Proposed Two-Storey Mixed-Use Building

The document outlines the architectural and engineering plans for a proposed two-storey mixed-use building located in Purok 9, Barangay Aguisan, Himamaylan City, Negros Occidental. It includes various detailed plans such as ground floor and second floor layouts, elevations, and electrical specifications. The project is prepared by JMA Design & Engineering Services and certified by relevant authorities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views10 pages

Proposed Two-Storey Mixed-Use Building

The document outlines the architectural and engineering plans for a proposed two-storey mixed-use building located in Purok 9, Barangay Aguisan, Himamaylan City, Negros Occidental. It includes various detailed plans such as ground floor and second floor layouts, elevations, and electrical specifications. The project is prepared by JMA Design & Engineering Services and certified by relevant authorities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Bago Republic of the Philippines

San Carlos D.P.W.H


PROVINCE OF NEGROS OCCIDENTAL

GUIMARASSTRAIT
La Carlota
CITY OF HIMAMAYLAN
Canlaon OFFICE OF THE BUILDING OFFICIAL

THIS SITE
HIMAMAYLAN CITY
District/City/Municipality

Kabankalan

NEGROS
OCCIDENTAL
Land Use and Zoning

Bais
NEGROS
Line & Grade
ORIENTAL

1 VICINITY MAP 2 LOCATION MAP Architectural


A 1 SCALE: NDTS A 1 SCALE: NDTS

Structural

Sanitary

Electrical

Mechanical

3 PERSPECTIVE VIEW 1 4 PERSPECTIVE VIEW 2


A 1 SCALE: NDTS A 1 SCALE: NDTS BUREAU OF FIRE PROTECTION

CIVIL ENGINEER
PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PROPOSED TWO STOREY
PTR No.
ISSUED AT
MIXED USE BUILDING
APRIL ROSE M. GARRATON A
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 1 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
A B
A B 1 2 3
℄ ℄
℄ ℄ ℄ ℄ ℄
B-B
3.80
2.00 1.80 3.80 1.60 2.60 2.60 1.50
GLASS SLIDING DOOR
1.05 FIREWALL ROUGH
SLIDING WALL CLADDING PAINTED FINISH
WINDOW
APEX APEX
UP

1.00

1.00
TOP ROOF TRUSS TOP ROOF TRUSS

1.60

.60

.60
.84
W TOP OF ROOF BEAM TOP OF ROOF BEAM
2

1 ℄
D2 SECOND FLOOR SECOND FLOOR
1.20

TOP OF DOORS TOP OF DOORS


T&B AND WINDOWS AND WINDOWS

3.00

3.00
D3

2.60
1.40

.90

6.00

6.00
SECOND FLOOR LINE SECOND FLOOR LINE
5.20

5.20
2 ℄ COMMERCIAL SPACE

GROUND FLOOR GROUND FLOOR


A-A A-A TOP OF DOORS TOP OF DOORS
AND WINDOWS AND WINDOWS
2.60

2.60

3.00

3.00
ROLL UP DOOR

ROLL UP DOOR
3 ℄ FINISH FLOOR LINE FINISH FLOOR LINE

.30

.30
NATURAL G.L NATURAL G.L
D1
B-B

1 GROUND FLOOR PLAN 3 FRONT VIEW ELEVATION 4 LEFT SIDE ELEVATION


A 2 SCALE: 1:100 A 2 SCALE: 1:100 A 2 SCALE: 1:100
A B

3.80

A
B A
B 3 2 1
2.00 1.80 ℄ ℄ ℄ ℄ ℄

B-B 1.30 3.80 1.50 2.60 2.60 1.60


0.4mm RIBTYPE AWNING WINDOW FIREWALL ROUGH
ROOFING SHEET PAINTED FINISH
APEX APEX
1.60

1.00

1.00
TOP ROOF TRUSS TOP ROOF TRUSS
W
2
DOWN

.60

.60
1 ℄ TOP OF ROOF BEAM TOP OF ROOF BEAM
1.20

T&B
D3 SECOND FLOOR SECOND FLOOR
2.60

TOP OF DOORS TOP OF DOORS


AND WINDOWS AND WINDOWS

3.00

3.00
1.40

A-A A-A
B E D R O O M
5.20

5.20

2 ℄

6.00

6.00
1.10

SECOND FLOOR LINE SECOND FLOOR LINE


2.60

W GROUND FLOOR GROUND FLOOR


1 GD1 TOP OF DOORS TOP OF DOORS
1.50

AND WINDOWS AND WINDOWS

3.00

3.00
T E R R A C E
3 ℄

FINISH FLOOR LINE FINISH FLOOR LINE


.30

.30
NATURAL G.L NATURAL G.L
B-B

2 SECOND FLOOR PLAN 5 REAR VIEW ELEVATION 6 RIGHT SIDE ELEVATION


A 2 SCALE: 1:100 A 2 SCALE: 1:100 A 2 SCALE: 1:100

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PROPOSED TWO STOREY
PTR No.
ISSUED AT
MIXED USE BUILDING
APRIL ROSE M. GARRATON A
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 2 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
A B
A B 1 2 3
℄ ℄
B-B ℄ ℄ ℄ ℄ ℄
3.80
2.00 1.80 3.80 1.60 2.60 2.60 1.50
1.05

UP APEX APEX

1.00

1.00
TOP ROOF TRUSS TOP ROOF TRUSS

1.60

.60

.60
.84
W SEE TRUSS DETAIL SEE TRUSS DETAIL
2 TOP OF ROOF BEAM TOP OF ROOF BEAM

1 ℄
D2

1.20
SECOND FLOOR SECOND FLOOR
T&B TOP OF DOORS TOP OF DOORS
AND WINDOWS AND WINDOWS

3.00

3.00
D3

2.60
1.40

BEDROOM T&B BEDROOM


ELEV + 0.30m TERRACE
5.20

5.20
ELEV + 0.30m

6.00

6.00
ELEV + 0.25m
2 ℄ COMMERCIAL SPACE SECOND FLOOR LINE ELEV + 0.25m SECOND FLOOR LINE

A-A A-A GROUND FLOOR GROUND FLOOR


TOP OF DOORS TOP OF DOORS
2.60

2.60
AND WINDOWS AND WINDOWS

3.00

3.00
ROLL UP DOOR
3 ℄
COMMERCIAL SPACE T&B COMMERCIAL SPACE
ELEV + 0.30m ELEV + 0.25m
ELEV + 0.30m
FINISH FLOOR LINE FINISH FLOOR LINE

.30

.30
D1 COMPACTED FILL COMPACTED FILL
NATURAL G.L NATURAL G.L
B-B

1 GROUND FLOOR PLAN 3 CROSS SECTION THRU AA" 4 LONGITUDINAL SECTION THRU BB"
1:100 A 5 1:100
A 2 SCALE: 1:100 A 3 SCALE: SCALE:
A B
℄ ℄
3.80 3.65
2.00 1.80
1.83 1.83
B-B 1.30

.90 .80 1.60


0.80m .70 .80 .80 .60 .60
.50
1.60

W
2
DOWN
1 ℄

.60

.60
1.20

T&B
D3
2.60

.60
2.10m
2.15

2.15
2.10

2.10
2.09
1.40

A-A A-A
B E D R O O M
5.20

5.20

2 ℄
1.10
2.60

W
1 GD1
D1 D2 D3 GD1 W1 W2
1.50

T E R R A C E FABRICATED ROLL UP DOOR PANEL DOOR PVC FLUSH DOOR ; 1/4" THK. ANALOC FRAMING ; 1/4" THK. ANALOC FRAMING ; 1/4" THK. ANALOC FRAMING
1 SET(COMMERCIAL SPACE) 2 SET(T&B) SLIDING DOOR SLIDING WINDOW SLIDING WINDOW
2 SET(BEDROOM /COMMERCIAL SPACE)
3 ℄ 1 SET (TERRACE) 1 SET (BEDROOM) 2 SET (T&B)

4 SCHEDULE OF DOORS AND WINDOWS


B-B
A 5 SCALE: 1:50
2 SECOND FLOOR PLAN
A 2 SCALE: 1:100

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PROPOSED TWO STOREY
PTR No.
ISSUED AT
MIXED USE BUILDING
APRIL ROSE M. GARRATON A
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 3 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
REPUBLIC OF THE PHILIPPINES
PROVINCE OF NEGROS OCCIDENTAL
CITY OF HIMAMAYLAN
OFFICE OF THE BUILDING OFFICIAL

LEGENDS:
BUILDING OFFICIAL

SYMBOL DESCRIPTION

DECORATIVE INDOOR LED LIGHTING FIXTURE

RECESSED LED DOWN LIGHT

OUTDOOR LED RECTANGULAR LIGHTING FIXTURE

OUTDOOR LED CANISTER TYPE LIGHTING FIXTURE


2- .0MM q.THW WIRES
S1 ONE GANG SWITCH-1 WAY ONE LINE DIAGRAM 1-3.5 IN 32mm PVC
Sab TWO GANG SWITCH-1 WAY PIPE
Sa-2way
M
ONE GANG SWITCH-2 WAY

Sabc THREE GANG SWITCH-1 WAY

PANEL BOARD
PB
40 AT
CKT.
CIRCUIT NO. 15 AT 15 AT
XX
9 CEILING LIGHT OUTLETS 10 CEILING LIGHT OUTLETS
TWO GANG, 220V CONVENIENCE OUTLET C1 C2
2-3.5mm Sq. THW/15 MMØ PIPE 2-3.5mm Sq. THW/15 MMØ PIPE
WP
TWO GANG, 220V CONVENIENCE OUTLET-WATER PROOF
30 AT 30AT
ACU
1.5 HP SPLIT TYPE AIRCONDITION UNIT
5 CONVENIENCE OUTLETS 5 CONVENIENCE OUTLETS
W
WASHING MACHINE C3 C4
2-2.0mm Sq. THW/20 MMØ PIPE 2-3.5mm Sq. THW/20 MMØ PIPE
REF
REFRIGERATOR
30 AT 30AT
M
MICROWAVE
SPARE SPARE
C5 C6

E 1 SCALE: NDTS GROUND

GENERAL ELECTRICAL NOTES: SPECIFICATION:


1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
ACCORDANCE WITH THE PROVISIONS OF THE LATEST EDITION
OF THE PHILIPPINE ELECTRICAL CODE, APPLICABLE
ORDINANCES, RULES AND REGULATIONS OF THE LOCAL
GOVERNMENT AND REQUIREMENTS OF THE LOCAL POWER
COMPANY.
SCHEDULE OF LOADS
2. ALL WIRING SHALL BE INSTALLED IN STANDARD CONDUITS DESCRIPTION CIRCUIT
RUN EMBEDDED IN CONCRETE AND HOLLOW BLOCK
CKT # VOLT WATT AMP
BREAKER
WIRE PIPE
L.O. C.O. OTHER LOAD
STRUCTURES,COLUMNS, WALLS, PARTITIONS, AND OR RUN
C1 9 - - 220 1800 8.18 15AT 2 # 3.5 mm ² 15 mm Ø PVC PIPE
CONCEALED BETWEEN DOUBLE WALL PARTITIONS AND INSIDE
THE CEILING SPACES. WHERE THE USE OF THE CONCEALED C2 10 - - 220 1300 5.91 15AT 2 # 3.5 mm ² 15 mm Ø PVC PIPE
CONDUIT WIRING IS IMPRACTICABLE, SURFACE METAL C3 - 5 - 220 1260 5.73 30AT 2 # 3.5 mm ² 20 mm Ø PVC PIPE
MOULDING MAYBE USED. C4 - 5 - 220 1080 4.91 30AT 2 # 3.5 mm ² 20 mm Ø PVC PIPE
C5 - - SPARE 220 - - 30AT 2 # 3.5 mm ² -
3. WHEREVER REQUIRED AND NECESSARY, PULL BOXES OR C6 - - SPARE 220 - - 30AT 2 # 3.5 mm ² -
JUNCTION BOXES OF PROPER SIZES SHALL BE INSTALLED AT TOTAL 5440 24.73
CONVENIENCE AND INCONSPICUOUS LOCATIONS.ALTHOUGH
SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED COMPUTATION:
IN THE SPECIFICATIONS. I total = 24.73 X 1.25 = 30.91
USE 2-8.0 MM SQ. THW WIRE IN 32mm RMC PIPE
40 AUTOMATIC CIRCUIT BREAKER,25 KAIC,230V,2P,60HZ.
4. THE ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT
AND IMMEDIATE SUPERVISION OF A DULY LICENSED
ELECTRICAL ENGINEER AND REGISTERED MASTER ELECTRICIAN.

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON E
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 1 2
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
A B A B
℄ ℄ ℄ ℄
3.80
3.80
2.00 1.80
2.00 1.80
1.05 1.30
RECEPTACLE
UP
1 2
1.60

1.60
PP-1 PP-1

.84
1 ℄ 1 ℄
S2 S2
1.20

1.20
PB1
S1 S1

2.60

2.60
1.40

1.40
5.20

5.20

5.20

5.20
2 ℄ 2 ℄ TO OTHER RECEPTACLE TO OTHER RECEPTACLE

1.10
2.60

2.60

2.60

1.50
S3 S3
S1 S1
3 ℄ 3 ℄
UTILITY BOX

1 GROUND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR LIGHTING LAYOUT 5 UTILITY BOX INSTALLATION DETAIL
E 2 SCALE 1:100 E 2 SCALE 1:100 E 2 SCALE NDTS
A B A B
℄ ℄ ℄ ℄
3.80
3.80
2.00 1.80
2.00 1.80
1.05 1.30
OCTAGONAL BOX
UP CONDUIT LOCK-NUTS
1.60

1.60

3 4 AND BUSHING
PP-1 PP-1
.84

1 ℄ 1 ℄
PB1
1.20

1.20
2.60

2.60
OCTAGONAL BOX
1.40

1.40

BUSHING
5.20

5.20

5.20

5.20
2 ℄ 2 ℄ LOCK-NUTS LOCK-NUTS
AND BUSHING

1.10
BOX PORTION
2.60

2.60

2.60

1.50

3 ℄ 3 ℄

J U N C T I O N B O X
3 GROUND FLOOR POWER LAYOUT 4 SECOND FLOOR POWER LAYOUT 6 INSTALLATION DETAIL
E 2 SCALE 1:100 E 2 SCALE 1:100 E 2 SCALE NDTS

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON E
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 2 2
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
REPUBLIC OF THE PHILIPPINES
PROVINCE OF NEGROS OCCIDENTAL
CITY OF HIMAMAYLAN
OFFICE OF THE BUILDING OFFICIAL
2.80
0.05 1.30 700 700 0.05

0.10MMØ PVC 0.10MMØ PVC


PIPE INLET PIPE OUTLET BUILDING OFFICIAL

1.20
MANHOLE MANHOLE MANHOLE

MANHOLE
P L A N

580
NGL
299.96

AIR SPACE CONCRETE COVER


.5m W/12mmØ CONCEALED
.08m .35m .08m LIFT HANDLE

1.40
.5m
10MM VERT. BARS WITH

.1m
LEACHING .08m .35m .08m
9MM HOR. BARS @ DIGESTIVE LEACHING
.3m
CHAMBER CHAMBER CHAMBER P"Ø DRAINAGE PIPE
EVERY 3 LAYER CHB
1 2

.48m
.7m
.13m
S E C T I O N

.13m
0.10
CONCRETE COVER

2 TYP. SEPTIC VAULT DETAIL 3 CATCH BASIN DETAIL W/12mmØ CONCEALED

1 VICINITY MAP P 1 SCALE 1:40 P 1 SCALE 1:30


P 1 SCALE: NDTS
GENERAL PLUMBING NOTES:
1. RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A GRADE NOT LESS THAN TWO PERCENT (2%).
LEGENDS:
2. ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES(45°) WYES, LONG SWEEP QUARTER BEND,
SYMBOL/ABB. DESCRIPTION SYMBOL/ABB. DESCRIPTION
SIXTH-EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL, A SINGLE ONE EIGHT (1/8) BEND
CO CLEAN OUT T/A TO ABOVE COMBINATION MAY BE USED ON VERTICAL STACKS, AND SHORT QUARTER BENDS MAY BE USED ON WASTE LINE, TEE AND CROSSES
MAYBE USED IN BENT PIPES.
DS DOWN SPOUT T/B TO BELOW

FCO FLOOR CLEAN OUT VSTR VENT STACK THRU ROOF 3. NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES.

FD FLOOR DRAIN W WASHING MACHINE 4. THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.

F FAUCET WC WATER CLOSET 5. PROVIDE CLEAN-OUTS UNDER THE FOLLOWING CONDITIONS:


F/A FROM ABOVE WCO WALL CLEAN OUT
a. EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND A HALF DEGREES(22.5°).
F/B FROM BELOW GATE VALVE b. ONE AND ONE HALF METERS (1.5m) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION .
c. EVERY FIFTEEN METERS (15m) IN HORIZONTAL RUN OF PIPES. AT THE END OF ANY HORIZONTAL PIPE LINES.
HB HOSE BIB ANGLE VALVE

KS KITCHEN SINK SANITARY/DRAINAGE LINES 6. NOT LESS THAN 0.30 METERS OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF THE TOP SLAB.

LAV LAVATORY VENT PIPES 7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
SHO SHOWER WATER LINES
8. ALL PLUMBING WORKS SHALL BE DONE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBER OR SANITARY ENGINEER.

9. UNLESS NOTED OTHERWISE, ALL WATER SUPPLY PIPES SHALL BE Ø21" uPVC.

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON P
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 1 2
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
A B A B
℄ ℄ ℄ ℄

VT

ST
R
1 ℄ CO 1 ℄

fd lav. fd lav.
wc wc

4" PVC SOIL PIPE


fd
2 ℄ 2 ℄

wc
lav
.

3 ℄ 3 ℄

TO PUBLIC
SEWER

GROUND FLOOR SECOND FLOOR


1 SEWER LINE LAYOUT 2 SEWER LINE LAYOUT
P 2 SCALE 1:100 P 2 SCALE 1:100
A B A B
℄ ℄ ℄ ℄

UP

CO
1 ℄ 1 ℄ fd
fd wc ST
fd lav. lav. lav
wc wc .

2 2 PE
PI
℄ ℄

IL
FR SO
SOOM VC
UR WA P
CE TE
R 4"
TO
SE PU
WE BL
3 ℄ 3 ℄ R IC

FROM WATER
5 P L U M B I N G I S O M E T R I C
SOURCE
P 2 SCALE 1:100
GROUND FLOOR SECOND FLOOR
3 WATER LINE LAYOUT 4 WATER LINE LAYOUT
P 2 SCALE 1:100 P 2 SCALE 1:100

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON P
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 2 2
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
REPUBLIC OF THE PHILIPPINES
PROVINCE OF NEGROS OCCIDENTAL
CITY OF HIMAMAYLAN
OFFICE OF THE BUILDING OFFICIAL

GENERAL:
STRUCTURAL NOTES
REINFORCING STEEL:
1.ALL DIMENSIONS ARE IN METERS AND MILIMETERS UNLESS NOTED
OTHERWISE. 1.STEEL REINFORCEMENT SHALL BE GRADE 230 IN ACCORDANCE WITH PNS 8.TABLE OF LAP SPLICES
49.
2.DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHOULD BE READ OR PARAMETERS
BUILDING OFFICIAL
COMPUTED. ANY DISCREPANCIES FOUND ON THE WRITTEN DIMENSIONS 2.UNLESS APPROVED BY THE ENGINEER, WELDING OF REINFORCING BARS fc'=20.7 MPa fy=230 MPa
SHOULD BE RAISED TO THE ATTENTION OF THE ENGINEER PRIOR TO SHALL NOT BE PERMITTED. BAR DIAMETER STANDARD TENSION SPLICE LENGTH (mm)*
EXECUTION OF THE WORK. (mm) HOOK (mm),ldh CLASS "A" CLASS "B"
3.REINFORCING STEEL BARS MUST BE FREE FROM OIL, GREASE, LOOSE RUST,
10 160 300 400
3.ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH THE PROJECT LOOSE MILL SACK OR OTHER HARMFUL MATTER IMMEDIATELY BEFORE
12 200 300 400
SPECIFICATIONS & OTHER PROJECT DOCUMENTS. POURING CONCRETE.
16 260 400 520
4.LAP SPLICE SHALL COMPLY WITH ACI-318M-14 AND NSCP C101-15. 20 320 500 650
EARTHWORKS: 25 400 750 975
AT LEAST 200mm AT LEAST 200mm
5.THE MINIMUM CLEAR COVER FOR REINFORCEMENTS SHALL BE AS 28 450 840 1100
1.UNLESS NOTED OTHERWISE ALL FILL MATERIALS SHOULD BE SELECTED
FROM COMMONLY EXCAVATED MATERIAL WHICH ARE FREE FROM
FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS: * For top bars (more than 300mm of concrete placed below the A
horizontal reinforcement) multiply the above values by 1.3
ORGANIC AND HAZARDOUS MATERIALS AND GENERAL DEBRIS,FILL - - LINTEL BEAM
STRUCTURAL ELEMENTS CONCRETE COVER,mm
MATERIALS SHALL BE INERT WELL GRADED AND GRANULAR MATERIAL WITH
A MAXIMUM SIZE NOT EXCEEDING 75mm. FOOTING 75
9.FORMWORKS REMOVAL
GROUND SLAB 40
FOUNDATION: SUSPENDED SLAB 20
B WINDOW
OPENING
1.IN ABSENCE OF SOIL INVESTIGATION REPORT, AND IN ACCORDNACE STRUCTURAL ELEMENTS
MINIMUM TIME REQUIRED - -
BEAMS STIRRUPS & BEFORE REMOVAL
40
WITH SECTION 304.2 OF NSCP 2015, THE ALLOWABLE BEARING CAPACITY COLUMN TIES
FOOTING 24 HRS
USED FOR FOUNDATION IS 100 kPa. CONCRETE EXPOSED
TO EARTH BUT POURED 50 SUSPENDED SLAB 21* DAYS
2.UNIT WEIGHT OF SOIL CONSIDERED IS 18 kN/m3. AGAINST FORMS
C FFL
COLUMNS 48 HRS
CONCRETE POURED
3.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING DIRECTLY TO EARTH
75
BEAMS SOFFIT FORMS
- -
21* DAYS
EXCAVATION HAVE BEEN COMPLETED TO CONFIRM THE DESIGN SOIL
BEARING CAPACITY. 6.STANDARD HOOKS: BEAMS SIDE FORMS 24 HRS
*IT CAN BE REMOVED AFTER A MINIMUM OF14 DAYS IF
BEND STRAIGHT
CONCRETE: TYPE OF STANDARD HOOK BAR SIZE,d
DIAMETER,D EXTENSION, lext
APPROVED BY THE ENGINEER

3.THE CONCRETE DESIGN AND CONSTRUCTION WORKS ARE IN 90 DEGREE HOOK


ACCORDANCE WITH THE AMERICAN CONCRETE INSTITUTE (ACI 318M-14) Point at which
Ø10mm to Ø25mm 6d MASONRY:
AND THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP bar is developed
d

Ø28mm to Ø36mm 8d 12d


C101-15). HORIZONTAL REINFORCEMENT CHB"t"
SCHEDULE OF STRUCT'L. CONCRETE D
1200>W<3400mm CHB"t"

lext
VERTICAL REINFORCEMENT
AT 28 DAYS COMPRESSIVE STRENGTH Ø40mm & Ø58mm 10d
GROUTED CELL
28-DAYS COMPRESSIVE HORIZONTAL
STRUCTURAL ELEMENTS 180 DEGREE HOOK SPACING CHB VERTICAL
STRENGTH (fc') Ø10mm to Ø25mm 6d
REINFORCEMENT CHB VERTICAL
Point at which
FOOTING 3,000psi (20.70 MPa) REINFORCEMENT

t(mm)
bar is developed LARGER OF 4d & 2 - 12mmØ
d

250 (min)
Ø28mm to Ø36mm 8d
BEAMS, COLUMNS & 3,000psi (20.70 MPa) 65mm

200(min)
SUSPENDED SLAB D 1-12mmØ
10mmØ STIRRUPS
SLAB ON FILL, RET. lext Ø40mm & Ø58mm 10d AT 300mm ON CENTER
WALLS, CONC. FOR 2,500 psi (17.24 MPa)
FENCE, LINTEL BEAMS
SCHEDULE OF MASONRY WALL
& LINTEL COLUMNS
LEAN CONC. 1,500 psi (10.34 MPa)
7.STIRRUP & TIE HOOKS: t
REINFORCEMENT
GROUTED SECTION A
HORIZONTAL VERTICAL
BEND STRAIGHT (mm) CELL
2.AGGREGATES SHALL BE CHEMICALLY INERT, STRONG, HARD AND TYPE OF STANDARD HOOK BAR SIZE,d DIA. SPACING DIA. SPACING W<1200mm
DIAMETER,D EXTENSION, lext
150 10 EVERY 3 LAYERS 10 600mm ALL CELLS
DURABLE, AND OF LIMITED POROSITY AND FREE FROM ADHERING
90 DEGREE HOOK 100 10 EVERY 3 LAYERS 10 600mm ALL CELLS
COATINGS AND ORGANIC OR OTHER IMPURITIES THAT MAY CAUSE LARGER OF 4d &
Ø10mm to Ø16mm 4d
75mm
CORROSION OF THE REINFORCEMENT OR MAY IMPAIR THE STRENGTH AND
d

TYPICAL DOOR/WINDOW
DURABILITY OF THE CONCRETE. D OPENING & LINTEL BEAM DETAIL
lext

Ø20mm to Ø25mm 6d 12d


SCHEDULE OF CONCRETE AGGREGATES AT LEAST 200mm AT LEAST 200mm
W(mm)
ITEMS AGGREGATE SIZE
FOOTING 19mm (3/4 in) 135 DEGREE HOOK
SLABS, BEAMS, COLUMNS, OTHERS 19mm (3/4 in) Ø10mm to Ø16mm 4d A
VARIES
d

SLAB ON GRADE 25mm (1 in) LARGER OF 6d & - - LINTEL BEAM


1 - 16mmØ
D 75mm 1 - 16mmØ
HORIZONTAL CHB
3.WATER FOR MIXING SHALL BE CLEAN AND FREE FROM OIL, ALKALIS, Ø20mm to Ø25mm 6d REINFORCEMENT CONTINIOUS CHB
t
lex

ACIDS, ORGANIC MATERIALS WHICH MIGHT AFFECT THE PROPERTIES OF CHB"t" VERTICAL
REINFORCEMENT
CONCRETE AND STEEL.
180 DEGREE HOOK 150
4.ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) DAYS Ø10mm to Ø16mm 4d
CHB"t"
IMMEDIATELY AFTER POURING BY USING WET BURLAP, FOG SPRAYING OR
d

DOOR
LARGER OF 6d & OPENING SECTION B
OTHER APPROVED METHOD. D 65mm B
5.TESTING OF CONCRETE SHALL CONSIST OF COMPRESSIVE TESTS OF lext Ø20mm to Ø25mm 6d - - SECTION C
MOLDED CONCRETE CYLINDERS FOR STRENGTH AND SLUMP TESTS FOR
CONSISTENCY. FFL

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON S
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 1 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
A B A B A B A B
℄ ℄ ℄ ℄ ℄ ℄ ℄ ℄
3.80 3.80 3.80
3.80
2.00 1.80 2.00 1.80 2.00 1.80
2.00 1.80
1.30 2"X3" C-PURLINS 1.30 0.4mm RIBTYPE 1.30
1.05 SPACED @ 0.60m BW ROOFING SHEET
WF

UP
FB-1
1.60

1.60

1.60

1.60
WF WF

1.00
FB-1

FB-1
.84
F1/C1 FTB F1/C1
1 ℄ 1 ℄ 1 ℄ 1 ℄
FB-1 RB-1 RB-1
1.20

1.20

1.20

1.20
WF
WF

RB-1

RB-1

RB-1

RB-1
FB-1

FB-1
2.60

2.60

2.60

2.60
FTB
FTB
1.40

1.40

1.40

1.40
STEEL DECK
SLAB
F1/C1 FTB
F1/C1 FB-1 RB-1 RB-1
5.20

5.20

5.20

5.20

5.20

5.20

5.20

5.20
2 ℄ 2 ℄ 2 ℄ 2 ℄

1.10

1.10

1.10
RB-1

RB-1

RB-1

RB-1
FB-1

FB-1
2.60

2.60

2.60

2.60

2.60
FTB

FTB
STEEL DECK
SLAB

1.50

1.50

1.50
F1/C1 FTB
F1/C1 FB-1 RB-1 RB-1
3 ℄ 3 ℄ 3 ℄ 3 ℄

RAFTER

RAFTER

RAFTER
2"X4" TUBULAR

2"X4" TUBULAR

2"X4" TUBULAR

2"X4" TUBULAR

1.00
WF
WF WF

2"X2" TUBULAR
3.80 3.80 3.80 3.80

1 FOUNDATION PLAN SECOND FLOOR 3 ROOF FRAMING PLAN 4 ROOFING PLAN


S 2 SCALE: 1:100 S 2 SCALE: 1:100 S 2 SCALE: 1:100
8-16MMØ 2 FRAMING PLAN
MAT. BARS E.W.
S 2 SCALE: 1:100
1.50
.30

REFER TO SCHEDULE OF REFER TO SCHEDULE OF


MASONRY WALL MASONRY WALL REFER TO SCHEDULE
PLAN
0.20 OF MASONRY WALL
NGL NGL
1.50
DOWELS TO MATCH 100mm THICK

3 LAYERS
3 LAYERS

OF CHB
OF CHB
6-16MMØ MAIN VERT. BARS CHB VERTICAL BARS SLAB ON FILL
W/ 9MMØ STIRRUPS

0.25
DOWELS TO MATCH 0.30 0.30

0.30

0.30
0.30
SPACED @ 1-0.05M, 3-0.10M, DOWELS TO MATCH
AND REST @ 0.20M.O.C CHB VERTICAL BARS CHB VERTICAL BARS TOP OF SLAB

NAT. GD. LN. BOT. OF BOT. OF BOT. OF


(ROAD LEVEL) FOOTING FOOTING FOOTING

0.25
0.25
Ø12mm@300mm OC Ø12mm@300mm OC Ø12mm@300mm OC
0.40 0.40 0.15 0.40 0.15
WELL COMPACTED BASE 3-Ø12mm WELL COMPACTED BASE 3-Ø12mm WELL COMPACTED BASE 5-Ø12mm
1.20

AS SHOWN

6 WALL FOOTING DETAIL TO WHERE APPLICABLE


0.20

SECTION S 2 SCALE: 1:40


5 COLUMN AND FOOTING DETAIL
S 2 SCALE: 1:40

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON S
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 2 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN
ISSUED AT
LENGTH OF SLAB
L/5 L/5

L 12mm Ø TOP BARS


SPACED @ 300mm O.C
0.10 BOTHWAYS
FB 1
L/4 L/2 L/4 (0.20m X 0.30m)

1-10mmØ
S 10mmØ CONT. BAR M S
16mmØ CUT BAR

L/5
10mmØ C-TIES
SLAB SECTION 1
0.15 SPACED @ EVERY
0.20m O.C.
N0TE: PROVIDE LINTEL

LENGTH OF SLAB

(0.20m X 0.30m)
1-10mmØ BEAM ON ALL DOORS AND

(0.20m X 0.30m)
WINDOW HEADERS AROUND

FB 1
FB 1
PERIMETER WALLS
10mmØ STIRRUPS SP. [email protected] 16mmØ CONT. BAR STEEL DECK
LINTEL BEAM [email protected], [email protected], REST @ 0.20m O.C.
16mmØ BENT UP BAR
CORRUGATION
12mm Ø MAIN BARS
L/5 L/5 SPACED @ 300mm O.C

0.20 0.20 0.20 0.20 0.20 0.20

L/5
4-12mmØ 10mm Ø TEMP BARS
6-16mmØ 6-16mmØ 5-16mmØ 3-16mmØ 2-12mmØ
SPACED @ 350mm O.C

FB 1 10MMØ TOP BARS


0.30 0.00 0.30 0.30 0.30 0.30 (0.20m X 0.30m)
CONCRETE SLAB SPACED @ 300mm
LENGTH OF SLAB
L/5 L/5
3-16mmØ 5-16mmØ 2-12mmØ 4-12mmØ

0.10
FB FB
@ SUPPORT @ MID SPAN @ SUPPORT @ MID SPAN @ SUPPORT @ MID SPAN 10MMØ TEMP BARS SPACED @ 350mm

10MMØ MAIN BARS SPACED @ 350mm


FTB FB-1 RB-1 0.8mm THK. STEEL DECK W/
12X19mm TEKSCREW FULL THREAD)

1 BEAM SCHEDULE AND DETAIL 3 STAIRS ELEVATION


S 3 SCALE 1:40
S 3 SCALE 1:50

2"X2" TUBULAR

1"X1" TUBULAR @ 0.15 B.W


TREAD

.90m
2"X3" CPURLINS 9 MM Ø BARS AT 0.30M
2"X6" C PURLINS O. C. BOTHWAYS .30m

12 MM Ø REINFORCEMENT
BARS AT 0.30 M. O. C.

.20m
16 MM Ø TENSILE BARS
RISER
AT 0.15 M. O. C.
0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
FINISH FLOOR LINE

.80
2 R A F T E R D E T A I L
S 3

.15m
SCALE 1:40 16 MM Ø MAT. BARS
AT 0.15 M. O. C.

4 STAIRS FOUNDATION DETAIL


S 3 SCALE 1:20

PREPARED BY THE OFFICE OF: CERTIFIED BY: PRC No. PROJECT TITLE: APPROVAL: SHEET CONTENT: DRAWN BY: SHEET NO.:
VALIDITY
JMA Design & PTR No. PROPOSED TWO STOREY
APRIL ROSE M. GARRATON S
ISSUED AT
MIXED USE BUILDING
Engineering Services ISSUED ON
TIN
OWNER
AS SHOWN
CAD BY: 3 3
PROJECT LOCATION:PUROK 9, BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL JBCN