Second Floor Plan
Second Floor Plan
14 13 12 11 10 9 8 7 6 5 4 3 2 1
NOTES:
Bridge
1. DRAWINGS SHOULD BE READ AND NOT SCALED.
2. ALL DIMENSIONS/LEVELS ARE IN MILLIMETERS UNLESS
MENTIONED OTHERWISE.
3. ALL WALLS HAVE 200MM THICK BLOCK WALL UNLESS
SPECIFIED IN TENDER .
4. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH
J OTHER RELEVANT DRAWINGS FOR STRUCTURE AND J
SERVICES.
5. FLOOR LEVELS ARE IN MM.
6. ALL INTERNAL LEVELS ARE FINISHED FLOOR LEVELS. ALL EXIT
LANDINGS SHALL BE 10 - 12MM LOWER THAN THE INTERNAL
FLOOR FINISH LEVEL.
7. ALL MATERIALS/FINISHES/FIXTURES SHALL BE AS PER
SPECIFICATION AND DRAWINGS AND SHALL BE PRE
APPROVED BY CONSULTANT/ CLIENT.
8. ALL LVLS.(AMSL) ARE WITH RESPECT TO THE TOPOGRAPHIC
ROOF
ENTRANCE BUILDING
PARATRANSIT
SURVEY. THE LEVEL TO BE CROSS CHECKED AT THE TIME OF
EXECUTION AND ANY DISCREPANCIES TO BE BROUGHT INTO
THE NOTICE OF THE CONSULTANTS.
9. THE OVERALL SITE DIMENSION & BUILDING DIMENSION ARE
APPROXIMATE, THE SAME TO BE VERIFIED AT SITE & PLANNED
ACCORDINGLY.
10. CHICKEN WIRE MESH TO BE PROVIDED AT ALL JUNCTIONS OF
RCC / SHEAR WALL AND BRICK WORK BEFORE PLASTERING
AS PER SPECIFICATIONS.
11. ALL STRUCTURAL MEMBER SIZES SHOULD BE CONFIRMED
FROM STRUCTURAL DRAWINGS.
12. ALL SHAFT SIZES SHOULD BE CONFIRMED FROM MEP
DRAWINGS
I 13. REINFORCEMENT IN SHAFTS TO CONTINUE AND CUT
WHEREVER NECESSARY FOR LAYING PIPES/CABLES ETC IN
ALL SHAFTS EXCEPT EXHAUST SHAFTS. ALL SHAFTS NEED TO
A
BE CLOSED AND FIRE SEALED AFTER LAYING [Link]
THE FINISHING SHALL BE AS PER THE SCHEDULE.
14. REFER DOOR,WINDOW & GLAZING DETAIL SHEETS FOR SIZES
FOB ROOF & DETAILS OF THEM.
15. ALL LANDSCAPED TERRACES SLAB SHALL BE MINIMUM 200MM
F
P''
ROO
(CLEAR) DOWN FROM THE MAIN FLOOR SLAB.
16. MARGIN FLOOR FINISH OF ALL FLOORS EXCEPT BASEMENTS
SHALL BE 100MM. STAIRCASE FLOOR FINISH MARGIN SHALL BE
FOB
10560
45 TO 50MM, HOWEVER FINISH LEVEL OF ALL FLOOR
STAIRCASE TO MATCH PERFECTLY.
17. ALL SERVICE AREAS, LOBBIES ETC, IN BASEMENTS SHALL BE
15290
150MM HIGHER THAN PARKING AREAS.
18. LIFT PIT / HEAD ROOM ETC TO BE CONFIRMED WITH LIFT
VENDOR BEFORE EXECUTION.
CONNECTING
BRIDGE THE LEVELS TO BE CHECKED AT THE TIME OF EXECUTION AND
O'' ROOF ANY DISCREPANCIES TO BE BROUGHT INTO NOTICE OF THE
EMPLOYER/ENGINEER.
FOB ROOF
P'
6710
4740
H JL5 JL5 JL5 JL5 JL5 JL5 JL5 JL5 NGL/EGL - NATURAL GROUND LEVEL/ EXISTING GROUND LEVEL H
CONNECTING JL5 JL5
FRL - FINISHED ROAD LEVEL
BRIDGE RWH
1930x500 GL2C GL10 GL10 GL10
RWH
1930x500 TREAD-300 FFL - FINISHED FLOOR LEVEL
DN DN
RISER-150
WIDTH-1800 PL SHAFT
ROOF RWH
RWH RWH
RWH
1300x750
P
SD SD
750
PL
SD
PL
SD1290
Lift 05
PL SHAFT
AHU
1020 x 750 PASSENGER BOARDING BAY-6 FD3 20 Pax
AHU
750
FD1
FHC
LD 2300x
5930
1200x750
2800
MD MD MD MD MD MD MD MD MD
FD1
3500
RWH RWH
JL1 GL3A JL1 1920x550 JL1B JL3B 1920x550 ELE SHAFT JL1 GL3A JL1
RWH RWH
RWH
O
RWH
17500
ELEC ELEC
SHAFT SHAFT
4850 5080
1500x500 1500x500
JL1
R1
JL7A
UP TO 2nd. FLOOR JL6
21
7000
60
FFL +7800 (SLOPE 1:8)
GL3A RWH
7.0 M WIDE DRIVE WAY
N
2100 x 2800
JL7A RWH
FFL +10800MM
R1 SERVICES
0
SD
77
19 FD1 JL6
6 ODU SPACE ABOVE
R4
3500
64950
G 0 40 G
18 60 AT 3M HEIGHT
M ELV &
R FD2 84 DRIVER'S REST
ROOM
V
V REQ. PL SHAFT
V
SIZE - 1000X350
L
HVAC V
1200x750
1200x750
R13
FD3
2680x750
SERVICES
FHC
SD
FHC
ELECTRICAL MD MD MD MD MD MD MD MD W2
FFL +10950MM
FD3
ELE SHAFT
ELEC ELV
180090 X 4950 TOILET
3020
ROOM
FFL +10950MM
K
580
1340 X 610 500 X 610 1350 X 700 1350 X 700 850 X 700 300MM SUNK W2
CLOAK ROOM 1.2M HIGH SS & GLASS RAILING 1.2M HIGH SS & GLASS RAILING SUNK
GD2 D3
C GD1 D3 TOILET
C
HVAC
FD2 FD2 7700 X 5350 3990 Lift 03
UP
Lift 04 CHANGING
W2
8000
LIFT 14 SERVICE
LIFT 08 20 Pax ST-03 20 Pax
FF TL-05
20 PAX LD ESCALATOR LD ESCALATOR 104 ROOM ROOM
LD 20 PAX TREAD-300
DN TO FF 2300x
LD TREAD-300
2300x
20 AHU ELECTRICAL,
1630
2300X2800 RISER-150 (FOR FUTURE PROVISION) 2800 2800 (FOR FUTURE PROVISION)
2300X2800 ST-01
WIDTH-2000
DN
RISER-150
WIDTH-2000 ROOM LV & SERVER
JL3 GD1 D1
2190
ROOM
1.2M HIGH SS & GLASS RAILING 1.2M HIGH SS & GLASS RAILING
H LIFT 13
20 PAX LD
LIFT LIFT LIFT 07
20 PAX
AIR
SHAFT
1500 X
2600 AHU FFL +10950MM FFL +10950MM FD2 FD2 FD2
J
LOBBY LD MD MD MD MD MD MD MD MD
FD3
2300X2800 LOBBY 2300X2800
7700 X 6000 FHC
HVAC
1380 x 700 DIFFERENTLY V
66740
COMMERCIAL HVAC
TERMINAL FD2
I
1380 x 700 TOILET
HVAC HVAC
D3A
3500
43940
9520
SHAFT
1500 X W2 LIFT 15 LIFT 16 [Link] 17
FFL +5700 FFL +5400
B
UP DN
JL3 LIFT 12 LIFT 06 2990
20 PAX 20 PAX 20 PAX 2000kg LD'
1.2M HIGH RCC LD LD 20 PAX D4 D4 D4 D4
2300X2800 2300X2800 2800X2300 2800X2300 3300 x 2550
PARAPET WALL FD2 FD1 SERVICE D3
TOILET
300MM
FD3 LD LD SUNK MALE
V
ALONG BOTH FHC
[Link] 18
LOBBY TOILET
GD2 1200x750
LIFT LOBBY
2000kg LD'
GD2 TL-04 V
RAMPS WITH PCC 3500 WIDE LOBBY
1200x800
FFL +10800MM GDL4 COMMERCIAL 3300 x 2550
FHC
FHC
D2
7000
FD3
1200x800
COPING JL3 FFL +10950MM GD1 7.0 M WIDE DRIVEWAY 6100 x 4630 BABY FEEDING
D4
JANITOR
V
FD2
PL
F
3800 x 2800
PL
SHAFT
980 x
2200 G F
SD
D3 TL-04
7190
TOILET
300MM
3500
SUNK
ABOVE TOILETS
32
JL3 ST-02
OFFICE SPACE GD1 D4
R1
GDL3 WIDTH-2000 D4
FHC
FD1 TERMINUS
D
FD3
DN V
FEMALE
MD MD MD MD MD MD MD MD
D4
MD 9800 x 7000 TOILET
60
V
E 21
1200x750
AHU D4
FD3
FHC
R1 1.2M HIGH SS RAILING PASSENGER BOARDING BAY-5 LD LD LD
RWH
3500 X 2350 GL9 V
4280
R1 1.2M HIGH SS & GLASS RAILING
C'
D4
1700 x 750
R6
SD
5150 5320
80
HVAC
0 DN LD
Lift 01 Lift 02 1500 x 750 SD
FHC
20 PAX 20 PAX 20 PAX HVAC
800 x
0
20 Pax 20 Pax TREAD-300 2100
JL7A
RWH
700 x1500
FFL +7800 RWH
RWH
GL10 GL10
JL7 GL3 JL8 GL3
C
B GL2C GL2C GL2C GL2C
5500
RWHRWH
GL2C GL10
SD
CONNECTING
B GL3A
FFL +4100 SERVICES/ODU SPACE
FD1
GL9
BRIDGE
JL7A ROOF
RWH
1100x650
RWH RWH
1100x650
RWH
1100x650 C''
A
1100x650
SD
RWH RWH RWH
RWH RWH
RWH RWH
JL1 GL3A JL1 JL1B JL1B JL2B JL3B JL1 GL3A JL1
E CONNECTING E
1.2M HIGH RCC BRIDGE
PARAPET WALL
10160
10160
ROOF
ALONG BOTH
RAMPS WITH PCC FOB ROOF
COPING
FOB-IN01 ROOF
A'
A
D1 D1
3010 8210 11570 8750 1800 6200 6700 8000 15450 10000 10000 10000 10000 10000 10000 10000 10000 10000 6000 8480 8560 10020 5130 5030 4750
3010 199900 4750
207650
1' 1 2 3 4 4A 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 23'
OF
C C
FOB ROOF
FOB ROOF
B B
CONTRACT
NAME Integrated Development of Multimodal Facility Complex with Kuralagam at Broadway,
Chennai