0% found this document useful (0 votes)
50 views2 pages

Level-12 Portion 1 & 2 MEP Schedule

The document outlines a project schedule for MEP (Mechanical, Electrical, and Plumbing) installations on Level 12, detailing tasks, durations, and start and finish dates from November 2024 to December 2024. It includes specific tasks such as the first fix, wall concealed work, and ceiling installations, along with their respective dependencies. The project is part of a larger construction effort for M Tower, located in Yangon, Myanmar.

Uploaded by

phyo7799
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

Level-12 Portion 1 & 2 MEP Schedule

The document outlines a project schedule for MEP (Mechanical, Electrical, and Plumbing) installations on Level 12, detailing tasks, durations, and start and finish dates from November 2024 to December 2024. It includes specific tasks such as the first fix, wall concealed work, and ceiling installations, along with their respective dependencies. The project is part of a larger construction effort for M Tower, located in Yangon, Myanmar.

Uploaded by

phyo7799
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ID Task Name Duration Start Finish Predecessors

November 2024 December 2024 January 2025


5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1
1 Level-12 Portion 49 days Mon Mon
1&2 MEP First Fix 11/11/24 12/30/24
2 Level-12 Portion-1 39 days Mon Fri
MEP Installation 11/11/24 12/20/24
3 MEP Wall 10 days Mon Thu
Concealed work 11/11/24 11/21/24
4 MEP Under 14 days Thu Thu 3
Floor Work 11/21/24 12/5/24
5 MEP Above 15 days Thu Fri 4
Ceiling 12/5/24 12/20/24
6 Level-12 Portion-2 39 days Thu Mon
MEP Installation 11/21/24 12/30/24
7 MEP Wall 10 days Thu Sun 3
Concealed work 11/21/24 12/1/24
8 MEP Under 14 days Sun Sun 7
Floor Work 12/1/24 12/15/24
9 MEP Above 15 days Sun Mon 8
Ceiling 12/15/24 12/30/24

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline


Project: msproj11 Split External Tasks Inactive Summary Manual Summary Progress
Date: Thu 11/7/24
Milestone External Milestone Manual Task Start-only Manual Progress
Summary Inactive Task Duration-only Finish-only

Page 1
CLG 02 CLG 01 CLG 04 CLG 01 CLG 01 CLG 01 CLG 01 CLG 05 CLG 05

CH +2800 FFL CH +2700 FFL CH +2850 FFL CH +2700 FFL CH +2700 FFL MT 02 CH +2750 FFL CH +2700 FFL CH +2750 FFL CH +2600 FFL
Maha Land Office:
30X50MM ALUMINUM Block No (1-KA A/1+3/KA), Min Dhama
HOLLOW SECTION IN POWDER Road, Ward No. (4), Mayangone Township,
3 4 4' 5 5' COATED MATTED FINISH 6 6' 7 7' 8 Yangon 11061, Myanmar.
AT +2800 (FROM FFL TO
60000 BOTTOM OF HOLLOW SECTION)
12000 6000 6000 6000 6000 6000 6000 6000 6000 Client Name

M TOWER CO.,LTD

F COFFEE
WARDROBE Rev. Date Description
2 05.04.2024 AMENDED LIGHTING SETTING OUT
HOD HOD CLG 01
INTERVIEW 3 26.04.2024 AMENDED LIGHTING SETTING OUT
CLG 01 ROOM-2 CH +2700 FFL 7 09.07.2024 AMENDED CEILING PROFILE
MEETING MEETING
3850

SHOWER

CH +2700 FFL ROOM-2 ROOM-1 9 27.08.2024 AMENDED GRID CEILING LAYOUT


RECEPTION/WAITING LOUNGE VANITY COUNTER

10 04.10.2024 AMENDED GRID CEILING LAYOUT

FIREMAN ACCESS PANELS


CLG 01A
MARCOM
PROCUREMENT INTERVIEW CH +2850 FFL
CLG 01 ROOM-1
VIP MEETING CEO LIVING ROOM
CH +2600 FFL
GALLERY

CLG 01
6850

98" TV 98" TV

OPEN CEILING CH +2800 FFL


(TO PAINT 4
STRUCTURE
SOFFIT & M&E
SERVICE )(PT-04)

CLG 01
STORAGE CH +2750 FFL
D CABINET
COFFEE COUNTER
LAV.

JANITOR STAIR 01 REVISION - 10


CLG 01 SSL CLG 01
LAV.
MALE
CH +2600 FFL CLG 02 PL 1 PL 4 TOILET CH +2700 FFL AMENDED GRID CEILING LAYOUT
STORE 4 REFLECTED ON LATEST LAYOUT PLAN
FEMALE
CLG 01 PANTRY CH +2600 FFL TOILET W.C. CLG 01
CH +2600 FFL W.C. CH +2600 FFL
W.C.
LAV.
30000

8600

PL 2 PL 5 BUSINESS DEVELOPMENT
AHU W.C.

W.C.
AHU CLG 02

CLG 01 BREAKOUT AREA


LAV.
W.C. CH +2800 FFL
QUIET-2 CLG 02 CH +2800 FFL
CH +2600 FFL PRINTING CLG 01
CH +2600 FFL LAV.
W.C.

PL 3 PL 6
CLG 01 CH +2750 FFL
STAIR 02 W.C.
FSL FFL/SSL
CH +2600 FFL
QUIET-1 STORAGE
C CABINET COFFEE COUNTER CLG 01
FINANCE
OPEN CEILING CH +2700 FFL
(TO PAINT
STRUCTURE
SOFFIT & M&E
CLG 01
4700

SERVICE )(PT-04)
CH +2700 FFL
SECRETARY OFFICE CLG 02
DESIGN HOD
PROJECT
CH +2800 FFL
B
CLG 01

CH +2600 FFL
PORTION-2 MATERIAL SAMPLE & LIBRARY
CEO OFFICE
PORTION-1 HR
(DESIGN TO BE UPDATE LATER)
6000

CLG 01
HR LEGAL & COMPLIANCE
SAFE ROOM
CH +2700 FFL
HOD HOD

FIREMAN ACCESS PANELS FIREMAN ACCESS PANELS


CLG 01 CLG 02 CLG 01 CLG 02 CLG 01 CLG 01 CLG 01 CLG 01 CLG 01 CLG 02 CLG 01 CLG 02 CLG 01 CLG 02 CLG 01
4
CH +2700 FFL CH +2800 FFL CH +2700 FFL CH +2800 FFL CH +2700 FFL CH +2700 FFL CH +2600 FFL CH +2700 FFL CH +2750 FFL CH +2800 FFL CH +2700 FFL CH +2800 FFL CH +2700 FFL CH +2800 FFL CH +2700 FFL

Project name

LEGEND P4 REFLECTED CEILING PLAN LEGEND M TOWER


SYMBOL DESCRIPTION SYMBOL DESCRIPTION SCALE A1 1:100 SYMBOLS DESCRIPTION
(LG-01) SINGLE CEILING RECESSED ADJUSTABLE (LG-06) SUSPENDED ADJUSTABLE DOWN LIGHT 12F A3 1:200 GYPSUM BOARD CEILING
12F_MAHA LAND OFFICE
DOWN LIGHT (4000K) (BEAM ANGLE 60°) (4000K) (BEAM ANGLE 60°) CLG 01 IN SELECTED PAINT FINISH(PT-01)
(LG-01A) SINGLE CEILING RECESSED DOWN LIGHT (LG-07) CEILING RECESSED ADJUSTABLE DOWN LIGHT
GYPSUM BOARD CEILING
(4000K) (BEAM ANGLE 60°) (4000K) (BEAM ANGLE 60°) CLG 01A IN SELECTED PAINT FINISH(PT-06)
(LG-02) DOUBLE CEILING RECESSED ADJUSTABLE 600X600MM ACOUSTIC METAL
(LG-08) SUSPENDED PENDANT LIGHT (6000K)
DOWN LIGHT (4000K) (BEAM ANGLE 60°) CLG 02 GRID CEILING (POWDER COATED Issued for
(LG-03) CEILING RECESSED ADJUSTABLE DOWN LIGHT (LG-09) CEILING RECESSED DOWN LIGHT FINISH TO MATCH WITH PT-01)
(4000K) (BEAM ANGLE 60°) (4000K) (BEAM ANGLE 25°) OPEN CEILING (TO PAINT STRUCTURE
FOR CONSTRUCTION
CLG 03 SOFFIT & M&E SERVICE) (PT-04)
(LG-04) DIRECTIONAL SURFACE MOUNTED ADJUSTABLE
(LG-10) SUSPENDED FLUORESCENT LIGHT (4000K)
SPOT LIGHT (4000K) (BEAM ANGLE 36°) Drawing Title
WALLPAPER ON PLYWOOD BACKING
CLG 04 (WP-02)
(LG-04A) CEILING RECESSED MAGNETIC TRACK
(LG-11) (600x600)MM LED PANEL LIGHT (6500K)
REFLECTED CEILING PLAN
SPOT LIGHT (4000K) (BEAM ANGLE 25°)
MOISTURE RESISTANT GYPSUM BOARD
(LG-05) LED STRIP COVED LIGHTING WITH ∠45° CLG 05 CEILING IN PAINT FINISH (PT-01)
ALUMINUM PROFILE & DIFFUSER (4000K) MEP'S LINEAR AIR GRILLE
Project No. Date Rev.
30X50 ALUMINUM BAFFLED CEILING
(LG-05B) LED STRIP COVED LIGHTING WITH BENDABLE (LG-12) CEILING RECESSED DOWN LIGHT LIGHT MT 02
IN GREY FINISH 04.10.2024 10
ALUMINUM PROFILE & DIFFUSER (HB) (4000K) (4000K) (BEAM ANGLE 36°)

OUTLINE OF MOTORIZED ROLLER BLIND


Drawing No.

OUTLINE OF VERTICAL BLIND MT/CD/ID/12F/RCP-004

You might also like