IRSEM Contents
IRSEM Contents
S.no Description
1. Signal Engineering Manual is organised as one Main Volume, Appendix I and Appendix II.
2. Numbering Convention of this Manual is given below.
(a) Para numbering: Each Para has a three segment number as: Chapter no. Section No.
Para no. (For Example: 21.1.4).
Further sub-divisions are given as (c) (ii) and explained below
21- Chapter:
Disclaimer :- (1) Any Example/scheme given in Signal Engineering Manual, Appendix I &
II showing any equipment or usage of any acronym is only for Technical &
conceptual information of signal Engineers & Technicians and does not endorse any
particular make/Brand
(2) References to other sources such as - GR, ACTM, SOD, Engineering Code,
Finance Code, Payment of wages act, Hours of Employment are given at appropriate paras
for ready referencing. However their accuracy/ latest updates shall be checked by the
reader.
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
1. Index i-xi
4. Section 2: Officers 3
Sl. Page
Contents
No. No.
25. Annexure 3-A5: List of Drawings & Registers at a Station 41
26. Annexure 3-A6: Cause Wise Analysis of Signal Incidences 43
27. Annexure 3-A7: SSE/JE (Signal) Progress Report 46
28. Annexure 3-A8: SSE/JE (Signal) Completion Certificate 47
29. Annexure 3-A9: Technician’s (Signal) Report 48
30. Annexure 3-A10: Disconnection/Reconnection Notice 49
31. Annexure 3-A11: Where Disconnection is not Required 50
32. Annexure 3-A12: Competency Certificate cum Training History Book 52
33. Annexure 3-A13: Hours of Employment Regulations, Workmen’s 54
Compensation Act, Payment of Wages Act.(Extract of
Manuals)
34. Chapter 4: Budget, Estimates, Expenditure, Budget Control 59
and Completion Reports
35. Section 1: Introduction – Budget Terms 59
36. Section 2: Works, Machinery and Rolling Stock Budget 60
37. Section 3: Maintenance of Accounts 61
38. Section 4: Control over Expenditure 62
39. Section 5: Completion Reports 62
40. Annexure 4-A1: Powers of the Railway Board 63
41. Annexure 4-A2: Review of Expenditure 65
42. Annexure 4-A3: Revenue Expenditure 67
43. Annexure 4-A4: Preparation of the Budget 69
44. Annexure 4-A5: Works Machinery and Rolling Stock Budget 71
45. Annexure 4-A6: Classification of Capital and other Works Expenditure 72
46. Annexure 4-A7: Distribution of Funds by the Railway Board 73
47. Annexure 4-A8: Revenue Allocation Registers 75
48. Annexure 4-A9: Register of Works is a Collective Record of Expenditure 76
Designed
Sl. Page
Contents
No. No.
67. Section 8: Stores Obtained for Works including Special Revenue Works 109
(iii)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
78. Annexure 6-A7: Accounts (EDP) Requisition and Issue Note 127
79. Annexure 6-A8: General Instructions for Proper Custody and 131
Maintenance of Stores
86. Section 6: Interlocking of Signals with Points and other Equipments 148
89. Annexure 7-A1: Extract from “Rules for Opening of Railway Lines” for 157
Isolation (Rule 36)
98. Annexure 8-A1: Various Books of Reference and their Distribution 176
among the Staff
99. Annexure 8-A2: Check list for Engineering Scale Plan (ESP) 178
(iv)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
102. Section 2: Obtaining Sanction for Works on Lines Opened to Traffic 185
109. Annexure 9-A5: Safety Certificate for S&T works for Introducing 199
Electrification
110. Annexure 9-A6: Joint Safety Certificate (for New Types of Locomotives 200
or Rolling Stock)
114. Annexure 9-A10: Check List for PCSTE Application for Sanction for 207
Signalling Works
(v)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
129. Section 4: Facing Point locks, Switch & Lock Movements and Spring 239
Point Levers
139. Section 14: Maintenance of Facing Point Locks, Switch & Lock 251
Movements and Spring Point Levers
142. Section 17: Maintenance of Signal Wire Run (Single Wire) 254
144. Section 19: Maintenance of Electrical Repeaters and Signal Lamps/LEDs 254
(vi)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
147. Section 22: Maintenance of Point, Trap and Shunting Permitted 258
Indicators
151. Section 26: Testing of Interlocking Frames, Interlocking Key Boxes 263
and Station Master’s Slide Control Frames
157. Chapter 13: ATP, ETCS, TPWS, IRATP (TCAS) & TMS 275
159. Section 2: European Train Control Systems (ETCS) & Train Protection 277
and Warning Systems (TPWS)
(vii)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
185. Chapter 17: Train Detection - Track Circuits & Axle Counters 331
Sl. Page
Contents
No. No.
195. Chapter 18: Block Instruments, BPAC & IBS Working 356
203. Section 8: Maintenance of Block Instruments & their Ancillary Apparatus 368
− General Instructions
211. Annexure 18-A4: Intermediate Block Signalling (using OFC, MSDAC) 378
Sl. Page
Contents
No. No.
222. Section 10: Lightning & Surge Protection for Outdoor Equipment 408
224. Annexure 19-A1: Signal Sighting Committee Report – For Shifting of 415
Existing Signals/Erection of New Signals
226. Annexure 19-A3: Method for Finding Out the Resistance of an Earth 419
232. Annexure 20-A1: Automatic Signalling Scheme with OFC, MSDAC & OC 427
240. Section 7: Lightning and surge protection for Signalling Equipments 462
(x)
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
Contents
No. No.
251. Section 8: Rules for Protection of Staff working on Signal & 483
Telecommunication Installation
253. Annexure 22-A2: Maintenance in Electrified Areas (Extract of part 'J' of 489
Permanent Way Manual PART 'J')
254. Annexure 22-A3: Clearances for Signals for High Rise OHE (For Running 494
Double Stack Container &Three Tier Car)
256. Annexure G1: Reliability, Availability, Maintainability & Safety (RAMS) 497
257. Annexure G2: Brief of High Speed Rail Signalling in Ahmedabad - 501
Mumbai Route
258. Annexure G3: Communication Based Train Control (CBTC) In Metro 508
Railway Systems
259. Annexure G4: Glossary of Technical Terms for Signal Engineering 514
Manual
(xi)