0% found this document useful (0 votes)
91 views3 pages

PFMEAf

The document outlines a Potential Failure Mode and Effects Analysis (Process FMEA) for Shubh Enterprises, detailing various process steps, potential failure modes, their causes, effects, and recommended actions. It includes a systematic approach to identifying risks in production processes and suggests preventive and detection controls to mitigate these risks. The analysis is structured to ensure quality control and compliance with customer requirements throughout the manufacturing and packing processes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views3 pages

PFMEAf

The document outlines a Potential Failure Mode and Effects Analysis (Process FMEA) for Shubh Enterprises, detailing various process steps, potential failure modes, their causes, effects, and recommended actions. It includes a systematic approach to identifying risks in production processes and suggests preventive and detection controls to mitigate these risks. The analysis is structured to ensure quality control and compliance with customer requirements throughout the manufacturing and packing processes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SE-QAD-F-002 , Rev.00, Rev. Date : 10.01.

2024

SHUBH ENTREPRISES POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS(PROCESS FMEA)

Part Name Process Responsibility Mr. Tarunn Document number

Part No /
Approval / Date Date (Org)
Issue
.
Customer /
Key Date Revision No 00
Model

Core Team Mr. Tarun Revision Date


Process Step C Resp. & Action Results
Potential S l Potential Cause(s) / O D R Recommen Target
Potential Effect(s) of Current Process Current Process S O D R
Function Requirements Failure e a Mechanism(s) of c e P ded Compl Actions
Failure Controls Prevention Controls Detection e c e P
Mode v s Failure c t N action(s) -etion Taken
v c t N
s Date

10. Qty. as per invoice Incorrect qty. Production planning failure,


Receipt & Supplier invoice clearing issue Supplier is instructed
Wrong documentation done by
Storage of 2 to verify before Inspection at receipt 7 42 None
supplier
Raw Material Dispatch
for Inspection
Supplier is instructed
Wrong weighing done by
3 2 to verify before Inspection at receipt 7 42 None
supplier
Dispatch
Proper and smooth Bad handling of Dusting of Material
Handling material on job training to be Inspection at
less skilled person 2 7 42 None
provided subsequent Stage

20. Accurate inspection Inaccurate Non-conforming material may Will detect in


Untrained inspector 2 Training to inspector 7 70 None
Inspection of inspection pass in production subsequent process
RM Inspection criteria
Will detect in
5 Inadequate inspection criteria 2 decided by cross 7 70 None
subsequent process
functional team
Inaccurate measuring Calibrated equipment Will detect in
2 7 70 None
equipment in use subsequent process
Chemical properties as Chemical NP:Part may crack if material
per grade properties not as grade not as per specifications
per grade Assy:None Supplier is instructed
Wrong material supplied by Testing done by
CE:None 7 2 to verify before 7 98 None
supplier supplier
EU:None Dispatch

No Dust Dust NP:May need rework for


sorting Supplier is instructed
Assy:None Wrong material supplied by Visual Inspection at
5 2 to verify before 7 70 None
CE:Unaesthetic look supplier receipt
Dispatch
EU:None
Material should be Material stored on NP:More material retreivability
Locations not defined Visual check for
stored at designated wrong place time 2 Locations defined 7 28 None
storage
location Assy:None 2
CE:None Stored on wrong location by Training to store Visual check for
30. EU:None 3 7 0 None
store executive executives storage
Storage of
Raw Material FIFO system to be FIFO system not NP:Quality of part will
No awareness of FIFO system Training to store
followed followed deteriorated 2 Visual check for FIFO 7 28 None
Assy:None among store executives executives
2
CE:None FIFO system not followed by Training to store
EU:None 3 Visual check for FIFO 7 0 None
store executive executives
SE-QAD-F-002 , Rev.00, Rev. Date : 10.01.2024

SHUBH ENTREPRISES POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS(PROCESS FMEA)

Part Name Process Responsibility Mr. Tarunn Document number

Part No /
Approval / Date Date (Org)
Issue
.
Customer /
Key Date Revision No 00
Model

Core Team Mr. Tarun Revision Date


Process Step C Resp. & Action Results
Potential S l Potential Cause(s) / O D R Recommen Target
Potential Effect(s) of Current Process Current Process S O D R
Function Requirements Failure e a Mechanism(s) of c e P ded Compl Actions
Failure Controls Prevention Controls Detection e c e P
Mode v s Failure c t N action(s) -etion Taken
v c t N
s Date
Free From CRACK CRACK
Process paramter
Part reject 3 curing time 2 Inspection record 7 42
Standarization
Free From Short Short Moulding
Weight monitoring
Moulding Less Material/Regrinded No Regrinded material
Does not fullfill the Req. of
Customer / Part Failure 3 2 Inspection record 7 42
material to be added for
40. Molding & moulding
Inspection
Free From Un-cured Un-cured
Process paramter
Fitment NG 3 Less cooling time 2 Inspection record 7 42
Standarization
Free From AIR BUBBLE AIR BUBBLE
Process paramter
Part reject/ Low strength 3 Low Temp./ Air Open 2 Inspection record 7 42
Standarization
proper cutting & Improper cutting & IC- Poor Appearance
50. Finishing Finishing CE- Fitment Issue work instruction, visual Inspection at Final
3 Less skilled operator 2 7 42
DEFLASHING boundary samples Stage

Accurate inspection Inaccurate Non-conforming parts may 100% Visual


inspection pass, Fitment issue at CE 4 Untrained inspector 2 Training to inspector 7 56 None
Inspection

60. Inspection criteria


100% Visual
100% 4 Inadequate inspection criteria 2 decided by cross 7 56 None
Inspection
INSPECTION functional team

Inaccurate measuring Calibrated equipment 100% Visual


4 2 7 56 None
equipment in use Inspection
Packing material Problem at customer end Packing standard
not as per freezed as per
customer Packing requirements not clear customer
requirement 3 2 Visual inspection 7 42 None
Incorrect packing material used requirements
Training to packing
team
Packing material Parts can spread Training to packing
3 Damaged packing material used 2 Visual inspection 7 42 None
damaged team
Part qty. not as per Problem at customer end Packing standard
customer freezed as per
70. requirement customer
Packing Qty. requirements not clear requirements
3 2 Visual inspection 7 42 None
Counting / weighing error Training to packing
team
Calibrated weighing
balance used
SE-QAD-F-002 , Rev.00, Rev. Date : 10.01.2024

SHUBH ENTREPRISES POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS(PROCESS FMEA)

Part Name Process Responsibility Mr. Tarunn Document number

Part No /
Approval / Date Date (Org)
Issue
.
Customer /
Key Date Revision No 00
Model
70.
Core Team Mr. Tarun Revision Date
Packing
Process Step C Resp. & Action Results
Potential S l Potential Cause(s) / O D R Recommen Target
Potential Effect(s) of Current Process Current Process S O D R
Function Requirements Failure e a Mechanism(s) of c e P ded Compl Actions
Failure Controls Prevention Controls Detection e c e P
Mode v s Failure c t N action(s) -etion Taken
v c t N
s Date
Identification of Problem at customer end Packing standard
part/ packing freezed as per
material not as per Identification requirements not
customer
customer 3 clear 2 Visual inspection 7 42 None
requirements
requirement Incorrect identification used
Training to packing
team
Material should be Material stored on NP:More material retreivability
Locations not defined Visual check for
stored at designated wrong place time 2 Locations defined 7 28 None
storage
location Assy:None 2
CE:None Stored on wrong location by Training to store Visual check for
80. EU:None 3 7 42 None
Material Move store executive executives storage
to FG & FIFO system to be FIFO system not NP:None
Storage followed followed Assy:None No awareness of FIFO system Training to store
2 Visual check for FIFO 7 56 None
CE:Quality of part may among store executives executives
4
deteriorated FIFO system not followed by Training to store
EU:None 3 Visual check for FIFO 7 84 None
store executive executives
Accurate inspection Inaccurate Non-conforming parts may Will detect at customer
Untrained inspector 2 Training to inspector 5 40 None
inspection pass end
90 Inspection criteria
Will detect at customer
Pre-Dispatch 4 Inadequate inspection criteria 2 decided by cross 5 40 None
end
Inspection functional team
Inaccurate measuring Calibrated equipment Will detect at customer
2 5 40 None
equipment in use end
100. Incorrect qty. as per Incorrect qty. not Invoice clearing problem Training to Dispatch Qty. verification at
4 Wrong invoice made 2 5 40 None
Dispatch invoice as per invoice team Dispatch Stage
Sev-Severity, Occ-Occurrence, Det-Detection, Class-Classification, NP-Next Process in SE, Assy-Assembly in SE,IC-Immediate Customer, CE-Customer End, EU-End User
Special Characteristics

Revision History
[Link]. Rev. Date Revision Details

Prepared By:- Approved By:-

You might also like