyl
Long Wall at
Emulsion to West Side Walls, Ceiling or
Plastered
Concrete Surface
FFL to bottom of Roof 1 1 122.75 14.00 1718.50 Sft
Center Short Walls
FFL to bottom of Roof 6 1 24.00 14.00 2016.00
Dedutions
Door Store # 3 -1 1 8.00 10.00 -80.00
Ventilator Store # 3 -1 1 5.000 2.000 -10.00
Door AC Store -1 1 5.00 8.00 -40.00
Door Rubber Store -1 1 5.00 8.00 -40.00
Ventilator Rubber Store -1 1 5.000 2.000 -10.00
Bath Room North Side Long Wall
FFL to bottom of Roof 1 1 13.88 8.50 117.98
East and west wall
FFL to bottom of Roof 2 1 5.00 8.50 85.00
Bath Room Partition Wall
FFL to bottom of Roof 1 2 5.00 8.50 85.00
Wash Room Doors -2 1 2.500 6.500 -32.50

3809.98 sft
Total Qty 353.956 Sqm
DPC(1:2:4) with two coats of Bitumen &
26 Polythene Sheet one layer

Long Wall at West Side


FFL to bottom of Roof 1 2 122.75 0.75 184.13
Center Short Walls
FFL to bottom of Roof 4 1 24.00 0.75 72.00
Dedutions
Door Store # 3 -1 1 8.00 0.75 -6.00
Door AC Store -1 1 5.00 0.75 -3.75
Door Rubber Store -1 1 5.00 0.75 -3.75

Bath Room North Side Long Wall 1 1 13.88 0.75 10.41


East and west wall 2 1 5.00 0.75 7.50

Bath Room Partition Wall 1 1 5.00 0.75 3.75


Wash Room Doors -2 1 2.500 0.750 -3.75
0.00
260.535 Sft
Total Qty 24.204 Sqm

Supply and install shop fabricated painted


steel hollow metal doors with 5mm thick
27 clear plain local glass (in upper panels
only)using 50x50x4mm MS box section
for frames, locking rail 100x50x4mm thick,
Store #3
1 1 8 10 80.00
AC Store
1 1 5 8 40.00
Rubber Store
1 1 5 8 40.00
Bath Room
2 1 2.5 7 35.00

195.00 Sft

Total Qty 18.116 Sqm

Providing and Fixing Pre-cast 75mm thick


slab (Izhar made or equivalent) 1m to
1.5m & 0.5m to 0.75m width jointed with
1:4 Cement Sand mortar complete in all
respect.
49

Store # 3 ,Ac Store ,Rubber Store 1 1 122.75 24.75 3038.06 Sft

3038.06 sft
Total Qty 282.243 Sqm

Providing and Laying first class burnt


brick masonry in sub structure and plinth
with 1:5 (Cement : Sand) mortar,
complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
54
El: upt o +0.00
Long Wall at West Side
1st Step 1 1 124.25 2.25 0.25 69.89 Cft
2 Step
nd
1 1 123.88 1.88 0.25 58.07
3 Step
rd
1 1 123.50 1.50 0.25 46.31
4th Step 1 1 123.13 1.13 0.25 34.63
9" wall 1 1 122.75 0.75 2.75 253.17

Short Walls & centre walls


1st Step 4 1 22.50 2.25 0.25 50.63
2nd Step 4 1 22.88 1.88 0.25 42.89
3 Step
rd
4 1 23.25 1.50 0.25 34.88
4th Step 4 1 23.63 1.13 0.25 26.58
9" wall 4 1 24.00 0.75 2.75 198.00
Bath Room Front Wall at North Side
1st Step 1 1 13.88 2.25 0.25 7.80
2nd Step 1 1 13.88 1.88 0.25 6.50
3rd Step 1 1 13.88 1.50 0.25 5.20
4 Step
th
1 1 13.88 1.13 0.25 3.90
9" wall 1 1 13.88 0.75 2.75 28.62
Bath Room North Side Long Wall
1st Step 1 1 15.38 2.25 0.25 8.65
2nd Step 1 1 15.00 1.88 0.25 7.03
3rd Step 1 1 14.63 1.50 0.25 5.48
4 Step
th
1 1 14.25 1.13 0.25 4.01
9" wall 1 1 13.88 0.75 2.75 28.62
East and west wall
1st Step 2 1 3.50 2.25 0.25 3.94
2nd Step 2 1 3.88 1.88 0.25 3.63
3rd Step 2 1 4.25 1.50 0.25 3.19
4 Step
th
2 1 4.63 1.13 0.25 2.60
9" wall 2 1 5.00 0.75 2.75 20.63

Bath Room Partition Wall


9 " wall 1 1 5.00 0.75 0.25 0.94
4.5"" wall 1 1 5.00 0.38 2.50 4.69

Sokage Pit 1 1 9.420 0.75 3.00 21.20


Rectangular Brick work in Soakage
pit(2x2x2) 2 1 2.375 0.38 2.00 3.56
2 1 2.000 0.38 2.00 3.00

Saptic Tank
Long Walls 2 1 8.500 0.75 9.00 114.75
Short Walls 2 1 4.000 0.75 9.00 54.00
Partition Walls 2 1 4.000 0.38 9.00 27.00

Providing and laying first class burnt brick 1183.98 Cft


masonry at any height , straight or curve
in any thickness set in (1:4) cement sand Total Qty 33.521 Cu.m
mortar in superstructure, placing wall ties
with R.C.C. members with 1/4" dia. M.S.
55
round bars including curing finishing and
racking out joints, scaffolding, lifting,
hoisting,
Long Walletc., complete
at West Side in all respects as
per specifications, drawings and as
FFL to bottom
directed by theofEngineer.
Roof 1 1 122.75 0.75 14.00 1288.88 Cft
Center Short Walls
FFL to bottom of Roof 4 1 24.00 0.75 14.00 1008.00
Dedutions
Door Store # 3 -1 1 8.00 0.75 10.00 -60.00
Door Lental -1 1 9.50 0.75 0.75 -5.34
Ventilator Store # 3 -1 1 5.000 0.750 2.000 -7.50
Ventilator Lental -1 1 6.500 0.750 0.750 -3.66
Door AC Store -1 1 5.00 0.75 8.00 -30.00
Door Lental -1 1 6.50 0.75 0.75 -3.66
Door Rubber Store -1 1 5.00 0.75 8.00 -30.00
Door Lental -1 1 6.50 0.75 0.75 -3.66
Ventilator Rubber Store -1 1 5.000 0.750 2.000 -7.50
Ventilator Lental -1 1 6.500 0.750 0.750 -3.66

Bath Room Front Wall at North Side


FFL to bottom of Roof 1 1 13.88 0.75 8.50 88.45
Bath Room North Side Long Wall
FFL to bottom of Roof 1 1 13.88 0.75 8.50 88.49
East and west wall
FFL to bottom of Roof 2 1 5.00 0.75 8.50 63.75

Bath Room Partition Wall


FFL to bottom of Roof 1 1 5.00 0.75 8.50 31.88
Wash Room Doors -2 1 2.500 0.750 6.500 -24.38
Wash Room Doors Lental -2 1 4.000 0.750 0.500 -3.00
0.00
2387.09 Cft
Total Qty 67.585 Cu.m
NBO
Q- Stone Filling in Soakage pit 1 1 3 Truk
Total Qty 3.000 Truk
SINACO ENGINEERS (PVT) LTD Abstract of cost
12-G Model Town Lahore IPC # 8
Project Name:- CFB 3&4 ICI Khewra . Engineering Shed / Store Yard & Misc. ( BOQ ITEMS ) Date :- June 17, 2016

B.O.Q. Quantity Amount (Rs.)


Item No
Description of Item Unit Rate Remarks
Previous Current Total Previous Current Total
Site Preparatory Works
Leveling & Dressing of Site around the Circulating pump
house including the cost of removal of surplus earth from site
to a place outside ICI Plant designated by Contractor, and
backfilling down areas to maintain the ground elevations as
1 shown on drawings, described in Specification and as
directed by the Engineer Incharge.

- Sft 7 0 0 0

Dismantling, Earthwork, Backfilling and Termite Control

Structural excavation for foundation trenches etc. in any type


of soil, including separating and stacking of required suitable
materials at site for back filling trenches in foundation, plinth
and under floor of all lead & lift as directed by the Engineer,
backfilling with approved suitable excavated material in layer
not exceeding 150mm in depth, watering and compacting to
95% modified AASHTO density, and disposal of surplus un-
suitable material to a place outside ICI Plant designated by
2 Contractor, including shoring & strutting where required.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

224.586 224.586 Cum 550 0 123,522 123,522


Dismantling
Dismantling of RCC works (Floors, Dike walls, Foundations,
Stubs etc.) including disposal of unserviceable material and
debris outside ICI Plant area designated by Contractor, as
8 directed by Engineer Incharge.

1.441 1.441 Cum 7,750 0 11,168 11,168


Concrete and Formwork
Providing, Mixing, handling and pouring Plain Cement
Concrete (PCC) using OPC Cement under Foundation, floors,
plinth protection etc. using graded crushed stone as coarse
aggregate (ASTM C-33 Class 67) including screening and
washing of aggregates, mechanical mixing, lifting, placing and
curing to all depths and height and to exact dimensions
9 shown on the drawings, and using proper formwork.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

b) PCC 1:4:8 10.607 10.607 Cum 5,725 0 60,725 60,725


Providing, Mixing, handling, pouring, finishing & curing etc.,
straight or curved cast-in place designed mix reinforced
structural cement concrete with min cylinder strength at 28
days as noted below, using Ordinary Portland Cement for all
work, unless specified otherwise, Lawrencepur sand and
Margalla crushed stone including vibrating through electro
mechanical vibrator, placing of all pipes, sleeves PVC conduits
& fittings, with necessary arrangements where required and
10 other embedded items before concreting complete in all
respects as per drawings, specifications and as approved by
the Engineer Incharge.

a) Foundations ,Pads & Footing Beams / Plinth Beams 4000


psi 42.172 42.172 Cum 8,910 0 375,753 375,753
b) Slab on Grade/RCC Floor 3000 psi - Cum 8,840 0 0 0
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) 3000 psi 0.000 Cum 9,315 0 0 0
e) RCC Columns/Pedestal 4000 psi 12.188 12.188 Cum 9,865 0 120,235 120,235
Supply, fabricate and fix formwork fabricated from Steel
12 Plates complete in all respect as per specifications and as
directed by Engineer Incharge:

a) Columns Foundations 92.565 92.565 Sqm 550 0 50,911 50,911


b) Columns/Pedestal in foundation and superstructure 78.684 78.684 Sqm 750 0 59,013 59,013
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) above ground 0.000 SM 750 0 0 0
Steel Reinforcement
Providing Cutting, fabricating and fixing in position Mild Steel
deformed reinforcement rebar grade 60 as per ASTM
A615,with minimum strength of 60,000 psi including all cost
of cleaning, straightening, cutting, bending, binding with 16
SWG annealed binding wire, wastage and such overlaps as
are not shown in drawings, using precast concrete spacer
14 blocks and steel chairs for formwork cover etc. Complete all
as per drawings, specifications and as directed by the
Engineer Incharge.

5.566 5.566 M.Ton 26,000 0 144,716 144,716


Furnish and Apply Waterproofing with Primer Coat and 2
Coats of Cold Bitumen including 500 gauge single layer
16 polythene sheet on vertical surface as per directions of the
manufacturer (Sika or equivalant). Complete all as per
drawings, specifications and as directed by the Engineer
Incharge. 257.906 257.906 SM 425 0 109,610 109,610
Providing and laying cement plaster in 1:5 cement: sand at
various levels, including curing, scaffolding, etc. as shown in
20
the drawings as per specification and as directed by Engineer
Incharge.
0
a) Internal sides - SM 425 0 0 0
b) External sides 13.834 13.834 SM 500 0 6,917 6,917

Deep Struck Pointing 1:2 Cement: Sand mortar at any height


21 and thickness, complete in all respect as per drawings,
specifications and as directed by Engineer Incharge.
- SM 500 0 0 0

Supply and apply M/S ICI Dulux Paints and approved make
and shade in three coats consisting one priming coat of lime
wash including sand papering, preparation of surfaces, one
coat of Dulux primer and two coats as paint as mentioned
22
below in sub-items as specified in the selected system as
shown on finishing Schedules/Drawings in approved color,
texture, shade and pattern complete in all respect. Vinyl
Emulsion to Plastered Walls, Ceiling or Concrete Surface

- SM 275 0 0 0
DPC(1:2:4) with two coats of Bitumen & Polythene Sheet one
26 layer - Sqm 753 0 0 0
Supply and install shop fabricated painted steel hollow metal
doors with 5mm thick clear plain local glass (in upper panels
only)using 50x50x4mm MS box section for frames, locking rail
100x50x4mm thick, 16 BG MS sheet covering, reinforced to
ensure the dimensional stability against applicable load and
forces, locking arrangement, stainless aldrops and other
27 hardware, fitting and fixing accessories as per hardware
schedule and finished in industrial enamel paint of approved
color, shades, pattern in accordance with the Specification, as
shown on Drawings and to the approval of the Engineer.

0.000 SM 11,925 0 0 0

Providing and fixing shop fabricated anodized corrosion


resistant Aluminum Door (Champaign) by an approved
manufacturer, comprising of 3.2 x 100mm outer tubular
sections with 2mm thick open able tubular section and
mullions, sash members. Including glass (5mm) and glazing
29 accessories. Consisting of corrosion resistant hardware, all
aluminum and glass fitting and fixing accessories, Sealed with
UV resistant building grade sealants, All doors to be designed
for resisting 150 Km/Hr wind pressure, complete in all
respects, in accordance with specifications, as shown on
drawings and to the approval of the Engineer.

- SM 11,985 0 0 0

Supply and fix champaign color or as approved by Engineer


Aluminum Extrusions Sliding Windows, consisting of
corrosion resistance, and not less than 1.6 mm thick at any
location for main frame and sash members, frames, angles,
30 channels, cover jointed, mullions including single glazing and
glass (5mm)accessories, mastic pointing sealant, fly screens,
applicable hardware fittings and fixing accessories complete
in all respect in accordance with the Specifications and as
Shown on Drawings.

- SM 7,990 0 0 0
33 Supply of Anchor/Embedded Plates, Angles and Channels,
pipe penetrations, frames complete in all respect, as per
drawings, specifications and as directed by the Engineer
Incharge.
715.657 715.657 Kg 120 85,879 85,879
34 Fixing Anchor/Embedded Plates, Angles and Channels, pipe
penetrations, frames in any type of RCC member at any
height & location, complete in all respect, as per drawings,
specifications and as directed by the Engineer Incharge.

515.629 515.629 Kg 65 33,516 33,516


49 Providing and Fixing Pre-cast 75mm thick slab (Izhar made or
equivalent) 1m to 1.5m & 0.5m to 0.75m width jointed with
1:4 Cement Sand mortar complete in all respect.

- SM 1,750 0 0
Providing and Laying first class burnt brick masonry in sub
structure and plinth with 1:5 (Cement : Sand) mortar,
54
complete in all respect as per drawings, specifications and as
directed by Engineer Incharge.
7.384 7.384 CM 6,825 50,396 50,396

Providing and laying first class burnt brick masonry at any


height , straight or curve in any thickness set in (1:4) cement
sand mortar in superstructure, placing wall ties with R.C.C.
55 members with 1/4" dia. M.S. round bars including curing
finishing and racking out joints, scaffolding, lifting, hoisting,
etc., complete in all respects as per specifications, drawings
and as directed by the Engineer.
5.613 5.613 CM 9,345 52,453 52,453

58
Providing and finishing Non shrink Cement grout, as per
drawings, specifications and as directed by Engineer Incharge - CM 122,750 0 0 0

Additional Items/ Non BOQ


0 0

NBOQ-1 Galvanized anchor Bolt


0.000 Nos 1,084 0 0

NBOQ-2 Filling of Stone in soakage pit


0.000 Truk 0 0
Total Amount Rs. 0 1,284,813 1,284,813
SINACO ENGINEERS (PVT) LTD
Measurement Sheet
12-G Model Town, Lahore. 547000 Sheet # :- IPC#7
Project Name:- CFB 3&4 ICI Khewra Jehlum. ENGINEERING SHED, STORE YARD & MISC(BOQ Items) Date:- ###

BOQ Length Width H/D


Item DESCRIPTION OF ITEM No Contents Remarks
# (M) (M) (M)
Leveling & Dressing of Site around the
Circulating pump house including the cost
1 of removal of surplus earth from site to a
place outside ICI Plant designated by
Contractor, and backfilling down areas to

0.000 Cft

Total Qty - Cu.m


Dismantling, Earthwork, Backfilling and
Termite Control
Structural excavation for foundation
trenches etc. in any type of soil, including
2 separating and stacking of required
suitable materials at site for back filling
trenches in foundation, plinth and under
Testing Shed
floor of all lead & lift as directed by the
Columns
Engineer, backfilling with approved 1 27 6.33 6.33 5.25 5679.77 Cft
suitable
Excavationexcavated material in layer not
for Brickwork 2 8 6.17 1.50 1.83 271.30
exceeding 150mm in depth, watering and
2 2 7.17 1.50 1.83 78.82
compacting to 95% modified AASHTO
Gantry Columns
density, and disposal of surplus un- 2 1 13.66 6.50 9.75 1731.41
suitable
Store Yardmaterial to acolums
Main Gate place outside ICI 2 1 3.17 3.17 3.58 71.95
Plant designated by Contractor, including
south
shoringside&of strutting
Ware House Brick Work
where required.
Long Span all
Complete as per drawings, 1 1 70.33 1.00 1.00 70.33
specifications
Short Span and as directed by the 2 1 3.25 1.00 1.00 6.50
Engineer Incharge.
Store Pad Ware House 0.00
Foundation 3 1 3.330 3.33 0.67 22.29
0.00
7932.36 Cft
Total Qty 224.586 Cu.m

Back Filling with the same Excavated


Material above G.L / Rate not available

Floor area back filling with same


excavated material

0.00

0.00

0.00

0.000 Cft

Dismantling of RCC works (Floors, Dike Total Qty - Cu.m


walls, Foundations, Stubs etc.) including
disposal of unserviceable material and
8
debris outside ICI Plant area designated
by Contractor, as directed by Engineer
Incharge.
Ramp Dismentling (Ware House South
Side)
Ramp 1 1 12.000 4.00 0.67 32.16 Cft

Foundation 1 1 4.000 0.67 3.00 8.04

1 1 4.000 2.67 1.00 10.68

50.880 Cft

Total Qty 1.441 Cu.m


9 PCC
Testing Shed Cft
Columns 1 27 6.33 6.33 0.17 180.67
Under Brickwork 2 8 10.50 1.50 0.33 83.16
2 2 11.50 1.50 0.33 22.77
Gantry Columns 4 1 4.66 4.66 0.17 14.51
Store Yard Main Gate colums 2 1 3.17 3.17 0.17 3.36
south side of Ware House Brick Work
Long Span 1 1 70.33 1.00 0.33 23.21
Short Span 2 1 3.25 1.00 0.33 2.15
Store Pad Ware House
Pcc for Column Foundation 3 1 3.33 3.33 0.17 5.56
Pcc for Floor 1 1 39.25 4.00 0.25 39.25

374.62 Cft
Total Qty 10.607 Cu.m
Providing, Mixing, handling, pouring,
finishing & curing etc., straight or curved
cast-in place designed mix reinforced
10 structural cement concrete with min
cylinder strength at 28 days as noted
below, using Ordinary Portland Cement
for all work, unless specified otherwise,
Lawrencepur sand and Margalla crushed
a) Foundations ,Pads & Footing Beams /
Plinth Beams 4000 psi
Testing Shed
Columns 1 27 6.00 6.00 1.50 1458.00 Cft
Store Yard Main Gate colums 2 1 3.00 3.00 1.00 18.00
Store Pad Ware House
Rcc for Column Foundation 3 1 3.00 3.00 0.50 13.50

1489.50 Cft
Total Qty 42.172 Cu.m
b) Slab on Grade/RCC Floor 3000 psi

0.000 Cft
Total Qty - Cu.m

e) RCC Columns/Pedestal 4000 psi

Testing Shed
Columns 1 27 2.00 2.00 3.83 413.64 Cft
Store Yard Main Gate colums 2 1 1.00 1.00 2.41 4.83
Store Pad Ware House 0.00
Rcc for Column Foundation 3 1 2.00 2.00 1.00 12.00
0.00
430.47 Cft
Total Qty 12.188 Cu.m
Supply, fabricate and fix formwork
fabricated from Steel Plates complete in
12 all respect as per specifications and as
directed by Engineer Incharge:

a) Column Foundations

Testing Shed
Foundation 27 4 6.00 1.50 972.00 Sft
Store Yard Main Gate colums
Foundation 2 4 3.00 1.00 24.00

996.00 Sft
Total Qty 92.565 Sq.m

b) Column/Pedestal in foundation and


superstructure

Testing Shed
Columns 27 4 2.00 3.83 827.28 Sft
Store Yard Main Gate colums
Columns 2 4 1.00 2.42 19.36
0.00
846.64 Sft
Providing, Cutting, fabricating and fixing Total Qty 78.684 Sq.m
in position Mild Steel deformed
reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of
60,000 psi including all cost of cleaning,
straightening, cutting, bending, binding
14 with 16 SWG annealed binding wire,
wastage and such overlaps as are not
shown in drawings, using precast
concrete spacer blocks and steel chairs
for formwork
As per attachedcover
BBS etc. Complete all as
per drawings, specifications and as
Testing Shed
directed by the& Pipe Rack
Engineer Incharge. 4.783 M.Ton
Gantry Column + Footing 0.693 M.Ton
Main Gate Column + Footing 0.090 M.Ton

Furnish and Apply Waterproofing with Total 5.566 M.Ton


Primer Coat and 2 Coats of Cold Bitumen
including 500 gauge single layer
16 polythene sheet on vertical surface as per
directions of the manufacturer (Sika or
equivalant). Complete all as per drawings,
specifications and as directed by the
Engineer Incharge.
Testing Shed
Raft Sides 27 4 6.00 1.50 972.00 Sft
Raft Top 27 1 6.00 6.33 1025.46
Deduction Column -27 1 2.00 2.00 -108.00
Columns 27 4 2.00 3.83 827.28
Store Yard Main Columns 0.00
Raft Sides 2 4 3.000 1.000 24.00
Raft Top 2 1 3.000 3.000 18.00
Deduction Column -2 1 1.000 1.000 -2.00
Columns 2 4 1.000 2.420 19.36

2776.10 sft
Total Qty 257.906 Sqm
Providing and laying cement plaster in 1:5
cement: sand at various levels, including
20 curing, scaffolding, etc. as shown in the
drawings as per specification and as
directed by Engineer Incharge.
Plinth Protection at South side Ware
House
Long Wall 1 1 70.33 1.17 82.08 sft
Short Span 2 1 3.250 1.17 7.59
Store Pad Ware House 0.00
1 2 17.000 1.00 34.00
1 1 17.000 0.75 12.75
1 2 3.750 1.00 7.50
1 1 3.000 0.75 2.25
1 2 1.000 1.00 2.00
1 1 1.000 0.75 0.75
0.00
148.91 sft
Total Qty 13.834 Sqm
Supply of Anchor/Embedded Plates,
Angles and Channels, pipe penetrations,
33 frames complete in all respect, as per
drawings, specifications and as directed
by the Engineer Incharge.

Testing Shed
27 1 1 1 0.08 2.16 Cft
Gantry Columns
4 1 1.5 1.5 0.08 0.72
Store Yard Main Gate
2 1 1 1 0.08 0.16
Store Pad Ware House
3 1 1 1 0.06 0.18

0.00

3.22 Cft

0.0912 Cmtr

Factor 7850.00

Total Weight 715.657 Kg

Fixing Anchor/Embedded Plates, Angles


and Channels, pipe penetrations, frames
in any type of RCC member at any height
34
& location, complete in all respect, as per
drawings, specifications and as directed
by the Engineer Incharge.
Testing Shed
27 1 1 1 0.08 2.16 Cft
Gantry Columns
4 1 1.5 1.5 0.08
Store Yard Main Gate
2 1 1 1 0.08 0.16
Store Pad Ware House
3 1 1 1 0.06 0.18

2.32 Cft

0.07 Cmtr

Total Weight 515.629 Kg


Providing and Laying first class burnt
brick masonry in sub structure and plinth
with 1:5 (Cement : Sand) mortar,
complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
54
Store yard
Long Span 2 8 10.50 1.13 0.25 47.25 Cft
2 8 10.50 0.75 1.25 157.50
Short Span 2 2 11.50 1.13 0.25 12.94
2 2 11.50 0.75 1.25 43.13
0.00
Providing and laying first class burnt brick 260.81 Cft
masonry at any height , straight or curve
in any thickness set in (1:4) cement sand Total Qty 7.384 Cu.m
mortar in superstructure, placing wall ties
with R.C.C. members with 1/4" dia. M.S.
55
round bars including curing finishing and
racking out joints, scaffolding, lifting,
hoisting,
Store Padetc.,
Warecomplete
House in all respects as
per specifications, drawings and as
directed by the Engineer. 1 1 17.00 0.75 1.00 12.75
1 1 3.00 0.75 1.00 2.25
1 1 1.00 0.75 1.00 0.75
Brick work for plinth protection
Long Wall 1 1 70.33 0.75 3.17 167.05
Short Span 2 1 3.250 0.75 3.17 15.44
0.00

198.24 Cft
Total Qty 5.613 Cu.m
NBO
Q- Fixing of Brick Soiling

Bricks Supply by ICI with sand Sprinkling


with Leveing and dressing
1 1 101.25 28.25 2860.31 sft
Total Qty
265.730 Sqm
SINACO ENGINEERS (PVT) LTD Abstract of cost
12-G Model Town Lahore IPC # 8
Project Name:- CFB 3&4 ICI Khewra Jehlum. Furnace Oil Tank Pit for Kilen & Drain Date :- June 16, 2016

B.O.Q. Quantity Amount (Rs.)


Item No
Description of Item Unit Rate Remarks
Previous Current Total Previous Current Total
Site Preparatory Works
Leveling & Dressing of Site around the Circulating pump
house including the cost of removal of surplus earth from site
to a place outside ICI Plant designated by Contractor, and
backfilling down areas to maintain the ground elevations as
1 shown on drawings, described in Specification and as
directed by the Engineer Incharge.

- Sft 7 0 0 0

Dismantling, Earthwork, Backfilling and Termite Control

Structural excavation for foundation trenches etc. in any type


of soil, including separating and stacking of required suitable
materials at site for back filling trenches in foundation, plinth
and under floor of all lead & lift as directed by the Engineer,
backfilling with approved suitable excavated material in layer
not exceeding 150mm in depth, watering and compacting to
95% modified AASHTO density, and disposal of surplus un-
suitable material to a place outside ICI Plant designated by
2 Contractor, including shoring & strutting where required.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

178.615 178.615 Cum 550 0 98,238 98,238

Providing and filling sand under floor including leveling,


4 dressing, watering and mechanically compacting to 95% MPD
as per specification and as directed by Engineer Incharge.
1.298 1.298 Cum 7,750 0 10,060 10,060
Dismantling
Dismantling existing plastered/un-plastered brickwork in
cement sand mortar, serviceable bricks are to be handed
7 over to ICI and disposal of unserviceable material and debris
outside ICI Plant area designated by Contractor, as directed
by Engineer Incharge.
7.516 7.516 Cum 2,650 0 19,917 19,917
Dismantling of RCC works (Floors, Dike walls, Foundations,
Stubs etc.) including disposal of unserviceable material and
debris outside ICI Plant area designated by Contractor, as
8 directed by Engineer Incharge.

8.402 8.402 Cum 7,750 0 65,115 65,115


Concrete and Formwork
Providing, Mixing, handling and pouring Plain Cement
Concrete (PCC) using OPC Cement under Foundation, floors,
plinth protection etc. using graded crushed stone as coarse
aggregate (ASTM C-33 Class 67) including screening and
washing of aggregates, mechanical mixing, lifting, placing and
curing to all depths and height and to exact dimensions
9 shown on the drawings, and using proper formwork.
Complete all as per drawings, specifications and as directed
by the Engineer Incharge.

b) PCC 1:4:8 14.219 14.219 Cum 5,725 0 81,404 81,404


Providing, Mixing, handling, pouring, finishing & curing etc.,
straight or curved cast-in place designed mix reinforced
structural cement concrete with min cylinder strength at 28
days as noted below, using Ordinary Portland Cement for all
work, unless specified otherwise, Lawrencepur sand and
Margalla crushed stone including vibrating through electro
mechanical vibrator, placing of all pipes, sleeves PVC conduits
& fittings, with necessary arrangements where required and
10 other embedded items before concreting complete in all
respects as per drawings, specifications and as approved by
the Engineer Incharge.

a) Foundations ,Pads & Footing Beams / Plinth Beams 4000


psi 12.923 12.923 Cum 8,910 0 115,144 115,144
b) Slab on Grade/RCC Floor 3000 psi - - Cum 8,840 0 0 0
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) 3000 psi 0.000 - Cum 9,315 0 0 0
d) RCC walls 3000 psi 16.570 Cum 9,315 0 154,350 154,350
e) RCC Columns/Pedestal 4000 psi - Cum 9,865 0 0 0
Supply, fabricate and fix formwork fabricated from Steel
12 Plates complete in all respect as per specifications and as
directed by Engineer Incharge:

a) Columns Foundations - Sqm 550 0 0 0


b) Columns/Pedestal in foundation and superstructure - Sqm 750 0 0 0
c) Slab, Beams, Brackets, Parapets, Stair case (waist slab,
intermediate landing and steps) above ground 0.000 SM 750 0 0 0
Steel Reinforcement
Providing Cutting, fabricating and fixing in position Mild Steel
deformed reinforcement rebar grade 60 as per ASTM
A615,with minimum strength of 60,000 psi including all cost
of cleaning, straightening, cutting, bending, binding with 16
SWG annealed binding wire, wastage and such overlaps as
are not shown in drawings, using precast concrete spacer
14 blocks and steel chairs for formwork cover etc. Complete all
as per drawings, specifications and as directed by the
Engineer Incharge.

5.092 5.092 M.Ton 26,000 0 132,392 132,392


Furnish and Apply Waterproofing with Primer Coat and 2
Coats of Cold Bitumen including 500 gauge single layer
16 polythene sheet on vertical surface as per directions of the
manufacturer (Sika or equivalant). Complete all as per
drawings, specifications and as directed by the Engineer
Incharge. - SM 425 0 0 0
Providing and laying cement plaster in 1:5 cement: sand at
various levels, including curing, scaffolding, etc. as shown in
20
the drawings as per specification and as directed by Engineer
Incharge.
0
a) Internal sides - SM 425 0 0 0
b) External sides - SM 500 0 0 0
Deep Struck Pointing 1:2 Cement: Sand mortar at any height
21 and thickness, complete in all respect as per drawings,
specifications and as directed by Engineer Incharge.
- SM 500 0 0 0

Supply and apply M/S ICI Dulux Paints and approved make
and shade in three coats consisting one priming coat of lime
wash including sand papering, preparation of surfaces, one
coat of Dulux primer and two coats as paint as mentioned
22
below in sub-items as specified in the selected system as
shown on finishing Schedules/Drawings in approved color,
texture, shade and pattern complete in all respect. Vinyl
Emulsion to Plastered Walls, Ceiling or Concrete Surface

- SM 275 0 0 0
DPC(1:2:4) with two coats of Bitumen & Polythene Sheet one
26 layer - Sqm 753 0 0 0
Supply and install shop fabricated painted steel hollow metal
doors with 5mm thick clear plain local glass (in upper panels
only)using 50x50x4mm MS box section for frames, locking rail
100x50x4mm thick, 16 BG MS sheet covering, reinforced to
ensure the dimensional stability against applicable load and
forces, locking arrangement, stainless aldrops and other
27 hardware, fitting and fixing accessories as per hardware
schedule and finished in industrial enamel paint of approved
color, shades, pattern in accordance with the Specification, as
shown on Drawings and to the approval of the Engineer.

0.000 SM 11,925 0 0 0
Providing and fixing shop fabricated anodized corrosion
resistant Aluminum Door (Champaign) by an approved
manufacturer, comprising of 3.2 x 100mm outer tubular
sections with 2mm thick open able tubular section and
mullions, sash members. Including glass (5mm) and glazing
29 accessories. Consisting of corrosion resistant hardware, all
aluminum and glass fitting and fixing accessories, Sealed with
UV resistant building grade sealants, All doors to be designed
for resisting 150 Km/Hr wind pressure, complete in all
respects, in accordance with specifications, as shown on
drawings and to the approval of the Engineer.

- SM 11,985 0 0 0

Supply and fix champaign color or as approved by Engineer


Aluminum Extrusions Sliding Windows, consisting of
corrosion resistance, and not less than 1.6 mm thick at any
location for main frame and sash members, frames, angles,
30 channels, cover jointed, mullions including single glazing and
glass (5mm)accessories, mastic pointing sealant, fly screens,
applicable hardware fittings and fixing accessories complete
in all respect in accordance with the Specifications and as
Shown on Drawings.

- SM 7,990 0 0 0
33 Supply of Anchor/Embedded Plates, Angles and Channels,
pipe penetrations, frames complete in all respect, as per
drawings, specifications and as directed by the Engineer
Incharge.
715.657 239.123 Kg 120 28,695 28,695
34 Fixing Anchor/Embedded Plates, Angles and Channels, pipe
penetrations, frames in any type of RCC member at any
height & location, complete in all respect, as per drawings,
specifications and as directed by the Engineer Incharge.

515.629 277.261 Kg 65 18,022 18,022


49 Providing and Fixing Pre-cast 75mm thick slab (Izhar made or
equivalent) 1m to 1.5m & 0.5m to 0.75m width jointed with
1:4 Cement Sand mortar complete in all respect.

- SM 1,750 0 0
Providing and Laying first class burnt brick masonry in sub
structure and plinth with 1:5 (Cement : Sand) mortar,
54
complete in all respect as per drawings, specifications and as
directed by Engineer Incharge.
0.000 CM 6,825 0 0

Providing and laying first class burnt brick masonry at any


height , straight or curve in any thickness set in (1:4) cement
sand mortar in superstructure, placing wall ties with R.C.C.
55 members with 1/4" dia. M.S. round bars including curing
finishing and racking out joints, scaffolding, lifting, hoisting,
etc., complete in all respects as per specifications, drawings
and as directed by the Engineer.
0.000 CM 9,345 0 0

58
Providing and finishing Non shrink Cement grout, as per
drawings, specifications and as directed by Engineer Incharge - CM 122,750 0 0 0

Additional Items/ Non BOQ


0 0

Sluice Galvanized Sluice Plate 2'-6 1/2" X 1'-6" With two angle
NBOQ-1 2'x1 1/2" x 1/4" on both sides with 1/2" hilti bolt @ 6" c/c
and Rubber Gaskit at bottom (0124-DRY-CIV-DRW-001)
0.000 Nos 1,084 0 0
Total Amount Rs. 0 723,337 723,337
SINACO ENGINEERS (PVT) LTD
Measurement Sheet
12-G Model Town, Lahore. 547000 Sheet # :- IPC#7
Project Name:- CFB 3&4 ICI Khewra Jehlum. ENGINEERING STORE (BOQ Items) Date:- ###

BOQ Length Width H/D


Item DESCRIPTION OF ITEM No Contents Remarks
# (M) (M) (M)
Leveling & Dressing of Site around the
Circulating pump house including the cost
1 of removal of surplus earth from site to a
place outside ICI Plant designated by
Contractor, and backfilling down areas to

0.000 Cft

Total Qty - Cu.m


Dismantling, Earthwork, Backfilling and
Termite Control
Structural excavation for foundation
trenches etc. in any type of soil, including
2 separating and stacking of required
suitable materials at site for back filling
trenches in foundation, plinth and under
floor of all lead & lift as directed by the
Furnace
Engineer,Oil Tank
backfilling with approved 1 1 35.00 23.50 6.42 5280.45 Cft
suitable
Concreteexcavated
Pit for kilenmaterial in layer not 1 1 12.88 8.13 5.42 566.98
exceeding 150mm in depth, watering and
Drain 1 1 82.00 2.50 2.25 461.25
compacting to 95% modified AASHTO
density, and disposal of surplus un- 0.00
suitable material to a place outside ICI
Plant designated by Contractor, including
shoring & strutting where required. 6308.68 Cft
Complete all as per drawings, Total Qty 178.615 Cu.m
specifications and as directed by the
Engineer Incharge.
Providing and filling sand under floor
including leveling, dressing, watering and
4 mechanically compacting to 95% MPD as
per specification and as directed by
Engineer Incharge.
Furnace Oil Tank 0.00

Tank Area 1 1 0.786 14.00 4.17 45.85

45.854 Cft
Dismantling existing plastered/un- Total Qty 1.298 Cu.m
plastered brickwork in cement sand
mortar, serviceable bricks are to be
7 handed over to ICI and disposal of
unserviceable material and debris outside
ICI Plant area designated by Contractor,
as directed by Engineer Incharge.
Killen # 7
Brick work Dismantiling 2 1 7.75 1.125 0.38 6.54

1 1 4.750 1.125 0.375 2.00 Cft

1 1 50.750 1.125 4.500 256.92

0.00

0.00

265.46 Cft
Total Qty 7.516 Cu.m

Dismantling of RCC works (Floors, Dike


walls, Foundations, Stubs etc.) including
disposal of unserviceable material and
8
debris outside ICI Plant area designated
by Contractor, as directed by Engineer
Incharge.

RCC Floor Dismantling


Concrete Pit for Kilen

Dismantling work 1 1 12.500 10.000 0.860 107.50 Cft

Deduction for Column -1 1 2.000 2.000 0.860 -3.44

Floor dismantling for Drain

1 1 47.75 2.5 0.83 99.08

1 1 1.83 2.5 0.42 1.92

1 1 34.0 2.5 0.42 35.70

Killen # 7

Slab dismantiling 1 1 6.0 9.33 1 55.98

0.00

0.00

296.74 Cft

Total Qty 8.402 Cu.m

9 PCC
Furnace oil Tank Cft
Under tank Wall 1 3.14 15.00 2.83 0.17 22.28
Under Dike Wall 1 1 31.08 2.17 0.17 11.25
1 1 31.08 3.33 0.17 17.28
Deduction -1 1 7.25 1.17 0.17 -1.41
Shorter Walls 1 2 17.13 3.33 0.17 19.05

Concrete Pit for Kilen 1 1 12.88 8.13 0.67 69.77


Drain PCC 1 1 82.00 2.25 0.17 30.81
PCC For Hard-Standing Area 1 1 21.00 35.00 0.17 122.75
1 1 21.000 60.00 0.17 210.420
502.20 Cft
Total Qty 14.219 Cu.m
Providing, Mixing, handling, pouring,
finishing & curing etc., straight or curved
cast-in place designed mix reinforced
10 structural cement concrete with min
cylinder strength at 28 days as noted
below, using Ordinary Portland Cement
for all work, unless specified otherwise,
Lawrencepur sand and Margalla crushed
a) Foundations ,Pads & Footing Beams /
Plinth Beams 4000 psi
Furnace Oil Tank
Under Tank Wall 1 3.14 15.00 2.50 1.00 117.75 Cft
Under Dike Wall (Long Walls) 1 1 30.75 2.00 1.00 61.50
1 1 30.75 3.00 1.00 92.25
Dedution -1 1 7.25 1.00 1.00 -7.25
Shorter Walls 1 2 17.13 3.33 1.00 114.07
Concrete Pit for Kilen 1 1 12.70 7.75 0.67 65.65
Pump Bed 1 1 4.17 3.25 0.92 12.46
Drain 1 1 78.00 2.50 0.33 64.35
456.43 Cft
Total Qty 12.923 Cu.m
b) Slab on Grade/RCC Floor 3000 psi

0.000 Cft
Total Qty - Cu.m
c) Slab, Beams, Brackets, Parapets, Stair
case (waist slab, intermediate landing
and steps) 3000 psi

Cft

0.00
0.00 Cft
Total Qty - Cu.m

d) RCC walls 3000 psi

Furnace Oil Tank


Tank Wall 1 3.14 15.00 1.00 6.75 317.93
Concrete Pit for Kilen 0.00
Long Wall 1 2 12.70 0.67 4.92 83.35
Extra conc 1 1 12.70 2.00 4.92 124.97
Short Walls 1 3 6.25 0.67 4.92 61.53
Deduction -1 1 1.50 0.67 2.53 -2.53
585.25 Cft
Total Qty 16.570 Cu.m

Supply, fabricate and fix formwork


fabricated from Steel Plates complete in
12 all respect as per specifications and as
directed by Engineer Incharge:

a) Column Foundations

0.00 Sft

0.00

0.00 Sft
Total Qty - Sq.m

b) Column/Pedestal in foundation and


superstructure

Testing Shed
Columns 0.00 Sft
Store Yard Main Gate colums
Columns 0.00
0.00
0.00 Sft
Total Qty - Sq.m

Providing, Cutting, fabricating and fixing


in position Mild Steel deformed
reinforcement rebar grade 60 as per
ASTM A615,with minimum strength of
60,000 psi including all cost of cleaning,
straightening, cutting, bending, binding
14 with 16 SWG annealed binding wire,
wastage and such overlaps as are not
shown in drawings, using precast
concrete spacer blocks and steel chairs
for formwork cover etc. Complete all as
per drawings, specifications and as
directed by the Engineer Incharge.

As per attached BBS


Furnace Oil Tank & Dike Walls 4.177 M.Ton
Concrete for Kilen Washing Pump 0.813 M.Ton
Drain for Kilen Washing Pump 0.102 M.Ton

Furnish and Apply Waterproofing with


Primer Coat and 2 Coats of Cold Bitumen Total 5.092 M.Ton
including 500 gauge single layer
16 polythene sheet on vertical surface as per
directions of the manufacturer (Sika or
equivalant). Complete all as per drawings,
specifications and as directed by the
Engineer Incharge.

0.00 Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 sft
Total Qty - Sqm
Providing and laying cement plaster in 1:5
cement: sand at various levels, including
20 curing, scaffolding, etc. as shown in the
drawings as per specification and as
directed by Engineer Incharge.

0.00 sft
0.00
0.00
0.00

0.00 sft
Total Qty - Sqm
Deep Struck Pointing 1:2 Cement: Sand
mortar at any height and thickness,
21 complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
0.00 Sft
0.00
Supply and apply M/S ICI Dulux Paints
and approved make and shade in three
coats consisting one priming coat of lime 0.00 sft
wash including sand papering, Total Qty - Sqm
preparation of surfaces, one coat of
Dulux primer and two coats as paint as
22 mentioned below in sub-items as
specified in the selected system as shown
on finishing Schedules/Drawings in
approved color,
a)Internal Sides onlytexture, shade and
pattern complete in all respect. Vinyl
Emulsion to Plastered Walls, Ceiling or
Concrete Surface 0.00 Sft
0.00
0.00
0.00
0.00 sft
Total Qty - Sqm
DPC(1:2:4) with two coats of Bitumen &
26 Polythene Sheet one layer

0.00
0.00
0.00
0.00
0.00
0.000 Sft
Total Qty - Sqm

Supply of Anchor/Embedded Plates,


Angles and Channels, pipe penetrations,
33 frames complete in all respect, as per
drawings, specifications and as directed
by the Engineer Incharge.

Concrete Pit for Kilen Washing Pump


Drain Gratting Cft

1 2 83 0.125 0.021 0.44

1 2 83 0.123 0.021 0.43


Steel Bars 3/4" @ 2" C/C

1 498 1.5 0.786 0.0004 0.21

1.08 Cft

0.03 Cmtr

Total Weight 239.123 Kg

Fixing Anchor/Embedded Plates, Angles


and Channels, pipe penetrations, frames
in any type of RCC member at any height
34
& location, complete in all respect, as per
drawings, specifications and as directed
by the Engineer Incharge.
Concrete Pit for Kilen Washing Pump
Drain Gratting Cft

1 2 83 0.125 0.021 0.44


1 2 83 0.123 0.021 0.43

Steel Bars 3/4" @ 2" C/C

1 498 1.5 0.786 0.0004 0.21

Fixing of E.P at Pump Pad


4 1 3.25 0.33 0.04 0.17

1.25 Cft

0.04 Cmtr

Total Weight 277.261 Kg

Providing and Fixing Pre-cast 75mm thick


slab (Izhar made or equivalent) 1m to
1.5m & 0.5m to 0.75m width jointed with
1:4 Cement Sand mortar complete in all
respect.
49

0.00 Sft

0.00 sft
Total Qty - Sqm

Providing and Laying first class burnt


brick masonry in sub structure and plinth
with 1:5 (Cement : Sand) mortar,
complete in all respect as per drawings,
specifications and as directed by Engineer
Incharge.
54
Brick work at South side Ware House
0.00 Cft
0.00
0.00
0.00

0.00 Cft
Total Qty - Cu.m
NBO
Q- Concrete Pit for Kilen Washing Pump
Sluice Galvanized Sluice Plate 2'-6 1/2" X
1'-6" With two angle 2'x1 1/2" x 1/4" on
both sides with 1/2" hilti bolt @ 6" c/c and
Rubber Gaskit at bottom (0124-DRY-CIV-
DRW-001) sft
Total Qty
- Sqm