The document outlines general construction notes for a project, detailing specifications for materials, excavation procedures, and safety measures. Key points include concrete and steel grades, insulation requirements, and protocols for handling groundwater and soil conditions. It emphasizes adherence to geotechnical surveys and contract specifications throughout the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views12 pages

Manhole-2000-1600 Mm-Type 2 DWG T2 250204

The document outlines general construction notes for a project, detailing specifications for materials, excavation procedures, and safety measures. Key points include concrete and steel grades, insulation requirements, and protocols for handling groundwater and soil conditions. It emphasizes adherence to geotechnical surveys and contract specifications throughout the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GENERAL NOTES

1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-02 T2-02
WALL N

WALL N
A A LEJANT:
KOTLAR:
- -
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-02

A
- ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=1.5 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-01-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø16 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-01 T2-01 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 1.578
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1217.85 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-01 T2-01 T2-01 T2-01

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=1.5 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25
WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4 Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025
SCALE : 1/25 SCALE : 1/25 A SECTION A-A
- SCALE : 1/25 Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-02-00
GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-04 T2-04
WALL N

WALL N
A A LEJANT:
KOTLAR:
- -
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-04

A
- ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=2.5 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-03-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø16 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-03 T2-03 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 1.578
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1250.70 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-03 T2-03 T2-03 T2-03

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=2.5 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25
WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4 Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025
SCALE : 1/25 SCALE : 1/25 A SECTION A-A
- SCALE : 1/25 Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-04-00
GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-06 T2-06
WALL N

WALL N
A A LEJANT:
KOTLAR:
T2-06 T2-06
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-06

A
T2-06 ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=5.14 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-05-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø20 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-05 T2-05 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 2.470
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1575.64 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-05 T2-05 T2-05 T2-05

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=5.14 m (DN2000)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025


WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4
SCALE : 1/25 SCALE : 1/25 A SECTION A-A Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-06-00
- SCALE : 1/25
GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-08 T2-08
WALL N

WALL N
A A LEJANT:
KOTLAR:
T2-08 T2-08
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-08

A
T2-08 ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=1.5 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-07-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø16 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-07 T2-07 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 1.578
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1282.15 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-07 T2-07 T2-07 T2-07

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=1.5 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25
WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4 Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025
SCALE : 1/25 SCALE : 1/25 A SECTION A-A
- SCALE : 1/25 Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-08-00
GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-10 T2-10
WALL N

WALL N
A A LEJANT:
KOTLAR:
T2-10 T2-10
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-10

A
T2-10 ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=2.5 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-09-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø16 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-09 T2-09 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 1.578
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1315.43 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-09 T2-09 T2-09 T2-09

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=2.5 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25
WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4 Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025
SCALE : 1/25 SCALE : 1/25 A SECTION A-A
- SCALE : 1/25 Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-10-00
GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR
3- Steel grade: "S420(C)"
4- Class for support and lean concrete; ''C16''
5- Slope Concrete; ''300 Dose''
6- Concrete Cover;
- 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
20- The compaction ratio of the fill material will be a minimum of 98%.
3 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
. W- -3
L No L No. W 22- Formwork: F2 / Surface: U2
WAL WA L

WALL No. W-2

WALL No. W-2


23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
A A 25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.
T2-12 T2-12
WALL N

WALL N
A A LEJANT:
KOTLAR:
T2-12 T2-12
o. W-4

o. W-4
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
WALL No. W-1 WALL No. W-1
BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

SILICOPOLYMER FILLING

CTP GRILL

FOUNDATION REINFORCEMENT PLAN - BOT. FOUNDATION REINFORCEMENT PLAN - TOP.


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

A
T2-12

A
T2-12 ..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SLAB REINFORCEMENT PLAN SEWERAGE COLLECTOR LINE CONSTRUCTION
SCALE : 1/25 B SECTION B-B CONTRACT NO: 2010-1-15K
- SCALE : 1/25
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=5.14 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025

Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-11-00


GENERAL NOTES
1- Elevations are given in "meters," dimensions in "centimeters," and pipe diameters in "millimeters
2- Concrete class: C30/37 WR

REINFORCEMENT LIST ( C30 / A-III ) 3- Steel grade: "S420(C)"


4- Class for support and lean concrete; ''C16''
TOTAL LENGTH (m)

POS.
5- Slope Concrete; ''300 Dose''
LENGTH
6- Concrete Cover;
DIA. NO. (cm) SHAPE
Ø8 Ø10 Ø12 Ø14 Ø20 - 5 cm for Shearwalls and Foundations.
- 2.5 cm for beams and slabs.
7- Steel Construction Material Quality; ''St.37/2''
8- Concrete surfaces in contact with soil will be insulated with three coats of tar paint, extending 30 cm above ground level.
9- Excavation slope inclinations are set at "1: m" where "m" values will be determined in accordance with the values
provided in the geological report and will be adjusted on-site by the Control Engineer depending on the ground conditions.
10- Please refer to the geotechnical survey for measures to be taken regarding the conditions of the ground where the structures will be built.
11- If groundwater emerges during excavation, the Control Engineer will be notified, and the groundwater will be removed by pumping.
12- In case the excavation reveals that the ground does not meet the qualities specified in the geotechnical survey and
project design criteria, relevant parties will be informed accordingly.
13- If harmful chemicals are found in the soil or groundwater that could damage the concrete, precautions will be taken according to TS 3440 guidelines.
14- All pipes will be installed with welded sealing collars before concrete pouring. Under no circumstances
will concrete be broken to create pipe holes.
15- Safety ring ladders will be installed in civil structures where the structure depth H exceeds 2.3 meters.
16- The painting and insulation of pipes and other metal components in the structure will be carried out in accordance with
the paint system principles specified in the relevant clause of the contract.
17- During the preparation of formwork, pipe openings will be left according to the mechanical design drawings.
18- A vibrator will be used during concrete pouring.
B B SLAB HOLE 19- If the excavated material is suitable, it will be sorted to remove stones and debris, then layered and compacted.
T2-11 T2-11 20- The compaction ratio of the fill material will be a minimum of 98%.
REİNFORCEMENT DETAİL 21- In civil structures where the structure depth H exceeds 6 meters, a rest platform for ship ladders will be constructed every 6 meters.
22- Formwork: F2 / Surface: U2
23- When the structure is below the groundwater level, water-retaining strips will be used, and gravel pockets will not be installed.
24- Reinforced concrete equipment covers will be prefabricated.
25- The relevant specifications stated in the contract will be followed for laying transmission pipeline.

LEJANT:
KOTLAR:
REINFORCED CONCRETE
0.00
TOP OF CONCRETE ELEVATION
LEAN CONCRETE
0.00 TOP OF CONCRETE ELEVATION
Slab Trestle Reinforcement BACKFILL

STABILIZED BACKFILL

SAND BEDDING

ROAD PAVEMENT

TOTAL LENGTH (m)


SILICOPOLYMER FILLING
UNIT WEIGHT (Kg/m) 0.395 0.617 0.888 1.208 2.470
CTP GRILL
WEIGHT BY DIA. (Kg)
Confinement bars TOTAL SUM (Kg) 1651.01 Kg

WALL HEIGHT REINFORCEMENT W-1 WALL HEIGHT REINFORCEMENT W-2


SCALE : 1/25 SCALE : 1/25

NO Date Revision Prepared by Checked by

£
APPROVAL AUTHORITY

HOUSING and INFRASTRUCTURE BOARD

APPROVED

B B B B
T2-11 T2-11 T2-11 T2-11

..../..../2025

CONSULTANT Maward Consulting Engineers


Seven Road 4.km, Tripoli - Libya
TEL: +218-21-4631784

info@mawardly.com
CONTRACTOR
ÇELTİKÇİOĞLU İNŞAAT
SANAYİ VE TİCARET LTD.ŞTİ.
Uğur Mumcu Cad. No: 92 GOP/ANKARA
TEL: (312) 446 72 12 FAX: (312 446 61 12
DESIGNER ART
ÇEVRE TEKNOLOJİLERİ
İNŞ.MÜH.TUR.TİC.LTD.ŞTİ.
Çukurambar Mah.Muhsin Yazıcıoğlu Cad.
1480.Sk.2A Blok 9.Kat No :33 BESA KULE ÇANKAYA / ANKARA
Tel: 0312 229 78 54 Fax:0 312 229 96 78

WADI EL MAJENEEN
SEWERAGE COLLECTOR LINE CONSTRUCTION
CONTRACT NO: 2010-1-15K
WADI ROUTE TYPICAL MANHOLE TYPE-2 Hmax=5.14 m (DN1600)
REINFORCEMENT PLANS and SECTIONS
Prepared by Asghar SHAHSAVAN Civil Eng. Scale 1/25

Prepared by Rukiye BÜYÜKDEMİRCİ Civil Eng. Date 2025


WALL HEIGHT REINFORCEMENT W-3 WALL HEIGHT REINFORCEMENT W-4
SCALE : 1/25 SCALE : 1/25 A SECTION A-A Checked by Ahmet UYANIK Env. Eng. Drawing No WAM-WAD-MH-T2-12-00
- SCALE : 1/25

You might also like