Define and explain the terms 'Project' and 'Project Management' as well as outline and
elaborate the various stages of the Project Life Cycle. Explain the common challenges faced
during the process of managing a Project.
In the contemporary dynamic landscape of business, technology, and societal development, the
ability to conceive, plan, execute, and deliver specific endeavors with defined objectives and
constraints is paramount. These endeavors, commonly referred to as projects, form the bedrock
of progress and innovation across diverse sectors. Simultaneously, the discipline of project
management has emerged as a critical competency, providing the frameworks, methodologies,
and tools necessary to navigate the inherent complexities and uncertainties associated with these
undertakings. According to A Guide to Project Management Body of Knowledge (2000) a project
is a temporary endeavour designed to produce a unique product, service or result with a defined
beginning and end, undertaken to meet unique goals and objectives. The essential features of a
project are that it is innovative, time-constrained and resource-constrained. Conversely, project
management is the application of knowledge, skills, tools and techniques to project activities to
meet project requirements (A Guild to Project Management Body of Knowledge, 2000). Its
immediate goal is to assure the successful completion of the project. Thus, in its practice, this
management process is frequently connected with risk management due to its complexity and
unpredictability of future happenings. In this regard, the project manager, who serves as the
intermediate between project board (project sponsor) and project team, often manages the risks
of the project. (De Marco, 1997).
The Project Life Cycle provides a structured framework for managing a project from its
inception to its closure. It represents the logical progression of a project through a series of
distinct phases, each with its own set of activities, objectives, and deliverables (PMI, 2021).
While different organizations and methodologies may define the stages slightly differently, a
common and widely accepted model typically comprises four main phases: Initiation, Planning,
Execution, and Closure (Kerzner, 2017). Project Initiation is often regarded as the project start-
up. The Initiation phase marks the formal commencement of a project, where it is authorized and
its broad objectives are defined (Project Management Institute, 2021). The primary goal of this
stage is to ascertain the project's feasibility, desirability, and viability. Key activities include
identifying the need or opportunity, defining high-level project objectives and scope, conducting
a feasibility study to assess the project's practicality within existing constraints, developing a
project charter that formally authorizes the project and outlines key elements, and identifying key
stakeholders to understand their interests and expectations. The Initiation phase concludes with a
decision on whether to proceed to the Planning phase based on the feasibility study and project
charter approval.
The Planning phase is a critical stage in the project lifecycle focused on refining project
objectives and creating a detailed roadmap for their achievement (Project Management Institute,
2021). This stage involves detailed planning, and the project manager needs to fulfil the tasks of
recruiting the right people, outline the activities and timeframe. In addition, financial plan and
resource distribution need to be specified. The primary goal is to develop a comprehensive
project management plan that guides execution, monitoring, and control (Larson & Gray, 2018).
Key activities include defining the detailed project scope by breaking down the high-level scope
from initiation into manageable components, developing a realistic project schedule by
identifying necessary activities, estimating their duration, logically sequencing them, and
allocating resources, estimating costs and developing a detailed budget using techniques ranging
from analogous to bottom-up estimating; developing a resource management plan that outlines
how the project team and other resources will be acquired, managed, and released, including
defining roles and responsibilities; creating a comprehensive risk management plan to
proactively identify potential risks, analyze their likelihood and impact, and develop effective
mitigation strategies, often documented in a risk register; establishing a clear communication
plan to define how project information will be disseminated to stakeholders, including frequency
and format; developing a quality management plan that specifies the quality standards for project
deliverables and the processes to ensure these standards are met; and creating a stakeholder
management plan to effectively engage and manage all stakeholders throughout the project,
addressing their needs and expectations.
The Execution phase is where the planned project work is actually carried out, with the project
team performing tasks outlined in the project management plan to produce the project
deliverables (Project Management Institute, 2021; Kerzner, 2017). The primary goal is to
manage and coordinate the necessary resources and activities to achieve the project objectives.
Key activities include directing and managing project work by leading the team and ensuring
adherence to the project management plan, acquiring and managing project resources such as
personnel, equipment, and materials for effective utilization, implementing the quality
management plan through planned quality assurance activities, managing communications by
distributing information to stakeholders as per the communication plan and addressing any
issues, implementing approved changes through a formal change control process, and actively
managing stakeholder engagement by addressing concerns and expectations (Larson & Gray,
2018; Meredith & Mantel, 2019). The Execution phase is typically the longest and demands
strong leadership, communication, and problem-solving skills from the project manager
(Heagney, 2016).
Project Closure marks formally completion of a project. In this stage, the deliverables will be
presented to the stakeholders. The Closure phase signifies the formal termination of the project
(Project Management Institute, 2021; Kerzner, 2017). The main objective is to finalize all project
activities, obtain formal acceptance of the deliverables, and communicate the project's
completion to all stakeholders. Key activities include finalizing all remaining tasks and ensuring
deliverable acceptance, obtaining formal sign-off from stakeholders or the client confirming the
deliverables meet requirements, releasing project resources including team members and
equipment, conducting a post-project review or lessons learned session to document successes,
failures, and insights for future projects (Larson & Gray, 2018), finalizing financial closure by
reconciling expenses and ensuring all payments are made, formally communicating the project's
closure to all stakeholders, and archiving all project-related documents for future reference
(Nicholas & Steyn, 2017; Meredith & Mantel, 2019). Thus, a successful project will meet the
defined objectives. In general practice, besides the project report to the stakeholders, a project
review report will be drafted for the documentation and evaluation of the project. A lessons-
learnt workshop might be organized so that the experiences of the project can be communicated
among the stakeholders.
Managing projects is inherently complex and often presents numerous challenges that can
impede success. Understanding these common issues is vital for proactive mitigation. Key
challenges include scope creep, which is the uncontrolled expansion of the project scope without
adjusting resources or timelines. Unrealistic expectations and objectives, stemming from poor
planning or external pressures, can lead to team confusion and failure. Inadequate
communication can cause misunderstandings, delays, and hinder collaboration. Resource
constraints, such as limited budget, time, or personnel, can negatively impact schedules and
quality. Ineffective risk management, a failure to identify and mitigate potential risks, can result
in unforeseen problems. Poor teamwork and collaboration, characterized by internal conflicts or
unclear roles, can reduce productivity. Lack of stakeholder engagement can lead to
dissatisfaction and resistance. Unforeseen issues and changes in the external environment require
adaptability. Inadequate project management skills in leadership and communication can
significantly affect performance. Finally, resistance to change from stakeholders or team
members can hinder project implementation.
In summary, projects are temporary undertakings aimed at creating unique outputs under various
constraints. Project management is the strategic application of knowledge and skills to guide
these projects through their Initiation, Planning, Execution, and Closure phases to meet their
objectives. However, project management is often challenging, with common hurdles including
scope creep, unrealistic expectations, poor communication, resource limitations, ineffective risk
management, lack of teamwork and stakeholder engagement, unforeseen issues, inadequate
management skills, and resistance to change. Recognizing and proactively addressing these
challenges is crucial for increasing project success and delivering valuable results in today's
complex environment. By adopting effective project management principles and diligently
tackling potential pitfalls, organizations can leverage projects to foster innovation, achieve
strategic goals, and succeed in their fields.
Q2. Discuss the role of a Project Manager and highlight the tools used during the process of
managing a Project as well as explain the importance and application of Monitoring and
Control in Project Management.
In the realm of modern organizational endeavors, projects serve as the engine of innovation and
strategic achievement. Guiding these complex undertakings from inception to successful
completion is the pivotal role of the Project Manager. The pivotal role of the project manager in
determining the success or failure of a project has therefore been widely acknowledged and
discussed by researchers. As the individual ultimately responsible for the project's trajectory, a
project manager must possess a specific set of skills to effectively guide the undertaking.
Bodepudi (2018) provides a concise framework for understanding the core responsibilities
inherent in this critical role, encompassing planning, organizing, leading, monitoring,
communicating, and managing risk.
The Project Manager is the critical linchpin for any project, shouldering a wide array of
responsibilities that span the entire project lifecycle, transforming abstract ideas into tangible
results. Their role is far more than simply assigning tasks; they embody leadership, serve as the
primary communication hub, adeptly solve problems, and engage in strategic foresight to steer
the project towards its intended destination. The specific duties of a Project Manager can adapt
based on the unique demands of the industry, the organizational framework in which they
operate, and the sheer complexity of the undertaking. However, several fundamental
responsibilities consistently underpin their vital contribution to project success. They are the
initial architects, working diligently with stakeholders to precisely define the project's objectives
and scope, often formalized through the creation of a project charter that lays the foundational
understanding for all involved (Project Management Institute, 2021). Furthermore, they
meticulously craft the project management plan, a comprehensive guide that charts the course for
execution, monitoring, and control across all project dimensions (Larson & Gray, 2018). Beyond
planning, they are the inspirational leaders of the project team, carefully selecting and integrating
members, clearly delineating roles and responsibilities, nurturing a collaborative and
communicative atmosphere, providing motivation, and effectively managing individual and
collective performance (Goleman, 1995). As the central point of contact, the Project Manager
maintains open and consistent communication with all stakeholders, ensuring expectations are
managed, concerns are addressed promptly, and everyone remains informed and engaged
throughout the project's journey (Bryson, 2018). They are also the vigilant guardians of the
project's boundaries, continuously monitoring constraints such as scope, schedule, and budget,
and skillfully implementing corrective actions to navigate inevitable deviations (Atkinson, 1999).
To effectively manage the complexities of modern projects, Project Managers rely on a variety of
tools and techniques that aid in planning, execution, monitoring, and control. One fundamental
tool is the Work Breakdown Structure (WBS), which decomposes the project scope into smaller,
more manageable tasks and sub-tasks (PMI, 2021). This hierarchical structure provides a clear
visual representation of the project deliverables, and the work required to achieve them,
facilitating better planning and assignment of responsibilities. For schedule management, Gantt
charts and network diagrams (e.g., PERT charts, CPM diagrams) are invaluable. Gantt charts
provide a visual timeline of project tasks, their durations, dependencies, and milestones, allowing
for easy tracking of progress against the schedule (Kerzner, 2017). Network diagrams illustrate
the logical relationships and dependencies between project activities, helping to identify the
critical path and potential schedule bottlenecks.
Furthermore, Project managers utilize various tools for different aspects of project management.
For cost management, spreadsheets and specialized software track expenses and forecast
overruns, while Earned Value Management (EVM) integrates scope, schedule, and cost for
performance analysis (Heagney, 2016; PMI, 2021). Risk management employs risk registers and
matrices to document and prioritize potential risks (Chapman & Ward, 2011). Communication
management uses platforms like email and collaboration software, guided by communication
plans (Larson & Gray, 2018). Quality management utilizes checklists and charts to monitor and
ensure adherence to quality standards (Juran & Godfrey, 1999). Stakeholder management uses
stakeholder registers and analysis matrices to understand and prioritize stakeholder needs
(Bryson, 2018). Effective selection and use of these tools are vital for project success,
streamlining processes, improving communication, and enhancing decision-making.
Project monitoring and evaluation (M&E), alongside the project management processes of
monitoring and control, are indispensable for steering projects toward successful outcomes and
achieving their intended impact. M&E offers a systematic approach to gather and analyze data
concerning a project's advancement and its wider consequences, empowering project managers
to verify the achievement of goals, pinpoint areas needing refinement, and comprehend the
lasting effects on beneficiaries. This ongoing assessment not only keeps the project aligned with
its objectives but also facilitates necessary adjustments along the way. Furthermore, M&E plays
a vital role in demonstrating a project's responsiveness to the needs of its intended beneficiaries,
thereby fostering stakeholder support and a sense of ownership, which are critical for long-term
success. By continuously learning and seeking improvements, M&E also cultivates innovation
and creativity within project teams and organizations. Mirroring these benefits, project
monitoring and control involve the constant tracking of project performance against established
plans, enabling the early identification of potential issues, proactive mitigation of risks,
controlled management of changes, and transparent communication with stakeholders (PMI,
2021; Nicholas & Steyn, 2017). The analysis of performance data and the effectiveness of
control measures in both M&E and project management fosters a culture of learning and
continuous improvement (Kerzner, 2017), enhancing accountability, transparency in data
methods and findings, and the overall probability of delivering high-quality projects that meet
organizational objectives and stakeholder expectations (Meredith & Mantel, 2019; Larson &
Gray, 2018). Ultimately, these processes provide the crucial data and insights needed for
informed decision-making regarding a project's direction and resource allocation, ensuring
alignment with organizational goals and maximizing the effective use of resources.
Thus, the application of monitoring and control throughout the project lifecycle is crucial for
effective project management, involving various activities and techniques to ensure the project
stays on track and meets its objectives. This includes regularly tracking progress against the
schedule using tools like Gantt charts (Kerzner, 2017), and continuously controlling costs
through budget tracking (Heagney, 2016; PMI, 2021), verifying scope to ensure deliverables
meet requirements (PMI, 2021), assuring quality through audits and inspections (Juran &
Godfrey, 1999), actively monitoring and controlling risks (Chapman & Ward, 2011),
communicating performance to stakeholders through reports and meetings (Larson & Gray,
2018), managing changes through a formal change control process (PMI, 2021), taking
corrective actions to address deviations (Nicholas & Steyn, 2017), and implementing preventive
actions to avoid future issues. As noted by Cooke-Davies (2002), effective monitoring and
control provide the necessary feedback loops for learning and adaptation, contributing
significantly to project success by enabling project managers to maintain visibility, manage
complexities, and proactively address potential problems, ultimately increasing the likelihood of
meeting stakeholder needs and organizational goals.
Q3. Project analysis is a critical component of Project Management that involves assessing
a project's feasibility, viability and potential outcomes. With concrete examples, discuss the
various ways of analysing a Project and explain the importance of Project Analysis.
In the dynamic landscape of modern business, projects serve as the primary vehicles for driving
change, innovation, and growth. However, the inherent uncertainty associated with projects
necessitates a rigorous evaluation process to ensure the efficient allocation of resources and the
achievement of desired outcomes. This process, known as project analysis, is a critical
component of project management, involving a systematic assessment of a project's feasibility,
viability, and potential outcomes. Project analysis provides a structured framework for decision-
making, enabling organizations to make informed choices about which projects to pursue, how to
allocate resources effectively, and how to mitigate potential risks. Thus, project analysis is the
process by which all the major aspects of a project; technical, commercial, organizational,
financial and economic, are assessed for the purpose of making a judgment on its worthiness.
This process includes all the work necessary to begin a careful review or appraisal of the project.
It refers to the careful examination of each of the aspects of project analysis, economic, financial,
technical, organization, managerial and commercial aspects, after the identification of the
projects.
Project analysis is therefore a vital and multi-faceted process that employs a range of techniques
and methodologies to rigorously evaluate the merits and feasibility of a proposed undertaking
(Project Management Institute, 2017). The primary objective of this analysis is to determine
whether a project is truly worthwhile, carefully considering its strategic alignment with
organizational goals, its inherent potential for successful execution, and its capacity to deliver
tangible value to the organization (Kerzner, 2017). And to achieve this comprehensive
understanding, various analytical methods are employed, each offering distinct and valuable
insights into different critical aspects of the project under consideration (Nicholas & Steyn,
2020). These methods collectively contribute to a well-informed decision-making process
regarding whether to allocate resources and proceed with a particular project initiative.
A crucial initial stage in project analysis is feasibility analysis. It usually begins with a feasibility
study to provide enough information for deciding whether or not to begin more advanced
planning. Implementation begins when a project has been determined to be good. Feasibility
analysis focuses on determining whether a project can be successfully completed by thoroughly
examining several key dimensions of viability (Schwalbe, 2015). This analysis typically
encompasses technical feasibility, which assesses the organization's possession of the necessary
technical expertise, infrastructure, and resources for project execution. Economic feasibility
evaluates the financial soundness of the project by comparing costs and benefits, often using
techniques like cost-benefit analysis (CBA) and return on investment (ROI) (Meredith & Mantel,
2018). Operational feasibility examines the organization's ability to effectively operate and
maintain the project's deliverables post-completion, considering factors like organizational
structure and human resources. Finally, legal feasibility ensures the project's compliance with all
applicable laws, regulations, and ethical standards, including permits and intellectual property
rights (Pinto, 2019). These interconnected feasibility assessments provide a holistic perspective
on a project's potential for successful implementation and long-term sustainability.
Beyond the initial feasibility assessment, project analysis incorporates several key techniques for
a more in-depth evaluation of various critical project dimensions. Cost-benefit analysis (CBA) is
a widely used technique that systematically compares the total anticipated costs of a project with
its total expected benefits, often striving to quantify these in monetary terms and discounting
future values to their present worth (Boardman et al., 2017). Return on investment (ROI) is
another essential financial metric used to specifically assess the profitability of a project
investment relative to its total cost (Gitman & Zutter, 2015). Risk analysis is a critical process
that involves identifying potential risks that could negatively impact the project, assessing their
likelihood and potential impact, and developing proactive strategies for response, such as
avoidance, mitigation, transfer, or acceptance (Chapman & Ward, 2011). Stakeholder analysis
focuses on identifying and understanding individuals or groups who have an interest in or can be
affected by the project, enabling the development of effective engagement and management
strategies (Bryson, 2018). Lastly, SWOT analysis is a strategic planning tool used in project
analysis to evaluate internal strengths and weaknesses alongside external opportunities and
threats, providing a comprehensive1 strategic overview of the project's context and potential
(Weihrich, 1982). By systematically examining these four key elements, project teams can gain a
deeper understanding of the project's current position and its potential future trajectory. Strengths
represent the internal capabilities and advantages that the project possesses, which can be
leveraged to achieve its objectives. These might include a highly skilled team, proprietary
technology, strong brand recognition, or efficient internal processes. Weaknesses, conversely, are
internal limitations or disadvantages that could hinder the project's success. Therefore,
systematic analysis of these four quadrants allows project managers and stakeholders to develop
informed strategies to capitalize on strengths, address weaknesses, exploit opportunities, and
mitigate threats, ultimately enhancing the likelihood of project success and maximizing its
potential value.
Project analysis is a foundation of effective project management, providing a systematic
framework for evaluating potential projects and guiding strategic decision-making (Project
Management Institute, 2017). It is crucial in project management as it provides the foundation
for making sound decisions. It enables organizations to systematically evaluate a project's
potential, ensuring that resources are invested in ventures that align with strategic goals and have
a higher probability of success. For instance, a thorough project analysis can help a company
decide whether to develop a new product line by assessing market demand, production costs, and
potential profitability. Without this analysis, the company risks wasting resources on a project
that may not be viable or profitable. Furthermore, project analysis plays a vital role in resource
allocation, risk mitigation, and stakeholder alignment. By identifying the resources needed and
their availability, organizations can avoid overcommitting or misallocating their assets. Effective
risk management, a key component of project analysis, allows project managers to anticipate
potential problems and develop strategies to minimize their impact (Chapman & Ward, 2011).
For example, a construction company might conduct a risk analysis to identify potential delays
due to weather or material shortages and then create contingency plans. Additionally, stakeholder
analysis helps ensure that the project meets the needs and expectations of all involved parties,
fostering support and minimizing conflicts (Bryson, 2018). Ultimately, the importance of project
analysis lies in its ability to enhance project success and contribute to overall organizational
value. It establishes a clear framework for measuring performance, tracking progress, and
making necessary adjustments throughout the project lifecycle. By aligning projects with
strategic objectives and providing a structured approach to evaluation, project analysis increases
the likelihood of achieving desired outcomes and maximizing the return on investment.
Q4. Assuming you intends to embark on a project of 'Growing and Selling Maize in
Zambia's Central Province' this farming season, develop: (i) a mini–Project Proposal and
(ii). a mini-Report for this undertaking.
Project Title: Enhancing Food Security and Farmer Livelihoods through Sustainable Maize
Production in Central Province, Zambia
Project Summary
This project aims to establish a sustainable maize farming operation in Central Province,
Zambia, to improve food security and generate income for local farmers. The project will employ
modern farming techniques, promote climate-smart agriculture, and establish efficient market
linkages to ensure the profitability and long-term viability of maize production. The project will
target 50 smallholder farmers in the region, providing them with the necessary inputs, training,
and market access to increase their maize yields and incomes.
Project Goal
To increase maize production and improve the livelihoods of smallholder farmers in Central
Province, Zambia contributing to the achievement of Sustainable Development Goals (SDGs) 1
which aims to eradicate poverty in all its forms and dimensions by 2030.
4. Project Objectives:
Increase maize yield per hectare through the adoption of improved farming practices.
Establish reliable market channels for maize farmers to sell their produce.
Baseline Survey: Conduct a comprehensive baseline survey to assess the current maize
production practices, yields, incomes, and challenges faced by the farmers.
Input Supply: Procurement and distribution of high-quality maize seeds, fertilizers, and
pesticides. Ensure timely delivery and adequate supply.
Marketing: Establishing market linkages, negotiating prices, and selling maize to buyers.
Project Budget:
7. Project Timeline
The table shows the duration of each activity across the 12-month project period.
Activity Mont Mont Mont Mont Mont Mont Mont Mont Mont Mont Mont Mont
h1 h2 h3 h4 h5 h6 h7 h8 h9 h 10 h 11 h 12
Baseline X
Survey
Land X X
Preparatio
n
Input X X
Supply
Training X X
and
Capacity
Building
Productio X X X X
n
Post- X X
Harvest
Handling
Marketing X X X
Monitorin X X X X X X X X X X X X
g and
Evaluation
Project Team
Project Title: Enhancing Food Security and Farmer Livelihoods through Sustainable Maize
Production in Central Province, Zambia
Executive Summary
This report details a project focused on enhancing maize production and improving the
livelihoods of 50 smallholder farmers in Central Province, Zambia. The project employed
improved farming practices, provided training, and established market linkages. Key outcomes
include increased maize yields (from 2 to 8 tons/hectare) and improved farmer incomes (by an
average of 200%). The report identifies challenges such as erratic rainfall and high transportation
costs, and it outlines lessons learned and provides recommendations for future interventions.
Introduction
Maize is a staple food crop in Zambia, and its production is critical for food security and rural
livelihoods. However, smallholder farmers in Central Province face numerous challenges,
including low yields, limited access to inputs and markets, and the adverse effects of climate
change. This project was designed to address these challenges and promote sustainable maize
production practices to improve food security and increase farmer incomes.
Project Goal
To increase maize production and improve the livelihoods of smallholder farmers in Central
Province, Zambia, contributing to the achievement of Sustainable Development Goals (SDGs) 1.
Project Objectives
Increase maize yield per hectare from the current average of 2 tons/hectare to 8
tons/hectare within three years through the adoption of improved farming practices.
Establish reliable market channels for maize farmers to sell their produce at fair prices.
Promote climate-smart agriculture practices to enhance resilience to climate change.
Methodology
The project employed a participatory approach, involving close collaboration with farmers
throughout the project cycle. The following methods were used:
Farmer Selection: Farmers were selected based on criteria including their willingness to
participate, land availability, and interest in adopting new farming practices.
Training and Capacity Building: Training needs were assessed through a Training Needs
Assessment (TNA) survey. Workshops were designed based on the TNA and delivered by
agricultural extension officers and experts from Seed Co. Ltd. The training included:
Input Supply: High-quality certified maize seeds (Seed Co. Ltd), fertilizers and approved
pesticides were procured through a competitive bidding process to ensure cost-effectiveness
and quality. Farmers received inputs based on their land size and specific needs.
Production: Farmers implemented the improved practices on their fields, with ongoing
technical support from extension officers. Regular monitoring visits were conducted to
provide guidance and address any challenges.
Post-Harvest Handling: Training on post-harvest handling was conducted, and farmers were
linked to potential buyers.
Marketing: Market linkages were established through meetings with traders, millers, and
processors. A farmer marketing group was formed to facilitate collective marketing.
Impact assessment after two years to measure the long-term effects of the project
Project Activities
Training and Capacity Building: Conducted five training workshops for farmers.
Project Outputs
50 farmers trained
Project Outcomes
Challenges
High Transportation Costs: Poor roads increased costs and reduced profits.
Delayed Payments: Some buyers delayed payments, causing cash flow problems.
Pests and Diseases: Outbreaks of maize streak virus and stalk borers affected some
farms.
Lessons Learned
Recommendations
Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a
phenomenon, its time to accept other success criteria. International Journal of Project
Management, 17(6), 337-342.
Boardman, A. E., Greenberg, D. H., Vining, A. R., & Weimer, D. L. (2017). Cost-benefit
analysis: Concepts and practice (5th ed.). Cambridge University Press.
Bryson, J. M. (2018). Strategic planning for public and nonprofit organizations: A guide to
strengthening and sustaining organizational achievement (5th ed.). John Wiley & Sons.
Chapman, C., & Ward, S. (2011). Project risk management: Processes, techniques and insights.
John Wiley & Sons
Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project
Management, 20(3), 185-190.
De Marco, T. (1997). The deadline: a novel about project management. New York, NY: Dorset
House.
Gitman, L. J., & Zutter, C. J. (2015). Principles of managerial finance (14th ed.). Pearson
Education.
Juran, J. M., & Godfrey, A. B. (1999). Juran's quality handbook (5th ed.). McGraw-Hill.
Meredith, J. R., & Mantel Jr., S. J. (2018). Project management: A managerial approach (10th
ed.). John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology (5th ed.). Routledge.
Pinto, J. K. (2019). Project management: Achieving competitive advantage (5th ed.). Pearson
Education.
Project Management Institute (2000). A Guide to the Project Management Body of Knowledge
(PMBOK® Guide). Project Management Institute, Inc. Four Campus Boulevard: Newtown
Square, Pennsylvania 19073-3299 USA.
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK® guide) (6th ed.). Project Management Institute.
Project Management Institute. (2021). A guide to the project management body of knowledge
(PMBOK® guide) (7th ed.). Project Management Institute.
Schwalbe, K. (2015). Information technology project management (8th ed.). Cengage Learning.
Weihrich, H. (1982). The TOWS matrix—A tool for situational analysis. Long Range Planning,
15(2), 54-66.