LOYAL BUILDING CONTRACTING L.L.
C
GROUP : MARIPPAN
PROJECT : SEVEN SEAS
MONTH : NOVEMBER
SITE NO : 651
ABSTRACT SHEET
[Link]. Description of work Unit Quantity Rate Amount
LABOURS 30.00
1 TOUCHUP WORK
2 ELECTRIC CABLE LAYING RUN.M
4C*25MM2 CABLE RUNM 405.00
1C*16MM2 CABLE RUNM 405.00
3 TRENCH STEP WORK LABOURS 4.00
4 TILE WORK SQM
TRENCH STEPS SQM 4.60
WEIGH BRIDGE STEP GRANITE SQM 1.08
5 ELECTRIC CABLE LAYING (REWORK) LABOURS 6.00
6 FLOOR CRACK+ EXPANSION JOINT REWORK LABOURS 24
7 MANPOWER WORK LABOURS 10
CHARGE HAND
SIGN:
Remarks
LOYAL BUILDING CONTRACTING L.L.C
GROUP : MARIAPPAN
MONTH : NOVEMBER
PROJECT : SEVEN SEAS
SITE NO : 651
DETAILED MEASUREMENT SHEET
Dimensions
Total
[Link]. Description of work Unit Nos. QTY Quantity
L (m) B (m) D (m)
A TOUCHUP WORK/ SNAG WORK LABOURS 30.00 30.00 30.00
B CABLE LAYING
WEIGH BRIDGE OFFICE CABLE(4c*25mm2) RUNM 1 185 185.00
WEIGH BRIDGE EARTH CABLE(1C*16MM2) RUNM 1 185 0.00 185.00
GUARD ROOM CABLE(4C*25MM2) RUNM 1 100 100.00
GUARD ROOM EARTH CABLE(4C*25MM2) RUNM 1 100 100.00
PRODUCTION OFFICE CABLE(4C*25MM2) RUNM 1 120 120.00
PRODUCTION OFFICE EARTH CABLE(1C*16MM2) RUNM 1 120 120.00
C STEP FOR TRENCH LABOURS 9 9.00
D TILE WORK
TRENCH STEPS SQM 2 2.3 1.00 2.30 4.60
SECURITY ROOM STEP GRANITE SQM 0.9 1.2 1.08 1.08
E ELECTRIC CABLE LAYING (REWORK AREA) LABOURS 6 6.00 6.00
F FLOOR CRACK + EXPANSION JOINT REPAIR LABOURS 24.00 24.00 24.00
G MAN POWER WORK
SITE CLEANING NOS 5 LABOURS
MATERIAL SHIFTING NOS 5 LABOURS
CHARGE HAND
SIGN :