0% found this document useful (0 votes)
56 views12 pages

Subcon

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views12 pages

Subcon

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SUBCONTRACTING PROCESS

In subcontracting process we provide raw material to

subcontractor vendor, he processes the material and he returns back

to our company as a semi finished or finished material. We are

paying charges to subcontractor vendor

Example: We have one starter motor manufacturing company

who manufactures the starter motors company provides the raw

materials like starter housing, armature, bushes, solenoid and pinion

bendex to subcontractor vendor. Subcontracting vendor processes

and assembles the all components and finally returns the Starter

motor to our company

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
Subcontracting with Subcontractor vendor

When there is no stock available for raw material in our storage

location we will order the materials from Third party vendor. Instead

of receiving materials in our storage location we will directly send

raw materials from third party vendor to subcontracting vendor

Steps Involved in subcontracting with SC vendor process

1. Create materials raw materials and finished materials

T code: MM01

Ex: Finished material starter motor

Raw materials starter housing, armature, bushes,

solenoid and pinion bendex

2. Create vendors

T code: XK01

Ex: Subcontracting vendor & third party vendor

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
3. Create Purchase Orders (PO)

T code: ME21N

 Normal PO (Raw materials)

 Subcontracting PO (Finished material)

4 .Goods receipt for normal PO

T code : MIGO

5. Goods receipt for Subcontracting PO

T code : MIGO

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
1. Create Material

T code: MM01

Material Material number Material type

Starter motor 0060080224 parent

Starter housing 0060010062 Child

Armature 0060010063 Child

Bushes 0060010064 Child

Solenoid 0060010065 Child

Pinion bendex 0060010066 Child

2. Create Sub contracting vendor T code: XK01

Subcontracting Vendor  2110000015

Third party Vendor 2110000016

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
3. Create normal Purchase Order (PO) for raw material

T code: ME21N

Create PO with third party vendor for raw materials

During creation of Normal PO assign subcontracting vendor in

delivery address tab

Standard PO created under the number 4500023466

Create subcontracting Purchase Order (PO)

T code: ME21N

Create subcontracting PO with subcontracting vendor for the

finished material

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
BOM

Standard PO created under the number 4500023467

PO TYPE VENDOR PO NUMBER

Normal PO 2110000016 4500023466

Subcontracting PO 2110000015 4500023467

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
4. Goods receipt of the Normal PO for raw materials

T code: MIGO

Before this let’s check stock of all raw materials in

MB52

Do GR in MIGO for raw materials

GR for raw materials with Mvt type 101 for normal PO

Material document 5000001845 posted

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
Check stock in MB52 after GR

Accounting entries after GR for raw materials

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
5. Goods receipt of the normal PO for finished materials

T code: MIGO

Material document 5000001846 posted


Movement types in Sub contracting while doing Goods receipt

(GR)

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
101 Parent material (Finished)

543 Child materials (Raw)

Accounting Entries in Subcontracting Process

During GR

Accounting entries in subcontracting always calculated in formula

- 4+2X

X  No of child materials

4 accounting entries for finished material

BSX Inventory account

WRX GR/IR clearing account

BSV Change in sub contracting stock

FRL Sub contracting charges

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
(In subcontracting FRL always comes as service charges paying to

vendor)

2 accounting entries For Raw materials

BSX  Inventory account

GBB Consumption account

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]
Disclaimer

© Copyright TagSkills. The copyright in this


work is vested in TagSkills. Please note and
abide by copyright laws. This presentation is
for educational purposes only, all logos,
photos, and information, etc used in this
Presentation is the property of TagSkills. SAP
is a registered trademark of SAP AG in
Germany and many other countries. We are
NOT ASSOCIATED with SAP.

LinkedIn | K Rajitha
Mail id – k.rajitha662@[Link]

You might also like