BSR Tti
BSR Tti
FLOOR Bricks Nr
MATERIALS LABOUR PL
2 Anti Corrosive Primer M-002 litre 245.00 2 Plumber L-002 Day 1,500.00 2
3 Asbestos Corrugated Sheet M-003 Sq.ft 26.00 3 SK Labour L-003 Day 1,250.00 3
152 Tor Steel Rods including transport to site M-152 Kg. 130.00
Price
Description Code No. Unit
( Rs.)
Hire of Mixer P-001 Day 2,500.00
5 Concrete Work
6 Formwork Note
8 Block Work
9 Brick Work
10 Roof
13 Plastering
14 Tiling
15 Ceiling
16 Painting
17 Electrical works pending
18 water proofing pending
Rate Break Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the
Rate Break Downs of Concrete Works
Page 14 Of 461
Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
01.B.03
excavated material not exceeding 30' 0"
Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
01.B.04
excavated material to distance not exceeding 30' 0"
Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
01.B.05
excavated material not exceeding 30' 0"
SDS 05/15/2025
Page 15 Of 461
Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
01.B.06
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
01.B.07
depositing excavated material to a distance not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 Blasting Powder M-007 Lbs 0.75 200.00 150.00
SDS 05/15/2025
Page 16 Of 461
SDS 05/15/2025
Item No Description Unit Qty Rate Amount
1 Foundation for the Parrepet wall
Did not visit the site. Site soil condition not
3
decided
If any changers in foundation with stability
4 condition extra coming quantity must pay by
the client sqft 2.46 29,975.00 73,648.58
5 Tie beam in ground and top cuft 1.82 41,670.00 75,839.40
6 column for each ten feet cuft 0.675 41,670.00 28,127.25
7 Form works sqft 3.64 19,283.00 70,190.12
8 Form work for column sqft 1.8 19,283.00 34,709.40
9 Block works with standard and good finish sqft 10.92 19,283.00 210,570.36
10 Rendering work on block 3/4" sqft 21.84 6,290.00 137,373.60
11 For rebar Nrs 36.4 550.00 20,020.00
Total amount for boundary wall 630,458.71
Page 18 Of 461
Backfilling
Filling under floors including levelling, watering & compacting in 3" layers with available and
02.A.03
selected earth at site
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.02 U / SK Labourer L-007 Day 2 1,000.00 2,000.00
SDS 05/15/2025
Page 19 Of 461
SDS 05/15/2025
Page 20 Of 461
03. Anti termite Treatment & DPC
03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1 D. D. T. Powder M-038 Lbs 16 25.00 400.00
DPC
3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with
03.B.01
sand.
Analysis for 1 Sqr
Cement 1000
Sand 10666.667
Page 24 Of 461
05. Concrete Work
A. Mixing Concrete
B. Screed
C. Mass Concrete
D. Column
E. Beam
F. Slab
G. Lintol
Mixing Concrete
Rate(Say) 1Cube
Rate(Say) 1m3
Rate(Say) 1m3
Rate(Say) 1Cube
Rate(Say) 1m3
Rate(Say) 1Cube
Rate(Say) 1m3
Rate(Say) 1Cube
Rate(Say) 1m3
Screed Concrete
05.B.01 2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Mixing Concrete 1:3:6(1 1/2") 05.A.02 Cube 0.1667 26,590.00
Rate(Say) 1 Sqr
Rate(Say) 1ft2
Rate(Say) 1m2
05.B.02 4" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"
Analysis for 1 Sqr
Rate(Say) 1 Sqr
Rate(Say) 1ft2
Rate(Say) 1m2
Mass Concrete
1.01 Mixing Concrete 1:2 1/2 : 5(1") 05.A.03 Cube 0.5 33,500.00
Rate(Say) 1 Sqr
Rate(Say) 1ft2
Rate(Say) 1m2
Column Concrete
05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.
Analysis for 0.51 Cube
1.01 Mixed Concrete 1:1 1/2 : 3 (3/4") 05.A.01 Cube 0.51 38,250.00
Rate(Say) 1Cube
Rate(Say) 1m3
Amount
22,425.00
4,410.00
7,790.00
832.50
375.00
416.25
2,000.00
38,248.75
38,248.75
38,250.00
13,515.90
Amount
12,675.00
8,740.00
832.50
1,925.00
416.25
2,000.00
26,588.75
26,588.75
Page 29 Of 461
26,590.00
9,395.76
Amount
13,650.00
6,300.00
8,550.00
832.50
1,750.00
416.25
2,000.00
33,498.75
33,498.75
33,500.00
11,837.46
Amount
17,550.00
5,250.00
8,360.00
832.50
2,100.00
416.25
2,000.00
36,508.75
36,508.75
36,510.00
12,901.06
Amount
30,225.00
4,620.00
Page 30 Of 461
9,120.00
832.50
3,500.00
416.25
2,000.00
50,713.75
50,713.75
50,710.00
17,918.73
Amount
4,432.55
156.25
500.00
5,088.80
5,088.80
5,090.00
50.90
547.68
Amount
8,774.70
156.25
750.00
9,680.95
9,680.95
9,680.00
96.80
1,041.57
Page 31 Of 461
Amount
16,750.00
3,500.00
625.00
1,250.00
22,125.00
22,125.00
22,130.00
221.30
2,381.19
d floor.
Amount
19,507.50
975.38
750.00
625.00
1,500.00
750.00
157.50
1,750.00
500.00
26,515.38
51,990.93
51,991.00
18,371.38
18,371.38
20,208.52
22,229.37
24,452.30
05.G.01 600 D concrete file
Analysis for 240 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Mixing Concrete 1:2:4(3/4") 05.A.04 Cu 0.45 38,250.00 17,212.50
1.02 lenth of pipe P-002 3 3 1,500.00 4,500.00
1.08 fixing charge L-007 Day 0.5 1,000.00 500.00
Total for 0 0 22,212.50
Rate for 1 0 92.55
Rate(Say) 1 ft 90.00
Rate(Say) 1m 295.20
Ground floor 1m 295.20
First Floor 1m 324.72
Second Floor 1m 357.19
Third Floor 1m 392.91
Page 33 Of 461
06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for 0.15 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork to 9" x 9" cement concrete
1.01 06.A.02 1 Use 1 1,000.00 1,000.00
column in ground floor - Making Mould
1.02 Bolts 16mm 18" (12 nos 20 uses) M-010 No 0.6 150.00 90.00
1.04 Timber props 4" x 2" M-144 L.ft 3.5 65.00 227.50
1.07 Carpenter - dismantling, cleaning & repairing L-008 Day 0.25 1,500.00 375.00
U / SK Labourer - dismantling, cleaning &
1.08 L-007 Day 0.25 1,000.00 250.00
repairing
Total for 0.15 Sq 2,642.50
06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 18.15 22.00 399.30
1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 17.1 35.00 598.50
1.03 2" x 1" Class II Timber Battens. M-142 L.ft 16.12 65.00 1,047.80
Beam
SDS 05/15/2025
Page 34 Of 461
1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00
1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00
SDS 05/15/2025
Page 35 Of 461
06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 60 22.00 1,320.00
1.02 2" x 1" Class II Timber Battens. M-142 L.ft 24 65.00 1,560.00
1.03 2" x 2" Class II Timber In Yokes M-143 L.ft 45 35.00 1,575.00
SDS 05/15/2025
Page 36 Of 461
06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 110 65.00 7,150.00
1.02 2" x 2" Class II Timber for bracings M-143 L.ft 80 35.00 2,800.00
1.03 1" Thick Class II Timber base plate M-141 Sq.ft 6 22.00 132.00
Slab
1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00
U / SK Labourer - dismantling, cleaning &
1.09 L-007 Day 2 1,000.00 2,000.00
repairing
Total for 2 Sq 28,379.00
06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
SDS 05/15/2025
Page 37 Of 461
1.01 1" Thick Class II Timber M-141 Sq.ft 220 22.00 4,840.00
1.02 Timber props 4" x 2" M-144 L.ft 121 65.00 7,865.00
Rate(Say) 5,136.00
06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 690 65.00 44,850.00
1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 66 35.00 2,310.00
Rate(Say) 10,929.00
SDS 05/15/2025
Page 38 Of 461
07. Reinforcement
Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied with
7.01
G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 M.S./Tor Steel Rods including transport to site M-152 kg 50 130.00 6,500.00
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.02
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 M.S./Tor Steel Rods including transport to site M-068 kg 50 130.00 6,500.00
7.03 Type A142 mesh laid with 150mm laps in ground floor slab
1.01 M.S./Tor Steel Rods including transport to site M-068 ft2 100 130.00 13,000.00
Rate(Say) 1 kg 145.00
Rate(Say) m2 1,208.36
Page 40 Of 461
14.76 108.24
steel
cemen reincorment
reinfoce 2x2
2 4x4
I beam
ready mix
pluming
50 x 100 x 6 mm
1.01 M-193 m 50 355.00 17,750.00
channel
Allow 15% of
1.02 Items ( 1.01 ) for - - - - 2,662.50
Wastage
1.03 fixing item 15% 2,662.50
1.05 SK Labour L-003 Day 2 ### 2,500.00
1.0599999 U / SK Labourer L-007 Day 2 ### 2,000.00
Total for 50 m 27,575.00
Rate for 1 m 551.50
Rate(Say) 1m 552.00
Rate(Say) 1m 552.00
Page 42 Of 461
08.01 8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Hollow Cement Block (16"x 8"x 8") M-057 No 204 30.00
Rate(Say) 1 Sq
Rate(Say) 1ft2
Rate(Say) 1m2
08.02 6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Hollow Cement Blocks (16"x 8"x 6") M-059 No 112 75.00
Rate(Say) 1 Sq
Rate(Say) 1ft2
Page 43
2 Of 461
Rate(Say) 1m
08.03 4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Hollow Cement Blocks (16"x 8"x 4") M-058 No 112 45.00
Rate(Say) 1 Sq
Rate(Say) 1ft2
Rate(Say) 1m2
Amount
6,120.00 10.7584 2.0449137 204.491374182035
306.00
731.25
0.21
1,875.00
2,500.00
131.25
11,663.71
11,663.71
11,664.00
116.64
1,255.05
1,255.05
1,380.55
1,518.61
1,670.47
unfilled.
Amount
8,400.00
420.00
633.75
51.00
1,875.00
2,000.00
116.25
13,496.00
13,496.00
13,496.00
134.96
Page 45 Of 461
1,452.17
1,452.17
1,597.39
1,757.13
1,932.84
unfilled. 08.03 4" Thick hollow block work in cement and sand mortar 1:5 with cavit
Analysis for
Amount No Item Description Item Ref
9,145.50 Rate(Say)
91.46 Rate(Say)
984.06 Rate(Say)
- - - 252.00
- - - 162.50
1 Sqr 9,145.50
Sqr 9,145.50
1 Sq 9,145.50
1ft2 91.46
1m2 984.06
1m2 1,082.46
09.01 Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Bricks M-019 No 550 6.00 3,300.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 165.00
Rate(Say) 1 Sq 9,677.00
09.02 9" thick brick wall cement sand 1:5 in ground floor
Rate(Say) 1 Sq 18,565.00
Page 48 Of 461
Rate(Say) 1ft2 185.65
Rate(Say) 1 Cu 21,786.00
Page 49 Of 461
Rate(Say) 1ft3 217.86
09.05 Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Rate(Say) 1 Sq 27,705.00
09.06 9" Brick Walls in cement sand 1:8 in superstructure in ground floor
Rate(Say) 1 Sq 16,574.00
4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
09.07
brickwork measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 Sq 14,102.00
09.08 9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 Sq 27,484.00
13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
09.10
measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 Sq 40,594.00
Rate(Say) 1 Sq 10,438.00
09.12 3" Thick floor paved in lime mortar 2:5 in ground floor
Rate(Say) 1 Sq 6,967.00
Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
09.13
rendering including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 ft 259.52
Rate(Say) 1m 851.22
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.14
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 ft 478.27
Rate(Say) 1m 1,568.72
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.15
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1 ft 410.51
Rate(Say) 1m 1,346.49
Page 54 Of 461
Page 55 Of 461
10. Roof Covering and Ceiling
Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
10.A.01
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for 6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 34 150.00 5,100.00
10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
10.A.04
separately)
Analysis for 3.6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Asbestos Corrugated M-003 Sq.ft 420 26.00 10,920.00
10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on
timber members.
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 2 2,200.00 4,400.00
18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 1 2,200.00 2,200.00
6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
10.B.03
fixed at 18" centres (other specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" eave gutter lengths (12' each) M-088 No 2 0.00 -
3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
10.B.07
specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 3 1/2" down pipe lengths (12' each) M-078 No 2 0.00 -
valance board
barge board
Page 64 Of 461
Page 65 Of 461
Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3
11.A.01
1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including
11.A.02 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4"
11.A.03 thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)
Analysis for 21.75 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount
1.05 6' 9" X 2' 9" Plywood Sash M-074 No 1 2,000.00 2,000.00
Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame
11.A.04 having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)
Analysis for 16.25 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable
11.A.05 sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut
11.A.06
and fixed with timber beadings to doors and windows.
Analysis for 9 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount
Ironmongery
Page 68 Of 461
11.B.01 Butt Hinges 5" X 2 1/2" Brass
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 4 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount
12.01 1/2 " Diameter PVC pipes fixed to walls (Specials paid separately)
Rate(Say) 1 L.ft
12.02 3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)
12.03 1 " Diameter PVC pipes fixed to walls (Specials paid separately)
12.05 1 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)
12.06 2" Diameter PVC pipes fixed to walls (Specials paid separately)
12.07 3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000
Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6"
12.08
Deep, Backfilling & Compacting
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate
Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and making
12.10
good. average depth 3" (Pipes and specials measured paid separately)
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Page 78 Of 461
1.01 2" PVC Elbows / Bent / Socket M-085 No 10 580.00
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Page 79 Of 461
12.20 3/4 " dia PVC Tee
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) Page
No80 Of 461
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Total for 10 No
Rate for No
Rate(Say) No
###
Supply and fix chromium plated brass towel rail
32 dia. and 600mm.
No Item Description Item Ref Unit Quantity Rate
236 Towel rail 32 dia. and 600mm. M-236 Nr 1 700
other fixing item 10%
2 Plumber L-002 Day 0.2 1500
Fixing paper holder 1 Item
###
Supply and fix approved quality, 960x960mm size
shower tray
No Item Description Item Ref Unit Quantity Rate
215 960x960mm size shower tray M-215 Nr 1 56611.2
plumbing and fixing allowed 5%
2 Plumber L-002 Day 1 1500
7 U / SK Labourer L-007 Day 1 1000
Fixing shower tray 1 Item
Page 83 Of 461
ately)
Amount
ately)
Amount
21.00
45.00
187.50
125.00
378.50
37.85
38.00
ely)
Amount
Page 84 Of 461
750.00
37.50
480.00
245.00
750.00
500.00
2,762.50
27.63
28.00
rately)
Amount
2,100.00
105.00
384.00
720.00
306.25
1,125.00
750.00
5,490.25
54.90
55.00
rately)
Amount
3,200.00
160.00
156.00
960.00
367.50
1,125.00
750.00
6,718.50
67.19
67.00
Page 85 Of 461
ately)
Amount
18,500.00
925.00
1,536.00
1,680.00
376.25
1,125.00
750.00
24,892.25
248.92
249.00
Amount
1,400.00
70.00
3,000.00
1,190.00
1,500.00
1,000.00
8,160.00
81.60
82.00
Amount
2,250.00
2,250.00
22.50
23.00
nd making good average Page 86 Of 461
Amount
97.50
0.04
3,750.00
3,000.00
6,847.54
68.48
68.00
Amount
195.00
0.11
4,375.00
3,500.00
8,070.11
80.70
81.00
Amount
3,500.00
300.00
375.00
4,175.00
417.50
418.00
Amount
140.00
450.00
375.00
Page 87 Of 461
965.00
96.50
97.00
Amount
105.00
600.00
375.00
1,080.00
108.00
108.00
Amount
210.00
900.00
375.00
1,485.00
148.50
149.00
Amount
420.00
1,200.00
750.00
2,370.00
237.00
237.00
Amount
Page 88 Of 461
5,800.00
2,100.00
750.00
8,650.00
865.00
865.00
Amount
1,100.00
3,000.00
750.00
4,850.00
485.00
485.00
Amount
3,600.00
750.00
4,350.00
435.00
435.00
Amount
1,655.00
450.00
750.00
2,855.00
285.50
286.00
Page 89 Of 461
Amount
635.00
675.00
750.00
2,060.00
206.00
206.00
Amount
1,020.00
900.00
750.00
2,670.00
267.00
267.00
Amount
1,650.00
1,350.00
750.00
3,750.00
375.00
375.00
Amount
155.00
1,800.00
1,500.00
3,455.00
345.50
346.00 Page 90 Of 461
Amount
5,260.00
3,150.00
1,500.00
9,910.00
991.00
991.00
Amount
8,750.00
4,500.00
2,250.00
15,500.00
1,550.00
1,550.00
Amount
215.00
5,400.00
2,250.00
7,865.00
786.50
787.00
Amount
6,500.00
500.00
450.00
500.00
Page 91 Of 461
2,500.00
250.00
450.00
3,500.00
750.00
15,400.00
462.00
31,262.00
8,500.00
900.00
450.00
900.00
1,500.00
750.00
13,000.00
650.00
26,650.00
Amount
5,000.00
450.00
450.00
450.00
6,350.00
1587.5
750.00
15,037.50
15,037.50
Amount
1,500.00
750.00
2,250.00
225.00
375.00
2,850.00
2,850.00
1,500.00
150.00
375.00
2,025.00 2561.6
Amount
700.00
70.00
300.00
1,070.00
Amount
6,000.00
600.00
250.00
6,850.00 Page 92 Of 461
Amount
49,000.00
2,450.00
1,500.00
1,000.00
52,950.00
Page 93 Of 461
2850
Page 94 Of 461
13. Plastering
A. Wall Plastering
B. Rendering
C. Sofit Plastering
D. Skirting
Wall Plastering
13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden
13.A.03
float.
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with
13.A.04
lime putty floating.
Analysis for 1 Sqr
13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for 1 Sqr
Rendering
13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
3/4" thick rendering in cement and sand 1:2 in colored cement floors finished
13.B.05
smooth
Analysis for 1 Sqr
Sofit Plastering
3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with
13.C.01
Lime putty
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including
13.C.02
floating with Lime putty
Analysis for 1 Sq
Skirting
1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with
13.D.01
floating including forming groove
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1m 301.76
0.08 520
0.625
Page 102 Of 461
Page 103 Of 461
Page 104 Of 461
Page 105 Of 461
14. Tilling
A. Wall Tilling
B. Floor Tilling
Wall Tilling
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.01
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (6''x6") M-155 No 400 0.50 200.00
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.02
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (8''x12") M-156 No 150 150.00 22,500.00
Floor Tilling
14.B.01 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Terrazzo Tiles 12" X 12" M-132 No 100 125.00 12,500.00
14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Pressed Tiles 8" X 8" M-130 No 225 100.00 22,500.00
Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
15.01
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
15.02
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
15.03
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
15.04
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
16. Painting
A. Wall
B. Sofit
C. Wood
D. Steel
Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 400.00 360.00
Rate(Say) 1 Sq 4,118.00
1.02 Emulsion Paint - Second coat M-043 litre 0.649 875.00 567.88
Rate(Say) 1 Sq 159.00
Rate(Say) 1 Sq 589.00
Soffit
Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
16.B.01
slabs
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 15.00 13.50
Rate(Say) 1 Sq 4,081.00
Wood
Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
16.C.01
ends etc. after fixing.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.605 354.40 214.41
Rate(Say) 1 Sq 1,860.00
16.C.02 Painting new timber work with two coats wood preservative
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.5 354.40 177.20
Rate(Say) 1 Sq 960.00
16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.75 15.00 11.25
Rate(Say) 1 Sq 3,830.00
Rate(Say) 1 Sq 1,500.00
Rate(Say) 1 Sq 2,130.00
Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
Page 119 Of 461
1.01 Anti Corrosive Primer M-002 litre 2.25 245.00 551.25
Rate(Say) 1 Sq 4,420.00
Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
16.D.02
erected steel roof truss.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 0.2 245.00 49.00
Rate(Say) 1 Sq 1,610.00
16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.
875
Page 122 Of 461
Page 123 Of 461
Page 124 Of 461
17.01 Electrical first fixing 13A lighting point
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Wire 13 A light point point 1 150.00
1.02 Wires m 5 875.00
1.03 Coduit m 5 17.50
1.04 Fixing clips No 50 495.00
1.05 Sand Papers Sheet 2 275.00
1.0599999 Painter Day 1.25 1,500.00
Allow 3% of Items (1.06) for
1.0699999 - - -
Scaffolding
Total for 0 0
Rate for 1 0
Rate(Say) 1 Sq
Rate(Say) 1ft2
Rate(Say) 1m2
Ground floor 1m2
First Floor 1m2
Second Floor 1m2
Third Floor 1m2
Description
fxd fire rated Dwnlight wht - each
Amount timer fan 100mm
150.00 1 Gang 2 way lightswitch
4,375.00 1 Gang 2 way lightswitch
87.50 1 Gang switched socket
24,750.00 131340012-White round celing light 28w low energy
550.00 13Amp switched connection unit
1,875.00 1g intermediate lightswitch
56.25
2 Gang 2 way lightswitch
31,843.75 2 Gang switched socket
#DIV/0! 2 Gang switched socket
#DIV/0! 2 Gang switched socket
#DIV/0! 3 Gang 2 way lightswitch
#DIV/0! 40000-Transport charges
#DIV/0! 45 Amp cooker outlet
#DIV/0! 45A square switch +nean
#DIV/0! Battery backup heat alarm
#DIV/0! Coach Black
Dicon 670 MBX Mains and 9V lon
Electric flexi duct 25m - 32mm
IP65 fire rated Dwnlight
IP65 Shower lightpak white
Louvre white 3 in Gas fitting Vent with flyscreen
mk 1G BT scecondary phone socket
MK 1G secondary phone socket
MR16 cast IP65 shower lightpack shite
Polypipe Electric white hockey stick
Three pole fan isolator with padlock
timer fan 100mm
Wylex 10 way high integrity CSU
water proofing
1 sqr
No Item Description Item Ref Unit Quantity Rate Amount
195 Barralastic or equla pinco materials M-195 kg 3 1,500.00 4500
196 baralastic- Chemical liquid--mixing M-196 litre 2 1500 3000
3 SK Labour L-003 Day 1 1250 1250
7 U / SK Labourer L-007 Day 1 1000 1000 shoud speak to Finco
9750
Cleaning works 5% 975
Rate for 1sqr 10725
Rate for m2 1 1153.846
BASIC LABOUR RATES
1 Excavation not exeed 4' 1ft3 රු. 32.00
2 Lean concrete 1ft3 රු. 30.00
3 Column base 3'x3' රු. 3,500.00
4 Column base 4'x4' රු. 3,500.00
5 Rubble works 1 cub රු. 3,750.00
6 Dpc rendering works 1ft2 රු. 30.00
7 Back filling 1ft3 රු. 8.50
8 Brick works 9" 1ft2 රු. 45.00
9 Brick works 41/2" 1ft2 රු. 40.00
10 Column 9"x9" with shuttering 1ft රු. 125.00
11 Column 12"x9" 1ft රු. 125.00
12 Column 12"x12" 1ft රු. 130.00
13 Concrete beam 9"x9" 1ft රු. 130.00
14 Concrete beam 12"x9" 1ft රු. 140.00
15 Concrete beam 12"x12" 1ft රු. 150.00
16 Concrete slab 4"5" 1ft2 රු. 95.00
17 Block works 1ft2 රු. 24.00
18 9"x6" Lintol 1ft රු. 95.00
19 41/2"x6" Lintol 1ft රු. 85.00
20 Concreting stair case 1ft2 රු. 40.00
21 Wall rendering (plastering) smooth 1ft2 රු. 25.00
22 Soffit rendering 1ft2 රු. 50.00
23 Beams and column 1ft2 රු. 175.00
24 Floor rendering smooth 1ft2 රු. 35.00
25 Cement skirting 1ft2 රු. 42.00
26 pergola fixing 1ft2 රු. 42.00
27 Fixing a window each රු. 950.00
28 Fixing door frame each රු. 950.00
29 Tile works 1ft2 රු. 40.00
30 Floor tile 1ft2 රු. 40.00
31 Moulding normal 1ft2 රු. 150.00
No Description Unit Qty Rate Amount
B PRELIMINARY WORKS
The Contractor shall be responsible for site safety and shall Note
maintain necessary safety equipments and procedures to
the satisfaction of the Engineer
Any other preliminary items not listed below but deemed Note
to be included in the tender rates, as no extras would be
made.
6 Allow for supplying temporary electricity for the work LS Item Allow 2,640,000.00
during the construction including temporary connection,
distribution system for the work, internal arrangements and
all payment to the authorities (including monthly bills) for
temporary connection including alternate supply as and
when require.
7 Allow for supplying temporary water for the work during LS Item Allow 1,430,000.00
the construction including temporary connection,
distribution system for the work, internal arrangements and
all payment to the authorities (including monthly bills) for
temporary connection including alternate supply as and
when require.
8 Allow for supplying temporary telephone facility during LS Item Allow 1,182,500.00
the construction including connection charges and monthly
bills and any alternative line as and when require.
9 Builders All Risk Insurance including strike, riots and LS Item Allow
civil commotion, third party liability, cross liability ,loss or
damage to the works, clearing of debris, maintenance
cover, extended maintenance visit cover, flood, fire, in
land transport, construction plants and equipments at site,
existing structures, adjoining structures, unfixed materials
at site, materials supplied by the Employer (Actual cost for
obtaining insurance cover shall be reimbursed to the
contractor subject to the maximum quoted for this item on
submission of documentary evidence ).
14 Allow for temporary site perimeter fence suitable to the LS Item Allow 3,145,000.00
nature of the project and security hut.
15 Allow for providing, maintaining and removing project LS Item Allow 550,000.00
sign board to the Engineer's approval
16 Allow for providing 3 sets of as built drawings and LS Item Allow 1,089,000.00
necessary technical information maintenance manuals and
other document to the Consultant's/Engineer's approval in
triplicate (one electronic copy and two hard copies ).
18 Allow for submission of performance bond. (Actual cost LS Item Allow 2,000,000.00
for submission of performance guarantee shall be
reimbursed to the Contractor subject to the maximum
quoted for this item on submission of documentary
evidence).
20 Allow for submission of progress report and photographs LS Item Allow 500,500.00
monthly covering all major activities taken place during
that period and adequate no of photograph to monitor the
progress.
TOTAL FOR PRELIMINARIES CARRIIED TO 30,061,000.00
SUMMERY
Kuru Kot
No No Description Unit Qty Rate Amount
PRILIMINARIS Item 1.00 500,000.00 500,000.00
TOTAL FOR CONCRETE WORK CARRIED TO
SUMMARY
Excavation
Rates and prices for excavation are to include for hand or machine
digging as required for excavation.
Rates and prices for excavation are to include for excavations any
hard materials excluding rock requiring blasting
Rates and prices for excavation are to include for cutting through
tree roots and for grubbing up all disused pipes and drains
encountered and sealing off ends.
Payments for bulk excavation shall be made making use of the spot
level drawing to be submitted by the Contractor and based on the
final excavated depths.
Site Clearance
D.1 D.1 Clearing site including removal of top soil up to a depth of 150 mm
including grubbing up roots, bushes and trees, filling voids with
selected excavated material and compacting and disposal of all m2 157.00 24.70 3,878.15
surplus excavated material away from the site as directed
Excavation
D.2 D.2 Excavation for strip foundation, not exceeding 1800mm depth from
formation level, in any material excluding rock requiring blasting,
back filling and compactions, leveling and compacting the bottom m3 92.00 815.00 74,980.00
of excavation, dewatering, earth work supports and disposal of any
surplus excavated materials
-
No No Description Unit Qty Rate Amount
D.3 D.3 Excavation of rock by blasting -
Filling -
-
D.4 D.4 k Imported hard earth filling, well rammed and consolidated using
suitable roller to achieve 95% maximum dry density , in make up m3 3.30 1,458.00 4,811.40
levels under floors 150mm thick layers
-
Anti termite Treatment -
-
Contractor shall submit ten years gurantee for entire building
through his specialist sub contractor in the name of the Client in an -
acceptable format
-
D.5 D.5 k Application of anti termite treatment under the ground floor slab in
accordance with the manufacture's specifications and to the m2 23 150 3,450.00
approval of Engineer
-
1 TOTAL FOR EXCAVATION AND EARTH WORK
87,120
CARRIED TO SUMMARY
F F CONCRETE WORK
Concrete
F.1 F.1 Under footings and wall foundation m2 65.2 547.68 35,709
-
Grade 30 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.2 F.2 In strip foundation m3 26.5 18,371.38 486,842
-
F.3 F.3 In column shafts m3 11.00 18,371.38 202,085
-
F.4 F.4 In tie beam m3 8 18,371.38 146,971
-
No No Description Unit Qty Rate Amount
Grade 25 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.5 F.5 k In floor concrete m3 2.50 17,724.38 44,311
-
F.6 Inside of toll island area (Thk. Approx. 100mm) m3 10 17,724.38 177,244
-
Work from D.P.C. level to roof -
-
Grade 30 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.7 F.6 In column shafts up to roof m3 21.25 18371.38 390,392
-
F.8 F.7 In middle beam m3 1.1 18371.38 20,209
-
F.9 F.8 In roof beam m3 33.45 18,371.38 614,523
F.10 F.9 In roof slab including flower trough m3 60.85 18,371.38 1,117,898
Reinforcement -
-
The size of reinforcement rods described in the drawing or
elsewhere shall be minimum size and the rolling margin and any
other tolerance shall be wholly above this size. Hooks and laps -
have been measured with the quantities.
-
All reinforcement shall be free from dirt, oil, paint, grease, or loose
rust before fixing in position and shall be brushed with stiff wire -
brush.
-
Reinforcement shall be bent cold by applying a slow even pressure
-
on an approved type of bending apparatus.
-
Rate shall include for cutting, bending, fabricating, placing in
position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, spaces, -
chairs.
-
Characteristic strength of High Tor steel should be 460 N/mm2 -
-
Characteristic strength of Mild steel should be 250 N/mm2 -
-
Work up to D.P.C. level -
-
Tor Steel Bar Reinforcement -
-
F.11 F.10 10mm Dia. Kg 667.00 202.00 134,734
-
F.12 F.11 12mm Dia. Kg 913.00 202.00 184,426
202.00 -
F.13 F.12 16mm Dia. Kg 679.50 -
202.00 -
F.14 F.13 20mm Dia. Kg 1,680.00 202.00 339,360
-
F.15 F.14 k 25mm Dia. Kg 192.00 202.00 38,784
202.00 -
F.16 F.15 k 32mm Dia. Kg 1,257.00 -
-
Mesh Reinforcement -
-
F.17 F.16 Type A142 mesh laid with 150mm laps in ground floor slab m2 23.00 478.40 11,003
-
No No Description Unit Qty Rate Amount
Work from D.P.C. level to roof -
-
Tor Steel Bar Reinforcement -
-
F.18 F.17 10mm Dia. Kg 8982 202.00 1,814,364
-
F.19 F.18 12mm Dia. Kg 2875 202.00 580,750
-
F.20 F.19 16mm Dia. Kg 161 202.00 32,522
-
F.21 F.20 20mm Dia. Kg 498 202.00 100,596
-
F.22 F.21 25mm Dia. Kg 1725 202.00 348,450
-
F.23 F.22 32mm Dia. Kg 12080 202.00 2,440,160
-
Formwork -
-
Rate shall include for all necessary boarding, supporting,
application of mould oil as necessary erecting, framing, cutting
angles, cleaning, wetting and treatment before placing concrete and -
striking or removal etc. construction joints.
Work up to D.P.C. level -
-
Formwork shall be in plywood not less than 16mm thick,
application of mould oil or laid on polythene layer with suitable
laps to prevent leaking with suitable up stand at edges complete as -
per the detailed drawing
-
F.24 F.23 Sides of strip foundation m2 41 2,105.52 86,326
-
F.25 F.24 Sides of column shafts m2 32 2,105.52 67,377
-
F.26 F.25 Sides of tie beam m2 22.5 2,105.52 47,374
-
Work from D.P.C. level to roof -
-
Formwork shall be in phenolic coated plywood - minimum 16mm
thick to provide fair face natural concrete finished on concrete
surfaces where necessary, Rate shall including grinding as
necessary to achieve a smooth flat even surfaces with out any -
defects. Rate shall include prepare 25mm Dia. P- cone on the edge
of the concrete surface as per the Drawing No TP/DO/R2,4/ARO4.
in the followings
-
F.27 F.26 Sides of column shafts up to roof level m2 62.00 2,105.52 130,542
-
F.28 F.27 Sides and soffit of middle beam m2 11.00 2,105.52 23,161
-
F.29 F.28 Sides and soffit of roof beam m2 525.00 2,105.52 1,105,396
-
No No Description Unit Qty Rate Amount
F.30 F.29 Sides and soffit of roof slab including flower trough , rate shall
include forming even grooves on the construction joint locations of m 2
307.44 2,105.52 647,320
the formwork of the fairfaced soffit.
-
Miscellaneous -
-
F.31 F.30 Precast concrete kerb (K-1) including excavation, backfilling, m
disposal of excavated materials, base and side concrete, form work 115.50 1,320.00 152,460
etc,. as per the detail drawing no. TP/TD/AR04
-
F.32 F.31 Precast concrete barrier (Jersey barrier) including excavation, m
backfilling, disposal of excavated materials, base and side concrete,
form work etc,. as per the detail drawing no. TP/TD/AR04 54.50 5,200.00 283,400
-
F.33 Provide kerb 1 along either sides of the concrete pavement in the m
177.45 2,320.00 411,684
Toll plazas
-
F.34 Filling tha gap of kerb line and retainning wall at Toll Plaza by m3
5.13 12,323.20 63,218
concrete shoulder pavement
-
-
Name Board and Provincial flags -
-
F.32 F.32 Art element of provincial flag (here southern province) embossed
in to the surface of RCC facia as per the detail drawings. 1.00 -
F.35 F.32 Supplying and fixing of apprx. 450mm height letters to the Toll
84.00 12,000.00 1,008,000
plaza
-
F.33 F.33 200mm high facia lettering form with suitable material matching
with the fair face concrete finish of the facia as per the drawing No. 1.00 -
TP/TD/AR/09.
F.36 F.33 Supplying and fixing of apprx. 200mm height letters to the Toll
84.00 11,200.00 940,800
plaza
-
F.37 Supplying and fixing of facia flower moulding (4'-0"x4'-0") to the
12.00 224,000.00 2,688,000
Toll plaza
-
F.38 Painting name board lettering of Toll plazas 1.00 160,000.00 160,000
-
Polythyne layer -
-
F.39 F.34 750 gauge polythyne layer under ground floor slab as per drawings
m2 23.00 71.20 1,638
and specifications
-
2 TOTAL FOR CONCRETE WORK CARRIED TO 17078028
SUMMARY
H H WATER PROOFING WORK
Rate shall include cutting top line, notching bending and extra
materials for lapping.
Water Proofing
Rates shall include for all shop fabrication, transport to the site and
erection in the final position. Rates shall include for all site
welding, drilling, splay cutting, notching, etc.
No No Description Unit Qty Rate Amount
Rate shall include for all structural anchor bolts, nuts, washers and
bolts, unless stated as per detail drawing.
Rates shall include for all costs associated with undertaking all
precautions against fire while welding and cutting as specified.
Roof Plumbing
All down pipes shall be of Upvc type 400 with solvent welded
joints
P.1 P.1 110mm dia. Upvc down pipe fixed with Al brackets at 1000mm
m 72.00 350.00 25,200.00
centers to column
-
P.2 Supply and fixing of 110mm dia Upvc roof outlet at Toll Plaza
nr 16.00 354.40 5,670.40
Roof
-
P.3 110 dia. uPVC pipes between down pipe and drain laid to a
gradient of 1:80 including necessary excavation and back filling m 481.31 354.40 170,576.26
-
4.00 TOTAL FOR ROOF PLUMBING CARRIED TO TENDER
201,446.66
SUMMARY.
S S ELECTRICAL INSTALLATION
Ceiling rose, Lamp holders, Switch box, Junction box and Conduit
- Polycrome or equivalent
Distribution Boards
Point wiring
The Contractor shall forward the conduit layout for prior approval
of the Consultant
Rates for point wiring shall include for all cables, switches, (1 way
or 2 way as necessary) junction boxes outlet boxes, conduits, pull
boxes, clips, earth cables, draw wires, wiring accessories, screws,
nails, hardware, fixing and insulating materials, cutting holes,
chases, make good the same in all trades, holders, ceiling boxes,
flexible codes and any other wirings accessories require up to the
final fixing point where ever necessary
No No Description Unit Qty Rate Amount
All lighting point wiring shall be in 2x1Cx1.5mm²Cu/PVC/PVC
cable and 2.5mm² protective earth in GI conduits including all
accessories
S.2 S.2 Wring for surface mounted luminaire with 70W metal halide lamp
with polished aluminium reflector die cast aluminium body, auto
balance fixing point for installation IP54 and integral control gear nr 16.00 9,280.80 148,492.80
suitable for installation in exposed surface, and other accessories as
shown in layout drawings
S.3 S.3 Wiring for spot light fitting out door type fixed to the beam at roof
level IP 65 and other accessories as shown in layout drawings nr 12.00 9,280.80 111,369.60
All socket and other point wiring (Except lighting point) shall be
in 1x2Cx2.5mm²Cu/PVC/PVC cable and 2.5mm² protective earth
in GI conduits including all accessories
S.4 S.4 Wiring for toll fee indicator with all accessories as shown in the
nr 2.00 2,016.80 4,033.60
layout drawing and specification.
S.5 S.5 Wiring for entry bar with all accessories as shown in the layout
nr 2.00 2,311.20 4,622.40
drawing and specification.
S.6 S.6 Wiring for TV camera with all accessories as shown in the layout
nr 4.00 8,712.00 34,848.00
drawing and specification.
S.7 S.7 Wiring for traffic signal as shown in layout drawings and
nr 4.00 9,280.80 37,123.20
specifications.
S.8 S.8 Wiring for loop coil with all accessories as shown in the layout
nr 2.00 2,311.20 4,622.40
drawing and specification.
S.9 S.9 Supply and install surface mounted luminaire with 70W metal
halide lamp with polished aluminium reflector die cast aluminium
body, auto balance fixing point for installation IP54 and integral nr 16.00 18,010.40 288,166.40
control gear suitable for installation in exposed surface as shown in
layout drawings
S.10 S.10 Supply and install spot light fitting out door type fixed to the beam
nr 12.00 7,911.20
at roof level IP 65 as shown in layout drawings
S.10 Supply and installation of 70W metal halide Bixton flood light
with Bixton accessories, Black colour (Lamp temperature 6000 K) nr 24.00 7,979.20 191,500.80
S.11 50mm dia medium duty steel pipe bracket welded to concrete beam
nr 24.00 11,410.40 273,849.60
for fixing flood light
S.12 Provide Covering of the service line channel of the Toll plaza
nr 48.00 13,200.00 633,600.00
column
S.13 Supply and Fixing Reflectors made out of Aluminum pasted high
intensity Prismatic reflective sheeting fixed to on concrete column nr 12.00 8,800.00 105,600.00
with anchor bolt
5 TOTAL FOR ELECTRICAL INSTALLATION CARRIED
1,837,828.80
TO SUMMARY
V V PAINTING WORK
Wall Painting
Prepare surface and apply two coats of colourless vax paint on fair
faced surfaces as directed
Ceiling Painting
Prepare surface and apply two coats of colourless vax paint on fair
faced surfaces as directed
V.2 V.2 In ground floor Sides and soffit of slab and beam m2 833.00 443.10 369,099.63
No No Description Unit Qty Rate Amount
Following costs shall cover the all work associated with supply,
install, testing and comissioning of the traffic signal system
W.1 200mm "Red Cross" and "Green Arrow" in LED optical units,
nr 13.00 47,764.00 620,932.00
horizontally mounted on the upper beam of the toll plaza
W.2 200mm "Red Cross" and "Green Arrow" in LED optical units,
nr 13.00 49,256.80 640,338.40
vertically mounted at the entry point to the toll plaza
Concrete
All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item.
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary.
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately.
F.2 100 x 100 mm RCC beam on top of the block wall, Rate shall m 7.40 638.35
include formwork and R/F, 2Y10 + R6 stirrups @ 125mm
c/c, as per the detail drawings.
G.1 100mm thk. Concrete hollow block wall in cement and sand
1:5 motar m2 6.08 1,107.55
All steel members to be hot dip galvanized and painted with Note
two coats of approved epoxy primer before appling the final
paint to architect's detail.
K.2 Supply fabricate and fix 50 x 100 x 6mm thk tubular GI floor
joists as per detail drawings m 6.05 5,451.90
Refrigerant piping
Drain piping
R.3 32mm dia. PVC condensate drain lines from indoor units laid
up to ground floor drain m 8.00 467.50
Builders Work
Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent
Distribution Boards
Point wiring
The contractor shall forward the conduit layout for prior Note
approval of the consultant
Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
S.5 Wiring for ceiling recessed down light point with all
accessories as shown in the layout drawing and specification. nr 1.00 3,598.90
S.8 Wiring for Terminal Box (TB) with all accessories as shown
nr 1.00 2,545.75
in the layout drawing and specification.
S.12 Wiring for Layer 2 Switch (L2 - SW) equipment with all
accessories as shown in the layout drawing and specification. nr 1.00 2,545.75
S.13 Wiring for Receipt Printer (RP exit only) equipment with all
accessories as shown in the layout drawing and specification. nr 1.00 2,545.75
S.14 Wiring for Loop coil Vehicle Detector (LVD) equipment with
all accessories as shown in the layout drawing and nr 1.00 2,545.75
specification.
S.15 Wiring for Card Reader (CR) equipment with all accessories
as shown in the layout drawing and specification. nr 1.00 2,545.75
S.20 Supply and install ceiling recessed down light with 11W CFL
and all accessories as shown in the layout drawing and nr 1.00 1,900.60
specification.
Floor Finishes
Wall Finishes
External
Internal
T.3 16mm thk. cement and sand 1:5 plaster finished smooth,
with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window m2 5.68 476.85
reveals
TOTAL FOR FLOOR, WALL AND CEILING
FINISHES CARRIED TO SUMMARY
V PAINTING WORK
Rate for painting shall include for painting to door and Note
window reveals.
Wall painting
External
V.1 Prepare surface and apply one coat of water proofing primer
and two coats of approved type weathershield paint to m2 6.30 371.45
external plastered surfaces of walls as directed
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Miscellaneous
Note
Note
Note
Note
15,132.63
13,625.88 13,625.88 15,132.63
Note
Note
Note
Note
Note
Note
7,630.68
6,733.90 6,733.90 7,630.68
Note
Note
Note
Note
224,734.05
224,734.05 224,734.05 224,734.05
Note
Note
Note
Note
131,962.50
131,962.50 131,962.50 131,962.50
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
164,407.85
164,407.85 164,407.85 164,407.85
Note
Note
Note
Note
Note
Note
Note
Note
38,058.90
38,058.90 38,058.90 38,058.90
Concrete
All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately
F.2 100 x 100 mm RCC beam on top of the block wall, Rate shall m 10.50 638.35
include formwork and R/F, 2Y10 + R6 stirrups @ 125mm
c/c, as per the detail drawings.
G.1 100mm thk. Concrete hollow block wall in cement and sand
m2 8.93 1,107.55
1:5 motar
All steel members to be hot dip galvanized and painted with Note
two coats of approved epoxy primer before applying the final
paint to architects detail
K.2 Supply fabricate and fix 50 x 100 x 6mm thk tubular GI floor
m 10.30 5,451.90
joists as per detail drawings
Refrigerant piping
Drain piping
R.3 32mm dia. PVC condensate drain lines from indoor units laid
m 12.00 467.50
up to ground floor drain
Builders Work
R.4 Allow for provide all necessary builders work in connections LS Item Allow
with including followings:
R.6 Allow for the submission of three sets of as a built drawings LS Item Allow
at commissioning of the system for approval of the consultant
Distribution Boards
Point wiring
Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
S.5 Wiring for ceiling recessed down light point with all
accessories as shown in the layout drawing and specification nr 2.00 3,636.30
S.8 Wiring for Terminal Box (TB) with all accessories as shown
in the layout drawing and specification nr 2.00 2,545.75
S.12 Wiring for Layer 2 Switch (L2 - SW) equipment with all
accessories as shown in the layout drawing and specification nr 2.00 2,545.75
S.13 Wiring for Receipt Printer (RP exit only) equipment with all
accessories as shown in the layout drawing and specification nr 1.00 2,545.75
S.14 Wiring for Loop coil Vehicle Detector (LVD) equipment with
all accessories as shown in the layout drawing and nr 2.00 2,545.75
specification
S.15 Wiring for Card Reader (CR) equipment with all accessories
as shown in the layout drawing and specification nr 2.00 2,545.75
S.16 Wiring for TV camera with all accessories as shown in the
nr 2.00 4,449.75
layout drawing and specification
S.20 Supply and install ceiling recessed down light with 11W CFL
and all accessories as shown in the layout drawing and nr 2.00 1,900.60
specification.
Floor Finishes
External
Internal
Rate for painting shall include for painting to door and Note
window reveals
Wall painting
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
-
-
-
-
-
-
5,610.00 m 12.00 467.50 5,610.00
-
-
-
3,400.00 LS Item Allow
3,400.00
-
-
-
-
-
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
7,272.60 nr 2.00 3,636.30 7,272.60
Note
Note
Note
Note
Note
Note
Note
Note
893057.363114
80%
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK
Excavation
Site Clearance
Excavation
Filling
Imported hard earth filling, well rammed and consolidated
using suitable roller to achieve 95% maximum dry density ,
D.4 in make up levels under floors 150mm thick layers m3 26.22 973.60
Empty Boring
Boring shall be carried out in accordance with the drawings
and specifications for following piles; approximate depth as
per drawings
Reinforcement in piles
Testing
Concrete
Reinforcement
The size of reinforcement rods described in the drawing or
elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks Note
and laps have been measured with the quantities
Type A142 mesh laid with 150mm laps in ground floor slab
m2 119.00
Formwork
Sides and soffit of first floor slab, rate shall include forming
F.29 even grooves on the construction joint locations of the m2 125.00 1,351.20
formwork of the fairfaced soffit.
F.35 Sides and soffit of beam in water tank slab m2 12.75 1,385.60
Miscellaneous
Lintels
RCC Pergola
Polythyne layer
G MASONRY WORK
Rubble work
G.1 200mm thick hollow block wall in cement and sand 1:5 m2 48.00 1,376.80
In ground floor
G.2 200mm thick. hollow block wall in cement and sand 1:5 m2 160.00 1,376.80
G.3 100mm thick. hollow block wall in cement and sand 1:5 m2 51.00 1,042.40
In first floor
G.4 200mm thick. hollow block wall in cement and sand 1:5 m2 288.00 1,407.20
G.5 100mm thick. hollow block wall in cement and sand 1:5 m2 98.00 1,064.00
Water Proofing
Hand rails
Extra over cost for supply and fix stainless steel handrail for
stair case consisting with 75mm dia. top rail, 25mm dia. up
rights and up rights welded to 60x60mm steel plate which in m 9.00
fixed to the RCC steps with anchor bolts as per the detail and
specifications
Balcony guard rails
Rates for all aluminum doors and windows shall include for
Note
all necessary ironmongery
Two way swing sashes clear toughen glazed panel door with
aluminium frame type " D2 ", size 1500 x 2100mm with
K.2 necessary approved quality iron mongery and locking nr 3.00 63,620.00
system, complete as per detail drawings
Two way swing double sash composite Al. louver panel door
with aluminium frame type " W16 ", size 1000x700mm with
K.3 necessary approved quality iron monger and locking system, nr 1.00 10,949.60
complete as per detail drawings in Toll Gate office
One way swing single sash clear toughen glazed panel door
with aluminium frame type " D3 ", size 900 x 2100mm with
K.4 necessary approved quality iron mongery and locking nr 7.00 39,843.20
system, complete as per detail drawings
K.15 Lintels in upper floor window with Al. Cladding m 34.72 2,200.00
Supply Only
Door lock type KC1 - key operated cylinder outtside and turn
K.16 nr 2.00 6,600.00
button inside
K.18 Door lock type KC3 - Key operated cylinder both side nr 2.00 6,000.00
K.19 Door lock type BPL -Bottom patch lock nr 2.00 7,200.00
Partition wall
Roof Frame
Supply, fabricated and install steel roof beam 203x102x27 (I
section) fixed to column with 10mm thick. steel bracket,
10mm thick. base plate 10mm thick shoe plate with
P.1 necessary nut and bolts as per detail drawings, beam length nr 4.00 82,898.40
6925mm, rate shall include hot dip galvanized and painted
with two coats of approved epoxy primer before applying the
final paint to architects detail.
Supply and fix 2 raw of M12 sag rod to purlins for each bay
P.6 m 142.00 491.20
as per the detail drawings
Roof Covering
Roof Plumbing
Rate for sanitary fixtures and fittings shall include supply and
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors, Note
screws, plugs, etc and complete to working order as per
specifications
Supply and fix eastern closet ( size approx. 550 mm) overall
with 'P' or 'S' trap and foot rest and high level cistern of an
Q.2 approved make to include flush pipe. Water supply and outlet nr 2.00 17,279.20
connections all complete to working order
Supply and fix pedestal wash basin ( size approx. 615 X 415
mm ) colored to the Engineer's approval with all accessories
Q.3 such as waste plug, chain approved type of plastic bottle trap, nr 5.00 17,480.80
angle valve, flexible connector, single tap connection
installed. complete to working order
Supply and fix chromium plated brass soap tray fixed to wall
Q.9 nr 6.00 1,875.20
with fiber plugs and chromium plated brass screws
Q.11 Supply and fix chromium plated brass towel rail 32 dia. and
600mm. long including fixed to wall with fiber plugs and nr 2.00
chromium plated brass screws
Supply and fix hand shower and installed complete to
Q.11 nr 1.00 7,005.60
working order
Q.18 Supply and fix 32mm dia. pipe, city main to sump m 17.00 298.40
Q.19 Supply and fix 32mm dia. pipe, sump to overhead tank m 16.00 298.40
Q.20 Supply and fix 32mm dia. gate valve nr 2.00 4,132.80
Allow provisional sum for getting 25mm dia. water
Q.20
connection from NWS & DB. Approx. distance 15meters
Internal Drainage
50 mm dia. waste pipes from shower areas, sinks etc. to the 398.40
Q.29 m 23.00
outlets
110 dia. uPVC pipes from toilet to manhole laid above floors 1,779.20
Q.31 m 22.00
and buried as shown in the drawings
110 dia. uPVC pipes between manhole to manhole, to septic
Q.32 tank, soakage pits. Laid to a gradient of 1:80 including m 7.0
necessary excavation and back filling
Gullies
Q.36 -Ditto- but 600 x 600x400mm depth sewer manhole nr 1.00 30,928.00
Vent Pipes
Q.40 63mm (2") dia. vent pipe up to above roof level m 6.00 613.60
Q.41 110mm (4") dia. vent pipe up to above roof level m 6.00 1,627.20
Ground Floor
Refrigerant piping
Drain piping
32mm dia. PVC condensate drain lines from indoor units laid
R.3 m 8.00 440.00
up to ground floor drain
First Floor
Supply and Installation of Split Type Air Conditioners
Refrigerant piping
Supply & install wall embedded, insulated cupper refrigerant
R.7 m 7.50 5,280.00
piping for 24000 Btu split AC
Drain piping
32mm dia. PVC condensate drain lines from indoor units laid
R.10 m 28.00 440.00
up to ground floor drain
Builders Work
Point wiring
The contractor shall forward the conduit layout for prior
Note
approval of the Consultant
Rates for point wiring shall include for all cables, switches,
(1 way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all Note
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
Ground floor
Wiring for ceiling fan point with regulator and series switch
S.9 nr 2.00 5,886.40
as shown in layout drawings
S.16 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60
First floor
Wring for 300 dia. ceiling recessed type lamp as shown in 5,886.40
S.18 nr 2.00
layout drawings
Wiring for ceiling fan point with regulator and series switch
S.24 nr 2.00 5,886.40
as shown in layout drawings
S.29 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60
S.30 Wiring for TV outlet as shown in layout drawings nr 2.00 8,712.00
Ground floor
Supply and install 300 dia. soffit mounted type lamp fitting
S.31 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings
First floor
Supply and install 300 dia. soffit mounted type lamp fitting
S.36 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings
Floor Finishes
Timber flooring
Timber raised floor consisting with 25mm thick. Approved
class I hardwood timber floor panels (1200 x 600mm) fix on
to 100x50mm timber joist placed at 600mm and 1200mm c/s
T.7 in both way and fixed to the RCC floor slab with 150mm m2 19.30 10,444.80
anchor bolt in cash collection room, as per the detail and
specifications
Skirting
Wall Finishes
Internal Finishes
Wall Tiling
External Finishes
16mm thk. cement and sand 1:5 plaster to external faces of
block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals
Plinth Plaster
Ceiling Finishes
Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
T.23 and specification. Rate shall include, Gap between roof sheet m2 86.00 1,000.00
and top edge of the wall covered with Zn/Al sheets,
T.25 300 x 300mm size, semi glazed homogenous ceramic tiles nr 25.00
T.26 600 x 600mm size, non slip homogenous ceramic tiles nr 25.00
Wall Painting
External
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Ceiling Painting
Prepare surface and apply two coats of colorless vax paint on
fair faced surfaces as directed
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
m 36
need to be dicuss with contractor for suppling price and m
m3 53 18,371.38 973,683.04
nr 12 required explanation
Kg 1082 203.96 220,684.72
nr 12
m3 46
Item 1
Note
Note
Note
Note
Note
Note
Note
Note
Note
- Kg 445.00 -
- -
255,816.00 Kg 1,683.00 202.00 339,966.00
Kg 81.50
m2 119.00
384,104.00 Kg 2,527.00 202.00 510,454.00
Note
m2 30.00 1,895.59
m2 65.60 1,895.59
m2 3.25 1,895.59
m2 48.00 1,895.59
m2 44.50 1,895.59
m2 1.55 1,895.59
m 8.70
m 1.60
m 48.60
m 47.00
m 48.60
- m 135.50 -
- -
- m 14.20 -
4,596,097.00 6,476,600.89
6,476,600.89
Note
Note
Note
Note
Note
Note
849,082.40 795,684.41
795,684.41
Note
Note
Note
Note
80,121.60 m2 64.20 1,153.85 74,076.92
135,905.28 124,615.38
124,615.38
Note
Note
Note
Note
Note
Note
Note
2,951,544.50 2,951,544.50
2,951,544.50
Note
Note
Note
Note
331,593.60 nr 4.00 82,898.40 331,593.60
- -
443,395.20 nr 4.00 110,848.80 443,395.20
- -
184,461.33 nr 2.00 92,230.66 184,461.33
- -
- -
- -
69,750.40 m 142.00 491.20 69,750.40
- -
86,546.94 m 77.44 1,117.60 86,546.94
- -
- -
- -
- -
- -
- -
- -
- -
53,617.60 m 62.00 864.80 53,617.60
- -
- -
- m 57.60 -
2,933,781.07 2,933,781.07
2,933,781.07
Note
Note
Note
Note
- -
- -
87,404.00 nr 5.00 17,480.80 87,404.00
- -
- -
- -
- -
- -
- -
8,840.00 nr 2.00 4,420.00 8,840.00
- -
11,251.20 nr 6.00 1,875.20 11,251.20
- -
- -
- -
- -
- -
7,155.20 nr 4.00 1,788.80 7,155.20
Note
Note
- -
- -
Note
Note
Note
Note
Note
Note
398.40
9,163.20 m 23.00 9,163.20
740.00
5,920.00 m 8.00 5,920.00
1,779.20
39,142.40 m 22.00 39,142.40
m 7.0
Note
nr 1.00
Note
Note
Note
Note
- -
- -
- -
42,240.00 m 8.00 5,280.00 42,240.00
- -
- -
- -
3,520.00 m 8.00 440.00 3,520.00
- -
- -
- -
- -
- Note -
- -
- -
- -
- -
- -
- -
39,600.00 m 7.50 5,280.00 39,600.00
- -
52,800.00 m 12.00 4,400.00 52,800.00
- -
55,440.00 m 14.00 3,960.00 55,440.00
- -
- -
- -
12,320.00 m 28.00 440.00 12,320.00
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
- -
- -
- -
- -
- -
- -
- Note -
- -
- Note -
- -
- -
- -
- Note -
- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
- -
- -
17,659.20 nr 3.00 5,886.40 17,659.20
- -
- Note -
- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
105,523.20 nr 24.00 4,396.80 105,523.20
Note
11,772.80 11,772.80
nr 2.00 5,886.40
Note
- -
- -
- -
- -
- -
- -
- -
5,947.20 nr 3.00 1,982.40 5,947.20
- -
14,868.80 nr 2.00 7,434.40 14,868.80
- -
- -
- -
- -
- -
- -
4,932.80 nr 2.00 2,466.40 4,932.80
- -
- nr 4.00 -
- -
- -
129,235.20 nr 12.00 10,769.60 129,235.20
- -
5,947.20 nr 3.00 1,982.40 5,947.20
2,175,378.40 2,175,378.40
2,175,378.40
Note
Note
Note
Note
Note
- m2 14.30 -
- -
- -
- -
24,044.92 m 2
12.85 1,871.20 24,044.92
- -
42,566.24 m2 22.30 1,908.80 42,566.24
- -
- -
- -
- -
201,584.64 m2 19.30 10,444.80 201,584.64
- -
- -
- -
8,403.63 m 13.66 615.20 8,403.63
- -
- -
- -
38,922.72 m 78.60 495.20 38,922.72
- -
34,507.20 m 68.25 505.60 34,507.20
- -
10,769.28 m 21.30 505.60 10,769.28
- -
495.20
7,031.84 m 14.20 7,031.84
- -
- -
- -
- -
- -
- -
- -
117,361.20 m 2
261.50 448.80 117,361.20
- -
144,625.20 m2 315.50 458.40 144,625.20
- -
- -
- -
- -
- -
110,069.28 m2 51.30 2,145.60 110,069.28
- -
43,228.80 m2 19.75 2,188.80 43,228.80
- -
- -
- -
- -
41,252.80 m 2
118.00 349.60 41,252.80
- -
- -
- m2 125.00 -
- -
- -
- -
332,964.00 m 2
184.98 1,800.00 332,964.00
- -
- -
- -
13,392.00 m2 30.00 446.40 13,392.00
- -
- -
- -
- -
- -
54,662.83 m 2
124.46 439.20 54,662.83
- -
5,178.17 m2 11.79 439.20 5,178.17
- -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
Note
Note
Note
Note
m2 13.25
Excavation
Site Clearance
Excavation
Filling
Reinforcement in piles
Testing
Concrete
All concrete shall be made dense with a vibrator and finished
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of Note
concreting of each item
Reinforcement
Type A142 mesh laid with 150mm laps in ground floor slab
m2 119.00
Formwork
Sides and soffit of first floor slab, rate shall include forming
F.29 even grooves on the construction joint locations of the m2 125.00 1,351.20
formwork of the fairfaced soffit.
F.35 Sides and soffit of beam in water tank slab m2 12.75 1,385.60
Miscellaneous
Lintels
RCC Pergola
Polythyne layer
G MASONRY WORK
Rubble work
G.1 200mm thick hollow block wall in cement and sand 1:5 m2 48.00 1,376.80
In ground floor
G.2 200mm thick. hollow block wall in cement and sand 1:5 m2 160.00 1,376.80
G.3 100mm thick. hollow block wall in cement and sand 1:5 m2 51.00 1,042.40
In first floor
G.4 200mm thick. hollow block wall in cement and sand 1:5 m2 288.00 1,407.20
G.5 100mm thick. hollow block wall in cement and sand 1:5 m2 98.00 1,064.00
Water Proofing
Hand rails
Extra over cost for supply and fix stainless steel handrail for
stair case consisting with 75mm dia. top rail, 25mm dia. up
rights and up rights welded to 60x60mm steel plate which in m 9.00
fixed to the RCC steps with anchor bolts as per the detail and
specifications
Balcony guard rails
Rates for all aluminum doors and windows shall include for
Note
all necessary ironmongery
Two way swing double sash composite Al. louver panel door
with aluminium frame type " W16 ", size 1000x700mm with
K.3 necessary approved quality iron monger and locking system, nr 1.00 10,949.60
complete as per detail drawings in Toll Gate office
One way swing single sash clear toughen glazed panel door
with aluminium frame type " D3 ", size 900 x 2100mm with
K.4 necessary approved quality iron mongery and locking nr 7.00 39,843.20
system, complete as per detail drawings
K.15 Lintels in upper floor window with Al. Cladding m 34.72 2,200.00
Supply Only
Door lock type KC1 - key operated cylinder outtside and turn
K.16 nr 2.00 6,600.00
button inside
K.18 Door lock type KC3 - Key operated cylinder both side nr 2.00 6,000.00
K.19 Door lock type BPL -Bottom patch lock nr 2.00 7,200.00
Partition wall
Roof Frame
Supply and fix 2 raw of M12 sag rod to purlins for each bay
P.6 m 142.00 491.20
as per the detail drawings
Roof Plumbing
Rate for sanitary fixtures and fittings shall include supply and
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors, Note
screws, plugs, etc and complete to working order as per
specifications
Supply and fix eastern closet ( size approx. 550 mm) overall
with 'P' or 'S' trap and foot rest and high level cistern of an
Q.2 approved make to include flush pipe. Water supply and outlet nr 2.00 17,279.20
connections all complete to working order
Supply and fix pedestal wash basin ( size approx. 615 X 415
mm ) colored to the Engineer's approval with all accessories
Q.3 such as waste plug, chain approved type of plastic bottle trap, nr 5.00 17,480.80
angle valve, flexible connector, single tap connection
installed. complete to working order
Supply and fix chromium plated brass soap tray fixed to wall
Q.9 nr 6.00 1,875.20
with fiber plugs and chromium plated brass screws
Q.11 Supply and fix chromium plated brass towel rail 32 dia. and
600mm. long including fixed to wall with fiber plugs and nr 2.00
chromium plated brass screws
Supply and fix hand shower and installed complete to
Q.11 nr 1.00 7,005.60
working order
Q.18 Supply and fix 32mm dia. pipe, city main to sump m 17.00 298.40
Q.19 Supply and fix 32mm dia. pipe, sump to overhead tank m 16.00 298.40
Q.20 Supply and fix 32mm dia. gate valve nr 2.00 4,132.80
Allow provisional sum for getting 25mm dia. water
Q.20
connection from NWS & DB. Approx. distance 15meters
50 mm dia. waste pipes from shower areas, sinks etc. to the 398.40
Q.29 m 23.00
outlets
110 dia. uPVC pipes from toilet to manhole laid above floors 1,779.20
Q.31 m 22.00
and buried as shown in the drawings
Gullies
Q.36 -Ditto- but 600 x 600x400mm depth sewer manhole nr 1.00 30,928.00
Vent Pipes
Q.40 63mm (2") dia. vent pipe up to above roof level m 6.00 613.60
Q.41 110mm (4") dia. vent pipe up to above roof level m 6.00 1,627.20
Ground Floor
Refrigerant piping
Drain piping
32mm dia. PVC condensate drain lines from indoor units laid
R.3 m 8.00 440.00
up to ground floor drain
First Floor
Supply and Installation of Split Type Air Conditioners
Refrigerant piping
Drain piping
32mm dia. PVC condensate drain lines from indoor units laid
R.10 m 28.00 440.00
up to ground floor drain
Builders Work
Point wiring
Rates for point wiring shall include for all cables, switches,
(1 way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all Note
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
Ground floor
Wiring for ceiling fan point with regulator and series switch
S.9 nr 2.00 5,886.40
as shown in layout drawings
S.16 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60
First floor
Wring for 300 dia. ceiling recessed type lamp as shown in 5,886.40
S.18 nr 2.00
layout drawings
Wiring for ceiling fan point with regulator and series switch
S.24 nr 2.00 5,886.40
as shown in layout drawings
Ground floor
Supply and install 300 dia. soffit mounted type lamp fitting
S.31 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings
First floor
Supply and install 300 dia. soffit mounted type lamp fitting
S.36 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings
Floor Finishes
Timber flooring
Skirting
Supply and fix 75mm high, 18mm thick polished approved
T.8 m 13.66 615.20
class I timber skirting in cash collection room
Wall Finishes
Internal Finishes
Wall Tiling
External Finishes
16mm thk. cement and sand 1:5 plaster to external faces of
block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals
Plinth Plaster
Ceiling Finishes
Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
T.23 and specification. Rate shall include, Gap between roof sheet m2 86.00 1,000.00
and top edge of the wall covered with Zn/Al sheets,
T.25 300 x 300mm size, semi glazed homogenous ceramic tiles nr 25.00
T.26 600 x 600mm size, non slip homogenous ceramic tiles nr 25.00
Wall Painting
External
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Ceiling Painting
Note
Note
Note
Note
Note
Note
Note
68,461.39 125,713.01
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
m 162
m 36
m3 53 18,371.38 973,683.04
nr 12
nr 12
m3 46 550.00 25,300.00
Item 1
1,764,563.04
Note
Note
Note
Note
- m3 0.45 -
125,696.64 m 3
10.20 20,360.42 207,676.33
Note
Note
Note
Note
Note
Note
326,040.00 Kg 2,145.00 202.00 433,290.00
- Kg 445.00 -
- -
255,816.00 Kg 1,683.00 202.00 339,966.00
145.00 17,255.00
m2 119.00
Note
m2 30.00 2,105.52 63,165.50
m 8.70
m 1.60
m 48.60
m 47.00
m 48.60
- m 135.50 -
- -
- m 14.20 -
4,596,097.00 7,502,956.88
Note
Note
Note
Note
Note
Note
9,531.80 57,190.81
m3 6.00
66,086.40 m2 48.00 1,670.47 80,182.40
849,082.40 1,032,366.64
Note
Note
Note
Note
135,905.28 135,905.28
Note
m 9.00
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
- -
443,395.20 nr 4.00 110,848.80 443,395.20
- -
184,461.33 nr 2.00 92,230.66 184,461.33
- -
- -
- -
69,750.40 m 142.00 491.20 69,750.40
- -
86,546.94 m 77.44 1,117.60 86,546.94
- -
- -
- -
- -
- -
- -
- -
- -
53,617.60 m 62.00 864.80 53,617.60
- -
- -
- m 57.60 -
Note
Note
Note
Note
- -
- -
- -
- -
- -
10,851.20 nr 4.00 2,712.80 10,851.20
- -
- -
- -
8,840.00 nr 2.00 4,420.00 8,840.00
- -
11,251.20 nr 6.00 1,875.20 11,251.20
- -
- -
- -
- nr 2.00 -
- -
- -
7,155.20 nr 4.00 1,788.80 7,155.20
Note
Note
- -
27,020.80 nr 1.00 27,020.80 27,020.80
- -
Note
Note
Note
Note
Note
398.40
9,163.20 m 23.00 9,163.20
740.00
5,920.00 m 8.00 5,920.00
1,779.20
39,142.40 m 22.00 39,142.40
m 7.0
Note
nr 1.00
- nr 1.00 -
- -
- -
Note
Note
Note
Note
- -
- -
- -
42,240.00 m 8.00 5,280.00 42,240.00
- -
- -
- -
3,520.00 m 8.00 440.00 3,520.00
- -
- -
- -
- -
- Note -
- -
202,400.00 nr 2.00 101,200.00 202,400.00
- -
- -
- -
- -
- -
39,600.00 m 7.50 5,280.00 39,600.00
- -
52,800.00 m 12.00 4,400.00 52,800.00
- -
55,440.00 m 14.00 3,960.00 55,440.00
- -
- -
- -
12,320.00 m 28.00 440.00 12,320.00
783,320.00 783,320.00
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
- -
- -
- -
- -
- -
- Note -
- -
- Note -
- -
- -
- -
- Note -
- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
- -
- -
17,659.20 nr 3.00 5,886.40 17,659.20
- -
- Note -
- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
105,523.20 nr 24.00 4,396.80 105,523.20
11,000.00
77,000.00 nr 7.00 77,000.00
Note
11,772.80 11,772.80
nr 2.00 5,886.40
Note
- -
- -
- -
- -
- -
- -
- -
5,947.20 nr 3.00 1,982.40 5,947.20
- -
14,868.80 nr 2.00 7,434.40 14,868.80
- -
- -
- -
- -
- -
- -
4,932.80 nr 2.00 2,466.40 4,932.80
- -
- nr 4.00 -
- -
31,916.80 nr 4.00 7,979.20 31,916.80
- -
129,235.20 nr 12.00 10,769.60 129,235.20
- -
5,947.20 nr 3.00 1,982.40 5,947.20
2,175,378.40 2,175,378.40
Note
Note
Note
Note
Note
- m2 14.30 -
- -
- -
- -
24,044.92 m 2
12.85 1,871.20 24,044.92
- -
42,566.24 m2 22.30 1,908.80 42,566.24
- -
- -
- -
- -
- -
- -
- -
8,403.63 m 13.66 615.20 8,403.63
- -
- -
- -
38,922.72 m 78.60 495.20 38,922.72
- -
34,507.20 m 68.25 505.60 34,507.20
- -
10,769.28 m 21.30 505.60 10,769.28
- -
495.20
7,031.84 m 14.20 7,031.84
- -
- -
- -
- -
- -
- -
- -
117,361.20 m2 261.50 448.80 117,361.20
- -
144,625.20 m2 315.50 458.40 144,625.20
- -
- -
- -
- -
- -
110,069.28 m 2
51.30 2,145.60 110,069.28
- -
43,228.80 m2 19.75 2,188.80 43,228.80
- -
- -
- -
- -
41,252.80 m 2
118.00 349.60 41,252.80
- -
- -
- m 2
125.00 -
- -
- -
- -
332,964.00 m 2
184.98 1,800.00 332,964.00
- -
- -
- -
13,392.00 m2 30.00 446.40 13,392.00
- -
- -
- -
- -
- -
54,662.83 m 2
124.46 439.20 54,662.83
- -
5,178.17 m2 11.79 439.20 5,178.17
- -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
2,228,115.63 2,228,115.63
Note
Note
Note
Note
m2 124.00
m2 13.25
295,806.60 295,806.60
24,445,137.52
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK
Excavation
Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation
Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting
Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends
Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary
Site Clearance
D.1 Clearing site including removal of top soil up to a depth of m2 234.00 87.00
150 mm including grubbing up roots, bushes and trees, filling
voids with selected excavated material and compacting and
disposal of all surplus excavated material away from the site
as directed
Excavation
D.2 Excavation for wall foundation trenches, not exceeding m3 16.80 984.00
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.
Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format
D.5 Application of anti termite treatment under the ground floor m2 164.00 152.00
slab in accordance with the manufacture's specifications and
to the approval of Engineer
TOTAL FOR EXCAVATION AND EARTH WORK
CARRIED TO SUMMARY
E CAST INSITU REINFORCED CONCRETE WORKING
PILES
Costs which are covered under Piling should not be repeated Note
in any other trade in BOQ
The tenderer is advised to visit the site of the proposed work, Note
as it is his responsibility to ascertain the conditions governing,
actual amount of work involved, access to the site, the
external working space, storage area etc.,
The price shall include for removal of all spoils including Note
removal of any cut lengths broken concrete of Laitance and
used fluid etc, away from the site. Concreting of piling shall
be terminated 1.0 m above the cut off level and then cut back
to the specified cut off level. Piling length will be measured
between the bottom level and up to the cut off level
The tenderers shall submit the detail of the method of piling Note
work together with necessary shop drawing, equipment to be
used, duration, durability and method of erection etc., The
method of piling should take into consideration the
surroundingbuildings and other services etc., in the
vicinity,suitable to the type of soil strata method of removal
of temporary work and constructionchosen to adopt the
proposal given here in.
Empty Boring
E.2 "Extra over" for boring through hard basement rock as m 30 34,408.00
specified in drawings.
Reinforcement in piles
E.9 Allow for disposal of ground and sub surface water LS Item Allow
(dewatering)
TOTAL FOR CAST INSITU REINFORCED
CONCRETE WORKING PILES CARRIED TO
SUMMARY
F CONCRETE WORK
Concrete
All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately
Reinforcement
All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush
Formwork
Miscellaneous
Lintels
F.23 Supply and fix 300x100mm size prefabricated fairfaced m 50.00 2,348.00
finished concrete moulding on to 200mm thick. cement block
wall by using 12mm dia. Steel rods with nuts at 1000mm
centers as per the detail drawing no. PH/T2/AR06
F.24 Fairfaced finished RCC arm supporting to the roof as per the nr 12.00 3,103.00
detail drawings STDP/PH/T2/S06 and PH/T2/AR06 Rate
shall include necessary form work , R/F and grinding as
necessary to achieve a smooth flat even surfaces with out
any defects
F.25 Expansion joint filled with compressible filler and sealant on m 49.00 2,334.00
top in ground floor as per the detail drawings and
specification
Polythene layer
F.26 750 gauge polythyne layer under ground floor slab as per m2 177.00 76.00
drawings and specifications
G.1 200mm thick hollow block wall in cement and sand 1:5 m2 40.00 1,463.00
In ground floor
G.2 200mm thick hollow block wall in cement and sand 1:5 m2 59.60 1,463.00
G.3 100mm thick hollow block wall in cement and sand 1:5 m2 140.00 1,108.00
TOTAL FOR MASONRY WORK CARRIED TO
SUMMARY
H WATER PROOFING WORK
Rate shall include cutting top line, notching bending and extra Note
materials for lapping
Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format
Water Proofing
All glass shall be 12mm thick toughen glass / 6mm thick clear Note
glass as directed
K.1 Two way swing double sash and both side composite nr 5.00 76,037.00
aluminium panel door with aluminium frame and aluminium
louver on top, type " D6", size 1500 x 2950mm with
necessary approved quality iron mongery and locking system,
complete as per detail drawings
K.2 Two way swing double sash composite Al. panel door with nr 2.00 155,005.00
louver panel door with aluminium frame type " W17 ", size
2800x3010 mm with necessary approved quality iron monger
and locking system, complete as per detail drawings in Power
House
K.3 One way swing single sash and both side composite nr 1.00 42,633.00
aluminium panel door with aluminium frame and aluminium
louver on top, type " D7 ", size 900 x 2950mm with
necessary approved quality iron mongery and locking system,
complete as per detail drawings
K.4 Window type " W11", size 2800 x 1275mm, 2800 x 910mm nr 7.00 85,027.00
with aluminium frame, glazed window and aluminium top
hung louver panel with fan light on top, rate shall include
necessary approved quality iron mongery, complete as per
detail drawings
K.5 Window type " W12", size 1800 x 1275mm, 1800 x 910mm nr 1.00 56,892.00
with aluminium frame, glazed window and aluminium louver
panel with necessary approved quality iron mongery,
complete as per detail drawings
K.6 Composite Al. louver panel top of the door as per detail m2 9.36 16,621.00
drawings in Power house
Rates shall include for all shop fabrication, transport to the Note
site and erection in the final position. Rates shall include for
all site welding, drilling, splay cutting, notching, etc
Rate shall include for all structural anchor bolts, nuts, washers Note
and bolts, unless stated as per detail drawing
Rates shall include for all costs associated with undertaking Note
all precautions against fire while welding and cutting as
specified
Roof Frame
P.3 Supply and fix "C" purlins (C20019 lipped channel) to roof m 350.00 3,385.00
beam with 100x100x6 cleat and necessary nut and bolts at
1000mm centers as per the detail drawings
P.4 Supply and fix 6mm thick. 100x50 mm size "C" channel to m 84.00 2,539.00
edge of roof beam, support to gutter as per the detail
drawings
P.5 Supply and fix 2 raw of M12 sag rod to purlins for each bay m 158.00 522.00
as per the detail drawings
P.6 Provide 1"x1" angle iron to both sides of the hips to avoid m 46.00 1,264.00
sagging of the roofing sheets at power house
Roof Covering
P.7 Supply and fix Zn/Al roof sheet covering (0.47mm thick) on m2 284.00 1,200.00
steel roof frame work as per detail drawings. Roof frame work
measured separately
P.8 Supply and lay 50mm thick. heat insulation layer to m2 190.00 906.00
underside of roof covering support with GI 50X50X0.3mm
mesh as per the detail drawing and specifications
Roof Plumbing
P.9 Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to m 84.00 919.00
edge of the roof as per detail drawings
P.10 Supply and installation of 0.47mm tk. Color bond Zn/Al m 62.00 1,338.0
(girth 900mm) rain water eave gutter with brackets at 600mm
centers as shown in the detail fixed to fascia with all
necessary gutter fittings
P.11 Supply and installation of 0.47mm tk. Color bond m 31.00 847.0
100x100mm Zn/Al square down pipe with brackets at
600mm centers with all necessary accessories
TOTAL FOR ROOF COVERING AND ROOF
PLUMBINGCARRIED TO TENDER SUMMARY.
Rate for sanitary fixtures and fittings shall include supply and Note
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors,
screws, plugs, etc and complete to working order as per
specifications
Q.1 Supply and fix pedestal type of water closet including cistern Nos. 1.00 21,532.00
colored to the Engineer's approval with all accessories such as
WC connector, flush pipe, seat cover approved angle valves
and flexible connector installed etc. complete to working
order
Q.2 Supply and fix approved quality hand spray bidet comprising Nos. 1.00 2,883.00
flexible chromium plated hose, angle valve and installed
complete to working order
The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of uPVC
type 1000 with solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately those should be deemed
to have included in the relevant items
Internal Drainage
All drainage pipes shall be of uPVC type 600 with solvent Note
welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. separately those should be
deemed to have included in the relevant items
Q.7 63 mm dia. waste pipes including bends, tees and socketed m 3.00 1,891.00
joints
Q.8 110 dia. uPVC pipes from toilet to manhole laid above floors m 3.00 1,891.00
and buried as shown in the drawings
Q.9 110 dia. uPVC pipes between down pipe and drain ,manhole m 41.50 1,891.00
to manhole, to septic tank, soakage pits laid to a gradient of
1:80 including necessary excavation and back filling
Gullies
Q.10 Construction of 150x150mm size uPVC trap moulded floor nr 1.00 1,955.00
gully of good quality, fixed to toilet floor slab with stainless
steel grating with water proofing on top and sides complete
with no leak inlet and outlet connection.
Q.11 Construction of storm water gully externally size 400 x nr 6.00 17,715.00
400x500mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings
Q.13 Construction of brick soakage pit 1200mm dia. internally as nr 1.00 72,568.00
per detail drawings. liquid depth apporx.2000mm.Rate shall
include for excavation, backfilling and removing surplus
excavations, 225x225mm RCC floor beam, 225mm thick
brick wall, 100mm thick cover slab with 600x600mm
removable access cover with handle, vent pipe, etc.
Q.14 Construction of RCC septic tank internally 2700mm x Nos. 1.00 345,059.00
900mm size and 1200mm liquid depth as per detail drawing
no. TP/ST/S01 & PH/MEP/SW/03. Rate to include for
excavation, backfilling and removing surplus excavations
TOTAL FOR PLUMBING AND SANITARY
INSTALLATION CARRIED TO SUMMRY
R MECHANICAL INSTALLATIONS
Ground Floor
R.1 Supply and installation of split type Air Conditioner unit of nr 1.00 107,525.00
24000 Btu 230V/50Hz. including all accessories such as
mounting brackets, insulated refrigerant piping etc. and all the
Civil works required for the completion of work
Refrigerant piping
R.2 supply & install wall embedded, insulated cupper refrigerant m 4.00 5,610.00
piping for 24000Btu split AC
Drain piping
R.3 32mm dia. PVC condensate drain lines from indoor units laid m 4.00 468.00
up to ground floor drain
Builders Work
R.4 (f) All tenderers shall provide a schedule of builders work LS Item Allow
along with the tender
R.6 Allow for the submission of three sets of as a built drawings LS Item Allow
at commissioning of the system for approval of the consultant
TOTAL FOR MECHANICAL INSTALLATIONS
CARRIED TO SUMMARY
S ELECTRICAL INSTALLATIONS
Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent
Point wiring
The contractor shall forward the conduit layout for prior Note
approval of the Consultant
Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
S.2 Wring for 300 dia. soffit mounted type lamp as shown in nr 4.00 8,960.00
layout drawings
S.3 Wring for 1x36W fluorescent lamp with diffuser as shown in nr 24.00 8,960.00
layout drawings
S.4 Wring for 1x18W fluorescent lamp with diffuser as shown in nr 1.00 8,960.00
layout drawings
S.5 Wiring for ceiling fan point with regulator and series switch nr 2.00 8,773.00
as shown in layout drawings.
S.6 Wiring for 13A (raw power) switched socket outlet as shown nr 13.00 9,860.00
in Layout drawings
S.7 Wiring for 15A switched socket outlet for AC as shown in nr 1.00 9,118.00
Layout drawings
S.8 Wiring for intercom extension as shown in layout drawings nr 6.00 11,688.00
S.10 Supply and install 300 dia. soffit mounted type lamp fitting nr 4.00 3,135.00
c/w 18W CFL to architect's approval, as shown in layout
drawings
S.11 Supply and install 1x36W fluorescent lamp fitting with nr 24.00 2,997.00
diffuser to architect's approval as shown in layout drawings
S.12 Supply and install 1x18W fluorescent lamp fitting with nr 1.00 2,763.00
diffuser to architect's approval as shown in layout drawings
S.13 Supply and install ceiling fan as shown in layout drawings nr 2.00 7,900.00
S.14 Allow for suitably designed earthling system complete with LS Item Allow
all necessary earth rods, copper plates, copper tapes,
connectors, and all necessary materials and hardware to
achieve the regulations and shall be consultant's approval and
Ceylon Electricity Board approval
Miscellaneous
Floor Finishes
Skirting
Wall Finishes
Internal finishes
Wall Tiling
External finishes
Plinth Plaster
T.8 20mm thick 1:3 cement sand rendering smooth finish with m2 64.00 475.00
colored cement
Ceiling Finishes
T.10 Supply and fix 600x600mm size 15mm thk. natural white m2 15.50 3,039.00
color mineral fiber exposed type suspended ceiling with
powder coated aluminium exposed frame work and solid
aluminium thread bar suspension system as per the detail
drawings and specification
T.11 Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet m2 160.00 1,063.00
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
and specification. Rate shall include, Gap between roof sheet
and top edge of the wall covered with Zn/Al sheets,
Rate for painting shall include for painting to door and Note
window reveals
Wall Painting
External
V.1 Prepare surface and apply one coat of water proofing primer m2 98.00 372.00
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed
V.2 Prepare surface and apply two coats of colorless vax paint on m2 37.00 338.00
external smooth cut plaster surfaces of wall as directed
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
- -
37,236.00 nr 12.00 3,103.00 37,236.00
15,930,266.55 15,930,266.55
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
- -
310,010.00 nr 2.00 155,005.00 310,010.00
- -
42,633.00 nr 1.00 42,633.00 42,633.00
- -
595,189.00 nr 7.00 85,027.00 595,189.00
1,540,481.56 1,540,481.56
Note
Note
Note
Note
- -
213,276.00 m 84.00 2,539.00 213,276.00
- -
82,476.00 m 158.00 522.00 82,476.00
- -
58,144.00 m 46.00 1,264.00 58,144.00
- -
172,140.00 m 2
190.00 906.00 172,140.00
- -
82,956.00 m 62.00 1,338.0 82,956.00
- -
26,257.00 m 31.00 847.0 26,257.00
3,384,427.00 3,384,427.00
Note
Note
Note
Note
- -
2,883.00 Nos. 1.00 2,883.00 2,883.00
Note
Note
Note
Note
Note
Note
- -
5,673.00 m 3.00 1,891.00 5,673.00
- -
78,476.50 m 41.50 1,891.00 78,476.50
- -
106,290.00 nr 6.00 17,715.00 106,290.00
Note
- -
17,068.00 nr 1.00 17,068.00 17,068.00
- -
72,568.00 nr 1.00 72,568.00 72,568.00
- -
345,059.00 Nos. 1.00 345,059.00 345,059.00
661,141.50 661,141.50
Note
Note
Note
Note
- -
1,872.00 m 4.00 468.00 1,872.00
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
87,256.00 nr 1.00 87,256.00 87,256.00
Note
Note
Note
- -
17,546.00 nr 2.00 8,773.00 17,546.00
- -
128,180.00 nr 13.00 9,860.00 128,180.00
- -
9,118.00 nr 1.00 9,118.00 9,118.00
- -
70,128.00 nr 6.00 11,688.00 70,128.00
- -
8,883.00 nr 1.00 8,883.00 8,883.00
12,540.00 nr 4.00 3,135.00 12,540.00
- -
2,763.00 nr 1.00 2,763.00 2,763.00
- -
15,800.00 nr 2.00 7,900.00 15,800.00
Note
Note
Note
Note
Note
- -
40,368.20 m 76.60 527.00 40,368.20
- -
20,406.00 m2 8.95 2,280.00 20,406.00
- -
41,748.00 m2 98.00 426.00 41,748.00
- -
- -
175,603.84 m2 91.80 1,913.00 175,603.84
30,400.00 m2 64.00 475.00 30,400.00
- -
170,080.00 m2 160.00 1,063.00 170,080.00
1,044,962.84 1,044,962.84
Note
Note
Note
Note
142,225.40 142,225.40
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK
Excavation
Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation
Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting
Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends
Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary
Excavation
D.1 Excavation for wall foundation trenches, not exceeding m3 3.00 984.00
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.
Filling
D.3 Imported hard earth filling, well rammed and consolidated m3 0.45 1,035.00
using suitable roller to achieve 95% maximum dry density , in
make up levels under floors 150mm thick layers
D.4 50 mm thick sand fill on hard earth filling as per detail m2 2.25 636.00
drawings and specifications
Anti termite Treatment
Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format
D.5 Application of anti termite treatment under the ground floor m2 3.80 152.00
slab in accordance with the manufacture's specifications and
to the approval of Engineer
Concrete
All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately
Reinforcement
All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush
Mesh Reinforcement
F.12 Type A142 mesh laid with 150mm laps in ground floor slab m2 8.50 509.00
Formwork
F.21 Sides and soffit of roof slab, rate shall include forming even m2 8.60 1,435.65
grooves on the construction joint locations of the formwork of
the fairfaced soffit.
Miscellaneous
F.23 Supply and fix 300x100mm size prefabricated fairfaced m 7.80 1,457.75
finished concrete moulding on to 200mm thick. cement block
wall by using 12mm dia. Steel rods with nuts at 1000mm
centers as per the detail drawing no. SP/AR01
F.24 200x150mm size reinforced concrete sill beam, rate including m 3.17 1,289.45
2T10 for top + R6@ 125 and necessary form work in the
following at Security Hut
F.25 200x200mm size reinforced concrete lintels, rate including m 3.05 3,102.50
2T12 for bottom, 2T10 for top,R6 @ 125 and necessary form
work in the following at Security Hut
Polythene layer
F.26 750 gauge polythyne layer under ground floor slab as per m2 2.25 75.65
drawings and specifications
F.27 Expansion joint filled with compressible filler and sealant on m 6.00 2,333.25
top in ground floor as per the detail drawings and
specification
Rubble work
G.1 Random rubble (150 x 225mm size) masonry wall foundation m3 1.12 7,462.15
in cement and sand 1:5 mortar
In ground floor
G.2 100mm thick hollow block wall in cement and sand 1:5 m2 10.64 1,107.55
Rate shall include cutting top line, notching bending and extra Note
materials for lapping
Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format
Water Proofing
H.1 2mm thick polyurathene water proofing membrane on top of m2 15.00 3,783.35
the roof slab and wall as per the drawing and specification
TOTAL FOR WATER PROOFING WORK CARRIED
TO SUMMERY
K METAL WORK
Rates for all aluminum doors and windows shall include for Note
all necessary ironmongery
All glass shall be 12mm thick toughen glass / 6mm thick clear Note
glass as directed
K.1 One way swing single sash aluminium and clear glass door nr 1.00 49,506.55
with aluminium frame and aluminium 1500x600mm size
louver on top, type " D8 ", size 900x 2100mm with necessary
approved quality iron mongery and locking system, complete
as per detail drawings
K.2 Window type " W14", size 550 x 1275mm with aluminium nr 1.00 8,565.45
frame, glazed window with necessary approved quality iron
mongery, complete as per detail drawings
K.3 Window type " W13", size 900 x 1275mm with aluminium nr 1.00 16,147.45
frame, glazed window with necessary approved quality iron
mongery, complete as per detail drawings
Roof Plumbing
P.1 Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to m 7.00 918.85
edge of the roof as per detail drawings
P.2 110mm dia. uPVC down pipe fixed with Al brackets at m 17.23 376.55
Security Hut (Type 400)
Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent
S.1 Supply and installation of sub distribution boards SDB nr 1.00 34,743.75
( lighting and general purpose power in security hut)
including MCCB's, MCB's, RCCB's internal cabling, all in
accordance with the specification and as per the detail
drawings
Point wiring
The contractor shall forward the conduit layout for prior Note
approval of the Consultant
Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
S.3 Wiring for outdoor flood light point as shown in layout nr 4.00 3,598.90
drawings
S.4 Wiring for wall mounted fan point with regulator and series nr 1.00 8,772.85
switch as shown in layout drawings
S.5 Wiring for 13A (raw power) switched socket outlet as shown nr 2.00 9,859.15
in layout drawings
S.6 Wiring for intercom extension as shown in layout drawings nr 1.00 11,687.50
S.7 Supply and install soffit mounted type 2x18Wx300x600mm nr 1.00 4,742.15
fluorescent lamp fitting with double parabolic reflectors and
other accessories to architect's approval, as shown in layout
drawings
S.8 Supply and installation of 70W metal halide Bixton flood nr 4.00 8,477.90
light with Bixton accessories, Black colour (Lamp
temperature 6000 K)
S.9 Supply and install wall mounted fan as shown in layout nr 1.00 10,336.85
drawings
S.10 50mm dia medium duty steel pipe bracket welded to concrete nr 12.00 12,123.55
beam for fixing flood light
Floor Finishes
T.1 600 x 600mm size, homogenous pocelain tile in an approved m2 2.25 2,579.75
color and quality including 18mm thick 1:3 cement sand
bedding and pointing with tile grout to match the color of
tiles laid (Tile rate per m2 Rs. 2000.00 - 2250.00 including
VAT)
Skirting
Wall Finishes
T.5 600 x 600mm size, Porcelain tile in an approved color and m2 25.32 1,912.50
quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls at;
Plinth Plaster
T.6 20mm thick 1:3 cement sand rendering smooth finish with m2 6.00 474.30
colored cement
V PAINTING WORK
Rate for painting shall include for painting to door and Note
window reveals
Wall Painting
External
V.1 Prepare surface and apply one coat of water proofing primer m2 15.00 371.45
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed
V.2 Prepare surface and apply two coats of colorless vax paint on m2 12.50 337.45
external smooth cut plaster surfaces of wall as directed
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Ceiling Painting
2,952.00
Rate only
465.75
1,431.00
577.60
5,426.35
1,595.43
10,213.32
-
6,547.00
-
4,582.90
-
15,974.68
-
-
-
-
-
10,606.14
-
20,550.40
-
11,065.60
12,150.00
-
6,966.00
-
-
-
2,997.00
-
-
-
4,326.50
-
-
-
-
-
28,424.00
-
8,882.50
-
3,553.00
-
-
-
-
3,876.00
3,387.04
-
8,747.39
-
3,053.24
18,993.65
12,346.59
-
11,198.07
-
-
-
11,370.45
-
4,087.56
-
9,462.63
-
-
-
170.21
-
13,999.50
249,126.80
8,357.61
11,784.33
20,141.94
56,750.25
56,750.25
49,506.55
-
8,565.45
-
16,147.45
74,219.45
6,431.95
6,487.96
12,919.91
34,743.75
3,598.90
14,395.60
8,772.85
19,718.30
11,687.50
4,742.15
-
33,911.60
-
10,336.85
-
145,482.60
287,390.10
5,804.44
2,683.37
6,365.95
6,387.75
48,424.50
2,845.80
72,511.80
5,571.75
4,218.13
4,039.71
3,782.50
17,612.09
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK
Excavation
Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation
Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting
Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends
Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary
Excavation
D.1 Excavation for wall foundation trenches, not exceeding m3 2.35 983.45
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.
Filling
D.3 Imported hard earth filling, well rammed and consolidated m3 0.20 1,034.45
using suitable roller to achieve 95% maximum dry density , in
make up levels under floors 150mm thick layers
D.4 50 mm thick sand fill on hard earth filling as per detail m2 1.00 635.80
drawings and specifications
Anti termite Treatment
Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format
D.5 Application of anti termite treatment under the ground floor m2 2.54 151.30
slab in accordance with the manufacture's specifications and
to the approval of Engineer
Concrete
All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately
Reinforcement
All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush
Mesh Reinforcement
F.12 Type A142 mesh laid with 150mm laps in ground floor slab m2 6.75 508.30
Formwork
Polythene layer
F.23 750 gauge polythyne layer under ground floor slab as per m2 1.00 75.65
drawings and specifications
F.24 Expansion joint filled with compressible filler and sealant on m 4.00 2,333.25
top in ground floor as per the detail drawings and
specification
Rubble work
G.1 Random rubble (150 x 225mm size) masonry wall foundation m3 0.72 7,462.15
in cement and sand 1:5 mortar
In ground floor
G.2 100mm thk. hollow block wall in cement and sand 1:5 m2 9.52 1,107.55
Rate shall include cutting top line, notching bending and extra Note
materials for lapping
Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format
Water Proofing
Rates for all aluminum doors and windows shall include for Note
all necessary ironmongery
K.1 One way swing single sash and both side composite nr 1.00 36,012.80
aluminium panel door with aluminium frame type " D7 ",
size 750 x 2100mm with necessary approved quality iron
mongery and locking system, complete as per detail drawings
Rate for sanitary fixtures and fittings shall include supply and Note
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors,
screws, plugs, etc and complete to working order as per
specifications
Q.1 Supply and fix pedestal type of water closet including cistern Nos. 1.00 21,531.35
colored to the Engineer's approval with all accessories such as
WC connector, flush pipe, seat cover approved angle valves
and flexible connector installed etc. complete to working
order
Q.2 Supply and fix approved quality hand spray bidet comprising Nos. 1.00 2,882.35
flexible chromium plated hose, angle valve and installed
complete to working order
All water supply pipes shall be of uPVC type 1000 with Note
solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be
deemed to have included in the relevant items
Q.3 Supply and install plastic water tank to the capacity of Nos. 1.00 14,894.55
1000Ltr. Located inside the ceiling, As shown with over
flow, wash out valve, ball valve etc. complete to working
order
Q.4 Supply and fix 32mm dia. pipe, city main to overhead tank m 7.00 317.05
Q.5 Supply and fix 32mm dia. ball valve nr 1.00 4,391.10
Piping shall be measured to the net length along the center Note
line of the pipes over all bends, junctions, tees and the similar
pipe fittings and shall be given in meter
The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of uPVC
type 1000 with solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. Separately should be deemed to
have included in the relevant items
Internal Drainage
All drainage pipes shall be of uPVC type 600 with solvent Note
welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. Separately should be deemed to
have included in the relevant items
Rates shall include excavation, sand/concrete bedding, Note
surrounding pipes with concrete where necessary and back
filling and pipe accessories etc. and complete as shown on
drawings and specifications
Q.12 63 mm dia. waste pipes including bends, tees and socketted m 3.00 786.25
joints
Q.13 110 dia. uPVC pipes from toilet to manhole laid above floors m 3.00 1,890.40
and buried as shown in the drawings
Q.14 110 dia. uPVC pipes between manhole to manhole, to septic m 1.5 1,890.4
tank, soakage pits. Laid to a gradient of 1:80 including
necessary excavation and back filling
Gullies
Q.15 Construction of 150x150mm size uPVC trap moulded floor nr 1.00 1,954.15
gully of good quality, fixed to toilet floor slab with stainless
steel grating with water proofing on top and sides complete
with no leak inlet and outlet connection.
Q.17 Construction of brick soakage pit 1200mm dia. internally as nr 1.00 77,102.65
per detail drawings. liquid depth apporx.2000mm.Rate shall
include for excavation, backfilling and removing surplus
excavations, 225x225mm RCC floor beam, 225mm thk.
brick wall, 100mm thk cover slab with 600x600mm
removable access cover with handle, vent pipe, etc.,
Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent
Point wiring
The contractor shall forward the conduit layout for prior Note
approval of the Consultant
Rates for point wiring shall include for all cables, switches, (1 Note
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary
S.2 Supply and install soffit mounted type 2x18Wx600 x300mm nr 1.00 4,742.15
fluorescent lamp fitting with double parabolic reflectors and
other accessories to architect's approval, as shown in layout
drawings
Floor Finishes
T.1 600 x 600mm size, Porcelain tile in an approved color and m2 5.00 1,988.15
quality including 18mm thick 1:3 cement sand bedding and
pointing with tile grout to match the color of tiles laid at
Toilet floor
Wall Finishes
Wall Tiling
T.3 600 x 300mm size, Porcelain tile in an approved color and m2 4.60 2,279.70
quality including 16mm thick 1:3 cement sand bedding and
pointing with tile grout to match the color of tiles laid at
internal wall at Toilet
T.4 16mm thk. cement and sand 1:5 plaster to external faces of m2 2.50 425.85
block walls and attached concrete surfaces above plaster
groove, finished semi rough, rate shall include door and
window reveals
T.5 600 x 600mm size, Porcelain tile in an approved color and m2 4.90 1,912.50
quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls
Miscellaneous
Rate for painting shall include for painting to door and Note
window reveals
Wall Painting
External
V.1 Prepare surface and apply one coat of water proofing primer m2 2.50 371.45
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed
Internal
Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.
Soffit Painting
V.3 Prepare and apply one coat of primer and two coats of m2 1.62 378.25
emulsion paint on soffit
Ceiling Painting
2,311.11
Rate only
206.89
635.80
384.30
3,538.10
1,271.12
8,117.91
6,546.70
3,666.15
13,093.40
9,034.45
9,484.47
8,852.17
10,820.50
6,137.00
2,664.75
3,431.03
17,119.00
7,186.75
2,584.00
3,230.00
2,699.81
8,786.66
2,454.38
15,375.81
7,178.25
9,116.38
75.65
9,333.00
168,259.34
5,372.75
10,543.88
15,916.62
18,160.08
1,989.00
20,149.08
36,012.80
36,012.80
21,531.35
2,882.35
14,894.55
-
2,219.35
-
4,391.10
-
2,743.80
-
792.63
-
180.20
-
182.33
4,391.10
-
7,351.65
2,358.75
-
5,671.20
-
2,835.60
1,954.15
17,068.00
77,102.65
345,058.35
513,609.10
3,598.90
4,742.15
8,341.05
9,940.75
3,576.37
10,486.62
1,064.63
9,371.25
755.97
586.50
35,782.09
928.63
2,269.50
612.77
1,181.08
4,991.96
No Description Unit Qty Rate
D EXCAVATION AND EARTH WORK
a) Method of Excavation
b) Equipment with details of capacities proposed for
excavation and
c) Method of removal ofifearth
dewatering, any
d) Details of temporary work
e) Method of earth work support, if any
Site Clearance
D.1 Clearing site including removal of top soil up to a depth of m2 1,010.00 86.70
150 mm including grubbing up roots, bushes and trees, filling
voids with selected excavated material and compacting and
disposal of all surplus excavated material away from the site
as directed
General Excavation
D.2 General excavation for cutting in making up levels to required m3 10,625.00
levels including transporting to proposed access road within
the land as shown in the drawings
General Filling
All concrete shall be made dence with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item
Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary
Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately
Concrete Pavement
F.4 Pre cast concrete fence panels laid and fixed all as per detail m 53.00 12,554.50
drawings
TOTAL FOR CONCRETE WORKS CARRIED TO
SUMMERY
G MASONARY
The tenderer is requested to refer the Preambles notes, Note
General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items
Retaining Wall
G.1 Random rubble (225 x 150 mm size) masonry in cement sand m3 7,462.15
mortar (1:5) in Retaining walls as per the detail drawing no.
TP/TD - 02 and specifications. Rate shall included geotextile
layer, 50mm thk. G 15 concrete screed, placing weep holes,
etc.
TOTAL FOR MASONARY CARRIED TO SUMMERY
J METAL WORKS
J.1 1.8m high security fence fixed on 50mm dia. G.I. pipe post at m 7,085.60
boundary, comprising of gauge 10 green colour uPVC coated
galvanized chain link wire mesh (50mm x50mm) fencing as
per the detail drawings. Rate shall include for providing
25mm dia. GI pipe tie on top with application of 2 coats of
anticorrosive paint in all exposed surfaces and as per the
detail drawings and specification. The strut also to be
provided with start/end and every 18m intervals. Rate shall
include excavation, rubble foundation, and bottom of the
fence post to be embedded in concrete pockets. All G.I. pipe
should be medium quality
Piping shall be measured to the net length along the center Note
line of the pipes over all bends, junctions, tees and the similar
pipe fittings and shall be given in feet
The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of UPVC
type 1000 with solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be
deemed to have included in the relevant items
Q.1 Allow for main water supply including connection to building LS Item Allow
from the water meter
Q.2 32 mm dia. Pipe, overhead tank to ramp from well including m 700.00 317.05
suction
Q.3 Supply and fix 25mm dia. gate valve nr 1.00 2,804.15
Q.4 50 dia. uPVC pipes from sump to Toll Plaza laid to a 555.90
m 118.72
gradient of 1:80 including necessary excavation and back
filling
Pipe Distribution System
Q.5 25mm dia Distribution pipe system including fittings laid m 256.01 184.45
through ducts to flower trough in Toll Plazas
Q.6 32mm dia Distribution pipe system including fittings from m 260.50 323.85
water suply to Toll plaza flower trough
Storm water
Q.7 Construction of 150mm wide, RCC drain with 75mm thick. m 111.00 13,368.80
base slab, 75mm thick, side walls and hot dip galvanized
gratting as per the layout to includes pricing, necessary R/F,
form work, cement rendering, excavation, backfilling, etc,
Q.8 Construction of Strom water middle drain (500mm width m 82.60 17,147.90
600mm height)
Q.9 Construction of Strom water Retainng wall side drain m 35.00 11,504.75
(300mm width 430mm height" L" - shape drain)
Q.10 Construction of storm water man hole externally size 450 x nr 14.00 12,282.50
450x1000mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and 75mm tk concrete manhole cover at Toll Plaza
Q.11 Construction of storm water man hole externally size nr 3.00 13,447.85
700x700mm x 450mm , including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and 75mm tk concrete manhole cover at Toll Plaza
Q.12 Supply and lay 225mm dia. R.C Hume pipe in trench to m 10.00 3,247.85
including collar joints, excavation, placing concrete
surrounding at 1200mtr. Intervals, back filling and removing
surplus excavations.
Q.13 Provision of 100x 100x 6mm tk. angle iron for manhole cover nr 41.00 4,289.10
Concrete Drains
Q.14 400mm width conrete drain from middle drain to retaining m 5.50 3,351.55
wall
Q.15 Supply and fixing of 400mm width steel grating to cover m 5.50 9,062.70
concrete drain
Q.16 Supply and fixing of 300mm width steel grating to cover m 10.70 6,796.60
concrete drain
Q.17 Allow for the submission of three sets of as built drawings for LS Item Allow
all plumbing detail of the interchange at commissioning of the
system for approval of the consultant
Q.18 Approved quality 20mm bid tap comprising angle valve nr 2.00 2,305.20
Q.19 Approved quality hand spray bidet comprising flexible nr 3.00 2,686.85
chromium plated hose, angle valve
S ELECTRICAL INSTALLATION
Contractor shall coordinate the above work with CEB for Note
obtaining the above power supply and and provide necessary
support for the CEB personnel and client
S.1 Allow for coordination work with CEB for obtaining above LS Item Allow
Power supply
S.2 Main distribution panel shall include for supply and nr 1.00 476,671.50
installation of all necessary MCCB's, MCB's, EFR's,
ELCB's/RCCB's auxiliary contacts, surge arrestor, Volt
meters, ammeter meters, indicator lamps, selector switches,
inter connecting copper bus bars, inter locks aligning and
grounding the panel, interconnections, internal wiring
instrument, wiring loops, connecting to switch gears, cable
gland lugs, steel channels and necessary hardware fixing and
installation materials with fully enclosed metal enclose
complete as shown in drawings and comply with the
specification and as per BS standards given in the relevant
items, I.E.E. regulation 17th edition and all complete to
working order to the approval of the Consultant
Cable Trenches
S.23 Construction of cable trench for laid under ground power m 36.00 8,882.50
cables as per the detail and specifications
S.24 Construction of electrical manhole type A, as per the detail nr 7.00 14,025.00
drawings and specifications
Earth System
S.27 Supply, errect and installation of 13.5 m high mast lighting nr 4.00 546,391.05
column with 2 nos of 400 Watt metal helide lamp as per the
detail and specifications
S.28 Additional Cost for Construction of high mast light nr 2.00 23,375.00
foundation as per detail drawing
Shop Drawings
S.33 Approved type 300 dia. soffit mounted type lamp fittings with nr 2.00 2,764.20
18W CFL
S.34 Approved type soffit mounted type 3x18Wx600x600mm nr 5.00 5,207.10
fluorescent lamp with double parabolic reflectors and other
accessories
S.36 Approved type wall mounted type mirror lamp nr 1.00 2,668.15
S.38 Approved type 1x36W fluorescent lamp fitting with diffuser nr 2.00 2,924.85
S.39 Approved type 1x18W fluorescent lamp fitting with diffuser nr 2.00 2,924.85
S.45 Approved type indicater lamps (red yelow blue) nr 1.00 116.45
ELECTRICAL WORK
87,567.00
Rate only
304,037.45
567,460.85
959,065.30 959,065.30
4,552,810.29
875,644.50
146,042.27
665,388.50
6,239,885.56 6,239,885.56
Rate only
Rate only
148,750.00
148,750.00 148,750.00
85,000.00
221,935.00
2,804.15
65,998.12
47,221.04
84,362.92
1,483,936.80
1,416,416.54
402,666.25
171,955.00
-
40,343.55
32,478.50
175,853.10
-
18,433.52
49,844.85
72,723.62
16,000.00
4,610.40
8,060.55
991.10
5,754.50
4,407,389.52 4,252,799.30
46,750.00
476,671.50
786,826.30
184,059.00
320,382.00
106,794.00
46,410.00
69,615.00
2,647,512.00
2,752,572.00
94,367.00
-
38,390.25
-
33,575.85
30,523.50
6,256.00
12,450.80
28,014.30
12,450.80
12,450.80
28,014.30
12,450.80
45,785.25
319,770.00
98,175.00
70,125.00
163,625.00
2,185,564.20
46,750.00
32,725.00
9,350.00
9,350.00
9,350.00
5,528.40
26,035.50
13,502.25
2,668.15
14,914.10
5,849.70
-
5,849.70
-
5,601.50
7,373.75
6,494.85
947.75
884.00
116.45
5,083.00
5,083.00
12,843.50
12,843.50
13,004.15
14,645.50
10,896,374.40 10,511,796.48
No Description Unit Qty Rate
DAY WORKS
The day work is defined as the additional or varied work not Note
envisaged at the time of tendering, which may be ordered to
be carried out by the Engineer under the contract provided in
the opinion of the Engineer, that such work cannot be
adequately measured in the normal way.
The day work shall be carried out under and incidental to the Note
contract.
LABOUR
The rate shall include for all cost relating to employment of Note
labor including
1. Subsistence payments
1. Conditions payments
2. Working on public holidays, weekends after normal
working hours
3. Transport of labour and travelling allowances
4. Supervision costs and expenses
5. Over heads and profits
6. Use of hand tools and protective gear
7. Any other statutory and incidental charges levied on the
employment of labor
8. Bonus payments
MATERIALS
11 Glass m2 28.00
TOTAL FOR MATERIALS CARRIED TO SUMMARY
The contractor shall state in schedule 11.3 below the hourly Note
rates of plant which may be ordered to be used under Day
works.