0% found this document useful (0 votes)
24 views1 page

A. Load Calculation For Design of Pile Foundation For Abutment

Uploaded by

scpl.lko23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

A. Load Calculation For Design of Pile Foundation For Abutment

Uploaded by

scpl.lko23
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

A.

LOAD CALCULATION FOR DESIGN OF PILE FOUNDATION FOR ABUTMENT

BRIDGE NO. : 441


ABUTMENT NO. : A1
SPAN ARRANGEMENT : 5 x 9.15 (RDSO STANDARD PSC Slab) RDSO Drg. No. /B-10272/R
GAD : NRHQE(P) PLAN NO. P-866-GB/2020/[Link].1.

1.0 INTRODUCTION
The system consists of a solid rectangular abutment with monolithic dirt wall, square return wall and solid
abutment cap. The top dimensions of the abutment cap are fixed so as to fit in the details of superstucture.

2.0 REFERENCE
For the design of the abutment and its different components generally the provisions of IRS (Indian Railway
Standards) Codes have been followed. Followings are the main references.

i. IRS Bridge Rules v. IS:2911(Part1/Sec2)-2010


ii. IRS Concrete Bridge Codes vi. IS:14593-1998
iii. IRS Substructure codes. vii. IRC:78
[Link] Guideline of RDSO-(2020)

3.0 DESIGN PARAMETERS


Proposed Rail Level RL 101.012 m
Proposed Rail Formation Level RL 100.272 m
Structural Depth of 6.1m Girder 0.78 m
Bottom of PSC Slab Level RL 99.432 m
Top of Bed Block Level RL 99.432 m
Top of Abutment Level RL 98.932 m
Ground Level RL 93.038 m
Top of Pile Cap Level RL 94.272 m
Bottom of Pile Cap Level RL 92.472 m
High Flood Level (HFL) RL 103.445 m As per approved GAD
Design Discharge 234.49
Max Velocity of Flood (m/sec) 1.200 m/sec
Scour LVL at Abutment No scour condition due to Toe protection

Seismic Zone = III


Z = 0.16 Z/2R = 0.04
Importance Factor (I) = 1.5 Sa/g = 2.5
R = 2

4.0 SPAN DETAILS


The Abutment is supporting PSC Slab of Clear Span 9.15 m. The Details of Span is gives as under
RDSO Drg. No. /B-10272/R
4.1 Left Side Span
Clear span = 9.150 m
Effective span between c/c of bearing = 9.715 m
Overall span = 10.28 m
Span between c/c of Expansion Joints = 10.30 m

Abutment (A1)'s Foundation