PERSPECTIVE VIEW
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
3990
1200
605 750 2635
300
230
230
d1
600 528
450 750 150 750 450230459 744 148 750 450
1800
1200 150 1200
squat w1
MALE d1 wc
TOILET
150
754
+300
d1
600
squat
1500 wc w1
828
230
230
230
5560
1200 150 1200
squat
600
wc w1 1
FEMAL
d1 A105
TOILET
150
+300 753
d1
529 600
squat w1
wc
1
300
603 750 2638
1200 3990
GROUND FLOOR ROOF PLAN
1 2 1 : 50
1 : 50
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
-oven-baked, bush green, 0.55mm guage
long span alluminium ridge cap
-oven-baked, bush green, 0.55mm guage
alluminium roofing sheets
-50 x 75mm hardwood purlins at 900mm c/c
-50 x 150mm hardwood principal rafter
at 1200mm c/c
-50 x 100mm hardwood struts and tie beam
at 1200mm c/c
-50 x 50mm well seasoned hardwood
noggings @ 600 c/c
-high quality PVC ceiling
-0.55 guage oven baked, bush green, aluminium
facia .
-225 x 225 reinforced concrete ring beam to
engr`s specification
2100
F.F.L
+300
150
A.G.L.
300
300
300
-floor finish(see finishing schedule)
-25mm cement/ sand screed (1:3)
-150mm r.c. floor slab (1:3:6) (brc wire mesh)
-polythene damp proof membrane
-300mm sizeable hard core
-300mm well compacted laterite earth filling
foundation wall filled with weak concrete
-concrete foundation footing
(1:2:4) to engr`s specification
-50 mm blinding
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
FRONT ELEVATION LEFT ELEVATION
1 1 : 50 4 1 : 50
RIGHT ELEVATION BACK ELEVATION
2 3 1 : 50
1 : 50
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
MARK ON
S/NO DRAWING DESCRIPTION QUANTITY SIZE LOCATION NOTE
powder coated aluminium sliding window
600
1 W1 with 5mm clear glass and standard guage
4 toilet
frame, including anti-burglar bars and 600
mosquitoe screen
2100
2 D1 single swing well polished 6 toilet
panel door
750
DOORS AND WINDOW SCHEDULE ALL DIMENSIONING ARE IN MM
UNLESS OTHERWISE STATED
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
S/NO COMPONENT LOCATION FINISHING MATERIAL REMARKS
1 CEILING external eaves high quality white PV ceiling
internal spaces FINISHING SCHEDULE
(auditorium, toilet, high quality white PV ceiling
store and ver.)
2 FLOOR both internal andexternal terrazzo floor finish on 25mm screeded
floor spaces bed, laid on close supervision by
the architect
3 WALLS external walls 1 undercoat and 2 finishing coats of high
quality textured paint (portland paint or
and approved)
internal walls 1 undercoat and 2 finishing coats of high
(living rooms,bedrooms quality emulsion paint(portland paint or
lobbies, stores, etc) and approved)
kitchen and toilets high quality ceramic wall tiles laid up to
2.1 m high from f.s.l
kitchen and toilets 2 coats of high quality gloss paint ,
above ceramic wall tiles up to head room
DATE REVISION DRAWING TITLE NOTE SHEET NO.
DO NOT SCALE
DRAWING, ALWAYS
MDGS PROJECTS UNDER THE 2013 APPROPRIATION DEC READ MEASUREMENT
2012 VIP TOILET IF IN DOUBT, CONTACT
THE ARCHITECT.
LEGEND
10A, 1 gang 2 way Switch
10A, 1 gang 1 way Switch
10A, 2 gang 1 way Switch
10A, 2 gang 2 way Switch
13A, SP 1 -gang Switch Socket Outlet, ABB Type
15A (A /C) Switch Socket Outlet, ABB type
TV, FM Signal Dual Socket Outlet
100W Daylight wall lampholder
Distribution Board
T 60W Water Tight Ceiling Mounted
60W Decorative Ceiling Mounted fitting
R Ceiling Fan & Fan Regulator
2 x 40W fluorescent fitting
DATE REVISION DRAWING TITLE NOTE SHEET NO.
EE VIP 02
DO NOT SCALE
MDGS PROJECTS UNDER THE 2013 APPROPRIATION
DRAWING, ALWAYS
JAN READ MEASUREMENT
VIP TOILET
2013 IF IN DOUBT, CONTACT
ELECTRICAL LEGEND THEENGINEER.
L1
T L1
L1 L1
T
L1 L1
T
L1 L1
L1
T
L1
DATE REVISION DRAWING TITLE NOTE SHEET NO.
EE VIP 02
DO NOT SCALE
MDGS PROJECTS UNDER THE 2013 APPROPRIATION
DRAWING, ALWAYS
JAN VIP TOILET READ MEASUREMENT
2013 LIGHTING INSTALLATION
IF IN DOUBT, CONTACT
THEENGINEER.
LEGEND/SPECIFICATION
MH 600 x600mm
IC 450 x450mm
GT F/AF/B From Above/From Below
GROUND TANK
ET ELEVATED TANK T/A To Above
CWP COLD WATER PIPE
SP SOIL PIPE T/B To Below
WP WASTE PIPE
SVS SOIL VENT STACK
fd FloorDrain
FD FLOOR DRAIN
MH MANHOLE ABC 9Kg C02 Fire Extinquisher
IC INSPECTION CHAMBER
SPLIT UNIT Air conditioner
100mmSP @1% Fall
DATE REVISION DRAWING TITLE NOTE SHEET NO.
ME VIP 01
DO NOT SCALE
MDGS PROJECTS UNDER THE 2013 APPROPRIATION
DRAWING, ALWAYS
JAN VIP TOILET- READ MEASUREMENT
2013 MECHANICAL LEGEND
IF IN DOUBT, CONTACT
THEENGINEER.
25mmCWP from Main
25mmCWP
20mmCWP 20mmCWP
15mmCWP
15mmCWP
DATE REVISION DRAWING TITLE NOTE SHEET NO.
ME VIP 02
DO NOT SCALE
MDGS PROJECTS UNDER THE 2013 APPROPRIATION
DRAWING, ALWAYS
JAN VIP TOILET- WATER SUPPLY READ MEASUREMENT
2013 IF IN DOUBT, CONTACT
THEENGINEER.
IC ST SAP
100mmSP @ 1% Fall
IC
fd
100mmSP @ 1% Fall
fd
IC
100mmSVS
50mmWP
100mmSP
DATE REVISION DRAWING TITLE NOTE SHEET NO.
ME VIP 03
DO NOT SCALE
MDGS PROJECTS UNDER THE 2013 APPROPRIATION
DRAWING, ALWAYS
JAN VIP TOILET- DRAINAGE READ MEASUREMENT
2013 IF IN DOUBT, CONTACT
THEENGINEER.