4-Star International Hotel Proposal
4-Star International Hotel Proposal
International Hotel
1/24
Contents
1 Executive Summary .............................................................................................................................. 3
1. Background of the project ................................................................................................................... 4
2. Introduction ..............................................................................................................................................6
3. Objective of the Project .................................................................................................................................7
4. Project Location and Description ........................................................................................................8
5. Market Situation ......................................................................................................................................9
5.1. Market Price ............................................................................................................................................12
6. Location and civil works ...................................................................................................................... 14
6.1. Location & Site .......................................................................................................................................14
6.2. Civil Work ................................................................................................................................................15
7. Internal Facilities/Furniture/equipment for bedroom services................................................21
8. Internal furniture/equipment/ machineries for hotel.................................................................22
9. Running cost ...........................................................................................................................................23
2. TECHNICAL ANALYISIS.................................................................................................................. 23
3. ECONOMIC OVERVIEW ................................................................................................................... 35
TABLE 6 PROJECTED NUMBERS OF TOURISTS..................................................................................... 39
4. TECHNOLOGY AND ENGINEERING ........................................................................................... 44
10. Services & Revenue projection .........................................................................................................47
11. Organization and Manpower ..............................................................................................................48
12. Other expenses......................................................................................................................................50
13. Financial Analysis ..................................................................................................................................51
13.1.Initial Investment Cost .................................................................................................................................52
13.1.1. Initial Fixed Investment .............................................................................................................52
13.1.2. Working Capital ......................................................................................................................... 52
13.2.Source of Finance ........................................................................................................................................53
14. Profitability Analysis ....................................................................................................................................53
14.1.Simple rate of return (SRR) .......................................................................................................................... 56
14.2.Payback period (PBP) ...................................................................................................................................56
2/24
1 Executive Summary
KEY INFORMATION HIGHLIGHTS
NATIONALITY Ethiopia
PRODUCTION
CAPACITY
PRODUCTS TO BE
International standard tourist hotel is high
SERVICE
class hotel where services like standard
bedroom, catering, conference hole, Spa
(Hot Spring), gymnasium, sauna and
massage, other sports facilities like tennis or
squash court, min-golf or badminton,
bowling, table tennis and children
playground, night club with dancing to live
music or discotheque or cabaret etc.
COST OF THE PROJECT Total investment Cost: 100,000,000 ETB is required, from this
amount 30% or 30,000,000.ETB from owner equity and the rest
70% 70,000,000 ETB from bank loan.
3/24
1. Background of the project
The owner of this project, Getachew Tolosa , has been engaged on a number of
investment activities in Ethiopia for a long period of time. His vast and successful
business experience coupled with strong financial position has now initiated him
to establish and run a designated five-star Hotel business in the city of Bishoftu
City. This star-designated and standardized hotel business is going to be
constructed and functional at the heart of the capital city of Oromia region. The
proposed hotel is going to serve various services such as superior quality deluxe
suite rooms (Junior, Executive, Presidential), standard and standard double
guest rooms, Gourmet restaurant and bar, Champagne bar & lounge, Roof top
bar, Wine cellar, Multifunctional meeting and conference rooms, Wellness & spa
area (including treatment rooms, sauna, steam bath, whirlpool, indoor pool) and
Fitness & gym area as well as various related business centers such
International Conference events, Cinema Halls, Children Entertainment
facilities, Wedding Ceremony areas & Ground Tennis court. The proposed
star-designated hotel project has two block building of each with G+6 and G+2.
The owner of the project, Mr. Getachew Tolosa, is a young Entrepreneur, with more than
4/24
The total initial investment cost of the proposed designated four-star hotel is
estimated at about birr 100,000,000of which birr 70,000,000will be required for
fixed asset and the remaining birr 30,000,000.00for day to day operation of the
project. This investment cost is proposed to finance both by the long run bank
loan and personal own equity. The rate of financing for the proposed project is
set at 70% by long-term bank loan and the remaining 30% from own source.
With the opening of the project, it will create Permanent employment opportunity
for about 70 citizens and Temporary opportunity for about 50 citizens total 20
citizens , and will contribute revenue to the local government in the form of tax.
Thus, the project is financially sound and worth investing and needs assistance
in materializing the project.
5/24
2. Introduction
The Ethiopian government has formulated it’s second 5-Year Growth and
Transformation Plan (GTP-II) to carry forward the important strategic directions
in maintaining a fast growing economy in all sectors. Accordingly, the tourism
sector is one of the key sectors set to benefit from the enormous efforts being
made by the government.
Generally, Ethiopia has much to offer to local and international tourists. It has a
unique historical and cultural heritage, natural attraction; it is a possessor of
eight world heritage sites, magnificent scenery, a surprisingly cool climate, rich
flora and fauna, important archaeological sites and hospitable people and their
cultures diversified a combination which makes it suitable for tourism
development.
The northern tourist circuit known as the “Historic Route’’ comprises the most
important tourist sites in country. Ethiopia’s wealth of tourism attractions gives
it great potential for cultural and educational tourism, photo safaris, hunting
safaris, bird watching, water sports including river rafting, desert trekking,
mountain climbing and-ecotourism. Health tourism, on the account of the cool
climate and numerous hot springs, is an additional type of tourism with great
potential. Tour operators of grade 1 have shown considerable growth in recent
years.
The stock of hotel rooms in the country has increased sharply over the last few
years. While some tourist accommodation is already available at all the major
attractions, improvement as well as new construction is taking place. The
tourism industry is growing because of Government commitment to provide an
enabling environment. Enormous opportunities exist for tourism investment in
6/24
star-designated eco-tourism, specialized international restaurants and tour
operation grade one.
Ethiopia is truly a land of contrasts and extremes; a land of remote and wild
places with a wide range of potential tourist attractions, which have not yet been
fully exploited.
Thus, potential investors can take full advantage of these opportunities through
direct investments or joint ventures with foreigners. Opportunities also exist in
this sector in the construction of star designated hotels and resort hotels all over
the country.
The study focuses on the investment environment of the country and location of
the proposed hotel, the assumed competitive market, the local hotel market, the
estimated trading performance of the hotel assuming a position at the very top
end of the market.
8/24
1.1. PROJECT DESCRIPITION
The concept of this project is contained in five-stars standard hotel in the
project area by fully G+20 constructing modern panoramic with other emergency exit
stairs and installing multipurpose modern and cultural bar and restaurant services,
meeting & conference room services, shopping centers, sauna bath & steam
services, and other facilities to its customers. It is assume that the project
will be implemented and attain a full capacity operation within two years period,
during which time the project is expected to undertake building construction
activates, purchase, import and install the required machinery and equipment in
order to be able to star up the improved service provision activity with 70%
of its capacity, that grows time to 80%, 90% and eventually attaining 100% of the
estimated full capacity.
For financial analysis and evaluation purpose, the average charging rates for similar
service activities in the city have been taken into account. After undertaking detail
computation of costs and benefits, in order to attract customers and penetrate
the market easily, it is suggested to add on the average of 30 % profit margin
and charge for meals and beverages a relatively reasonable price on its standards.
The total estimated initial investment cost of the project is estimated to be about
birr 100,000,000from the total investment cost 70% is assumed to be financed
by long- term bank loan obtained in three phases, of which 49% will be required
in foreign currency and the remaining 30% of the total investment cost will be
covered by equity capital contribution of the owner/investor.
5. Market Situation
All investments particularly that of a private investment are being made in return
of economic benefits both privately and socially. The benefits can also be
expressed in different forms but the economic return in the form of profit is the
basic criteria for determining to invest or not. To do so, analyzing the market
situation of the proposed project becomes indispensable. Thus, before making
9/24
any more financial investment, the market situation of the proposed project
should be dealt critically.
In big projects, undertaking market study is unavoidable task since its future
fate is basically determined by the situation of the market. Similarly, though the
required market study for this particular project may not be as shallow as to that
of complex projects, looking to its market situation is an important step. The
owner of the project has made a lot of study for establishing the project before
deciding to invest money and starting the construction activities.
The demand and supply situation for most business is basically a function of
various economic variables, such as population, income level and taste,
urbanization, overall economic activity and growth, government policies and
strategies and the like. These factors have got an impact on the availability of
market. When we look to the demand and supply situation of a star-designated
hotel basically its demand is highly dependent on the active economy prevailing
in the country and off course in the region where this project is going to be
opened. Taking the prevailing market of the existing hotel businesses in the city,
it can be concluded that a hotel building completed with the latest state of the
art construction technology is highly demanded by customers, like businessmen,
traders and government offices, local and international tourists, local and
international NGOs, national and international delegates, sportsmen, investors,
etc.
Bishoftu City being one of the fast growing city in the country is attracting many
to invest, discuss on economic and political affairs and a center of all activities
undertaken in the region. Such activity would definitely call for the movement of
people from different zones of the region, from the center of the country and
other regions of the country as well as from neighboring countries and some of
these would definitely require the service of the hospitality industry. In addition
to this, most of the inhabitant of the city and the region in general are looking
for modern recreation and sport centers due to increasing of income level and
10/24
growing life styles such demand also call for the establishment of star-designated
hotel services.
To explain the demand & supply situation for this particular project more
qualitatively, it can be said that since this project is going to be constructed at
the center of the city where the economic activity is highly concentrated/ central
business district/ and no other service of same standard is available in the city
and close to this project, it will have an advantage in securing the highest market
share. Moreover, the fact that superior quality bedroom services, Gourmet
restaurant and bar, multifunctional meeting and conference rooms, wellness &
spa area (including treatment rooms, sauna, steam bath, whirlpool, indoor pool),
fitness & gym area are expected to be of the highest standard and with a
reasonable price that can be afforded by most businessmen and governmental
officials, tourists local and international agencies employee etc; it will again enjoy
the market. In addition to this Bishoftu City as a center of the region a number
of regional and international workshops are undertaken and this by itself call for
higher demand for the star- designated hotel services.
On the other side when we look to the supply aspect, there are no enough
buildings giving multipurpose functions in the heart of the city. There are only
few existing hotels with very limited services available in the city. The existing
hotels in the city are few in number as compared with existing demand and did
not provide a full range of services expected from 4 star hotels.
In general, the region is a tourist center and also located at the heart of the
northern tourist route making it attractive and convenient for a number of local
and international visitors which definitely create a huge demand for the hoteling
services.
In conclusion, as there are no enough hotels with standard and full range of star
hotel services at affordable price; the investment of this star-designated hotel is
highly expected to be a preference and taste of many businessmen,
11/24
governmental officials, tourists, international agencies employees and inhabitant
at large. Therefore, the establishment of such kind of star-designated hotel with
satisfying services in the city of Bishoftu City will be more feasible and have a
great contribution for the ever increasing development of the city and the region.
The proposed 4-star hotel has one main four star including another G+5 building.
The bed rooms are categorized in two types namely standard bedroom and suit
bedroom. Basically both bedroom types are with self-contained facilities such as
toilet, hand wash bath; cold and warm bath room, television, refrigerator and so
on. The difference is that: -
Standard bedroom has an average total area coverage of up to
20000m2 including toilet room
Standard double bedroom has a total area coverage of up to 200m2
including toilet room
12/24
Deluxe has a total area coverage of up to 250m2 including toilet room.
Suit room has a total area coverage of up to 280m2 including toilet room.
Family suit rooms up to 100m2 including toilet room
Presidential suit room up to 960m2 including toilet room
The suit room has living, dining and bed room.
The price per bed per night for each of the bedroom types is fixed at the
following rate/with reference to the market price of similar services in the city
and other similar cities of the country.
2. Other services
The proposed new designated five-star hotel is going to provide diversified
services related to hotel business such as
Bar and Restaurant is available in the first and second floor of the
buildings covering an area of 1627.50m2. And the price is roughly
birr 200 per person per dishes.
Special event and meeting hall located in the second floor of the
building occupying an area of 20000m2. And the price is set to be
birr 700 per person.
Wellness & spa as well as fitness & gym services for both gents and
ladies independently including changing rooms, shower and toilet
rooms located in the basement of the building with a total area of
520m2 with estimated price of birr 200 per person.
Office, banking and Business centers occupying an area of 300m 2
13/24
are also available for renting purpose starting from Birr 200 per m 2
per month.
Standard Cinema that can hold more than 250 persons a time will
be available in 1500 m2 And the price is set to be birr 100 per
person.
New and high technology indoor virtual game will be available in
1500 m2 And the price is set to be birr 10 per coin.
The prices of all the above mentioned services are rough estimates of project
average costs and current assessments prevailing in other similar services in the
city and the country but are subject to adjustments and revisions based on future
market prices and level of affordability.
As to the size of the project, the proposed project has a total land area coverage
of about 10000m2 in which the detail site analysis is presented below.
SITE ANALYSIS for Total Plot Size area Requirement
Total Entertainme Mini Intern Tem Treatm Gree Open Tot
Built nt area Spo al Parki ent n outdo al
Bloc Swimmi Up rt Road ng Plant Area or Are
Block 1 k 2 ng Pool Area field worki a
ng
Area
14/24
(m2) (m2) (m2) 9% 22% 22% 9% 6% 10% 11% 10% (m2)
15/24
Support area- Bar 1
Kitchenette 458 206
Support area- Janitors 1 58 58
Corridor(20%) 1356 271
Total area 1628
3 Guest Rooms Standard 180 36 6480
Standard Double 100 40 4000
Deluxe 50 50 2500
Suit(10%) 30 60 1800
Family 10 80 800
Presidential 4 240 960
Corridor(20%) 3,308
Lockers/ Changing 2 12 24
Toilet/ Showers 2 12 24
Corridor(20%) 87
Total area 520
6 Administration Front Office 1 25 25
Back Office 1 25 25
Manager's Office 1 25 25
Manager's Office- 1
Executive 25 25
Secretary
Manager's Office- 1
Toilet/ 25 25
Shower
Finance and 1 45 45
administration
Sales 1 45 45
Human Resources 1 45 45
IT, CCTV and Security 3 25 75
First Aid Clinic 1 50 50
Administration- Staff Lounge 1
Support 90 90
Employee changing 2 45 90
room
Staff Toilet 2 30 60
Store 1 90 90
Janitor's 1 20 20
Kitchenette 1 54 54
Corridor 158
Total area 947
7 Main Kitchen 60%
Preparation area- 1
Vegetable 86 52
Preparation area- Meat 1 86 52
Preparation area- Fish 1 86 52
Cooking area- 1 86 52
Vegetable
Cooking area- Meat 1 86 52
Cooking area- Fish 1 86 52
8 Main Kitchen
Support
Changing Room 1 75 75
Chef's Office 1 75 75
17/24
Cold Room 3 25 75
Freezer 3 25 75
Stores 1 155 155
Pastry/ Bakery 1 75 75
Butcher 1 75 75
Corridor(20%) 121
Total Area 1036
Laundry and
9 House
Keeping
18/24
Laundry and Washing 1
House 39 39
Keeping-
Laundry
Drying 1 39 39
Ironing 1 39 39
Sewing 1 39 39
Linen Store 1 39 39
Supplies Store 1 39 39
Receiving Office 1 39 39
Executive House 1 39 39
Keeping
Laundry and Workshop 1
House
Keeping- 52 52
Engineering
Section
Engineering Head 1 52 52
Office
Reception 1 52 52
Paint and lock Store 1 52 52
Laundry and Main Distribution room 1
House
Keeping- 45 45
Technical
Rooms
Transformer Room 1 45 45
Generator House 1 45 45
Pump house 1 45 45
Water Reservoir 1 45 45
Boiler Room 1 45 45
Corridor 20% 157
Total Area 944
Grand Total Area 2491
9
19/24
Generally speaking, the building is going to be furnished with high quality
finishing materials and aluminum frame. Accordingly,
All bed rooms and gymnasium of the building will be decorated using
carpet
Corridors, lobbies, stair cases and trace by using marble tiles
All the toilets, kitchen will be finished using ceramic
Based on the above consideration, the engineering cost estimation for
construction activities of both buildings is estimated about birr 80,000,030.00
which is calculated by considering the construction cost of Birr 17,000.00 per
m2. The owner of the project has already availed about 30% of the construction
cost which means the owner of the project is investing a capital investment
equivalent to be Birr 234,000,009.00.
UP LC (ETB) FC TC (ETB)
No Description Unit Qty (ETB)
20/24
7. Internal Facilities/Furniture/equipment for bedroom services
As explained in the project description part, the proposed star-designated hotel
project is going to furnished and equipped using imported best and standard
materials, furniture, equipment, machineries. The detail required materials and
respective costs are described hereunder.
Imported best and standard materials, furniture & equipment
ITEM DESCRIPTIO UNIT Qty UNIT Total Amount
N PRICE (birr)
1 King size wooden bed pcs 100 35,000.00 3,500,000
2 Wooden cupboard pcs 150 20,000.00 3,000,000
3 Matters and pair pillow pcs 150 2,500.00 375,000
4 Sofa pcs 150 40,000.00 6,000,000
5 Blanket and bed sheet pcs 150 8,000.00 1,200,000
6 Flat television pcs 150 30,000.00 4,500,000
7 Refrigerator pcs 150 18,000.00 2,700,000
8 Set of working table with pcs 150 25,000.00 3,750,000
chairs
9 Safe box pcs 150 15,000.00 2,250,000
10 Small size sofa and table pcs 250 15,000.00 3,750,000
11 Refrigerator pcs 212 18,000.00 3,816,000
12 Wooden bed pcs 370 18,000.00 6,660,000
13 TV pcs 370 20,000.00 7,400,000
14 Cupboard pcs 250 15,000.00 3,750,000
and equipment to the bed room service is estimated at about Birr 57,776,000.
Imported best and standard Game machine for Indoor and outdoor
Total estimated
S.No Description cost
(birr)
Utensils
3 Meeting hall chairs, sofa and tables and other 2,500,000.00
accessories
4 Vehicles 15,500,000.00
7 Others 1,000,000.00
Total 52,275,000.00
22/24
9. Running cost
The proposed project will require a running budget for the smooth operation all
hospitality services. Accordingly, the project will require a total amount of
311,725,930.00 birr as a working capital.
2. TECHNICAL ANALYISIS
Bishoftu City has developed land area of 3280 hectare in 1976, while currently the land
is developed for further services and activities for the total area of 18,278 hec, which
six fold time than 20 years ago. The land is allocated for different use such as: residence
(15.6%), commercial (1.66%), transport and street network ( 12.6), Social service
(13.6), recreation (17.4), open space for further development (24.44) and other
purposes respectively.
Topologically, Bishoftu City has a buffer zone has been characterized in north and east
by flat land which includes swampy, express road, rail way road and lakes. In south by
undulating lands that is dominated by hills. The elevation is ranged from 1800-1995
meter from mean sea level. It is very important to note that the city is part of the Great
23/24
Rift Valley, which found in between fault of land located from Egypt to South Africa.
Bishoftu City has a very convenient climate that favors the activities of the
society in all seasonal year time. The element includes temperature, rain fall and
winds, in which most of the annual time it has hot temperature that favors the
mobility and business activity of the year. In most case most of the time the
dwellers of central city of Addis Ababa leaves for vacation to live in Bishoftu City
during winter Ethiopia season for their healthy reason. The climate of the city
in general belongs to Woina adega (agro climate zone). The maximum annual
temperature is 26.25 degree Celsius and the minimum is 11.18 degree Celsius.
Annual average rain fall of the city is 762mm. April is the hottest month with
31.1 degree Celsius while December is the coldest with 7.6 degree Celsius.
December is the driest while August is the rainy season with 209mm of the year.
Currently the hotel renders the following services such as bar and restaurant
services, bed room, meeting & conference room services, sauna bath & steam
services indoor and outdoor services, seeming and recreation with all the
standard amenities. Now the owner plans to project hotel into 5* star
Luxurious hotel to render well diversified hotel services. The quality of the
service, color flavor, cleanness and hygiene of the food and drinking items
including the compound will be given greater attention in order to make
their customers happy. Experienced cooks and staffs as well as technicians
will be hired to better service quality according the recommended hotel
management practices.
2.3.1. PROPOSED FACILITIES SUMMARY
S.N FUNCTIO SPACE NO. TOTA
N NOTE REQUIRMENT L
PER AREA
FUNCTION (M2)
(SFT)
1 Public Space
Front Desk 160 01 14.86
Lobby 1000 01 92.90
Lounge 1600 01 148.64
Toilet 5 24.15
24/24
Total (with 30% circulation)
364.74 sq.m
2 Administration
Front Office
Reservation office 150 01 13.94
Front office manager 140 01 13.01
Room manager 140 01 13.01
Secretary 140 02 26.01
Accounting section 100 01 9.29
1600 01 148.64
150 01 13.94
03 14.86
Total (with 30% circulation)
328.51sq.m.
3 Executive office
Secretary 140 01 13.01
General manager 160 01 14.86
Assistance General 160 01 14.86
manager
25/24
Food & beverage manager 200 01 18.58
Storage 500 01 46.45
Toilet 05 120.77
Total (with 30% circulation)
297.10sq.m.
4 Sales and catering office
Secretary 150 13.94 13.94
Banquet manager 140 13.01 13.01
Conference service 160 14.86 14.86
manager
Catering 500 46.45 46.45
Convention Coordinator 140 13.01 13.01
Storage 500 46.45 46.45
Toilet 03 44.59
Total (with 30% circulation)
250 sq.m.
5 Halls
Lobby + Lounge 2000 1500 139.35
Banquet Hall 500nos 15000 1393.55
Total (with 30% circulation)
1992.77sq.m.
6 Restaurants
Main restaurant 16 350 520.26
Shrimp restaurant 16 200 297.29
Breakfast hall 16 100 148.64
Café 16 80 118.92
Bar 4000 371.61
Storage 500 46.45
Total (with 30% circulation)
1954.12 sq.m.
7 Recreation facility
Swimming pool
Indoor swimming pool 01 1000 92.90
Outdoor swimming pool 01 3000 278.71
Office 150 13.94
Total (with 30% circulation)
501.21 sq.m.
8 Health club
GYM 1000+800 02 167.23
Sauna 200 02 37.16
Steam bath 150 02 27.87
Message 150 02 27.87
Locker, Change room 300 02 55.74
Total (with 30% circulation)
410.63 sq.m. 26/24
9 Indoor Game 2000 01 185.81
Library 4000 01 371.61
Beauty parlor 300 01 27.87
27/24
Barber shop 200 01 18.58
Total (with 30% circulation)
785.03 sq.m.
10 Outdoor facilities
Tennis 1337.80
Basket ball 436.64
Hand ball 371.61
Squash 209.03
Total (with 30% circulation)
3061.62 sq.m.
11 Business Center
Lobby 74.32
Communication cell 37.16
Conference hall 26 150 362.32
Meeting room 300 05 139.35
Audio visual 18.58
Journalist room 18.58
Exhibition & Trade center 743.22
Total (with 30% circulation)
1811.61sq.m.
12 Guest rooms
Single 350 120 3901.93
Double 450 80 3344.51
Twin 600 30 1672.25
Suites 850 20 1579.35
Executive suite 1500 10 1393.55
Total (with 30% circulation)
15459.06sq.m.
Back of house
Receiving area
Storage area
Dry food Storage 139.35
Refrigerated food Storage 92.90
Non food Storage 139.35
Total (with 30% circulation)
483.1 sq.m.
13 Main Kitchen (Total area of the following)
Restaurant 111.48
Ballroom & banquet 46.45
Cocktail lounge 27.87
Hotel guestroom 65.03
Total (with 30% circulation)
326.09 sq.m.
14 Employee facilities
Security & timekeeping 01 278.71
28/24
Changing & toilet facilities 01 37.16
Dining room 01 92.90
Rest room 300 02 55.74
29/24
Training & interview room 01 92.90
Total (with 30% circulation)
724.64 sq.m.
15 Laundry & housekeeping
Laundry 150/floor 10 139.35
Housekeeping 250/floor 10 232.26
Supervision 120 10 111.48
Store 160 10 148.64
Total (with 30% circulation)
821.26 sq.m.
16 Engineering & mechanical
Engineers office 37.16
Maintenance workshop 92.90
Electrical areas 278.71
Air Conditioning 557.42
Generator and pump 185.81
Total (with 30% circulation)
1497.6 sq.m.
As explained in the project description part, the proposed modern hotel project
will be constructed and equipped using standard material, furniture,
equipments, and machineries bed room services furnished with highest quality
material. The furniture, machinery and equipment required for the hotel will be
imported from abroad. The detail required materials are described here after.
Every bed room shall have imported wooden bed, wooden cupboard, mattresses
and pair of pillow, blanket and sheet, television, telephone, refrigerator
Apart from the internal facility furniture required for the bedrooms, there is also
a need to buy furniture and equipment for the reception, manager office,
restaurant, meeting halls, bar, internet café, laundry business centers etc the
expected cost for those furniture will be 44,801,224.79 Birr and the detailed list
of these items is given here below briefly as follows:
Sr. Unit of
Description Qty
No. Measure
1 Bar & Cafeteria
Coffee machine 10 lt Pcs 5
Armed chair Pcs 600
30/24
Sr. Unit of
Description Qty
No. Measure
Oval shaped table Pcs 200
Umbrella Pcs 50
Juice glass Set 250
Tea spoon Pcs 500
Coffee spoon Pcs 500
Juice strainer pcs 20
Juice glass Set 250
Water glass Set 1250
Coffee cups with saucer Set 250
Tea cups w/saucer Set 250
Ice cream box Pcs 10
Water sprinklers Pcs 30
Water hose nylon rope reinforced 25.4 mm dia, 36 mt Pcs 8
length with
Gardener kit Set 8
Children Play ground set 3
Two chain rope swing with steel site and stand Set 10
Plastic made Slide and hide tower (2- 8 years) Set 20
15ft x 42 in. plastic made play tunnel Set 10
Merry-go-round (made of steel) Set 10
See-saw (made of steel) Set 10
Sand filled pits, 5m2 Set 30
Coin operated toy vehicles Set 20
Coin operated video game machines (different type) Set 16
2 GUEST ROOMS
BED ROOMS Pcs
Bed-2.2*1.90 Pc 260
Bed side armoires-wood with 2 chest Drawers Pcs 260
Sofa- single seat upholstery 2 for each room Pcs 260
Coffee table- round glass top Pcs 250
Chair- wooden Pcs 250
Luggage rack- movable & flexible Pcs 250
Wardrobe – wooden built-in with Partitions Pcs 250
TV set – 43-55 inches , flat screen Pcs 280
Telephone Pcs 275
Bath Pcs 280
Shower Pcs 280
Toilet seat Pcs 280
Washing basin Pcs 275
31/24
Mirror Pcs 280
Sr. Unit of
Description Qty
No. Measure
3 RESTAURANT Pcs
Tables- round Pcs 125
Chairs Pcs 400
Side service tables Pcs 50
Service trolleys Pcs 20
Cupboards Pcs 20
Main dish Plate with rim- 20 cm Pcs 600
Soup cup with saucer Pcs 180
Salad plate Pcs 200
Bread plate Pcs 100
Salt & pepper –set Pcs 100
Butter holder/dish Pcs 100
Coffee cup with saucer Pcs 180
Tea cup with saucer Pcs 180
Soup spoon Pcs 180
Main dish knife Pcs 200
Forks Pcs 200
Salad knife Pcs 200
Dessert bowl Pcs 200
Water glass Pcs 200
Red wine glass Pcs 100
White wine glass Pcs 100
Champagne glass Pcs 100
Liqueur glass Pcs 100
Cocktail glass Pcs 100
Beer glass Pcs 120
Wine cooler with stand Pcs 12
Ashtray Pcs 40
Cash register Pcs 4
Wine storage shelf Pcs 10
4 BAR Pcs
Tables Pcs 40
Chairs Pcs 160
Bar counter Pcs 2
Beverage shelve/ cupboard Pcs 2
Bar stool (counter chairs) Pcs 8
Bar coffee machine Pcs 1
32/24
Mixer & Juicer Pcs 2
Beverage dispenser Pcs 10
Sr. Unit of
Description Qty
No. Measure
Water glass Pcs 200
White wine glass Pcs 50
Red wine glass Pcs 50
Wine cooler Pcs 4
Ice bucket Pcs 10
Cash register Pcs 10
5 COFEE SHOP Pcs
Coffee shop counter unit- custom built Pcs 1
Coffee machine Pcs 1
Long-leg counter stool Pcs 5
Chair with coffee table (set) Pcs 20
Coffee cup with saucer Pcs 50
Tea cup with saucer Pcs 50
Sugar holder (for all outlets) Pcs 20
6 KITCHEN
Electrical & gas grill with six burners Pcs 5
Microwave oven-20nos Pcs 5
Salamander Pcs 5
Deep fryer Pcs 5
Mixer Pcs 5
Silcer Pcs 5
Hot – water bath ( bain maire) Pcs 5
Freezer Pcs 5
Stock pot(50 liters) Pcs 8
Sauce pan Pcs 13
Sauce pot(50 liters) Pcs 15
Boiler( 30 liters) Pcs 4
Baking pan Pcs 3
Roasting pan Pcs 5
Scale(portion) Pcs 1
Scale Pcs 1
Measuring spoons Pcs 5
Chef’s Knife (10 in.) Pcs 5
Salad knife (6 in.) Pcs 2
Vegetable knife (2in.) Pcs 3
Boning (6in.) Pcs 4
33/24
Slicer knife (12in.) Pcs 2
Bucher’s knife(12in.) Pcs 2
Cleaver (4in.) Pcs 1
Sr. Unit of
Description Qty
No. Measure
Vegetable peeler (set) Pcs 1
Cutting Board – hard rubber Pcs 4
Pastry wheel Pcs 2
Kitchen spoon ( perforated) Pcs 4
Kitchen spoon( solid) Pcs 10
Tongs (long) Pcs 2
Grater (normal size) Pcs 1
Can opener Pcs 1
Kitchen counter top, with cupboard Unit Pcs 1
Sink unit (900 / 1600mm) Pcs 2
Wall attached shelves Pcs 2
Refrigerator (self contained)- 1500lt Pcs 2
Hot cupboard (warmer) Pcs 2
Ice cream machine Pcs 1
Dishwashing machine Pcs 2
7 HOUSEKEEPING Pcs
Cleaning trolley Pcs 5
Supplies and linen storage shelf unit Pcs 3
Wet and dry floor cleaning machine Pcs 4
Vacuum cleaner (upright) Pcs 5
Mop trolley with squeezer Pcs 5
Buckets big size Pcs 5
Buckets small size Pcs 10
10 Stand By Generator Set With Canopy And Unit 1
Accessories(100KVA)
N.B the equipments will be bought both in domestic and foreign markets
34/24
3. ECONOMIC OVERVIEW
3.1. Introduction
The market potential of hotel properties are influenced by National, Provincial
and local economic conditions. Accordingly, the analysis has included a review
of recent economic performance in Ethiopia, for the Town of Bishoftu City
specifically, in order to assess potential implications for the accommodation
market and the subject hotel.
35/24
As discussed earlier, currently there are no such more facility available in
the whole city, therefore, its uniqueness would attract its customers to have
a different and new experience staying at its family huts and/or enjoy the
palace view meals. Also for corporate culture, its palace view conference hall
would also provide a very unique environment.
37/24
% per annum (source: Bishoftu City Administration). Now the city is divided
in 7 sub city, furthermore; the city has many small scale private and
public institutions, factories, tourists and passengers who came to the city
for visit, business and non- business activates or to pass over through the
city to other parts of the region and the general public in Bishoftu City and
around the city are considered as potential customers for the project.
The proposed Hotel would also induce significant demand into the market and
maximize the ability of bedroom facilities. The primary source of this demand
would be group business and recapture of suburban demand.
Excluding tourists’ number of customer are increasing year to year by 23% including passengers
and local residents.
According to the above table number of tourists’ arrival will increase routinely
by 23% annually and in the near future 2018 when the hotel begin its
operation the number of tourists will reach 1,114,798 excluding number
habitants, passenger and businessmen.
40/24
1 star 4 21 11 1 37
TOTAL 31 109 39 12 191
Source: Bishoftu City Investment office 2017
According, to the above data there will be big gap between the supply and
demand only 191 hotels which receive license, 12 hotels are not exist at the
ground. The promoter forecast the demand of 2 star hotels because there is
only 60 hotels under-construction. Strategic plan GTP-2 of Oromia
government bureau of culture and tourism setting a plan of being Oromia
preferable place of tourists, national in 2024 number of tourist arrival and
receipts will be reach 4 million and regionally 1.1 will be visited.
Information from office of culture and tourism the projections assume that
there is no more new hotel in the sub-city area during the two-year projection
period.
Looking back to the same report for December 2014, over 148 hotels are
under construction with almost 191 in the planning and final planning stages.
So while there is slight an increased level of proposed hotels across the town.
The above trend shows that tracking only newly constructed hotel rooms does
not tell the complete story of the changes in hotel supply.
MARKET STUDY
General Market View
Ethiopia’s Growth and Transformation Plan (GTP II), a second five year grand
plan, the Ministry of Culture and Tourism has a vision to make Ethiopia one
of the top five tourist destinations by 2020. Despite an increase in the number
of tourist arrivals, however, this strategic target “seems unlikely to be
achieved with the current rates of inbound tourist arrivals in the country,” say
Ebisa and Andualem.
A report released in June 2014 by Fast Market Research, a distributor of
market research and business information, states that the number of
domestic trips within Ethiopia has reached 8.1 million people while
international trips were merely more than 660 000 with the main source
countries being China, the US, Nigeria and Sudan. The number showed a 12%
41/24
increase from the previous year. For a country which has its own fair share of
historical, cultural and natural attractions in the continent, and is one of the
safest destinations, this is not a performance to pride with.
Third only to Brussels (185) and Washington DC (176), Addis Abeba is home
to 118 diplomatic missions accredited to both the government in Ethiopia, the
AU and the UN¬ECA, which adds to the increasing trend in the number of
conventions held year in, year out.
One familiar month when Addis Ababa becomes crowded with diplomats,
lobbyists, journalists, and aid workers is the month of January, when the AU
hosts its bi-annual summit for heads of state and government. The 86 hotels,
according to Ministry of Culture and Tourism, and 118 B & B Inns, and 18
specialty lodgings, according to Trip Advisors, become utterly short of the
demands, forcing conference participants to book at expensive lodges and
resorts outside of the city. Although the January AU summit is the landmark
of huge gathering in the city, Addis Abeba is never short of other small and
medium range regional and international conferences. “This unfortunate gap
of demand and supply often leads to not only unethical exploitations by hotels
of desperate customers, but also the provision of substandard service which
forces many customers to think twice before boarding a flight bound for Addis
Ababa,” said Elias.…and the quest for professionalism
According to unofficial estimates from the AHA, approximately one hotel joins
the market every month and that number may rise up to 1.5 hotels a month
in the coming few years. Thanks to both local and international architects
commissioned by developers, a number of dazzling buildings are giving the
city a new look. However, there are cases in which the scene behind the
glamour is not so attractive.
“It is not the building that makes a hotel a hotel. It is the flawless combination
of the right people, the right prices and the right technology providing an
Projection of Tourist Arrival (projected and unsatisfactory demand)
unforgettable service,” says Elias.
42/24
No Year Projected Tourist Room night Demand Gap
Arrival Demand
1 2015 758,039 3,032,156 1,253,876
2 2016 831,569 3,326,276 1,547,996
3 2017 912,231 3,648,924 1,870,644
4 2018 1,000,718 4,002,872 2,024,592
5 2019 1,097,787 4,391,148 2,612,8682
6 2020 1,204,273 4,817,092 3,038,812
Finally, we can analyze the average amount of spending each household incurs
during their visit and what their spending on. This information will help in evaluating
the market and what customers are willing to pay for which will help us in determining
fair prices and services. Key points are looked at here, while the full data can be
viewed in Exhibit 5.
Once guests have made reservations or have stayed at the Manor, a quarterly
newsletter will be sent to each guest as a way to let customers know what is going
on, new specials, and continually keep them informed and aware of the Manor.
Looking at typical general spending, we can select rates that are all inclusive and
guests are likely to pay for throughout the year. Finally, it will be important to
establish deals with the mountains, golf course, and local attractions in order to be
able to create packages.
As travelers become more „thrifty‟ this will help to create opportunities for those who
43/24
may not want to pay for everything on a solitary basis.
The baby boomer generation encompasses the greatest number of travelers that can
share their experience with friends and family. Their referrals will also bring in more
guests giving us the opportunity to give repeat visitors discounts for referring friends
and family.
4. TECHNOLOGY AND
ENGINEERING
The main processes of establishing modern hotels at Bishoftu City include
studying the market, securing land, constructing buildings, equipping and
furnishing the buildings and starting the operations of the businesses.
44/24
the building are described below
Ground floor café, Bar, beauty salon, laundry, reception office, store,
toilet and shower for gents and ladies
1st floor Meeting and restaurant,
2nd, 3rd - 20th floors for bedrooms
The compound will accommodate sauna and steam bath.
As explained in the project description part, the proposed modern two star
hotel project will be constructed and equipped using standard material,
furniture, equipments, and machineries bed room services furnished with
highest quality material the furniture machinery and equipment required for
the hotel will be imported from abroad. The detail required materials are
described here after Every bed room shall have imported wooden bed, wooden
cupboard, mattresses and pair of pillow, blanket and sheet, television,
telephone, refrigerator
Apart from the internal facility furniture required for the bedrooms, there is
also the need to buy furniture and equipment for the reception, manager
office, restaurant, meeting halls, bar, internet café, laundry business centers
etc the expected cost for those furniture will be 44,200,000 Birr and the
detailed list of these items is given here below briefly as follows:
For the purpose of market test and getting important experiences on the new
modern hotel begins its service operation at 70% capacity services of the
project therefore. Full capacity service operation will start from the fourth
year. Based on the information obtained and assessed from the existing
similar service provider business centers of the town, the annual income to
be generated from each of the services of the project at full capacity operation
is estimated as follows.
A. Bed Rooms
The proposed project has got 260 bed rooms in total out of which 120 of them
are single, 80 double bed rooms, 30 twin, suit, executive and presidential. All
the bed rooms are self contained having bathroom, television and built in
cupboard. In addition to this all the rooms have 2.5x2m imported bed, two
chairs and one table, satellite TV, and internet access.
E. Restaurant services
The proposed hotel project will serve out local and foreign dish in breakfast,
lunch and dinner time to both the local and overseas people. Since the hotel
will be constructed along the main road many domestic and foreign tourist
are expected to dine. The expected income from the restaurant assuming 100
persons use the service at all times of the meal time breakfast, lunch and
dinner.
G. Sweeming pool
The proposed hotel will have two categories of sweeming pool (of Children
and Olympic size for adults) where it his highly fall below the demand for the
service in the city as well as the region and this will also one source of
income for the project.
47/24
the envisaged project has been worked out assuming the life span of the project
is 20 years and the project will start services soon after the time when finishing
of the construction works and installation and furnishing of the hotel project is
done as per the required quality.
For the purpose of market test and getting important experiences on the new
star-designated hotel services of the proposed project begins its service
operation at 70% capacity service utilization.
Then it will increase its service provision by 5% every year until it reach full
capacity services of the project. Therefore, full capacity service operation will
start from the five (5) years and then after.
Based on the information obtained and assessed from existing similar service
provider businesses of the city the annual income to be generated from each of
the services of the proposed project at the assumed services capacity utilization
is estimated at 247,810,000.00 as indicated in the table below.
UP Annual
No Description of Service Unit Qty Annual Qty Revenue
1 Standard No 180 65,700 1,000.00 65,700,000
2 Standard Double No 100 36,500 1,400.00 51,100,000
3 Deluxe No 50 18,250 1,800.00 32,850,000
4 Suit(10%) No 30 10,950 2,500.00 27,375,000
5 Family No 10 3,650 4,500.00 16,425,000
6 Presidential No 4 1,460 10,000.00 14,600,000
7 Bar & Restaurant No 300 109,500 200.00 21,900,000
8 Gym & SPA No 50 18,250 200.00 3,650,000
9 Meeting hall services No 500 7,800 700.00 5,460,000
10 Shops, banking and office
renting services m2 300 3,600 200.00 720,000
11 Cinema NO 73,000 100.00
200
7,300,000
12 Indoor and Outdoor No 73,000 10.00
200
Games 730,000
SUB TOTAL 247,810,000.00
49/24
12. Other expenses
For smooth operation of the project, it is expected to incur the following major
auxiliary and sundry expense during its operational activities.
Telephone, mobile and internet service: The Project shall have PBX and other
additional direct line. The PBX shall entertain the calls coming from the rooms
and it is expected to be high quality. In addition to this the hotel is going to
provide 200MB/s broad band internet services and also provide mobile services
for the higher staff members to run the project services smoothly. Thus, on the
average, the yearly telecommunication related bill is estimated at birr
3,390,000.00.
Cost
50/24
S.No Utility Unit Qty UP ( Birr )
. of
Measu
1 re
Electricity kWh 99,840 2.0 399,680.00
2 Water m3 43,800. 5 219,000.00
0
0
3 Telephone, mobile & internet Months 12.00 30,00 3,390,000.
service 0 00
4 Sanitary Months 12.00 20,00 240,000.00
0
5 Stationery Months 12.00 5,000 60,000.00
Total 4,878,680
.00
13. Financial Analysis
Major assumptions considered in undertaking the financial analysis of the proposed project
are: -
51/24
13.1. Initial Investment Cost
13.1.1. Initial Fixed Investment
This cost category comprises capital requirement for the construction of building and purchase of
furniture, machineries and equipment. As shown below, the total initial fixed investment of the
proposed project is estimated to be birr 1,150,000,000. The detail breakdown is given below.
1,150,000,000 1,150,000,000
Total Fixed Investment -
52/24
2 Utilities expense 1,078,680.00
3 Business running costs (raw
materials) 13,680,000.00
4 Contingency 684,750.00
Total 31,725,930.00
The total initial investment outlay of the proposed project is therefore estimated to be birr
537,576,123.33. Which is: -
Source of finance
Source Amount (in Birr) Percentage %
Bank loan 70,000,000 70%
Own equity 30,000,000 30%
Total 100,000,000 100%
Basic assumptions
Building depreciation is taken 15% per annum on a straight line method
53/24
Machinery and office furniture deprecation 10% per annum
Vehicles deprecation rate 20% per year
Bank repayment period is for 9 years.
Bank Interest rate is taken 11.5%
Repair and maintenance rate is taken 0.5% for building, 1% for furniture, equipment and
machineries and 5% for project vehicles
Accordingly, the net profit after tax in normal year or at assumed capacity service provision is
estimated to be birr 53,445,315.00.
The detail profit and loss statement of the project at normal year of operation or at assumed
capacity services operation is shown in the table below.
Annual Profit and Loss Statement for the 5 Star Hotel Project
21,900,000.00
Utilities 1,078,000.00
54/24
Repair & Maintenance 4,602.000.00
Insurance 500,000.00
55/24
14.1. Simple rate of return (SRR)
SRR= 13.8%
The project will recover its initial investment cost almost after 12 years. This is calculated if it
operated at the assumed capacity of service utilization. If it is not operated as per the assumed
capacity of operation the payback period will take more than the estimated years.
56/24