November Project Summary: Seven Seas

The document outlines the work performed by Loyal Building Contracting L.L.C for the Seven Seas project in November, detailing various tasks such as touchup work, electric cable laying, trench step work, tile work, and manpower work. It includes a summary of quantities, rates, and amounts for each type of work, along with a detailed measurement sheet specifying dimensions and total quantities. The document serves as a record of labor and materials used on the project site number 651.

Uploaded by

JAMES neel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views8 pages

November Project Summary: Seven Seas

The document outlines the work performed by Loyal Building Contracting L.L.C for the Seven Seas project in November, detailing various tasks such as touchup work, electric cable laying, trench step work, tile work, and manpower work. It includes a summary of quantities, rates, and amounts for each type of work, along with a detailed measurement sheet specifying dimensions and total quantities. The document serves as a record of labor and materials used on the project site number 651.

Uploaded by

JAMES neel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

LOYAL BUILDING CONTRACTING L.L.

C
GROUP : MARIPPAN

PROJECT : SEVEN SEAS

MONTH : NOVEMBER

SITE NO : 651

ABSTRACT SHEET

[Link]. Description of work Unit Quantity Rate Amount

LABOURS 30.00
1 TOUCHUP WORK
2 ELECTRIC CABLE LAYING RUN.M

4C*25MM2 CABLE RUNM 405.00

1C*16MM2 CABLE RUNM 405.00

3 TRENCH STEP WORK LABOURS 4.00

4 TILE WORK SQM

TRENCH STEPS SQM 4.60

WEIGH BRIDGE STEP GRANITE SQM 1.08

5 ELECTRIC CABLE LAYING (REWORK) LABOURS 6.00

6 FLOOR CRACK+ EXPANSION JOINT REWORK LABOURS 24

7 MANPOWER WORK LABOURS 10


CHARGE HAND

SIGN:
Remarks
LOYAL BUILDING CONTRACTING L.L.C

GROUP : MARIAPPAN

MONTH : NOVEMBER

PROJECT : SEVEN SEAS

SITE NO : 651

DETAILED MEASUREMENT SHEET

Dimensions
Total
[Link]. Description of work Unit Nos. QTY Quantity
L (m) B (m) D (m)

A TOUCHUP WORK/ SNAG WORK LABOURS 30.00 30.00 30.00

B CABLE LAYING

WEIGH BRIDGE OFFICE CABLE(4c*25mm2) RUNM 1 185 185.00

WEIGH BRIDGE EARTH CABLE(1C*16MM2) RUNM 1 185 0.00 185.00

GUARD ROOM CABLE(4C*25MM2) RUNM 1 100 100.00

GUARD ROOM EARTH CABLE(4C*25MM2) RUNM 1 100 100.00

PRODUCTION OFFICE CABLE(4C*25MM2) RUNM 1 120 120.00

PRODUCTION OFFICE EARTH CABLE(1C*16MM2) RUNM 1 120 120.00

C STEP FOR TRENCH LABOURS 9 9.00

D TILE WORK

TRENCH STEPS SQM 2 2.3 1.00 2.30 4.60

SECURITY ROOM STEP GRANITE SQM 0.9 1.2 1.08 1.08

E ELECTRIC CABLE LAYING (REWORK AREA) LABOURS 6 6.00 6.00

F FLOOR CRACK + EXPANSION JOINT REPAIR LABOURS 24.00 24.00 24.00

G MAN POWER WORK


SITE CLEANING NOS 5 LABOURS
MATERIAL SHIFTING NOS 5 LABOURS
CHARGE HAND
SIGN :