The document provides a comprehensive list of construction materials and their respective units, including excavation materials, concrete components, formwork items, reinforcement steel, and plumbing supplies. It also includes basic prices for various materials and labor costs associated with construction tasks. The information is organized by categories such as roofing, flooring, walls, and painting, detailing the quantity and pricing for each item.

Uploaded by

breakupgura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views461 pages

BSR Tti

The document provides a comprehensive list of construction materials and their respective units, including excavation materials, concrete components, formwork items, reinforcement steel, and plumbing supplies. It also includes basic prices for various materials and labor costs associated with construction tasks. The information is organized by categories such as roofing, flooring, walls, and painting, detailing the quantity and pricing for each item.

Uploaded by

breakupgura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Dry hard earth with transport cost cube.

EXCAVATION Quarry dust with transport cost cube.

EXCAVATION 1 1/2" thick plank (class 11) S. ft

EXCAVATION 2" x 4" joist (class 11) L. ft

EXCAVATION 2" x 6" joist (class 11) L. ft

EXCAVATION Wire nails kg.

CONCRETE Cement bag

CONCRETE Sand cube.

CONCRETE Metal 3/4 " cube.

CONCRETE Metal 1 " cube.

CONCRETE Metal 2 " cube.

CONCRETE Water gal.

FORM WORK 1" thick plank class 11 S. ft

FORM WORK 2 " x 4 " class 11 L. ft

FORM WORK 2 " x 2 " class 11 L. ft

FORM WORK 2 " x 1 " class 11 L. ft

FORM WORK Wire nails kg.

FORM WORK Mould oil ltr

FORM WORK 16mm bolt Nr


REINFORCEM
Tor Steel
ENT
REINFORCEM
25mm kg.
ENT
REINFORCEM
20mm kg.
ENT
REINFORCEM
16mm kg.
ENT
REINFORCEM
12mm kg.
ENT
REINFORCEM
10mm kg.
ENT
REINFORCEM
binding wire kg.
ENT
REINFORCEM
Mild steel
ENT
REINFORCEM
10mm kg.
ENT
REINFORCEM
6mm kg.
ENT
RUBBLE &
CEMENT Rubble cube.
BLOCKS
RUBBLE &
CEMENT cement bag
BLOCKS
RUBBLE &
CEMENT sand cube.
BLOCKS
RUBBLE &
CEMENT water gal.
BLOCKS
RUBBLE &
CEMENT 8" thick cemrnt hollow block Nr
BLOCKS
RUBBLE &
CEMENT 6" thick cemrnt hollow block Nr
BLOCKS
RUBBLE &
CEMENT 4" hick cemrnt hollow block Nr
BLOCKS
BRICK WORK Cement bag

BRICK WORK Sand cube.

BRICK WORK Water gal.

BRICK WORK Bricks Nr


WATER
Cement bag
PROOFING
WATER
Sand cube.
PROOFING
WATER
DPC tar ltr
PROOFING
DOORS &
4" X 3" Class 1 timber L. ft.
WINDOWS
DOORS &
4" X 2" Class 1 timber L. ft.
WINDOWS
DOORS &
11/4 thick plank s. ft.
WINDOWS
DOORS &
Ply wood door sash size 3' 0" x 6' 9" Nr
WINDOWS
DOORS &
1" thick plank 6" wide L. ft.
WINDOWS
DOORS &
5mm.glaze sheet. s. ft.
WINDOWS
DOORS &
4" Brush Nr
WINDOWS
DOORS &
Sand paper Nr
WINDOWS
DOORS &
Wood primer ltr.
WINDOWS
DOORS &
Enamel paint ltr.
WINDOWS
DOORS &
4" x 3" Butt hinges pair.
WINDOWS
DOORS &
4" x 2" Butt hinges pair.
WINDOWS
DOORS &
3/4" brass screws Nr
WINDOWS
DOORS &
1/2" brass screws Nr
WINDOWS
DOORS &
6" long barrel bolt Nr
WINDOWS
DOORS &
12" long barrel bolt Nr
WINDOWS
DOORS &
Mortice lock Nr
WINDOWS
DOORS &
Hold fast Nr
WINDOWS
DOORS &
casement fastner Nr
WINDOWS
DOORS &
casement stay Nr
WINDOWS
ROOF 1" thick Ginisapu plank s. ft.
ROOF 3/4" thick Ginisapu plank s. ft.
ROOF Class 1 timber c. ft.
ROOF Calicut tile Nr
ROOF Calicut pattern ridge tile Nr
ROOF Half round tile Nr
ROOF Asbestos roofing sheet s. ft.
ROOF Reepers 2" x 1" l. ft.
ROOF Wire nails kg.
ROOF Colouring powder kg.
ROOF Cement bag
ROOF Sand cube
ROOF Lime kg.
ROOF " J " bolt Nr
ROOF Wood primer ltr
ROOF Enamel paint ltr
ROOF Wood preservative ltr
ROOF 3/4" x 9" timber for valance board S. ft.
ROOF Asbestos close fitting pair
ROOF Roofing screws Nr
ROOF Brass screws 11/2 Nr
FLOOR Lime kg.

FLOOR Cement cube.

FLOOR Sand cube.

FLOOR water gall.

FLOOR Bricks Nr

FLOOR Floor tile 6" x 6" Nr

FLOOR Flor tile 8" x 8" Nr

FLOOR Floor tile 12" x 12" Nr

FLOOR Tile grout kg.

WALL Cement bag

WALL Sand cube

WALL Lime kg.

WALL water gal

WALL Wall tile 6" x 6" Nr

WALL Wall tile 8" x 12" Nr

WALL Wall tile 8" x 8" Nr

WALL Tile grout kg.

CEILING Cement bag

CEILING Sand cube

CEILING Lime kg.

CEILING water gal

CEILING 4" x 2" class 1 timber l. ft.

CEILING 2" x 2" class 1 timber l. ft.

CEILING 2" x 1" class 1 timber l. ft.

CEILING 11/2" x 11/2" cove moulding l. ft.

CEILING 1/2" x 1/2" beading l. ft.

CEILING 3/4 " thick timber ceiling plank (lunumidella ) s. ft.

CEILING Asbestos ceiling sheet s. ft.

CEILING Wire nails kg.


CEILING Emulsion paint ltr

PAINTING Emulsion paint ltr

PAINTING Weathersheild paint ltr

PAINTING Brush 4" Nr

PAINTING Acrylic filler ltr

PAINTING Sand paper Nr

PAINTING Water gal


PVC Pipe Type 400 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PVC Pipe Type 600 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PVC Pipe Type 1000 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Tee
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Bend
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Elbow
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Value socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Faucet Socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING Solvent cement kg.
Basic Prices

MATERIALS LABOUR PL

Item Code Price Item Price Item


Description Unit Best Moderate Cheap Description Code No. Unit
No. No. ( Rs.) No. ( Rs.) No.
1 Acid M-001 Gal 254.00 1 Painter L-001 Day 1,500.00 1

2 Anti Corrosive Primer M-002 litre 245.00 2 Plumber L-002 Day 1,500.00 2

3 Asbestos Corrugated Sheet M-003 Sq.ft 26.00 3 SK Labour L-003 Day 1,250.00 3

4 Barrel Bolt M-004 No 75.00 4 SK Labour (Vibrator) L-004 Day 1,500.00 4

5 Binding Wire - 16 BW M-005 Lbs 250.00 5 Tinker L-005 Day 1,500.00 5

6 Bitumen M-006 Gal 80.00 6 Tiler L-006 Day 1,500.00 6

7 Blasting Powder M-007 Lbs 200.00 7 U / SK Labourer L-007 Day 1,000.00

8 Blue M-008 Ozs 10.00 8 Carpenter L-008 Day 1,500.00

9 Boild Lime M-009 Cwt 300.00 9 Mason L-009 Day 1,250.00

10 Bolts 16mm 18" M-010 No 150.00 10 Glazier L-010 Day 1,500.00

11 Brass Fanlight Chtches M-011 No 45.00

12 Brass Nails - 1 1/2" M-012 Lbs 50.00

13 Brass Pannel Pins M-013 Doz 1.00

14 Brass scews - 1" M-014 No 2.50

15 Brass Screws 1 1/2" M-015 No 3.75

16 Brass Screws - 1/2 " M-016 No 1.30

17 Brass Screws - 3/4" M-017 No 1.25

18 Brass Screws - 4" Long M-018 No 7.50

19 Bricks M-019 No 6.00

20 Brush - 3" M-020 No 210.00

21 Brush - 6" M-021 No 495.00

22 Brush 2" M-022 No 165.00

23 Butt Hinges M-023 No 70.00

24 Casement Fasteners M-024 No 55.00

25 Casement Stays M-025 No 55.00

26 Cement M-026 Bag 975.00

27 Clear Glass panes M-027 Sq.ft 25.00

28 Clips and Nails - 1 " M-028 No 7.00

29 Clips and Nails - 1 1/2 " M-029 No 10.50

30 Clips and Nails - 1 1/4 " M-030 No 8.75

31 Clips and Nails - 2 " M-031 No 10.75

32 Clips and Screws - 3 " M-032 No 34.00

33 Clout Nails - 1/4" M-033 Lbs 25.00

34 Coir Brush - 6" M-034 No 45.00

35 Coloured Pigment M-035 Lbs 175.00

36 Colouring Powder M-036 Lbs 175.00

37 Cotton Waste M-037 Lbs 12.50

38 D. D. T. Powder M-038 Lbs 25.00

39 Diesel Fuel M-039 Ltr 70.00

40 Door Closer M-040 No 1,850.00

41 Draw Rings M-041 No 22.50

42 Earth Delivered at Site M-042 Cube 2,500.00

43 Emulsion Paint M-043 litre 875.00

44 Enamel Paint M-044 litre 354.00

45 Fibre / Plastic Plugs M-045 No 1.50

46 Fire Wood M-046 Lbs 250.00

47 Flannel Cloth M-047 Yards 70.00

48 Flat Asbestos Ceiling Sheets M-048 Sq.ft 15.00

49 Floor Brush M-049 No 210.00

50 Fuel Forge M-050 Ltr 100.00

51 Fuse wire M-051 L.ft 10.00

Galvanised iron sheet(8'X4') - 18 B.W.G


52 M-052 No 2,200.00
(1.2 mm)
53 Gravel delivered to site M-053 Cube 2,000.00

54 Gutter Brackets M-054 No

55 Gutter joiner M-055 No

56 Half Round Clay Tiles M-056 No 5.00


57 Hollow Cement Block - 8" thk. M-057 No 85.00

58 Hollow Cement Blocks - 4" thk. M-058 No 45.00

59 Hollow Cement Blocks - 6" thk. M-059 No 75.00

60 Iron Nails - 1 1/2 M-060 Kg. 25.00

61 Iron Screws - 3/4" M-061 No 0.55

62 Jumper Steel M-062 Lbs 65.00

63 Jute Hessian M-063 Sq.ft 3.50

64 Metal - 1 " M-064 Cube 9,500.00

65 Metal - 1 1/2 " M-065 Cube 9,500.00

66 Metal - 3/4 " M-066 Cube 9,500.00

67 Mild Steel Dowels - 5/8" , 4" Long. M-067 No 6.00

68 Mild Steel Rods including transport to site M-068 Kg. 153.00

69 Mineral Turpentine or Thinner M-069 litre 80.00

70 Mortice lock with screws M-070 No 960.00

71 Mould Oil M-071 litre 150.00

72 Nails - 2" M-072 Lbs 90.00

73 Nails - 3/4" M-073 Lbs 90.00

74 Plywood Sash - 6' 9" X 2' 9" M-074 No 2,000.00

75 Primer M-075 litre 400.00

76 PVC Elbows / Bent / Socket - 3/4" M-076 No 15.00


77 PVC Sockets - 1" M-077 No 14.00
78 PVC down pipes - 12' length M-078 No

79 PVC elbow - for rainwater down pipes. M-079 No

80 PVC Elbows / Bent / Socket - 1 1/2" M-080 No 69.00

81 PVC Elbows / Bent / Socket - 1 1/4" M-081 No 42.00

82 PVC Elbows / Bent / Socket - 1" M-082 No 21.00

83 PVC Elbows / Bent / Socket - 1/2" M-083 No 10.50

84 PVC Elbows / Bent / Socket - 2 1/2" M-084 No 350.00

85 PVC Elbows / Bent / Socket - 2" M-085 No 110.00


86 PVC Elbows / Bent / Socket - 3" M-086 No 580.00

87 PVC End cap M-087 No

88 PVC gutter - 12' length M-088 No

89 PVC gutter head - 6" M-089 No

90 PVC joiner - 3 1/2" M-090 No

91 PVC mitre bend 6" dia M-091 No

92 PVC Pipes - 1 1/2" M-092 L.ft 46.00

93 PVC Pipes - 1 1/4" M-093 L.ft 32.00

94 PVC Pipes - 1" M-094 L.ft 21.00

95 PVC Pipes - 1/2" M-095 L.ft 7.50

96 PVC Pipes - 2" M-096 L.ft 79.00

97 PVC Pipes - 3" M-097 L.ft 185.00

98 PVC Pipes - 3/4" M-098 L.ft 14.00

99 PVC Shoe M-099 No

100 PVC Sockets - 1 1/2" M-100 No 29.50

101 PVC Sockets - 1 1/4" M-101 No 19.50

102 PVC Sockets - 2" M-102 No 48.00

103 PVC Sockets - 3" M-103 No 192.00

104 PVC Straps M-104 No

105 Ridge Tiles (calicut) M-105 No 35.00

106 Ridges 3' 8" Long (Asbestos) M-106 Pair 245.00

107 Rim Lock with Screws M-107 No 500.00

108 Roof tiles - calicut M-108 No 16.00

109 Roofing Screws and Washers M-109 No 3.50

110 Roofing Screws or Bolts M-110 No 3.50

111 Rubble - 6" - 9" M-111 Cube 9,500.00

112 Salt M-112 Lbs 10.00

113 Sand M-113 Cube 10,500.00

114 Sand Papers M-114 No 3.50

115 Slaked Lime M-115 Lbs 275.00

116 Soldering Lead M-116 Lbs 13.75

117 Solvent Cement M-117 Grms 1.40


118 Spur Stone M-118 No 15.00

119 Tarnap M-119 Gal 450.00

120 Tee - 1 " Dia M-120 No 31.25

121 Tee - 1 1/2 " Dia M-121 No 102.00

122 Tee - 1/2 " Dia M-122 No 15.50

123 Tee - 2 " Dia M-123 No 165.50

124 Tee - 2 1/2" Dia M-124 No 526.00

125 Tee - 3 " Dia M-125 No 875.00

126 Tee - 3/4 " Dia M-126 No 21.50

127 Tee - Dia 1 1/4 " M-127 No 63.50

128 Tee Hinges M-128 Pair 165.00

129 Tiles Pressed - 12" X 12" M-129 No 180.00

130 Tiles Pressed - 8" X 8" M-130 No 125.00

131 Tiles Terrazzo - 6" X 6" M-131 No 100.00


132 Tiles Terrazzo - 12" X 12" M-132 No 125.00 341.25 235.00 125.00
133 Timber Beading - 1/2" X 1/2" M-133 L.ft 1.50

134 Timber Beadings - 1 1/2"X1/2" (Halmilla) M-134 L.ft 12.00


Timber Ceiling Plank - 6"x3/4"
135 M-135 Sq.ft 28.00
(Lunumidella)
136 Timber Class I M-136 Cu.ft 1,200.00
137 Timber Class I - 3" x 1'1/2" M-137 L.ft 45.00

138 Timber Class I - 4"X3" M-138 Cu.ft 1,300.00

139 Timber Class I Planks - 1 1/2" M-139 Sq.ft 140.00


140 Timber Class II M-140 Cu.ft 750.00
141 Timber Class II - 1" Thick M-141 Sq.ft 65.00
142 Timber Class II - 2" x 1" M-142 L.ft 12.00

143 Timber Class II - 2" x 2" M-143 L.ft 22.00

144 Timber class II - 4"X 2" M-144 L.ft 65.00

145 Timber Cove Molding - 2"X2" (Halmilla) M-145 Sq.ft 35.00

146 Timber ceiling Joists - 4" x 2" M-146 L.ft 65.00

147 Timber Planks - 1" (Valance board) M-147 Sq.ft 65.00

148 Timber Purlins M-148 L.ft 100.00

149 Timber Reepers - 2"X1" M-149 L.ft 12.00

150 Timber Strips - 2" X 1/4" M-150 L.ft 5.00

151 Timber Wedges M-151 No 5.00

152 Tor Steel Rods including transport to site M-152 Kg. 130.00

153 Tower / Skeleton Brass Bolts M-153 No 145.00


154 Varnish M-154 Ltr 355.00
155 Wall Tiles Glazed 6" x 6" M-155 No 75.00

156 Wall Tiles Glazed 8" x 12" M-156 No 100.00

157 Water M-157 Gal 0.50

158 Wax Polish M-158 Lbs 150.00

159 White Cement/ tile grout M-159 Lbs 17.50

160 Wire Brush M-160 No 65.00

161 Wire Nails M-161 Lbs 85.00

162 Wire Nails 2" Long M-162 Lbs 85.00

163 Wire Nails 6" Long M-163 Lbs 85.00

164 Wirecut Bricks M-164 No 8.75

165 Wood Preservative M-165 Gal 450.00

166 Yellow Ochre M-166 Lbs 15.00

167 110mm dia. Upvc down pipe M-167 Lbs 354.40

168 110mm dia Upvc roof outlet M-168 Lbs 354.40


169 70W metal halide lamp M-169 Lbs 354.40
|Installation IP54 and integral control gear
170 M-170 Lbs
171 2.5mm² protective earth in GI conduits M-171 No
172 1x2Cx2.5mm²Cu/PVC/PVC cable and M-172 No
173 Wiring for entry bar with all accessories M-173 m
174 Wiring for TV camera with all accessories M-174 m
PLANT

Price
Description Code No. Unit
( Rs.)
Hire of Mixer P-001 Day 2,500.00

Hire of Vibrator P-002 Day 1,500.00

Vibrating Rammer P-003 Day 1,500.00

3.5 digger P-004 DAY 20,000.00

dumper 1 ton P-005 DAY 8,000.00

12.5 Ton machine P-006 mh 24,000.00


Activity
1 Site Preparation & Excavation

2 Earth work support and Filling

3 Anti Termite Treatment & DPC

4 Random Rubble Masonry Work

5 Concrete Work

5-1 precast concrete

6 Formwork Note

7 Reinforcement Rate Break Downs of all trades are ac


Rate Break Downs of Concrete Work
7-1 Steel works -patitions

8 Block Work

9 Brick Work

10 Roof

11 Doors and Windows

12 Plumbing & Drainage

13 Plastering

14 Tiling

15 Ceiling

16 Painting
17 Electrical works pending
18 water proofing pending
Rate Break Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the
Rate Break Downs of Concrete Works
Page 14 Of 461

Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
01.B.03
excavated material not exceeding 30' 0"

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 2.25 1,000.00 2,250.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools 56.25

Total for 1 Cube 2,306.25

Rate for 1 Cube 2,306.25

Rate(Say) 1Cube 2,306.25

Rate(Say) 1ft3 23.06

Rate(Say) 1m3 815.00

Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
01.B.04
excavated material to distance not exceeding 30' 0"

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 3.5 1,000.00 3,500.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools 87.50

Total for 1 Cube 3,587.50

Rate for 1 Cube 3,587.50

Rate(Say) 1Cube 3,587.50

Rate(Say) 1ft3 35.88

Rate(Say) 1m3 1,268.00

Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
01.B.05
excavated material not exceeding 30' 0"

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools 75.00

Total for 1 Cube 3,000.00

Rate for 1 Cube 3,000.00

Rate(Say) 1Cube 3,000.00

Rate(Say) 1ft3 30.00

Rate(Say) 1m3 1,060.00

SDS 05/15/2025
Page 15 Of 461

Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
01.B.06
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 2.5 1,000.00 2,500.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools 62.50

Total for 1 Cube 2,562.50

Rate for 1 Cube 2,562.50

Rate(Say) 1Cube 2,562.50

Rate(Say) 1ft3 25.63

Rate(Say) 1m3 905.48

Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
01.B.07
depositing excavated material to a distance not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 Blasting Powder M-007 Lbs 0.75 200.00 150.00

1.01 Fuse wire M-051 L.ft 10 10.00 100.00

1.02 Jumper Steel M-062 Lbs 1 65.00 65.00


Allow 20% of Items ( 1, 1.01, 1.02 ) for Steel
1.03 63.00
Fuel and Forge
1.04 SK Labour L-003 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

Total for 1 Cube 3,628.00

Rate for 1 Cube 3,628.00

Rate(Say) 1Cube 3,628.00

Rate(Say) 1ft3 36.28

Rate(Say) 1m3 1,282.00

01.B.08 Benching rock in foundation in 3"-6" Steps (Blasting Prohibited)


Analysis for 10 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount
1 SK Labour L-003 Day 1.5 1,250.00 1,875.00

Allow 25% of Items ( 1 ) for Steel, fuel &


1.01 468.75
forge

1.02 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 10 Sq.ft 2,843.75

Rate for 1 Sq.ft 284.38

Rate(Say) 1 Sq.ft 284.38

Rate(Say) 1m2 3,059.88

SDS 05/15/2025
Page 16 Of 461

01.B.09 Rock Requiring Blasting


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Labour Skilled L-003 Day 3 1,250.00 3,750.00

1.03 Allow 2.5% of Items ( 1.01, 1.02 ) for Tools 93.75

1.04 Fuel Forge etc. M-050 Ltr 0.25 100.00 25.00

1.05 Blasting powder M-007 lbs 0.68 200.00 136.00

1.06 Fuse wire M-051 L.ft 3.05 10.00 30.50

1.07 Steel Jumper M-062 lbs 0.45 32.00 14.40

Total for 1 Cube 4,049.65

Rate for 1 Cube 4,049.65

Rate(Say) 1Cube 4,049.65

Rate(Say) 1ft3 40.50

Rate(Say) 1m3 1,431.00

SDS 05/15/2025
Item No Description Unit Qty Rate Amount
1 Foundation for the Parrepet wall
Did not visit the site. Site soil condition not
3
decided
If any changers in foundation with stability
4 condition extra coming quantity must pay by
the client sqft 2.46 29,975.00 73,648.58
5 Tie beam in ground and top cuft 1.82 41,670.00 75,839.40
6 column for each ten feet cuft 0.675 41,670.00 28,127.25
7 Form works sqft 3.64 19,283.00 70,190.12
8 Form work for column sqft 1.8 19,283.00 34,709.40
9 Block works with standard and good finish sqft 10.92 19,283.00 210,570.36
10 Rendering work on block 3/4" sqft 21.84 6,290.00 137,373.60
11 For rebar Nrs 36.4 550.00 20,020.00
Total amount for boundary wall 630,458.71
Page 18 Of 461

02. Filling and Earth Work Support


A. Filling
B. Earthwork Support

Backfilling

02.A.01 Backfilling to trenches with selected earth available at site.


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 1 1,500.00 1,500.00

1.02 Allow 2.5% of Items ( 1 ) for Tools 37.50

Total for 1 Cube 1,537.50

Rate for 1 Cube 1,537.50

Rate(Say) 1Cube 1,537.50

Rate(Say) 1 ft3 15.38

Rate(Say) 1m3 543.00

02.A.02 Backfilling to trenches with Imported Material


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount

1 Earth Delivered at Site M-042 Cube 1 2,500.00 2,500.00

1.01 Allow 15% of Items ( 1 ) for Compacting 375.00

1.02 U / SK Labourer L-007 Day 1.25 1,000.00 1,250.00

Total for 1 Cube 4,125.00

Rate for 1 Cube 4,125.00

Rate(Say) 1Cube 4,125.00

Rate(Say) 1 ft3 41.25

Rate(Say) 1m3 1,458.00

Filling under floors including levelling, watering & compacting in 3" layers with available and
02.A.03
selected earth at site
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.02 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

1.02 Allow 2.5% of Items ( 1 ) for Tools 50.00

Total for 1 Cube 2,050.00

Rate for 1 Cube 2,050.00

SDS 05/15/2025
Page 19 Of 461

Rate(Say) 1Cube 2,050.00

Rate(Say) 1 ft3 20.50

Rate(Say) 1m3 724.00

SDS 05/15/2025
Page 20 Of 461
03. Anti termite Treatment & DPC

A. Anti Termite Treatment


B. DPC

Anti Termite Treatment

03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1 D. D. T. Powder M-038 Lbs 16 25.00 400.00

1.01 Water M-157 Gal 20 17.50 350.00

1.02 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 1,250.00

Rate for 1 Sqr 1,250.00

Rate(Say) 1Sqr 1,250.00

Rate(Say) 1ft2 12.50

Rate(Say) 1m2 134.50

DPC

3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with
03.B.01
sand.
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 2.25 975.00 2,193.75

1.02 Sand M-113 Cube 0.11 3.50 0.39

1.03 Bitumen M-006 Gal 1.5 80.00 120.00

1.04 Fire Wood M-046 Lbs 10 250.00 2,500.00

1.05 Water M-157 Gal 10 17.50 175.00

1.06 Mason L-009 Day 1.25 1,250.00 1,562.50

1.07 U / SK Labourer L-007 Day 2.5 1,000.00 2,500.00

Total for 1 Sqr 9,051.64

Rate for 1 Sqr 9,051.64

Rate(Say) 1Sqr 9,052.00

Rate(Say) 1ft2 90.52

Rate(Say) 1m2 974.00

Road Development Department - North - East Province


Page 21 Of 461

Road Development Department - North - East Province


Page 22 Of 461
04. Random Rubble Masonry Work

04.01 Random Rubble Masonry in cement mortar 1:5 in foundation

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" - 9" Rubble M-111 Cube 1.3 9,500.00 12,350.00

1.02 Cement M-026 Bag 5 975.00 4,875.00

1.03 Sand M-113 Cube 0.3 10,500.00 3,150.00

1.04 Water M-157 Gal 100 1.00 100.00

1.05 Mason L-009 Day 2 1,250.00 2,500.00

1.06 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

Total for 1 Cube 26,975.00

Rate for 1 Cube 26,975.00

Rate(Say) 1Cube 26,975.00

Rate(Say) 1ft3 269.75

Rate(Say) 1m3 9,531.80

04.02 Random Rubble Masonry in cement mortar 1:5 in Superstructure


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" - 9" Rubble M-111 Cu 1.3 9,500.00 12,350.00

1.02 Cement M-026 Bag 5 975.00 4,875.00

1.03 Sand M-113 Cu 0.3 10,500.00 3,150.00

1.04 Water M-157 Gal 100 17.50 1,750.00

1.05 Mason L-009 Day 4.5 1,250.00 5,625.00

1.06 U / SK Labourer L-007 Day 7 1,000.00 7,000.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 378.75
Scaffolding
Total for 1 Cube 35,128.75

Rate for 1 Cube 35,128.75

Rate(Say) 1Cube 35,129.00

Rate(Say) 1ft3 351.29

Rate(Say) 1m3 12,413.07


Page 23 Of 461

Rubble cube 9500

Cement 1000

Sand 10666.667
Page 24 Of 461
05. Concrete Work

A. Mixing Concrete

B. Screed

C. Mass Concrete

D. Column

E. Beam

F. Slab

G. Lintol

Mixing Concrete

05.A.01 Mixing Concrete 1:1-1/2:3(3/4")


Analysis for 1 Cube
No. Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 23 975.00

1.02 Sand M-113 Cube 0.42 10,500.00

1.03 3/4 " Metal M-066 Cube 0.82 9,500.00

1.04 Hire of Mixer P-001 Day 0.333 2,500.00

1.05 Water M-157 Gal 150 2.50

1.06 SK Labour L-003 Day 0.333 1,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00

Total for 1 Cube

Rate for 1 Cube

Rate(Say) 1Cube

Rate(Say) 1m3

05.A.02 Mixing Concrete 1:3:6(1 1/2")


Analysis for 1 Cube

No Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 13 975.00

1.02 Sand M-113 Cube 0.53

1.03 1 1/2 " Metal M-065 Cube 0.92 9,500.00

1.04 Hire of Mixer P-001 Day 0.333 2,500.00

1.05 Water M-157 Gal 110 17.50

1.06 SK Labour L-003 Day 0.333 1,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00

Total for 1 Cube

Rate for 1 Cube


Page 25 Of 461
Rate(Say) 1Cube

Rate(Say) 1m3

05.A.03 Mixing Concrete 1:2 1/2 :5 (1")


Analysis for 1 Cube

No Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 14 975.00

1.02 Sand M-113 Cube 0.6 10,500.00

1.03 1 " Metal M-064 Cube 0.9 9,500.00

1.04 Hire of Mixer P-001 Day 0.333 2,500.00

1.05 Water M-157 Gal 100 17.50

1.06 SK Labour L-003 Day 0.333 1,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00

Total for 1 Cube

Rate for 1 Cube

Rate(Say) 1Cube

Rate(Say) 1m3

05.A.04 Mixing Concrete 1:2:4(3/4")


Analysis for 1 Cube

No Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 18 975.00

1.02 Sand M-113 Cube 0.5 10,500.00

1.03 3/4 " Metal M-066 Cube 0.88 9,500.00

1.04 Hire of Mixer P-001 Day 0.333 2,500.00

1.05 Water M-157 Gal 120 17.50

1.06 SK Labour L-003 Day 0.333 1,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00

Total for 1 Cube

Rate for 1 Cube

Rate(Say) 1Cube

Rate(Say) 1m3

05.A.05 Mixing Concrete 1:1:2(3/4")


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate
1.01 Cement M-026 Bag 31 975.00

1.02 Sand M-113 Cube 0.44 10,500.00


Page 26 Of 461
1.03 3/4 " Metal M-066 Cube 0.96 9,500.00

1.04 Hire of Mixer P-001 Day 0.333 2,500.00

1.05 Water M-157 Gal 200 17.50

1.06 SK Labour L-003 Day 0.333 1,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00

Total for 1 Cube

Rate for 1 Cube

Rate(Say) 1Cube

Rate(Say) 1m3

Screed Concrete

05.B.01 2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Mixing Concrete 1:3:6(1 1/2") 05.A.02 Cube 0.1667 26,590.00

1.02 SK Labour L-003 Day 0.125 1,250.00

1.03 U / SK Labourer L-007 Day 0.5 1,000.00

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sqr

Rate(Say) 1ft2

Rate(Say) 1m2

05.B.02 4" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate

1.01 Mixing Concrete 1:3:6(1 1/2") 05.A.02 Cube 0.33 26,590.00

1.02 SK Labour L-003 Day 0.125 1,250.00

1.03 U / SK Labourer L-007 Day 0.75 1,000.00

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sqr

Rate(Say) 1ft2

Rate(Say) 1m2

Mass Concrete

05.C.01 6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass concrete)


Analysis for 1 Page
Sqr27 Of 461

No Item Description Item Ref Unit Quantity Rate

1.01 Mixing Concrete 1:2 1/2 : 5(1") 05.A.03 Cube 0.5 33,500.00

1.025 Water M-157 Gal 200 17.50

1.03 SK Labour L-003 Day 0.5 1,250.00

1.04 U / SK Labourer L-007 Day 1.25 1,000.00

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sqr

Rate(Say) 1ft2

Rate(Say) 1m2

Column Concrete

05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.
Analysis for 0.51 Cube

No Item Description Item Ref Unit Quantity Rate

1.01 Mixed Concrete 1:1 1/2 : 3 (3/4") 05.A.01 Cube 0.51 38,250.00

Allow 5% of Items ( 1.01 ) for Wastage

1.025 Hire of Vibrator P-002 Day 0.5 1,500.00

1.03 Mason L-009 Day 0.5 1,250.00

1.04 U / SK Labourer L-007 Day 1.5 1,000.00

1.05 SK Labourer (Vibrator) L-004 Day 0.5 1,500.00

1.06 Jute Hessian M-063 Sq.ft 45 3.50

1.07 Water M-157 Gal 100 17.50

1.08 U / SK Labourer (curing) L-007 Day 0.5 1,000.00

Total for 0.51 Cube

Rate for 1 Cube

Rate(Say) 1Cube

Rate(Say) 1m3

Ground floor - First Floor 1m3

First Floor - Second Floor 1m3

Second Floor - Third Floor 1m3

Third Floor - Fourth Floor 1m3


Page 28 Of 461

Amount

22,425.00

4,410.00

7,790.00

832.50

375.00

416.25

2,000.00

38,248.75

38,248.75

38,250.00

13,515.90

Amount

12,675.00

8,740.00

832.50

1,925.00

416.25

2,000.00

26,588.75

26,588.75
Page 29 Of 461
26,590.00

9,395.76

Amount

13,650.00

6,300.00

8,550.00

832.50

1,750.00

416.25

2,000.00

33,498.75

33,498.75

33,500.00

11,837.46

Amount

17,550.00

5,250.00

8,360.00

832.50

2,100.00

416.25

2,000.00

36,508.75

36,508.75

36,510.00

12,901.06

Amount
30,225.00

4,620.00
Page 30 Of 461
9,120.00

832.50

3,500.00

416.25

2,000.00

50,713.75

50,713.75

50,710.00

17,918.73

exceed in 5' 0"

Amount
4,432.55

156.25

500.00

5,088.80

5,088.80

5,090.00

50.90

547.68

ot exceeding 5' 0"

Amount

8,774.70

156.25

750.00

9,680.95

9,680.95

9,680.00

96.80

1,041.57
Page 31 Of 461

Amount

16,750.00

3,500.00

625.00

1,250.00

22,125.00

22,125.00

22,130.00

221.30

2,381.19

d floor.

Amount

19,507.50

975.38

750.00

625.00

1,500.00

750.00

157.50

1,750.00

500.00

26,515.38

51,990.93

51,991.00

18,371.38

18,371.38

20,208.52

22,229.37

24,452.30
05.G.01 600 D concrete file
Analysis for 240 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Mixing Concrete 1:2:4(3/4") 05.A.04 Cu 0.45 38,250.00 17,212.50
1.02 lenth of pipe P-002 3 3 1,500.00 4,500.00
1.08 fixing charge L-007 Day 0.5 1,000.00 500.00
Total for 0 0 22,212.50
Rate for 1 0 92.55
Rate(Say) 1 ft 90.00
Rate(Say) 1m 295.20
Ground floor 1m 295.20
First Floor 1m 324.72
Second Floor 1m 357.19
Third Floor 1m 392.91
Page 33 Of 461

06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for 0.15 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork to 9" x 9" cement concrete
1.01 06.A.02 1 Use 1 1,000.00 1,000.00
column in ground floor - Making Mould
1.02 Bolts 16mm 18" (12 nos 20 uses) M-010 No 0.6 150.00 90.00

1.03 Mould Oil M-071 litre 0.5 150.00 75.00

1.04 Timber props 4" x 2" M-144 L.ft 3.5 65.00 227.50

1.05 Carpenter - assembling L-008 Day 0.25 1,500.00 375.00

1.06 U / SK Labourer - assembling L-007 Day 0.25 1,000.00 250.00

1.07 Carpenter - dismantling, cleaning & repairing L-008 Day 0.25 1,500.00 375.00
U / SK Labourer - dismantling, cleaning &
1.08 L-007 Day 0.25 1,000.00 250.00
repairing
Total for 0.15 Sq 2,642.50

Rate for 1 Sq 17,616.67

Rate(Say) 1Sq 17,617.00

Rate(Say) 1ft2 176.17

Rate(Say) 1m2 1,895.59

Ground floor - First Floor 1m2 1,895.59

First Floor - Second Floor 1m2 2,085.15

Second Floor - Third Floor 1m2 2,293.66

Third Floor - Fourth Floor 1m2 2,523.03

06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 18.15 22.00 399.30

1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 17.1 35.00 598.50

1.03 2" x 1" Class II Timber Battens. M-142 L.ft 16.12 65.00 1,047.80

1.04 Wire Nails M-161 Lbs 1.5 85.00 127.50

1.05 Carpenter L-008 Day 0.5 1,500.00 750.00

1.06 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 4 Uses 3,423.10

Rate for 1 Uses 855.78

Rate(Say) 1 Use 856.00

Beam

SDS 05/15/2025
Page 34 Of 461

06.B.01 Sawn timber formwork for concrete beams in ground floor


Analysis for 0.55 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork for 9" x 12" concrete beams
1.01 06.B.02 1 Use 1 1,925.00 1,925.00
in ground floor - Making the mould
Sawn timber formwork for concrete beams in
1.02 06.B.03 1 Use 1 2,212.00 2,212.00
ground floor-Assembling

1.03 Allow 10% of Items ( 1.02 ) for Repairs - - - - 221.20

1.04 Carpenter - Assembling L-008 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer - Assembling L-007 Day 2 1,000.00 2,000.00

1.06 Mould Oil M-071 litre 0.5 150.00 75.00

1.07 Wire Nails M-161 Lbs 0.5 100.00 50.00

1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00

U / SK Labourer - dismantling, cleaning &


1.09 L-007 Day 2 1,000.00 2,000.00
repairing
Total for 0.55 Sq 10,733.20

Rate for 1 Sq 19,514.91

Rate(Say) 1Sq 19,515.00

Rate(Say) 1ft2 195.15

Rate(Say) 1m2 2,099.81

Ground floor 1m2 2,099.81

First Floor 1m2 2,309.80

Second Floor 1m2 2,540.77

Third Floor 1m2 2,794.85

06.B.01 rated for coated plywoods


Analysis for 0.55 Sq
No Item Description Item Ref Unit Quantity Rate Amount

1.01 coated plywood both side M-074-1 3 time 1 2,662.65 2,662.65

Sawn timber formwork for concrete beams in


1.02 06.B.03 1 Use 1 1,574.68 1,574.68
ground floor-Assembling

1.03 Allow 10% of Items ( 1.02 ) for Repairs - - - - 157.47

1.04 Carpenter - Assembling L-008 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer - Assembling L-007 Day 2 1,000.00 2,000.00

1.06 Mould Oil M-071 litre 0.5 150.00 75.00

1.07 Wire Nails M-161 Lbs 0.5 85.00 42.50

1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00

U / SK Labourer - dismantling, cleaning &


1.09 L-007 Day 2 1,000.00 2,000.00
repairing
Total for 0.55 Sq 10,762.30

Rate for 1 Sq 19,567.82

SDS 05/15/2025
Page 35 Of 461

Rate(Say) 1Sq 19,568.00

Rate(Say) 1ft2 195.68

Rate(Say) 1m2 2,105.52

Ground floor 1m2 2,105.52

First Floor 1m2 2,316.07

Second Floor 1m2 2,547.68

Third Floor 1m2 2,802.44

06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 60 22.00 1,320.00

1.02 2" x 1" Class II Timber Battens. M-142 L.ft 24 65.00 1,560.00

1.03 2" x 2" Class II Timber In Yokes M-143 L.ft 45 35.00 1,575.00

1.04 4"X2" Timber bearers M-144 L.ft 30 65.00 1,950.00

1.05 Wire Nails M-161 Lbs 2 85.00 170.00

1.06 Carpenter L-008 Day 1.5 1,500.00 2,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

Total for 4 Uses 10,825.00

Rate for 1 Uses 2,706.25

Rate(Say) 1 Use 2,706.00

SDS 05/15/2025
Page 36 Of 461

06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 110 65.00 7,150.00

1.02 2" x 2" Class II Timber for bracings M-143 L.ft 80 35.00 2,800.00

1.03 1" Thick Class II Timber base plate M-141 Sq.ft 6 22.00 132.00

1.04 Timber Wedges M-151 No 22 145.00 3,190.00

Total for 6 Uses 13,272.00

Rate for 1 Uses 2,212.00

Rate(Say) 1 Use 2,212.00

Slab

06.C.01 Sawn timber formwork for underside of first floor slab


Analysis for 2 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork for 20" x 10" concrete slab
1.01 06.C.02 1 Use 1 5,136.00 5,136.00
in ground floor - Making panels
1.02 Allow 20% of Items ( 1.01 ) for Repairs - - - - 1,027.20
Sawn timber formwork for underside of first floor
1.03 06.C.03 Sq 1 10,929.00 10,929.00
slab - assembling
1.04 Allow 20% of Items ( 1.03 ) for Wastage - - - - 2,185.80

1.04 Carpenter - Assembling L-008 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer - Assembling L-007 Day 4 1,000.00 4,000.00

1.06 Mould Oil M-071 litre 4.54 150.00 681.00

1.07 Wire Nails M-161 Lbs 2 85.00 170.00

1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 1,500.00 750.00
U / SK Labourer - dismantling, cleaning &
1.09 L-007 Day 2 1,000.00 2,000.00
repairing
Total for 2 Sq 28,379.00

Rate for 1 Sq 14,189.50

Rate(Say) 1Sq 14,190.00

Rate(Say) 1ft2 141.90

Rate(Say) 1m2 1,526.84

Ground floor 1m2 1,526.84

First Floor 1m2 1,679.53

Second Floor 1m2 1,847.48

Third Floor 1m2 2,032.23

06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount

SDS 05/15/2025
Page 37 Of 461

1.01 1" Thick Class II Timber M-141 Sq.ft 220 22.00 4,840.00

1.02 Timber props 4" x 2" M-144 L.ft 121 65.00 7,865.00

1.03 Wire Nails M-161 Lbs 4 85.00 340.00

1.04 Carpenter L-008 Day 3 1,500.00 4,500.00

1.05 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

Total for 4 Uses 20,545.00

Rate for 1 Uses 5,136.25

Rate(Say) 5,136.00

06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 690 65.00 44,850.00

1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 66 35.00 2,310.00

1.03 Timber Wedges M-151 No 122 145.00 17,690.00

1.04 1" Thick Class II Timber M-141 Sq.ft 33 22.00 726.00

Total for 6 Uses 65,576.00

Rate for 1 Uses 10,929.33

Rate(Say) 10,929.00

SDS 05/15/2025
Page 38 Of 461
07. Reinforcement

Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied with
7.01
G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount

1.01 M.S./Tor Steel Rods including transport to site M-152 kg 50 130.00 6,500.00

1.02 Allow 15% of Items ( 1.01 ) for Wastage - - - - 975.00

1.03 16 BWG Binding Wire M-005 Lbs 1.5 250.00 375.00


Allow 1.5% of Items ( 1.01 ) for spaces or
1.04 - - - - 97.50
chairs
1.05 SK Labour L-003 Day 1 1,250.00 1,250.00

1.06 U / SK Labourer L-007 Day 1 1,000.00 1,000.00

Total for 1 Cwt. 10,197.50

Rate for 1 Cwt. 10,197.50

Rate(Say) 1Cwt 10,198.00

Rate(Say) 1Kg 203.96

Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.02
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount

1.01 M.S./Tor Steel Rods including transport to site M-068 kg 50 130.00 6,500.00

1.02 Allow 15% of Items ( 1.01 ) for Wastage - - - - 975.00

1.03 16 BWG Binding Wire M-005 Lbs 1.5 250.00 375.00

1.04 SK Labour L-003 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 1 1,000.00 1,000.00

Total for 1 Cwt. 10,100.00

Rate for 1 Cwt. 10,100.00

Rate(Say) 1Cwt 10,100.00

Rate(Say) 1Kg 202.00

7.03 Type A142 mesh laid with 150mm laps in ground floor slab

Analysis for 100 ft2


No Item Description Item Ref Unit Quantity Rate Amount

1.01 M.S./Tor Steel Rods including transport to site M-068 ft2 100 130.00 13,000.00

1.02 Allow 15% of Items ( 1.01 ) for Wastage - - - - 260.00


Page 39 Of 461
1.03 16 BWG Binding Wire M-005 Lbs 0.5 250.00 125.00

1.04 SK Labour L-003 Day 0.5 1,250.00 625.00

1.05 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for ft2 100 14,510.00

Rate for 1 kg 145.10

Rate(Say) 1 kg 145.00

Rate(Say) m2 1,208.36
Page 40 Of 461

14.76 108.24

steel

cemen reincorment

reinfoce 2x2

2 4x4

perlin roofing sheet they will give

sheet roofin c peril in

I beam

ready mix

balance rate 20%

pluming

electrical material price


07. Steel fabricating

7.01 Steel fabricating, partitioning


Analysis for 50 m
No Item Description Item Ref Unit Quantity Rate Amount

50 x 100 x 6 mm
1.01 M-193 m 50 355.00 17,750.00
channel

Allow 15% of
1.02 Items ( 1.01 ) for - - - - 2,662.50
Wastage
1.03 fixing item 15% 2,662.50
1.05 SK Labour L-003 Day 2 ### 2,500.00
1.0599999 U / SK Labourer L-007 Day 2 ### 2,000.00
Total for 50 m 27,575.00
Rate for 1 m 551.50
Rate(Say) 1m 552.00
Rate(Say) 1m 552.00
Page 42 Of 461

08. Block Work

08.01 8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Hollow Cement Block (16"x 8"x 8") M-057 No 204 30.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 Cement M-026 Bag 0.75 975.00

1.04 Sand M-113 Cube 0.06 3.50

1.05 Mason L-009 Day 1.5 1,250.00

1.06 U / SK Labourer L-007 Day 2.5 1,000.00

1.07 Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding - - - -

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sq

Rate(Say) 1ft2

Rate(Say) 1m2

Ground floor 1m2

First Floor 1m2

Second Floor 1m2

3rd floor 1m2

08.02 6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Hollow Cement Blocks (16"x 8"x 6") M-059 No 112 75.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 Cement M-026 Bag 0.65 975.00

1.04 Sand M-113 Cube 0.07 3.50

1.05 Mason L-009 Day 1.5 1,250.00

1.06 U / SK Labourer L-007 Day 2 1,000.00

1.07 Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding - - - -

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sq

Rate(Say) 1ft2
Page 43
2 Of 461
Rate(Say) 1m

Ground floor 1m2

First Floor 1m2

Second Floor 1m2

Third Floor 1m2

08.03 4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate

1.01 Hollow Cement Blocks (16"x 8"x 4") M-058 No 112 45.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 Cement M-026 Bag 0.4 975.00

1.04 Sand M-113 Cube 0.03 10,500.00

1.05 Mason L-009 Day 1 1,250.00

1.06 U / SK Labourer L-007 Day 2 1,000.00

1.07 Allow 5% of Items ( 1.05, 1.06 ) for Scaffolding - - - -

Total for 1 Sqr

Rate for 1 Sqr

Rate(Say) 1 Sq

Rate(Say) 1ft2

Rate(Say) 1m2

Ground floor 1m2

First Floor 1m2

Second Floor 1m2

Third Floor 1m2


Page 44 Of 461

oor (Cavities unfilled)

Amount
6,120.00 10.7584 2.0449137 204.491374182035

306.00

731.25

0.21

1,875.00

2,500.00

131.25

11,663.71

11,663.71

11,664.00

116.64

1,255.05

1,255.05

1,380.55

1,518.61

1,670.47

unfilled.

Amount
8,400.00

420.00

633.75

51.00

1,875.00

2,000.00

116.25

13,496.00

13,496.00

13,496.00

134.96
Page 45 Of 461
1,452.17

1,452.17

1,597.39

1,757.13

1,932.84

unfilled. 08.03 4" Thick hollow block work in cement and sand mortar 1:5 with cavit
Analysis for
Amount No Item Description Item Ref

5,040.00 1.01 Hollow Cement Blocks (16"x 8"x 4") M-058

252.00 1.02 Allow 5% of Items ( 1.01 ) for Wastage -

390.00 1.03 Cement M-026

51.00 1.04 Sand M-113

1,250.00 1.05 Mason L-009

2,000.00 1.0599999 U / SK Labourer L-007

Allow 5% of Items ( 1.05, 1.06 ) for


162.50 1.0700001 -
Scaffolding

9,145.50 Total for

9,145.50 Rate for 1

9,145.50 Rate(Say)

91.46 Rate(Say)

984.06 Rate(Say)

984.06 Ground floor

1,082.46 First Floor

1,190.71 Second Floor

1,309.78 Third Floor


Page 46 Of 461

ement and sand mortar 1:5 with cavities unfilled.


Analysis for 1 Sqr
Unit Quantity Rate Amount

No 112 45.00 5,040.00

- - - 252.00

Bag 0.4 975.00 390.00

Cube 0.03 10,500.00 51.00

Day 1 1,250.00 1,250.00

Day 2 1,000.00 2,000.00

- - - 162.50

1 Sqr 9,145.50

Sqr 9,145.50

1 Sq 9,145.50

1ft2 91.46

1m2 984.06

Ground floor 1m2 984.06

1m2 1,082.46

Second Floor 1m2 1,190.71

Third Floor 1m2 1,309.78


Page 47 Of 461
09. Brick Work

09.01 Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Bricks M-019 No 550 6.00 3,300.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 165.00

1.03 Cement M-026 Bag 1.3 975.00 1,267.50

1.04 Sand M-113 Cu 0.1 3.50 0.35

1.05 Water M-157 Gal 50 17.50 875.00

1.06 Mason L-009 Day 1.5 1,250.00 1,875.00

1.07 U / SK Labourer L-007 Day 2 1,000.00 2,000.00


Allow 5% of Items (1.06, 1.07 ) for
1.08 - - - - 193.75
Scaffolding
Total for 1 Sqr 9,676.60

Rate for 1 Sqr 9,676.60

Rate(Say) 1 Sq 9,677.00

Rate(Say) 1ft2 96.77

Rate(Say) 1m2 1,041.25

Ground floor 1m2 1,041.25

First Floor 1m2 1,093.31

Second Floor 1m2 1,147.97

Third Floor 1m2 1,205.37

09.02 9" thick brick wall cement sand 1:5 in ground floor

Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1090 6.00 6,540.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 327.00

1.03 Cement M-026 Bag 3 975.00 2,925.00

1.04 Sand M-113 Cu 0.2 3.50 0.70

1.05 Water M-157 Gal 115 17.50 2,012.50

1.06 Mason L-009 Day 2.25 1,250.00 2,812.50

1.07 U / SK Labour L-007 Day 3.75 1,000.00 3,750.00


Allow 3% of Items (1.06, 1.07 ) for
1.08 - - - - 196.88
Scaffolding
Total for 1 Sqr 18,564.58

Rate for 1 Sqr 18,564.58

Rate(Say) 1 Sq 18,565.00
Page 48 Of 461
Rate(Say) 1ft2 185.65

Rate(Say) 1m2 1,997.59

Ground floor 1m2 1,997.59

First Floor 1m2 2,097.47

Second Floor 1m2 2,202.35

Third Floor 1m2 2,312.46

09.03 Brick work in cement sand 1:5 in foundation upto D. P. C

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1450 6.00 8,700.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 435.00

1.03 Cement M-026 Bag 4 975.00 3,900.00

1.04 Sand M-113 Cu 0.25 3.50 0.88

1.05 Water M-157 Gal 150 17.50 2,625.00

1.06 Mason L-009 Day 3 1,250.00 3,750.00

1.07 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

Total for 1 Cube 23,410.88


Rate for 1 Cube 23,410.88
Rate(Say) 1 Cu 23,411.00

Rate(Say) 1ft3 234.11

Rate(Say) 1m3 8,272.44

09.04 Brick Work in cement sand 1:8 in foundation upto D. P. C

Analysis for 1 Cube

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1450 6.00 8,700.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 435.00

1.03 Cement M-026 Bag 2.333 975.00 2,274.68

1.04 Sand M-113 Cu 0.375 3.50 1.31

1.05 Water M-157 Gal 150 17.50 2,625.00

1.06 Mason L-009 Day 3 1,250.00 3,750.00

1.07 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

Total for 1 Cube 21,785.99

Rate for 1 Cube 21,785.99

Rate(Say) 1 Cu 21,786.00
Page 49 Of 461
Rate(Say) 1ft3 217.86

Rate(Say) 1m3 7,698.23

09.05 Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor

Analysis for 1 Sqr


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1630 6.00 9,780.00

1.02 Allow 5% of Items ( 1.01 ) for wastage - - - - 489.00

1.03 Cement M-026 Bag 4.5 975.00 4,387.50

1.04 Sand M-113 Cu 0.3 3.50 1.05

1.05 Water M-157 Gal 170 17.50 2,975.00

1.06 Mason L-009 Day 3.5 1,250.00 4,375.00

1.07 U / SK Labourer L-007 Day 5.5 1,000.00 5,500.00


Allow 2% of Items (1.06, 1.07 ) for
1.08 - - - - 197.50
Scaffolding
Total for 1 Sqr 27,705.05

Rate for 1 Sqr 27,705.05

Rate(Say) 1 Sq 27,705.00

Rate(Say) 1ft2 277.05

Rate(Say) 1m2 2,981.06

Ground floor 1m2 2,981.06

First Floor 1m2 3,279.16

Second Floor 1m2 3,607.08

Third Floor 1m2 3,967.79

09.06 9" Brick Walls in cement sand 1:8 in superstructure in ground floor

Analysis for 1 Sqr


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1090 6.00 6,540.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 327.00

1.03 Cement M-026 Bag 1.75 975.00 1,706.25

1.04 Sand M-113 Cu 0.3 3.50 1.05

1.05 Water M-157 Gal 115 17.50 2,012.50

1.06 Mason L-009 Day 2.25 1,250.00 2,812.50

1.07 U / SK Labourer L-007 Day 3 1,000.00 3,000.00


Allow 3% of Items ( 1.06, 1.07 ) for
1.08 - - - - 174.38
Scaffolding
Total for 1 Sqr 16,573.68
Page 50 Of 461
Rate for 1 Sqr 16,573.68

Rate(Say) 1 Sq 16,574.00

Rate(Say) 1ft2 165.74

Rate(Say) 1m2 1,783.36

Ground floor 1m2 1,783.36

First Floor 1m2 1,961.70

Second Floor 1m2 2,157.87

Third Floor 1m2 2,373.66

4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
09.07
brickwork measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Wire cut Bricks M-164 No 550 15.00 8,250.00

1.02 Allow 2% of Items ( 1.01 ) for Wastage - - - - 165.00

1.03 Cement M-026 Bag 1.2 975.00 1,170.00

1.04 Sand M-113 Cu 0.08 3.50 0.28

1.05 Water M-157 Gal 30 17.50 525.00

1.06 Mason L-009 Day 1.5 1,250.00 1,875.00

1.07 U / SK Labourer L-007 Day 2 1,000.00 2,000.00


Allow 3% of Items (1.06, 1.07 ) for
1.08 - - - - 116.25
Scaffolding
Total for 1 Sqr 14,101.53

Rate for 1 Sqr 14,101.53

Rate(Say) 1 Sq 14,102.00

Rate(Say) 1ft2 141.02

Rate(Say) 1m2 1,517.38

Ground floor 1m2 1,517.38

First Floor 1m2 1,669.11

Second Floor 1m2 1,836.02

Third Floor 1m2 2,019.63

09.08 9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)

Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Wire cut Bricks M-164 No 1060 15.00 15,900.00

1.02 Allow 4% of Items ( 1.01 ) for Wastage - - - - 636.00

1.03 Cement M-026 Bag 2.5 975.00 2,437.50


Page 51 Of 461
1.04 Sand M-113 Cu 0.18 3.50 0.63

1.05 Water M-157 Gal 100 17.50 1,750.00

1.06 Mason L-009 Day 2.25 1,250.00 2,812.50

1.07 U / SK Labourer L-007 Day 3.75 1,000.00 3,750.00


Allow 3% of Items ( 1.06, 1.07 ) for
1.08 - - - - 196.88
Scaffolding
Total for 1 Sq 27,483.51

Rate for 1 Sq 27,483.51

Rate(Say) 1 Sq 27,484.00

Rate(Say) 1ft2 274.84

Rate(Say) 1m2 2,957.28

Ground floor 1m2 2,957.28

First Floor 1m2 3,253.01

Second Floor 1m2 3,578.31

Third Floor 1m2 3,936.14

13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
09.10
measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Wire cut Bricks M-164 No 1630 15.00 24,450.00

1.02 Allow 2% of Items ( 1.01 ) for Wastage - - - - 489.00

1.03 Cement M-026 Bag 4.5 975.00 4,387.50

1.04 Sand M-113 Cu 0.3 3.50 1.05

1.05 Water M-157 Gal 50 17.50 875.00

1.06 Mason L-009 Day 3.75 1,250.00 4,687.50

1.07 U / SK Labourer L-007 Day 5.5 1,000.00 5,500.00


Allow 2% of Items (1.06, 1.07 ) for
1.08 - - - - 203.75
Scaffolding
Total for 1 Sqr 40,593.80

Rate for 1 Sqr 40,593.80

Rate(Say) 1 Sq 40,594.00

Rate(Say) 1ft2 405.94

Rate(Say) 1m2 4,367.91

Ground floor 1m2 4,367.91

First Floor 1m2 4,804.71

Second Floor 1m2 5,285.18

Third Floor 1m2 5,813.69


Page 52 Of 461
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground
09.11
floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.5 975.00 487.50

1.02 Sand M-113 Cu 0.01 3.50 0.04

1.03 Acid M-001 Gal 0.1 254.00 25.40

1.04 Water M-157 Gal 10 17.50 175.00

1.05 Mason L-009 Day 5 1,250.00 6,250.00

1.06 U / SK Labourer L-007 Day 3.5 1,000.00 3,500.00

Total for 1 Sqr 10,437.94

Rate for 1 Sqr 10,437.94

Rate(Say) 1 Sq 10,438.00

Rate(Say) 1ft2 104.38

Rate(Say) 1m2 1,123.13

09.12 3" Thick floor paved in lime mortar 2:5 in ground floor

Analysis for 1 Sqr


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 350 6.00 2,100.00

1.02 Slaked Lime M-115 Lbs 1.2 13.75 16.50

1.03 Sand M-113 Cu 0.11 3.50 0.39

1.04 Water M-157 Gal 45 17.50 787.50

1.05 Mason L-009 Day 1.25 1,250.00 1,562.50

1.06 U / SK Labourer L-007 Day 2.5 1,000.00 2,500.00

Total for 1 Sqr 6,966.89

Rate for 1 Sqr 6,966.89

Rate(Say) 1 Sq 6,967.00

Rate(Say) 1ft2 69.67

Rate(Say) 1m2 749.65

Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
09.13
rendering including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 120 6.00 720.00

1.02 Cement M-026 Bag 0.5 975.00 487.50

1.03 Sand M-113 Cu 0.05 3.50 0.18


Page 53 Of 461
1.04 Water M-157 Gal 15 17.50 262.50

1.05 Mason L-009 Day 0.5 1,250.00 625.00

1.06 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 10 L.ft 2,595.18

Rate for 1 L.ft 259.52

Rate(Say) 1 ft 259.52

Rate(Say) 1m 851.22

Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.14
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 140 6.00 840.00

1.02 Cement M-026 Bag 0.8 975.00 780.00

1.03 Sand M-113 Cu 0.05 3.50 0.18

1.04 Water M-157 Gal 20 17.50 350.00

1.05 Mason L-009 Day 1.25 1,250.00 1,562.50

1.06 U / SK Labourer L-007 Day 1.25 1,000.00 1,250.00

Total for 10 L.ft 4,782.68

Rate for 1 L.ft 478.27

Rate(Say) 1 ft 478.27

Rate(Say) 1m 1,568.72

Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.15
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 110 6.00 660.00

1.02 Cement M-026 Bag 0.7 975.00 682.50

1.03 Sand M-113 Cu 0.04 3.50 0.14

1.04 Water M-157 Gal 15 17.50 262.50

1.05 Mason L-009 Day 1 1,250.00 1,250.00

1.06 U / SK Labourer L-007 Day 1.25 1,000.00 1,250.00

Total for 10 L.ft 4,105.14

Rate for 1 L.ft 410.51

Rate(Say) 1 ft 410.51

Rate(Say) 1m 1,346.49
Page 54 Of 461
Page 55 Of 461
10. Roof Covering and Ceiling

A. Roof Frame & Roof Covering


B. Roof Plumbing

Roof frame & Roof Covering

Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
10.A.01
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for 6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 34 150.00 5,100.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 510.00

1.03 2"X1" Reepers M-149 L.ft 660 15.00 9,900.00

1.04 Allow 5% of Items ( 1.03 ) for Wastage - - - - 495.00

1.05 Wire Nails 6" Long M-163 Lbs 8 450.00 3,600.00

1.06 Wire Nails 2" Long M-162 Lbs 2 8.75 17.50

1.07 Carpenter L-008 Day 7 2,000.00 14,000.00

1.08 U / SK Labourer L-007 Day 8 1,200.00 9,600.00

Total for 6 Sqrs 43,222.50

Rate for 1 Sqrs 7,203.75


Rate(Say) 7,204.00

10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building

Analysis for 6 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Tiles M-108 No 750 3.50 2,625.00

1.02 Carpenter L-008 Day 3 1,500.00 4,500.00

1.03 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

Total for 6 Sqrs 10,125.00

Rate for 1 Sqrs 1,687.50


Rate(Say) 1,688.00

10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building

Analysis for 3.6 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 13.25 45.00 596.25

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 59.63


Page 56 Of 461
1.03 Carpenter L-008 Day 2.5 1,500.00 3,750.00

1.04 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

Total for 3.6 Sqrs 7,405.88

Rate for 1 Sqrs 2,057.19


Rate(Say) 2,057.00

Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
10.A.04
separately)
Analysis for 3.6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Asbestos Corrugated M-003 Sq.ft 420 26.00 10,920.00

1.02 Roofing Screws and Washers M109 No 72 3.50 252.00

1.03 Carpenter L-008 Day 1 1,500.00 1,500.00

1.04 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

Total for 3.6 Sqrs 14,672.00

Rate for 1 Sqrs 4,075.56


Rate(Say) 4,076.00

10.A.05 One layer half round clay tiles over corrugated asbestos roof covering

Analysis for 1 Sqr


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Half Round Clay Tiles M-056 No 650 5.00 3,250.00

1.02 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

Total for 1 Sqr 5,250.00

Rate for 1 Sqr 5,250.00


Rate(Say) 1 Sqr 5,250.00

10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)

Analysis for 13.33 L.ft.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Ridges 3' 8" Long - Asbestos M-106 Pair 4 500.00 2,000.00

1.02 Roofing Screws or Bolts M-110 No 16 9,500.00 152,000.00

1.03 Carpenter L-008 Day 0.25 1,500.00 375.00

1.04 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 13.33 L.ft. 154,625.00

Rate for 1 L.ft. 11,599.77


Rate(Say) 1 L.ft 11,600.00
Page 57 Of 461

10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4

Analysis for 12 L.ft.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Ridge Tiles M-105 No 9 245.00 2,205.00

1.02 Cement M-o26 Bag 0.333 975.00 324.68

1.03 Sand M-113 Cu 0.02 3.50 0.07

1.04 Slaked Lime M-115 Lbs 15 13.75 206.25

1.05 Colouring Powder M-036 Lbs 0.5 175.00 87.50

1.06 Mason L-009 Day 0.25 1,250.00 312.50

1.07 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 12 L.ft. 3,386.00

Rate for 1 L.ft. 282.17


Rate(Say) 282.00

10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)

Analysis for 100 L.ft.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Planks M-147 Sq.ft 75 12.00 900.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 45.00

1.03 Brass Screws 1 1/2" M-015 No 100 3.75 375.00

1.04 Carpenter L-008 Day 3 1,500.00 4,500.00

1.05 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

1.06 Allow 5% of Items ( 1.04, 1.05 ) for Wastage - - - - 375.00

Total for 100 L.ft. 9,195.00

Rate for 1 L.ft. 91.95


Rate(Say) 92.00

10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters

Analysis for 100 L.ft.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Planks M-147 Sq.ft 75 12.00 900.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 45.00

1.03 Brass Screws 1 1/2" M-015 No 50 3.75 187.50

1.04 Carpenter L-008 Day 3 1,500.00 4,500.00

1.05 U / SK Labourer L-007 Day 3 1,000.00 3,000.00


Allow 5% of Items ( 1.04, 1.05 ) for Page 58 Of 461
1.06 - - - - 375.00
Scaffolding
Total for 100 L.ft. 9,007.50

Rate for 1 L.ft. 90.08


Rate(Say) 90.00

Roof Plumbing

18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on
timber members.
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 2 2,200.00 4,400.00

1.02 Wood Preservative M-165 Gal 0.25 354.40 88.60

1.03 Cement M-026 Bag 0.1 975.00 97.50

1.04 Slaked Lime M-115 Lbs 0.05 13.75 0.69

1.05 Sand M-113 Cu 0.01 3.50 0.04

1.06 1" Thick Class II Timber M-141 Sq.ft 50 22.00 1,100.00

1.07 2" Nails M-072 Lbs 2 90.00 180.00

1.08 Carpenter L-008 Day 1 1,500.00 1,500.00

1.09 U / SK Labourer L-007 Day 1 1,000.00 1,000.00

1.10 Tinker L-005 Day 0.5 1,500.00 750.00

1.11 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

1.12 Mason L-009 Day 0.25 1,250.00 312.50

1.13 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 15 L.ft. 10,179.32

Rate for 1 L.ft. 678.62


Rate(Say) 679.00

18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 1 2,200.00 2,200.00

1.02 Cement M-026 Bag 0.05 975.00 48.75

1.03 Sand M-113 Cu 0.01 3.50 0.04

1.04 Soldering Lead M-116 Lbs 1 1.40 1.40

1.05 Tinker L-005 Day 0.5 1,500.00 750.00


Page 59 Of 461
1.06 Mason L-009 Day 0.125 1,250.00 156.25

1.07 U / SK Labourer L-007 Day 0.75 1,000.00 750.00

Total for 15 L.ft. 3,906.44

Rate for 1 L.ft. 260.43


Rate(Say) 260.00

6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
10.B.03
fixed at 18" centres (other specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" eave gutter lengths (12' each) M-088 No 2 0.00 -

1.02 Joiner M-055 No 1 0.00 -

1.03 gutter brackets M-054 No 17 0.00 -

1.04 3/4" brass screws M-017 No 34 1.25 42.50

1.05 Solvent cement M-117 grms 20 15.00 300.00

1.06 Plumber L-002 Day 0.5 1,500.00 750.00

1.07 U / SK Labourer L-007 Day 0.5 1,000.00 500.00


Allow 5% of Items ( 1.06, 1.07) for
1.08 62.50
Scaffolding
Total for 24 L.ft. 1,655.00

Rate for 1 L.ft. 68.96


Rate(Say) 1 L.ft. 69.00

10.B.04 6" dia PVC gutter head

Analysis for 1 No.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" dia PVC gutter head M-089 No 1 0.00 -

1.02 Gutter Joiner M-055 No 2 0.00 -

1.03 gutter brackets M-054 No 2 0.00 -

1.04 3/4" brass screws M-017 No 4 1.25 5.00

1.05 Solvent cement M-117 grms 12 15.00 180.00

1.06 Plumber L-002 Day 0.125 1,500.00 187.50

1.07 U / SK Labourer L-007 Day 0.125 1,000.00 125.00


Allow 5% of Items ( 1.06, 1.07) for
1.08 15.63
Scaffolding
Total for 1 No. 513.13

Rate for 1 No. 513.13


Rate(Say) 1 No. 513.00
Page 60 Of 461

10.B.05 6" dia PVC mitres

Analysis for 1 No.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" dia PVC mitre bend M-091 No 1 46.00 46.00

1.02 Gutter Joiner M-055 No 2 0.00 -

1.03 gutter brackets M-054 No 2 0.00 -

1.04 3/4" brass screws M-017 No 4 1.25 5.00

1.05 Solvent cement M-117 grms 12 15.00 180.00

1.06 Plumber L-002 Day 0.125 1,500.00 187.50

1.07 U / SK Labourer L-007 Day 0.125 1,000.00 125.00


Allow 5% of Items ( 1.06, 1.07) for
1.08 15.63
Scaffolding
Total for 1 No. 559.13

Rate for 1 No. 559.13


Rate(Say) 1 No. 559.00

10.B.06 6" dia PVC end caps

Analysis for 1 No.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 end cap M-087 No 1 0.00 -

1.05 Solvent cement M-117 grms 12 15.00 180.00

1.06 Plumber L-002 Day 0.0625 1,500.00 93.75

1.07 U / SK Labourer L-007 Day 0.0625 1,000.00 62.50


Allow 5% of Items ( 1.06, 1.07) for
1.08 7.81
Scaffolding
Total for 1 No. 344.06

Rate for 1 No. 344.06


Rate(Say) 1 No. 344.00

3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
10.B.07
specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 3 1/2" down pipe lengths (12' each) M-078 No 2 0.00 -

1.02 3 1/2" Joiner M-090 No 1 0.00 -

1.03 PVC straps M-104 No 4 35.00 140.00

1.04 1" brass screws M-014 No 8 2.50 20.00

1.05 Solvent cement M-117 grms 30 15.00 450.00


Page 61 Of 461
1.06 Plumber L-002 Day 0.33 1,500.00 500.00

1.07 U / SK Labourer L-007 Day 0.33 1,000.00 333.33


Allow 5% of Items ( 1.06, 1.07) for
1.08 41.67
Scaffolding
Total for 24 L.ft. 1,485.00

Rate for 1 L.ft. 61.88


Rate(Say) 1 L.ft. 62.00

10.B.08 3 1/2" dia PVC elbow

Analysis for 1 No.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 elbow M-079 No 1 69.00 69.00

1.05 Solvent cement M-117 grms 32 15.00 480.00

1.06 Plumber L-002 Day 0.0625 1,500.00 93.75

1.07 U / SK Labourer L-007 Day 0.0625 1,000.00 62.50


Allow 5% of Items ( 1.06, 1.07) for
1.08 7.81
Scaffolding
Total for 1 No. 713.06

Rate for 1 No. 713.06


Rate(Say) 1 No. 713.00

10.B.09 3 1/2" dia PVC Shoe

Analysis for 1 No.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Shoe M-099 No 1 29.50 29.50

1.05 Solvent cement M-117 grms 15 15.00 225.00

1.06 Plumber L-002 Day 0.0625 1,500.00 93.75

1.07 U / SK Labourer L-007 Day 0.0625 1,000.00 62.50

Allow 5% of Items ( 1.06, 1.07) for


1.08 7.81
Scaffolding
Total for 1 No. 418.56

Rate for 1 No. 418.56


Rate(Say) 1 No. 419.00
Page 62 Of 461
Page 63 Of 461

valance board

barge board
Page 64 Of 461
Page 65 Of 461

11. Doors & Windows

A. Doors & Windows


B. Ironmongery

Doors & Windows

Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3
11.A.01
1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)

Analysis for 22.75 Sq.ft


No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 1.5 250.00 375.00

1.02 Spur Stone M-118 No 2 450.00 900.00

1.03 Fibre / Plastic Plugs M-045 No 6 1.50 9.00

1.04 4" Long Brass Screws M-018 No 6 7.50 45.00

1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00

1.06 1 1/2" Planks M-139 Sq.ft 14 750.00 10,500.00

1.07 1" Planks M-139a Sq.ft 5 65.00 325.00

1.08 Carpenter L-008 Day 5 1,500.00 7,500.00

1.09 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00

Total for 22.75 Sq.ft 21,166.00

Rate for Sq.ft 930.37


Rate(Say) 930.00

Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including
11.A.02 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft

No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 1.66 250.00 415.00

1.02 Spur Stone M-118 No 2 450.00 900.00

1.03 Fibre / Plastic Plugs M-045 No 6 1.50 9.00

1.04 4" Long Brass Screws M-018 No 6 7.50 45.00

1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00

1.06 1 1/2" Planks M-139 Sq.ft 16 750.00 12,000.00

1.07 1" Planks M-139a Sq.ft 7 65.00 455.00


Page 66 Of 461
1.08 Carpenter L-008 Day 6 1,500.00 9,000.00

1.09 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

Total for 28 Sq.ft 24,836.00

Rate for Sq.ft 887.00


Rate(Say) 887.00

Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4"
11.A.03 thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)
Analysis for 21.75 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 1.8 140.00 252.00

1.02 Spur Stone M-118 No 2 450.00 900.00

1.03 Fibre / Plastic Plugs M-045 No 6 1.50 9.00

1.04 4" Long Brass Screws M-018 No 6 7.50 45.00

1.05 6' 9" X 2' 9" Plywood Sash M-074 No 1 2,000.00 2,000.00

1.06 Carpenter L-008 Day 0.75 1,500.00 1,125.00

1.07 U / SK Labourer L-007 Day 0.375 1,000.00 375.00

1.08 Mason - fixing frame L-009 Day 0.25 1,250.00 312.50

1.09 U / SK Labourer - fixing frame L-007 Day 0.25 1,000.00 250.00

Total for 21.75 Sq.ft 5,268.50

Rate for Sq.ft 242.23


Rate(Say) 242.00

Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame
11.A.04 having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)
Analysis for 16.25 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 1.7 140.00 238.00

1.02 Spur Stone M-118 No 2 450.00 900.00

1.03 Fibre / Plastic Plugs M-045 No 6 1.50 9.00

1.04 4" Long Brass Screws M-018 No 6 7.50 45.00

1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00

1.06 1" Planks M-139a Sq.ft 21 65.00 1,365.00

1.07 Brass Screws 1 1/2" M-015 No 36 3.75 135.00

1.08 Carpenter L-008 Day 2.25 1,500.00 3,375.00

1.09 U / SK Labourer L-007 Day 1 1,000.00 1,000.00


Page 67 Of 461
1.10 Mason - fixing frame L-009 Day 0.25 1,250.00 312.50

1.11 U / SK Labourer - fixing frame L-007 Day 0.25 1,000.00 250.00

Total for 16.25 Sq.ft 7,641.50

Rate for Sq.ft 470.25


Rate(Say) 470.00

window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable
11.A.05 sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 3.2 140.00 448.00

1.02 4" Long Brass Screws M-018 No 4 7.50 30.00

1.03 Fibre / Plastic Plugs M-045 No 4 1.50 6.00

1.04 1 1/2" Planks M-139 Sq.ft 9.25 750.00 6,937.50

1.05 Carpenter L-008 Day 6 1,500.00 9,000.00

1.06 U / SK Labourer L-007 Day 2.5 1,000.00 2,500.00

1.07 Mason - fixing frame L-009 Day 0.5 1,250.00 625.00

1.08 U / SK Labourer - fixing frame L-007 Day 0.5 1,000.00 500.00

Total for 28 Sq.ft 20,046.50

Rate for Sq.ft 715.95


Rate(Say) 716.00

1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut
11.A.06
and fixed with timber beadings to doors and windows.
Analysis for 9 Sq.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Glass panes M-027 Sq.ft 9 25.00 225.00

1.02 1/2" X 1/2" Beading M-133 L.ft 30 12.00 360.00

1.03 Brass Pannel Pins M-013 Doz 4 1.00 4.00

1.04 Glazier L-010 Day 0.5 1,500.00 750.00

1.05 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 9 Sq.ft 1,839.00

Rate for Sq.ft 204.33


Rate(Say) 204.00

Ironmongery
Page 68 Of 461
11.B.01 Butt Hinges 5" X 2 1/2" Brass

Analysis for 1.5 Pair


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Butt Hinges (pairs 1 1/2) M-023 No 3 70.00 210.00

1.02 3/4" Brass Screws M-017 No 24 1.25 30.00

1.03 Carpenter L-008 Day 0.25 1,500.00 375.00

1.04 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 1.5 Pair 865.00

Rate for Pair 576.67


Rate(Say) 577.00

11.B.02 Tee Hinges 6" X 1/2" Brass

Analysis for 1.5 Pair


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Tee Hinges M-128 Pair 1 180.00 180.00

1.02 3/4" Iron Screws M-061 No 18 0.55 9.90

1.03 Carpenter L-008 Day 0.25 1,500.00 375.00

1.04 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 1.5 Pair 814.90

Rate for Pair 543.27


Rate(Say) 543.00

11.B.03 Mortice Lock

Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Mortice lock with screws M-070 No 1 960.00 960.00

1.02 Carpenter L-008 Day 0.5 1,500.00 750.00

1.03 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 No 2,210.00

Rate for No 2,210.00


Rate(Say) 2,210.00

11.B.04 Casement Stays

Analysis for 4 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Casement Stays M-025 No 4 55.00 220.00

1.02 1/2 " Brass Screws M-016 No 16 1.30 20.80


Page 69 Of 461
1.03 Carpenter L-008 Day 0.25 1,500.00 375.00

1.04 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 4 No 865.80

Rate for No 216.45


Rate(Say) 216.00

11.B.05 Door Closer (Hydraulic)

Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Door Closer M-040 No 1 1,850.00 1,850.00

1.02 3/4" Brass Screws M-017 No 8 1.25 10.00

1.03 Carpenter L-008 Day 0.25 1,500.00 375.00

1.04 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 1 No 2,485.00

Rate for No 2,485.00


Rate(Say) 2,485.00

11.B.06 Tower / Skeleton Brass Bolts 12"

Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Tower / Skeleton Brass Bolts M-153 No 1 75.00 75.00

1.02 1/2 " Brass Screws M-016 No 10 1.30 13.00

1.03 Carpenter L-008 Day 0.063 1,500.00 94.50

1.04 U / SK Labourer L-007 Day 0.063 1,000.00 63.00

Total for 1 No 245.50

Rate for No 245.50


Rate(Say) 246.00

11.B.07 Barrel Bolt 4"

Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Barrel Bolt M-004 No 1 75.00 75.00

1.02 1/2 " Brass Screws M-016 No 8 1.30 10.40

1.03 Carpenter L-008 Day 0.063 1,500.00 94.50

1.04 U / SK Labourer L-007 Day 0.063 1,000.00 63.00

Total for 1 No 242.90

Rate for No 242.90


Rate(Say) Page 70243.00
Of 461

11.B.08 Casement Fasteners

Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Casement Fasteners M-024 No 6 55.00 330.00

1.02 1/2 " Brass Screws M-016 No 24 1.30 31.20

1.03 Carpenter L-008 Day 0.5 1,500.00 750.00

1.04 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 6 No 1,611.20

Rate for No 268.53


Rate(Say) 269.00

11.B.09 Check this item

Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Brass Fanlight Chtches M-011 No 6 45.00 270.00

1.02 1/2 " Brass Screws M-016 No 24 1.30 31.20

1.03 Carpenter L-008 Day 0.5 1,500.00 750.00

1.04 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 6 No 1,551.20

Rate for No 258.53


Rate(Say) 259.00

11.B.10 Draw Rings

Analysis for 6 No
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Draw Rings M-041 No 6 22.50 135.00

1.02 1/2 " Brass Screws M-016 No 12 1.30 15.60

1.03 Carpenter L-008 Day 0.125 1,500.00 187.50

1.04 U / SK Labourer L-007 Day 0.125 1,000.00 125.00

Total for 6 No 463.10

Rate for No 77.18


Rate(Say) 77.00
Page 71 Of 461
Page 72 Of 461
Page 73 Of 461

12. Plumbing & Drainage


pipe works
senitary fitting
AC installation

12.01 1/2 " Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 10 L.ft

No Item Description Item Ref Unit Quantity Rate

1.01 1/2" PVC Pipes M-095 L.ft 13 79.00

1.02 1 " Clips and Nails M-028 No 3 7.00

1.03 Solvent Cement M-117 Grms 2 15.00

1.04 Plumber L-002 Day 0.125 1,500.00

1.05 U / SK Labourer L-007 Day 0.125 1,000.00

Total for 10 L.ft

Rate for L.ft

Rate(Say) 1 L.ft

12.02 3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 10 L.ft


No Item Description Item Ref Unit Quantity Rate

1.01 3/4" PVC Pipes M-098 L.ft 13 0.00

1.02 1 " Clips and Nails M-028 No 3 7.00

1.03 Solvent Cement M-117 Grms 3 15.00

1.04 Plumber L-002 Day 0.125 1,500.00

1.05 U / SK Labourer L-007 Day 0.125 1,000.00

Total for 10 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

12.03 1 " Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 100 L.ft


No Item Description Item Ref Unit Quantity Rate
Page 74 Of 461
1.01 1" PVC Pipes M-094 L.ft 100 7.50

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 1" PVC Sockets M-077 No 8 0.00

1.04 Solvent Cement M-117 Grms 32 15.00

1.05 1 " Clips and Nails M-028 No 35 7.00

1.06 Plumber L-002 Day 0.5 1,500.00

1.07 U / SK Labourer L-007 Day 0.5 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

12.04 1 1/4"Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 100 L.ft


No Item Description Item Ref Unit Quantity Rate

1.01 1 1/4" PVC Pipes M-093 L.ft 100 21.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 1 1/4" PVC Sockets M-101 No 8 48.00

1.04 Solvent Cement M-117 Grms 48 15.00

1.05 1 1/4 " Clips and Nails M-030 No 35 8.75

1.06 Plumber L-002 Day 0.75 1,500.00

1.07 U / SK Labourer L-007 Day 0.75 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

12.05 1 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 100 L.ft


No Item Description Item Ref Unit Quantity Rate

1.01 1 1/2" PVC Pipes M-092 L.ft 100 32.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 1 1/2" PVC Sockets M-100 No 8 19.50

1.04 Solvent Cement M-117 Grms 64 15.00

1.05 1 1/2 " Clips and Nails M-029 No 35 10.50

1.06 Plumber L-002 Day 0.75 1,500.00

1.07 U / SK Labourer L-007 Day 0.75 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft
Page 75 Of 461

12.06 2" Diameter PVC pipes fixed to walls (Specials paid separately)

Analysis for 100 L.ft


No Item Description Item Ref Unit Quantity Rate

1.01 2" PVC Pipes M-096 L.ft 100 185.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - -

1.03 2" PVC Sockets M-102 No 8 192.00

1.04 Solvent Cement M-117 Grms 112 15.00

1.05 2 " Clips and Nails M-031 No 35 10.75

1.06 Plumber L-002 Day 0.75 1,500.00

1.07 U / SK Labourer L-007 Day 0.75 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

12.07 3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000

Analysis for 100 L.ft.


No Item Description Item Ref Unit Quantity Rate

1.01 3" PVC Pipes M-097 L.ft 100 14.00

1.02 Allow 5% of Items ( 1.01 ) for Compaction - - - -

1.03 3" PVC Sockets M-103 No 8 0.00

1.04 Solvent Cement M-117 Grms 200 15.00

1.05 3 " Clips and Screws M-032 No 35 34.00

1.06 Plumber L-002 Day 1 1,500.00

1.07 U / SK Labourer L-007 Day 1 1,000.00

Total for 100 L.ft.

Rate for L.ft.


Rate(Say) 1 L.ft

Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6"
12.08
Deep, Backfilling & Compacting
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate

1.01 U / SK Labourer L-007 Day 2.25 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft
Page 76
Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good Of 461
average
12.09
depth 2" (Pipes and specials paid separately)
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 0.1 975.00

1.02 Sand M-113 Cu 0.01 3.50

1.06 Mason L-009 Day 3 1,250.00

1.07 U / SK Labourer L-007 Day 3 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and making
12.10
good. average depth 3" (Pipes and specials measured paid separately)
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate

1.01 Cement M-026 Bag 0.2 975.00

1.02 Sand M-113 Cu 0.03 3.50

1.06 Mason L-009 Day 3.5 1,250.00

1.07 U / SK Labourer L-007 Day 3.5 1,000.00

Total for 100 L.ft

Rate for L.ft


Rate(Say) 1 L.ft

12.11 1/2" dia PVC specials viz-elbow / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1/2" PVC Elbows / Bent / Socket M-083 No 10 350.00

1.02 Solvent Cement M-117 Grms 20 15.00

1.06 Plumber L-002 Day 0.25 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.12 3/4" dia PVC specials viz-elbow / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 3/4" PVC Elbows / Bent / Socket M-076 No 10 14.00

1.02 Solvent Cement M-117 Grms 30 15.00

1.06 Plumber L-002 Day 0.25 1,500.00


Page 77 Of 461
Total for 10 No

Rate for No
Rate(Say) No

12.13 1" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1" PVC Elbows / Bent / Socket M-082 No 10 10.50

1.02 Solvent Cement M-117 Grms 40 15.00

1.06 Plumber L-002 Day 0.25 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.14 1 1/4" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1 1/4" PVC Elbows / Bent / Socket M-081 No 10 21.00

1.02 Solvent Cement M-117 Grms 60 15.00

1.06 Plumber L-002 Day 0.25 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.15 1 1/2" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1 1/2" PVC Elbows / Bent / Socket M-080 No 10 42.00

1.02 Solvent Cement M-117 Grms 80 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.16 2" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate
Page 78 Of 461
1.01 2" PVC Elbows / Bent / Socket M-085 No 10 580.00

1.02 Solvent Cement M-117 Grms 140 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.17 2 1/2" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 2 1/2" PVC Elbows / Bent / Socket M-084 No 10 110.00

1.02 Solvent Cement M-117 Grms 200 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.18 3" dia PVC specials viz-elbo / Bends / Sockets.

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 3" PVC Elbows / Bent / Socket M-086 No 10 0.00

1.02 Solvent Cement M-117 Grms 240 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.19 1/2" dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1/2 " Dia Tee M-122 No 10 165.50

1.02 Solvent Cement M-117 Grms 30 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No
Page 79 Of 461
12.20 3/4 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 3/4 " Dia Tee M-126 No 10 63.50

1.02 Solvent Cement M-117 Grms 45 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.21 1" dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1 " Dia Tee M-120 No 10 102.00

1.02 Solvent Cement M-117 Grms 60 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.22 1 1/4 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1 1/4 " Dia Tee M-127 No 10 165.00

1.02 Solvent Cement M-117 Grms 90 15.00

1.06 Plumber L-002 Day 0.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.23 1 1/2 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 1 1/2 " Dia Tee M-121 No 10 15.50

1.02 Solvent Cement M-117 Grms 120 15.00

1.06 Plumber L-002 Day 1 1,500.00

Total for 10 No

Rate for No
Rate(Say) Page
No80 Of 461

12.24 2 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 2 " Dia Tee M-123 No 10 526.00

1.02 Solvent Cement M-117 Grms 210 15.00

1.06 Plumber L-002 Day 1 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.25 2 1/2 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 2 1/2" Dia Tee M-124 No 10 875.00

1.02 Solvent Cement M-117 Grms 300 15.00

1.06 Plumber L-002 Day 1.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.26 3 " dia PVC Tee

Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate

1.01 3 " Dia Tee M-125 No 10 21.50

1.02 Solvent Cement M-117 Grms 360 15.00

1.06 Plumber L-002 Day 1.5 1,500.00

Total for 10 No

Rate for No
Rate(Say) No

12.26 water closet and cistern


No Item Description Item Ref Unit Quantity Rate
Pedestal type of water closet ( size approx.
227 550 mm) M-227 Nr 1 6500

238 WC connector M-238 Nr 1 500

239 Isolator valve M-239 Nr 1 450

229 Quality 20mm bid tap M-229 Nr 1 500


Page 81 Of 461
231 Seat cover M-231 Nr 1 2500

222 Flexible connector M-222 Nr 1 250

240 flaxible hose M-240 Nr 1 450

221 Cistern M-221 Nr 1 3500

2 Plumber L-002 Day 0.5 1500

Other accosseries ( Nails, roll plugs etc.

Total cost for fixing commode (water closet)

12.3 Fixing wash basing with required item


242 vanity wash basin M-242 Nr 1 8500
240 flaxible hose M-240 Nr 2 450
241 plastic bottle trap M-241 Nr 1 450
239 Isolator valve M-239 Nr 2 450
216 Angle valves M-216 Nr 2 750
2 Plumber L-002 Day 0.5 1500

Other accessories of fixing allowed 5%


fixing of wash basing Nr 1

12.3 Fixing urinal with required item


No Item Description Item Ref Unit Quantity Rate
237 Urinals M-237 Nr 1 5000
239 Isolator valve M-239 Nr 1 450
240 flaxible hose M-240 Nr 1 450
241 plastic bottle trap M-241 Nr 1 450

other plumbing and accessories25%


2 Plumber L-002 Day 0.5 1500

Fixing urinal with required item Nr 1

12.3 Fixing bided spray with required item


No Item Description Item Ref Unit Quantity Rate
243 Hand spray bidet comprising flexible c M-243 Nr 1 1500
216 Angle valves M-216 Nr 1 750

other plumbing and accessories 10%


2 Plumber L-002 Day 0.25 1500

Fixing urinal with required item Nr 1

### Fixing paper holder


219 Chromium plated brass toilet paper holder M-219 Nr 1 1500
other fixing item 10%
2 Plumber L-002 Day 0.25 1500
Fixing paper holder 1 Item

###
Supply and fix chromium plated brass towel rail
32 dia. and 600mm.
No Item Description Item Ref Unit Quantity Rate
236 Towel rail 32 dia. and 600mm. M-236 Nr 1 700
other fixing item 10%
2 Plumber L-002 Day 0.2 1500
Fixing paper holder 1 Item

Supply and fix hand shower and installed complete


###
to working order
No Item Description Item Ref Unit Quantity Rate
244 Hand shower M-244 Nr 1 4500
other fixing item 10%
9 Mason L-009 Day 0.2 1250
Fixing paper holder 1 Item Page 82 Of 461

###
Supply and fix approved quality, 960x960mm size
shower tray
No Item Description Item Ref Unit Quantity Rate
215 960x960mm size shower tray M-215 Nr 1 56611.2
plumbing and fixing allowed 5%
2 Plumber L-002 Day 1 1500
7 U / SK Labourer L-007 Day 1 1000
Fixing shower tray 1 Item
Page 83 Of 461

ately)

Amount

1,027.00 1/2 " 20mm dia pipe

21.00 3/4" 25mm dia pipe

30.00 1" 32mm dia pipe

187.50 11/4" 40mm dia pipe

125.00 11/2" 50mm dia pipe

1,390.50 2" 63mm dia pipe

139.05 21/2" 75mm dia pipe

139.00 3" 90mm dia pipe

ately)

Amount

21.00

45.00

187.50

125.00

378.50

37.85
38.00

ely)

Amount
Page 84 Of 461
750.00

37.50

480.00

245.00

750.00

500.00

2,762.50

27.63
28.00

rately)

Amount

2,100.00

105.00

384.00

720.00

306.25

1,125.00

750.00

5,490.25

54.90
55.00

rately)

Amount

3,200.00

160.00

156.00

960.00

367.50

1,125.00

750.00

6,718.50

67.19
67.00
Page 85 Of 461

ately)

Amount

18,500.00

925.00

1,536.00

1,680.00

376.25

1,125.00

750.00

24,892.25

248.92
249.00

ely) Type 1000

Amount

1,400.00

70.00

3,000.00

1,190.00

1,500.00

1,000.00

8,160.00

81.60
82.00

nd not less than 1' 6"

Amount

2,250.00

2,250.00

22.50
23.00
nd making good average Page 86 Of 461

Amount

97.50

0.04

3,750.00

3,000.00

6,847.54

68.48
68.00

round and floor and making


separately)

Amount

195.00

0.11

4,375.00

3,500.00

8,070.11

80.70
81.00

Amount

3,500.00

300.00

375.00

4,175.00

417.50
418.00

Amount

140.00

450.00

375.00
Page 87 Of 461
965.00

96.50
97.00

Amount

105.00

600.00

375.00

1,080.00

108.00
108.00

Amount

210.00

900.00

375.00

1,485.00

148.50
149.00

Amount

420.00

1,200.00

750.00

2,370.00

237.00
237.00

Amount
Page 88 Of 461
5,800.00

2,100.00

750.00

8,650.00

865.00
865.00

Amount

1,100.00

3,000.00

750.00

4,850.00

485.00
485.00

Amount

3,600.00

750.00

4,350.00

435.00
435.00

Amount

1,655.00

450.00

750.00

2,855.00

285.50
286.00
Page 89 Of 461

Amount

635.00

675.00

750.00

2,060.00

206.00
206.00

Amount

1,020.00

900.00

750.00

2,670.00

267.00
267.00

Amount

1,650.00

1,350.00

750.00

3,750.00

375.00
375.00

Amount

155.00

1,800.00

1,500.00

3,455.00

345.50
346.00 Page 90 Of 461

Amount

5,260.00

3,150.00

1,500.00

9,910.00

991.00
991.00

Amount

8,750.00

4,500.00

2,250.00

15,500.00

1,550.00
1,550.00

Amount

215.00

5,400.00

2,250.00

7,865.00

786.50
787.00

Amount

6,500.00

500.00

450.00

500.00
Page 91 Of 461
2,500.00

250.00

450.00

3,500.00

750.00
15,400.00

462.00

31,262.00

8,500.00
900.00
450.00
900.00
1,500.00
750.00
13,000.00
650.00
26,650.00

Amount
5,000.00
450.00
450.00
450.00
6,350.00
1587.5
750.00
15,037.50
15,037.50

Amount
1,500.00
750.00
2,250.00
225.00
375.00
2,850.00
2,850.00

1,500.00
150.00
375.00
2,025.00 2561.6

Amount
700.00
70.00
300.00
1,070.00

Amount
6,000.00
600.00
250.00
6,850.00 Page 92 Of 461

Amount
49,000.00
2,450.00
1,500.00
1,000.00
52,950.00
Page 93 Of 461

2850
Page 94 Of 461
13. Plastering

A. Wall Plastering

B. Rendering

C. Sofit Plastering

D. Skirting

Wall Plastering

13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 1.4 975.00 1,365.00

1.02 Sand M-113 Cu 0.06 10,500.00 630.00

1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00


Allow 3% of Items ( 1.04, 1.05 ) for
1.06 - - - - 82.50
Scaffolding
Total for 1 Sqr 5,002.50

Rate for Sqr 5,002.50

Rate(Say) 1Sq 5,003.00

Rate(Say) 1ft2 50.03

Rate(Say) 1m2 538.32

13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 975.00 780.00

1.03 Sand M-113 Cu 0.07 3.50 0.25

1.04 Water M-157 Gal 10 17.50 175.00

1.05 Mason L-009 Day 1 1,250.00 1,250.00

1.06 U / SK Labourer L-007 Day 1.25 1,000.00 1,250.00

Total for 1 Sqr 3,455.25

Rate for Sqr 3,455.25

Rate(Say) 1Sq 3,455.00

Rate(Say) 1ft2 34.55

Rate(Say) 1m2 371.76

Ground floor - First Floor 1m2 371.76


Page 95 Of 461
First Floor - Second Floor 1m2 408.93

Second Floor - Third Floor 1m2 449.83

Third Floor - Fourth Floor 1m2 494.81

5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden
13.A.03
float.
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 975.00 780.00

1.02 Slaked Lime M-115 Lbs 44 13.75 605.00

1.03 Sand M-113 Cu 0.07 3.50 0.25

1.04 Water M-157 Gal 10 17.50 175.00

1.05 Mason L-009 Day 1 1,250.00 1,250.00

1.06 U / SK Labourer L-007 Day 1.25 1,000.00 1,250.00


Allow 3% of Items ( 1.04, 1.05 ) for
1.07 - - - - 75.00
Scaffolding
Total for 1 Sqr 4,135.25

Rate for Sqr 4,135.25

Rate(Say) 1Sq 4,135.00

Rate(Say) 1ft2 41.35

Rate(Say) 1m2 444.93

Ground floor - First Floor 1m2 444.93

First Floor - Second Floor 1m2 489.42

Second Floor - Third Floor 1m2 538.36

Third Floor - Fourth Floor 1m2 592.20

5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with
13.A.04
lime putty floating.
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 975.00 780.00

1.02 Slaked Lime M-115 kg 30 13.75 412.50

1.03 Sand M-113 Cu 0.07 3.50 0.25

1.04 Water M-157 Gal 10 17.50 175.00

1.05 Mason L-009 Day 1.5 1,250.00 1,875.00

1.06 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 101.25
Scaffolding
Total for 1 Sqr 4,844.00

Rate for Sqr 4,844.00

Rate(Say) 1Sq 4,844.00


Page 96 Of 461
Rate(Say) 1ft2 48.44

Rate(Say) 1m2 521.21

Ground floor - First Floor 1m2 521.21

First Floor - Second Floor 1m2 573.34

Second Floor - Third Floor 1m2 630.67

Third Floor - Fourth Floor 1m2 693.74

13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Slaked Lime M-115 kg 65 13.75 893.75

1.02 Sand M-113 Cu 0.07 3.50 0.25

1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 1.75 1,000.00 1,750.00


Allow 3% of Items ( 1.04, 1.05 ) for
1.06 - - - - 90.00
Scaffolding
Total for 1 Sqr 4,159.00

Rate for Sqr 4,159.00

Rate(Say) 1Sq 4,159.00

Rate(Say) 1ft2 41.59

Rate(Say) 1m2 447.51

Rendering

13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 1.75 975.00 1,706.25

1.02 Sand M-113 Cu 0.08 3.50 0.28

1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1.25 1,250.00 1,562.50

1.05 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,000.00 250.00

Total for 1 Sqr 5,694.03

Rate for Sqr 5,694.03

Rate(Say) 1Sq 5,694.00

Rate(Say) 1ft2 56.94

Rate(Say) 1m2 612.67


Page 97 Of 461
Ground floor 1m2 612.67

First Floor 1m2 673.94

Second Floor 1m2 741.34

Third Floor 1m2 815.47

13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 1.07 975.00 1,043.25

1.02 Sand M-113 Cu 0.05 3.50 0.18

1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00

Total for 1 Sqr 3,968.43

Rate for Sqr 3,968.43

Rate(Say) 1Sq 3,968.00

Rate(Say) 1ft2 39.68

Rate(Say) 1m2 426.96

13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount

` 1.01 Cement M-026 Bag 1.5 975.00 1,462.50

1.02 Sand M-113 Cu 0.05 3.50 0.18

1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1 1,250.00 1,250.00

1.05 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,000.00 250.00

Total for 1 Sq 4,637.68

Rate for Sq 4,637.68

Rate(Say) 1Sq 4,638.00

Rate(Say) 1ft2 46.38

Rate(Say) 1m2 499.05

13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 2.25 975.00 2,193.75

1.02 Sand M-113 Cu 0.08 3.50 0.28


Page 98 Of 461
1.03 Water M-157 Gal 10 17.50 175.00

1.04 Mason L-009 Day 1.25 1,250.00 1,562.50

1.05 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,000.00 250.00

Total for 1 Sqr 6,181.53

Rate for Sqr 6,181.53

Rate(Say) 1Sq 6,182.00

Rate(Say) 1ft2 61.82

Rate(Say) 1m2 665.18

3/4" thick rendering in cement and sand 1:2 in colored cement floors finished
13.B.05
smooth
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 2.25 975.00 2,193.75

1.02 Sand M-113 Cu 0.08 3.50 0.28

1.03 Coloured Pigment M-035 Lbs 5 175.00 875.00

1.04 Water M-157 Gal 10 17.50 175.00

1.05 Mason L-009 Day 1.25 1,250.00 1,562.50

1.06 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

1.07 U / SK Labourer - curing L-007 Day 0.25 1,000.00 250.00

Total for 1 Sqr 7,056.53

Rate for Sqr 7,056.53

Rate(Say) 1Sq 7,057.00

Rate(Say) 1ft2 70.57

Rate(Say) 1m2 759.33

Sofit Plastering

3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with
13.C.01
Lime putty
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 975.00 780.00

1.02 Slaked Lime M-115 kg 8 13.75 110.00

1.03 Sand M-113 Cu 0.05 3.50 0.18

1.04 Water M-157 Gal 5 17.50 87.50

1.05 Mason L-009 Day 2.5 1,250.00 3,125.00

1.06 U / SK Labourer L-007 Day 2.5 1,000.00 2,500.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 168.75
Scaffolding
Total for 1 Sqr 5,991.43
Page 99 Of 461
Rate for Sqr 5,991.43

Rate(Say) 1Sq 5,991.00

Rate(Say) 1ft2 59.91

Rate(Say) 1m2 644.63

Ground floor 1m2 644.63

First Floor 1m2 709.09

Second Floor 1m2 780.00

Third Floor 1m2 858.00

3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including
13.C.02
floating with Lime putty
Analysis for 1 Sq

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 975.00 780.00

1.02 Slaked Lime M-115 kg 8 13.75 110.00

1.03 Sand M-113 Cu 0.05 3.50 0.18

1.04 Water M-157 Gal 5 17.50 87.50

1.05 Mason L-009 Day 2 1,250.00 2,500.00

1.06 U / SK Labourer L-007 Day 2 1,000.00 2,000.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 135.00
Scaffolding
Total for 1 Sqr 4,832.68

Rate for Sqr 4,832.68

Rate(Say) 1Sq 4,833.00

Rate(Say) 1ft2 48.33

Rate(Say) 1m2 520.03

Ground floor 1m2 520.03

First Floor 1m2 572.03

Second Floor 1m2 629.24

Third Floor 1m2 692.16

Skirting

1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with
13.D.01
floating including forming groove
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.1 975.00 97.50

1.02 Sand M-113 Cu 0.003 3.50 0.01

1.03 Coloured Pigment M-035 Lbs 0.25 175.00 43.75

1.04 Mason L-009 Day 0.375 1,250.00 468.75


Page 100 Of 461
1.05 U / SK Labourer L-007 Day 0.312 1,000.00 312.00

Total for 10 L.ft 922.01

Rate for L.ft 92.20

Rate(Say) 1ft 92.00

Rate(Say) 1m 301.76

Ground floor 1m 301.76

First Floor 1m 331.94

Second Floor 1m 365.13

3rd floor 1m 401.64


Page 101 Of 461

0.08 520

0.625
Page 102 Of 461
Page 103 Of 461
Page 104 Of 461
Page 105 Of 461
14. Tilling

A. Wall Tilling

B. Floor Tilling

Wall Tilling

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.01
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (6''x6") M-155 No 400 0.50 200.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 20.00

1.03 Cement M-026 Bag 2.5 975.00 2,437.50

1.04 Sand M-113 Cu 0.11 3.50 0.39

1.05 White Cement M-159 Lbs 1 85.00 85.00

1.06 Mason L-009 Day 4 1,250.00 5,000.00

1.07 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

1.08 U / SK Labourer L-007 Day 0.25 1,000.00 250.00

Total for 1 Sqr 11,992.89

Rate for 1 Sqr 11,992.89

Rate(Say) 1Sq 11,993.00

Rate(Say) 1ft2 119.93

Rate(Say) 1m2 1,290.45

Ground floor 1m2 1,290.45

First Floor 1m2 1,419.49

Second Floor 1m2 1,561.44

Third Floor 1m2 1,717.58

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.02
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (8''x12") M-156 No 150 150.00 22,500.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 2,250.00

1.03 Cement M-026 Bag 2.5 975.00 2,437.50

1.04 Sand M-113 Cu 0.11 3.50 0.39

1.05 White Cement M-159 Lbs 1 85.00 85.00

1.06 Mason L-009 Day 4 1,250.00 5,000.00

1.07 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

1.08 U / SK Labourer L-007 Day 0.25 1,000.00 250.00


Page 106 Of 461
Total for 1 Sqr 36,522.89

Rate for 1 Sqr 36,522.89

Rate(Say) 1Sq 36,523.00

Rate(Say) 1ft2 365.23

Rate(Say) 1m2 3,929.87

Ground floor 1m2 3,929.87

First Floor 1m2 4,322.86

Second Floor 1m2 4,755.15

Third Floor 1m2 5,230.66

Floor Tilling

14.B.01 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Terrazzo Tiles 12" X 12" M-132 No 100 125.00 12,500.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 625.00

1.03 Cement M-026 Bag 1.25 975.00 1,218.75

1.04 Sand M-113 Cu 0.07 3.50 0.25

1.05 Coloured Pigment M-035 Lbs 2 175.00 350.00

1.06 Wax Polish M-158 Lbs 0.5 65.00 32.50

1.07 Cotton Waste M-037 Lbs 2 12.50 25.00

1.08 Mason L-009 Day 4 1,250.00 5,000.00

1.09 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

1.10 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 23,251.50

Rate for 1 Sqr 23,251.50

Rate(Say) 1Sq 23,251.00

Rate(Say) 1ft2 232.51

Rate(Say) 1m2 2,501.81

Ground floor 1m2 2,501.81

First Floor 1m2 2,751.99

Second Floor 1m2 3,027.19

Third Floor 1m2 3,329.91

14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Pressed Tiles 8" X 8" M-130 No 225 100.00 22,500.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 1,125.00


Page 107 Of 461
1.03 Cement M-026 Bag 1.25 975.00 1,218.75

1.04 Sand M-113 Cu 0.07 3.50 0.25

1.05 Colouring Powder M-036 Lbs 0.25 175.00 43.75

1.06 Cotton Waste M-037 Lbs 2 12.50 25.00

1.07 Mason L-009 Day 4 1,250.00 5,000.00

1.08 U / SK Labourer L-007 Day 4 1,000.00 4,000.00

1.09 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 34,412.75

Rate for 1 Sqr 34,412.75


Rate(Say) 1Sq 34,413.00
Rate(Say) 1ft2 344.13

Rate(Say) 1m2 3,702.84

Ground floor 1m2 3,702.84

First Floor 1m2 4,073.12

Second Floor 1m2 4,480.43

Third Floor 1m2 4,928.48


Page 108 Of 461
Page 109 Of 461
15. Ceiling

Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
15.01
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber

Analysis for 1.95 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 8 45.00 360.00

1.02 2" Nails M-072 Lbs 1 90.00 90.00

1.03 Fibre / Plastic Plugs M-045 No 26 1.50 39.00

1.04 Cement M-026 Bag 0.23 975.00 224.25

1.05 Sand M-113 Cu 0.02 3.50 0.07

1.06 Brush 2" M-022 No 0.25 165.00 41.25

1.07 Tarnap M-119 Gal 0.333 31.25 10.41

1.08 Carpenter L-008 Day 2.5 1,500.00 3,750.00

1.09 Mason L-009 Day 0.5 1,250.00 625.00

1.10 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00

Allow 3% of Items ( 1.08, 1.09,


1.11 - - - - 176.25
1.10 ) for Scaffolding

Total for 1.95 Sqrs 6,816.23

Rate for 1 Sqrs 3,495.50


Rate(Say) 3,496.00

Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
15.02
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)

Analysis for 1.95 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Flat Asbestos Sheets M-048 Sq.ft 210 15.00 3,150.00

1.02 2"X2" halmilla Cove Moulding M-145 Sq.ft 60 65.00 3,900.00

1.03 1 1/2"X1/2" Halmilla Beadings M-134 L.ft 125 28.00 3,500.00

1.04 1/4" clout Nails M-033 lbs 0.25 25.00 6.25

1.05 Brass Screws 1 1/2" M-015 No 96 3.75 360.00


1.06 Carpenter L-008 Day 1.5 1,500.00 2,250.00

1.07 U / SK Labourer L-007 Day 2 1,000.00 2,000.00


Allow 3% of Items ( 1.06, 1.07 ) for
1.08 - - - - 127.50
Scaffolding
Total for 1.95 Sqrs 15,293.75

Rate for 1 Sqrs 7,842.95


Rate(Say) 7,843.00

3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
15.03
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails

Analysis for 1.95 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 4" x 2" Timber Joists M-146 L.ft 115 100.00 11,500.00
6" x 3/4" Lunumidella Ceiling
1.02 M-135 Sq.ft 215 1,200.00 258,000.00
Planks.
1.03 Cement M-026 Bag 0.027 975.00 26.33

1.04 Sand M-113 Cu 0.04 3.50 0.14

1.05 1 1/2 brass Nails M-012 lbs 9 50.00 440.53


Mason - making holes, fixing joists &
1.06 L-009 Day 1 1,250.00 1,250.00
making goods
Carpenter - making holes, fixing
1.07 L-008 Day 1 1,500.00 1,500.00
joists & making goods
U / SK Labourer - making holes,
1.08 L-007 Day 3 1,000.00 3,000.00
fixing joists & making goods
1.09 Carpenter - Fixing ceiling boards L-008 Day 3 1,500.00 4,500.00
U / SK Labourer - Fixing ceiling
1.10 L-007 Day 4 1,000.00 4,000.00
boards
Allow 3% of Items (1.06, 1.07, 1.08,
1.11 - - - - 427.50
1.09, 1.10) for Scaffolding
Total for 1.95 Sqrs 284,644.49

Rate for 1 Sqrs 145,971.54


Rate(Say) 145,972.00

3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
15.04
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary

Analysis for 1.8 Sq


No Item Description Item Ref Unit Quantity Rate Amount
6" x 3/4" Lunumidella Ceiling
1.01 M-135 Sq.ft 220 1,200.00 264,000.00
Planks.
1.02 2" X 1/4" Timber Strips M-150 L.ft 40 130.00 5,200.00

1.03 3/4" Nails M-073 Lbs 4.5 90.00 405.00

1.04 1 1/2" Brass Nails M-012 Lbs 9 50.00 440.53

1.05 Carpenter L-008 Day 3 1,500.00 4,500.00

1.06 U / SK Labourer L-007 Day 6 1,000.00 6,000.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 315.00
Scaffolding
Total for 1.8 Sq 280,860.53

Rate for 1 Sq 156,033.63


Rate(Say) 156,034.00
Page 114 Of 461

16. Painting

A. Wall

B. Sofit

C. Wood

D. Steel

Wall

16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 400.00 360.00

1.02 Emulsion Paint M-043 litre 1.4 875.00 1,225.00

1.03 Water M-157 Gal 0.1 17.50 1.75

1.04 6" Brush M-021 No 0.1 495.00 49.50

1.05 Sand Papers M-114 Sheet 2 275.00 550.00

1.06 Painter L-001 Day 1.25 1,500.00 1,875.00

1.07 Allow 3% of Items (1.06) for Scaffolding - - - - 56.25

Total for 1 Sqr 4,117.50

Rate for 1 Sqr 4,117.50

Rate(Say) 1 Sq 4,118.00

Rate(Say) 1ft2 41.18

Rate(Say) 1m2 443.10

Ground floor 1m2 443.10

First Floor 1m2 487.41

Second Floor 1m2 536.15

Third Floor 1m2 589.76

16.A.02 Painting walls with emulsion paint (2 Coats)


Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Emulsion Paint - first coat M-043 litre 0.757 875.00 662.38

1.02 Emulsion Paint - Second coat M-043 litre 0.649 875.00 567.88

1.03 6" Brush M-021 No 0.1 675.00 67.50

1.04 Water M-157 Gal 0.1 17.50 1.75

1.05 Painter L-001 Day 0.75 1,500.00 1,125.00

1.06 Allow 3% of Items (1.05 ) for Scaffolding - - - - 33.75

Total for 1 Sqr 2,458.25

Rate for 1 Sqr 2,458.25


Page 115 Of 461
Rate(Say) 1 Sq 2,458.00

Rate(Say) 1ft2 24.58

Rate(Say) 1m2 264.48

Ground floor 1m2 264.48

First Floor 1m2 290.93

Second Floor 1m2 320.02

Third Floor 1m2 352.02

16.A.03 White or colourwashing two coats in single storey


Analysis for 10 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Boild Lime M-009 Cwt 0.5 300.00 150.00

1.02 Salt M-112 Lbs 2 10,500.00 20.00

1.03 Yellow Ochre M-166 Lbs 0.5 354.40 7.50

1.04 Blue M-008 Ozs 2 10.00 20.00

1.05 6" Brush M-021 No 0.333 495.00 165.83

1.06 Water M-157 Gal 10 17.50 3.00

1.07 Painter L-001 Day 2.5 1,500.00 687.50

1.08 U / SK Labourer L-007 Day 2.5 1,000.00 500.00

1.09 Allow 3% of Items (1.07, 1.08 ) for Scaffolding - - - - 35.63

Total for 10 Sqr 1,589.46

Rate for 1 Sqr 158.95

Rate(Say) 1 Sq 159.00

Rate(Say) 1ft2 1.59

Rate(Say) 1m2 17.11

16.A.04 White or colourwashing two coats in two storeyed building


Analysis for 10 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Boild Lime M-009 Cwt 0.5 300.00 150.00

1.02 Salt M-112 Lbs 2 10,500.00 21,000.00

1.03 Yellow Ochre M-166 Lbs 0.5 354.40 177.20

1.04 Blue M-008 Ozs 2 10.00 20.00

1.05 6" Brush M-021 No 0.333 495.00 164.84

1.06 Water M-157 Gal 10 17.50 175.00

1.07 Painter L-001 Day 3 1,500.00 4,500.00

1.08 U / SK Labourer L-007 Day 3 1,000.00 3,000.00

1.09 Allow 3% of Items (1.07, 1.08 ) for Scaffolding - - - - 225.00

Total for 10 Sqr 29,412.04


Page 116 Of 461
Rate for 1 Sqr 2,941.20

Rate(Say) 1 Sqr 2,941.00

Rate(Say) 1ft2 29.41

Rate(Say) 1m2 316.45

16.A.05 Cement washing to walls of single storyed building 2 coats


Analysis for 10 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Cement M-026 Bag 0.625 975.00 609.38

1.02 6" Coir Brush M-034 No 1 45.00 45.00

1.03 Water M-157 Gal 5 17.50 87.50

1.04 Painter L-001 Day 2 1,500.00 3,000.00

1.05 U / SK Labourer L-007 Day 2 1,000.00 2,000.00

1.06 Allow 3% of Items ( 1.04, 1.05 ) for Scaffolding - - - - 150.00

Total for 10 Sqr 5,891.88

Rate for 1 Sqr 589.19

Rate(Say) 1 Sq 589.00

Rate(Say) 1ft2 5.89

Rate(Say) 1m2 63.38

Ground floor 1m2 63.38

First Floor 1m2 69.71

Second Floor 1m2 76.69

Third Floor 1m2 84.35

Soffit

Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
16.B.01
slabs
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 15.00 13.50

1.02 Emulsion Paint M-043 litre 1.5 875.00 1,312.50

1.03 Water M-157 Gal 0.1 17.50 1.75

1.04 6" Brush M-021 No 0.1 495.00 49.50

1.05 Painter L-001 Day 1.75 1,500.00 2,625.00

1.06 Allow 3% of Items (1.05 ) for Scaffolding - - - - 78.75

Total for 1 Sq 4,081.00

Rate for 1 Sq 4,081.00

Rate(Say) 1 Sq 4,081.00

Rate(Say) 1ft2 40.81


Page 117 Of 461
Rate(Say) 1m2 439.12

Ground floor 1m2 439.12

First Floor 1m2 483.03

Second Floor 1m2 531.33

Third Floor 1m2 584.46

Wood

Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
16.C.01
ends etc. after fixing.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.605 354.40 214.41

1.02 3" Brush M-020 No 0.1 210.00 21.00

1.03 Painter L-001 Day 0.75 1,500.00 1,125.00

1.04 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 1,860.41

Rate for 1 Sqr 1,860.41

Rate(Say) 1 Sq 1,860.00

Rate(Say) 1ft2 18.60

Rate(Say) 1m2 200.14

16.C.02 Painting new timber work with two coats wood preservative
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.5 354.40 177.20

1.02 Brush 2" M-022 No 0.2 165.00 33.00

1.03 Painter L-001 Day 0.5 1,500.00 750.00

Total for 1 Sqr 960.20

Rate for 1 Sqr 960.20

Rate(Say) 1 Sq 960.00

Rate(Say) 1ft2 9.60

Rate(Say) 1m2 103.30

16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.75 15.00 11.25

1.02 Enamel Paint M-044 litre 2.5 400.00 354.00

1.03 Brush 2" M-022 No 0.1 60.00 165.00

1.04 Sand Papers M-114 No 2 275.00 550.00


Page 118 Of 461
1.05 Painter L-001 Day 1.5 1,500.00 2,250.00

1.06 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 3,830.25

Rate for 1 Sqr 3,830.25

Rate(Say) 1 Sq 3,830.00

Rate(Say) 1ft2 38.30

Rate(Say) 1m2 412.11

16.C.04 Varnishing two coats with copal varnish after sandpapering


Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Varnish M-154 litre 1.8 100.00 180.00

1.02 3" Brush M-020 No 0.33 210.00 70.00

1.03 Painter L-001 Day 0.5 1,500.00 750.00

1.04 U / SK Labourer L-007 Day 0.5 1,000.00 500.00

Total for 1 Sqr 1,500.00

Rate for 1 Sqr 1,500.00

Rate(Say) 1 Sq 1,500.00

Rate(Say) 1ft2 15.00

Rate(Say) 1m2 161.40

16.C.05 Wax polishing to timber in panals & floors


Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wax Polish M-158 Lbs 0.75 65.00 48.75

1.02 Sand Papers M-114 Sheet 6 275.00 1,650.00

1.03 Floor Brush M-049 No 0.1 210.00 21.00

1.04 Flannel Cloth M-047 Yards 0.5 70.00 35.00

1.05 U / SK Labourer L-007 Day 0.375 1,000.00 375.00

Total for 1 Sqr 2,129.75

Rate for 1 Sqr 2,129.75

Rate(Say) 1 Sq 2,130.00

Rate(Say) 1ft2 21.30

Rate(Say) 1m2 229.19

Steel

16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
Page 119 Of 461
1.01 Anti Corrosive Primer M-002 litre 2.25 245.00 551.25

1.02 Mineral Turpentine or Thinner M-069 litre 0.15 80.00 12.00

1.03 Wire Brush M-160 No 1 85.00 85.00

1.04 Brush 2" M-022 No 0.125 165.00 20.63

1.05 Painter L-001 Day 1.5 1,500.00 2,250.00

1.06 U / SK Labourer L-007 Day 1.5 1,000.00 1,500.00

Total for 1 Sqr 4,418.88

Rate for 1 Sqr 4,418.88

Rate(Say) 1 Sq 4,420.00

Rate(Say) 1ft2 44.20

Rate(Say) 1m2 475.59

Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
16.D.02
erected steel roof truss.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 0.2 245.00 49.00

1.02 Enamel Paint M-044 litre 1.33 354.00 470.82

1.03 Mineral Turpentine or Thinner M-069 litre 0.2 80.00 16.00

1.04 Brush 2" M-022 No 0.2 165.00 165.00

1.05 Painter L-001 Day 2.5 1,500.00 687.50

1.06 U / SK Labourer L-007 Day 1 1,000.00 200.00

1.07 Allow 3% of Items (1.05, 1.06 ) for Scaffolding - - - - 26.63

Total for 1 Sqr 1,614.95

Rate for 1 Sqr 1,614.95

Rate(Say) 1 Sq 1,610.00

Rate(Say) 1ft2 16.10

Rate(Say) 1m2 173.24

16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.

Analysis for 50 Sq.ft


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 1.5 245.00 367.50

1.02 Enamel Paint M-044 litre 0.67 354.00 237.18

1.03 Mineral Turpentine or Thinner M-069 litre 0.2 80.00 16.00

1.04 Wire Brush M-160 No 0.5 85.00 42.50

1.05 Brush 2" M-022 No 0.2 165.00 33.00

1.06 Painter L-001 Day 0.5 1,500.00 750.00

1.07 U / SK Labourer L-007 Day 0.75 1,000.00 750.00


Page 120 Of 461
Total for 50 Sq.ft 2,196.18

Rate for 1 Sq.ft 43.92

Rate(Say) 1 Sq. ft 40.00

Rate(Say) 1ft2 40.00

Rate(Say) 1m2 430.40

16.D.04 Painting steel in new work with 2 coats of anti-corrosive paint


Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 0.667 245.00 163.42

1.02 Brush 2" M-022 No 0.2 165.00 33.00

1.03 Painter L-001 Day 1.5 1,500.00 2,250.00

Total for 1 Sqr 2,446.42

Rate for 1 Sqr 2,446.42

Rate(Say) 1 Sqr 2,450.00

Rate(Say) 1ft2 24.50

Rate(Say) 1m2 263.62


Page 121 Of 461

875
Page 122 Of 461
Page 123 Of 461
Page 124 Of 461
17.01 Electrical first fixing 13A lighting point
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate
1.01 Wire 13 A light point point 1 150.00
1.02 Wires m 5 875.00
1.03 Coduit m 5 17.50
1.04 Fixing clips No 50 495.00
1.05 Sand Papers Sheet 2 275.00
1.0599999 Painter Day 1.25 1,500.00
Allow 3% of Items (1.06) for
1.0699999 - - -
Scaffolding
Total for 0 0
Rate for 1 0
Rate(Say) 1 Sq
Rate(Say) 1ft2
Rate(Say) 1m2
Ground floor 1m2
First Floor 1m2
Second Floor 1m2
Third Floor 1m2
Description
fxd fire rated Dwnlight wht - each
Amount timer fan 100mm
150.00 1 Gang 2 way lightswitch
4,375.00 1 Gang 2 way lightswitch
87.50 1 Gang switched socket
24,750.00 131340012-White round celing light 28w low energy
550.00 13Amp switched connection unit
1,875.00 1g intermediate lightswitch

56.25
2 Gang 2 way lightswitch
31,843.75 2 Gang switched socket
#DIV/0! 2 Gang switched socket
#DIV/0! 2 Gang switched socket
#DIV/0! 3 Gang 2 way lightswitch
#DIV/0! 40000-Transport charges
#DIV/0! 45 Amp cooker outlet
#DIV/0! 45A square switch +nean
#DIV/0! Battery backup heat alarm
#DIV/0! Coach Black
Dicon 670 MBX Mains and 9V lon
Electric flexi duct 25m - 32mm
IP65 fire rated Dwnlight
IP65 Shower lightpak white
Louvre white 3 in Gas fitting Vent with flyscreen
mk 1G BT scecondary phone socket
MK 1G secondary phone socket
MR16 cast IP65 shower lightpack shite
Polypipe Electric white hockey stick
Three pole fan isolator with padlock
timer fan 100mm
Wylex 10 way high integrity CSU
water proofing
1 sqr
No Item Description Item Ref Unit Quantity Rate Amount
195 Barralastic or equla pinco materials M-195 kg 3 1,500.00 4500
196 baralastic- Chemical liquid--mixing M-196 litre 2 1500 3000
3 SK Labour L-003 Day 1 1250 1250
7 U / SK Labourer L-007 Day 1 1000 1000 shoud speak to Finco
9750
Cleaning works 5% 975
Rate for 1sqr 10725
Rate for m2 1 1153.846
BASIC LABOUR RATES
1 Excavation not exeed 4' 1ft3 රු. 32.00
2 Lean concrete 1ft3 රු. 30.00
3 Column base 3'x3' රු. 3,500.00
4 Column base 4'x4' රු. 3,500.00
5 Rubble works 1 cub රු. 3,750.00
6 Dpc rendering works 1ft2 රු. 30.00
7 Back filling 1ft3 රු. 8.50
8 Brick works 9" 1ft2 රු. 45.00
9 Brick works 41/2" 1ft2 රු. 40.00
10 Column 9"x9" with shuttering 1ft රු. 125.00
11 Column 12"x9" 1ft රු. 125.00
12 Column 12"x12" 1ft රු. 130.00
13 Concrete beam 9"x9" 1ft රු. 130.00
14 Concrete beam 12"x9" 1ft රු. 140.00
15 Concrete beam 12"x12" 1ft රු. 150.00
16 Concrete slab 4"5" 1ft2 රු. 95.00
17 Block works 1ft2 රු. 24.00
18 9"x6" Lintol 1ft රු. 95.00
19 41/2"x6" Lintol 1ft රු. 85.00
20 Concreting stair case 1ft2 රු. 40.00
21 Wall rendering (plastering) smooth 1ft2 රු. 25.00
22 Soffit rendering 1ft2 රු. 50.00
23 Beams and column 1ft2 රු. 175.00
24 Floor rendering smooth 1ft2 රු. 35.00
25 Cement skirting 1ft2 රු. 42.00
26 pergola fixing 1ft2 රු. 42.00
27 Fixing a window each රු. 950.00
28 Fixing door frame each රු. 950.00
29 Tile works 1ft2 රු. 40.00
30 Floor tile 1ft2 රු. 40.00
31 Moulding normal 1ft2 රු. 150.00
No Description Unit Qty Rate Amount
B PRELIMINARY WORKS

The attention of the tenderer is drawn to the use of Bill of Note


Quantities, Drawings, Conditions of Contract,
Specifications and any other particulars related to this
tender. It is the tenderer's responsibility to see that his price
includes for complying with all the requirements of the
conditions of contract and other documents whether
specifically referred to in this Bill of Quantities or not.

The tenderer is advised to visit the site of the proposed Note


work, as it is his responsibility to ascertain the Conditions,
governing access to the site, the external working space,
storage area, status of the adjoining properties etc.

The contractor shall be responsible for any loss or damage Note


to the works, existing structures, adjoining structures and
unfixed materials.

The contractor shall be responsible for maintaining the site Note


in a clean and orderly manner at all times and during the
entire contract period.

The contractor shall be responsible for providing adequate Note


provisions to reduce the amount of vibration, dust,
pollution and noise from the site and shall be the
contractor's responsibility for any complaints, damages or
claims in connection with the works.

The contractor shall be responsible for erection and Note


maintaining of necessary protective netting, fencing and
other precautions to the required standard and approval of
the Consultants/Engineer.

The contractor shall be responsible for providing Note


necessary lighting, watchmen, and other suitable security
measures during construction until handing over.

The contractor shall be responsible for carrying out Note


accurate survey to define the building site works etc., and
check the layout and all levels and such other surveys as
may be necessary to establish accurately the placing of
forms and pouring of concrete and all other works and
setting out in both vertical and horizontal plane.
The contractor shall be responsible for providing and Note
maintaining access to the site. It would be his
responsibility to complete the access roads to suite the
requirement of the project with necessary paving etc to the
approval of the Consultant and to ensure satisfactory
maintenance of the access road for movement of plant and
traffic.

The contractor shall be responsible for submission of Note


programme of works to the approval of the
Consultant/Engineer and shall include all activities,
delivery, construction, installation, testing and
commissioning of components and all items associated
with setting up on site shall be indicated.

The contractor shall be responsible for maintaining of Note


quality and standards during construction including
supplying specimen or samples of materials and
equipments for approvals and for testing.

The Contractor shall be responsible for site safety and shall Note
maintain necessary safety equipments and procedures to
the satisfaction of the Engineer

All temporary works shall be dismantled and cleared away Note


from the site on completion of the work

Payment for preliminary item shall be considered as 75% Note


for section A and 25% for section B

Any other preliminary items not listed below but deemed Note
to be included in the tender rates, as no extras would be
made.

1 Allow for construction, furnishing and maintaining of LS Item Allow 2,200,000.00


temporary site office and sanitary facilities for the
contractor and sub contractors. (one office for each
interchange)

2 Allow for construction, furnishing and maintaining of LS Item Allow 645,000.00


temporary accommodation and sanitary facilities for the
contractor's and sub contractor's staff. (three
accomodations for entire project)

3 Allow for construction, furnishing and maintaining of LS Item Allow 400,000.00


temporary huts and sanitary facilities for the contractor's
and sub contractor's labour. (three accomodations for entire
project)

4 Allow for construction, furnishing and maintaining of LS Item Allow 2,500,000.00


temporary site office and sanitary facilities for the
Engineer. (three offices for entire project)
5 Allow for setting out the work LS Item Allow 500,000.00

6 Allow for supplying temporary electricity for the work LS Item Allow 2,640,000.00
during the construction including temporary connection,
distribution system for the work, internal arrangements and
all payment to the authorities (including monthly bills) for
temporary connection including alternate supply as and
when require.

7 Allow for supplying temporary water for the work during LS Item Allow 1,430,000.00
the construction including temporary connection,
distribution system for the work, internal arrangements and
all payment to the authorities (including monthly bills) for
temporary connection including alternate supply as and
when require.

8 Allow for supplying temporary telephone facility during LS Item Allow 1,182,500.00
the construction including connection charges and monthly
bills and any alternative line as and when require.

The Contractor shall obtain an insurance policy from a Note


company or companies approved by the
Consultant/Engineer in writing on all risk insurance policy
or policies indemnifying the contractor, the
Consultants/Engineer and the Employer's staff at the site
from all liabilities including claims

9 Builders All Risk Insurance including strike, riots and LS Item Allow
civil commotion, third party liability, cross liability ,loss or
damage to the works, clearing of debris, maintenance
cover, extended maintenance visit cover, flood, fire, in
land transport, construction plants and equipments at site,
existing structures, adjoining structures, unfixed materials
at site, materials supplied by the Employer (Actual cost for
obtaining insurance cover shall be reimbursed to the
contractor subject to the maximum quoted for this item on
submission of documentary evidence ).

10 Consultant's/Engineer's staff at site and visiting. (Actual LS Item Allow 3,500,000.00


cost for obtaining insurance cover shall be reimbursed to
the contractor subject to the maximum quoted for this item
on submission of documentary evidence)
11 Employer's staff at site and visiting. (Actual cost for LS Item Allow
obtaining insurance cover shall be reimbursed to the
contractor subject to the maximum quoted for this item on
submission of documentary evidence)

12 Workmen's compensation insurance including all sub LS Item Allow 500,000.00


contractor's workers

13 Allow for providing construction management services LS Item Allow 3,795,000.00


throughout the project

14 Allow for temporary site perimeter fence suitable to the LS Item Allow 3,145,000.00
nature of the project and security hut.

15 Allow for providing, maintaining and removing project LS Item Allow 550,000.00
sign board to the Engineer's approval

16 Allow for providing 3 sets of as built drawings and LS Item Allow 1,089,000.00
necessary technical information maintenance manuals and
other document to the Consultant's/Engineer's approval in
triplicate (one electronic copy and two hard copies ).

17 Allow for providing coordinated drawings including LS Item Allow 484,000.00


coordination of all services and 3 sets of shop drawings
(one electronic copy and two hard copies ).

18 Allow for submission of performance bond. (Actual cost LS Item Allow 2,000,000.00
for submission of performance guarantee shall be
reimbursed to the Contractor subject to the maximum
quoted for this item on submission of documentary
evidence).

19 Allow for submission of advance payment guarantee LS Item Allow 3,000,000.00


(Actual cost for submission of advance payment guarantee
shall be reimbursed to the Contractor subject to the
maximum quoted for this item on submission of
documentary evidence).

20 Allow for submission of progress report and photographs LS Item Allow 500,500.00
monthly covering all major activities taken place during
that period and adequate no of photograph to monitor the
progress.
TOTAL FOR PRELIMINARIES CARRIIED TO 30,061,000.00
SUMMERY
Kuru Kot
No No Description Unit Qty Rate Amount
PRILIMINARIS Item 1.00 500,000.00 500,000.00
TOTAL FOR CONCRETE WORK CARRIED TO
SUMMARY

D D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or machine
digging as required for excavation.

Rates and prices for excavation are to include for excavations any
hard materials excluding rock requiring blasting

Rates and prices of excavation are to include for backfilling with


selected excavated materials and compactions.

Rates and prices for excavation are to include for cutting through
tree roots and for grubbing up all disused pipes and drains
encountered and sealing off ends.

Payments for bulk excavation shall be made making use of the spot
level drawing to be submitted by the Contractor and based on the
final excavated depths.

Rates and prices for filling are to include selection of filling


materials from excavated earth as well as use of imported materials
where necessary.

No additional payments will be made for working space.

Site Clearance

D.1 D.1 Clearing site including removal of top soil up to a depth of 150 mm
including grubbing up roots, bushes and trees, filling voids with
selected excavated material and compacting and disposal of all m2 157.00 24.70 3,878.15
surplus excavated material away from the site as directed

Excavation

D.2 D.2 Excavation for strip foundation, not exceeding 1800mm depth from
formation level, in any material excluding rock requiring blasting,
back filling and compactions, leveling and compacting the bottom m3 92.00 815.00 74,980.00
of excavation, dewatering, earth work supports and disposal of any
surplus excavated materials
-
No No Description Unit Qty Rate Amount
D.3 D.3 Excavation of rock by blasting -
Filling -
-
D.4 D.4 k Imported hard earth filling, well rammed and consolidated using
suitable roller to achieve 95% maximum dry density , in make up m3 3.30 1,458.00 4,811.40
levels under floors 150mm thick layers
-
Anti termite Treatment -
-
Contractor shall submit ten years gurantee for entire building
through his specialist sub contractor in the name of the Client in an -
acceptable format
-
D.5 D.5 k Application of anti termite treatment under the ground floor slab in
accordance with the manufacture's specifications and to the m2 23 150 3,450.00
approval of Engineer
-
1 TOTAL FOR EXCAVATION AND EARTH WORK
87,120
CARRIED TO SUMMARY
F F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished to


receive respective finishes. The type and stability shall be agreed
with the consultant prior to commencement of concreting of each
item.

Rates shall include for plant for mixing, handling, hoisting,


depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary.

Rate for concrete shall include forming joints between new


concrete and old concrete, separation joints as per drawings and
specification unless otherwise measured separately.
Concrete mix design details to be submitted to consultant's/
Engineer's approval.

Work up to D.P.C. level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following.

F.1 F.1 Under footings and wall foundation m2 65.2 547.68 35,709
-
Grade 30 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.2 F.2 In strip foundation m3 26.5 18,371.38 486,842
-
F.3 F.3 In column shafts m3 11.00 18,371.38 202,085
-
F.4 F.4 In tie beam m3 8 18,371.38 146,971
-
No No Description Unit Qty Rate Amount
Grade 25 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.5 F.5 k In floor concrete m3 2.50 17,724.38 44,311
-
F.6 Inside of toll island area (Thk. Approx. 100mm) m3 10 17,724.38 177,244
-
Work from D.P.C. level to roof -
-
Grade 30 reinforced concrete as per drawings and specifications in
-
to the followings
-
F.7 F.6 In column shafts up to roof m3 21.25 18371.38 390,392
-
F.8 F.7 In middle beam m3 1.1 18371.38 20,209
-
F.9 F.8 In roof beam m3 33.45 18,371.38 614,523
F.10 F.9 In roof slab including flower trough m3 60.85 18,371.38 1,117,898
Reinforcement -
-
The size of reinforcement rods described in the drawing or
elsewhere shall be minimum size and the rolling margin and any
other tolerance shall be wholly above this size. Hooks and laps -
have been measured with the quantities.
-
All reinforcement shall be free from dirt, oil, paint, grease, or loose
rust before fixing in position and shall be brushed with stiff wire -
brush.
-
Reinforcement shall be bent cold by applying a slow even pressure
-
on an approved type of bending apparatus.
-
Rate shall include for cutting, bending, fabricating, placing in
position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, spaces, -
chairs.
-
Characteristic strength of High Tor steel should be 460 N/mm2 -
-
Characteristic strength of Mild steel should be 250 N/mm2 -
-
Work up to D.P.C. level -
-
Tor Steel Bar Reinforcement -
-
F.11 F.10 10mm Dia. Kg 667.00 202.00 134,734
-
F.12 F.11 12mm Dia. Kg 913.00 202.00 184,426
202.00 -
F.13 F.12 16mm Dia. Kg 679.50 -
202.00 -
F.14 F.13 20mm Dia. Kg 1,680.00 202.00 339,360
-
F.15 F.14 k 25mm Dia. Kg 192.00 202.00 38,784
202.00 -
F.16 F.15 k 32mm Dia. Kg 1,257.00 -
-
Mesh Reinforcement -
-
F.17 F.16 Type A142 mesh laid with 150mm laps in ground floor slab m2 23.00 478.40 11,003
-
No No Description Unit Qty Rate Amount
Work from D.P.C. level to roof -
-
Tor Steel Bar Reinforcement -
-
F.18 F.17 10mm Dia. Kg 8982 202.00 1,814,364
-
F.19 F.18 12mm Dia. Kg 2875 202.00 580,750
-
F.20 F.19 16mm Dia. Kg 161 202.00 32,522
-
F.21 F.20 20mm Dia. Kg 498 202.00 100,596
-
F.22 F.21 25mm Dia. Kg 1725 202.00 348,450
-
F.23 F.22 32mm Dia. Kg 12080 202.00 2,440,160
-
Formwork -
-
Rate shall include for all necessary boarding, supporting,
application of mould oil as necessary erecting, framing, cutting
angles, cleaning, wetting and treatment before placing concrete and -
striking or removal etc. construction joints.
Work up to D.P.C. level -
-
Formwork shall be in plywood not less than 16mm thick,
application of mould oil or laid on polythene layer with suitable
laps to prevent leaking with suitable up stand at edges complete as -
per the detailed drawing
-
F.24 F.23 Sides of strip foundation m2 41 2,105.52 86,326
-
F.25 F.24 Sides of column shafts m2 32 2,105.52 67,377
-
F.26 F.25 Sides of tie beam m2 22.5 2,105.52 47,374
-
Work from D.P.C. level to roof -
-
Formwork shall be in phenolic coated plywood - minimum 16mm
thick to provide fair face natural concrete finished on concrete
surfaces where necessary, Rate shall including grinding as
necessary to achieve a smooth flat even surfaces with out any -
defects. Rate shall include prepare 25mm Dia. P- cone on the edge
of the concrete surface as per the Drawing No TP/DO/R2,4/ARO4.
in the followings

-
F.27 F.26 Sides of column shafts up to roof level m2 62.00 2,105.52 130,542
-
F.28 F.27 Sides and soffit of middle beam m2 11.00 2,105.52 23,161
-
F.29 F.28 Sides and soffit of roof beam m2 525.00 2,105.52 1,105,396
-
No No Description Unit Qty Rate Amount
F.30 F.29 Sides and soffit of roof slab including flower trough , rate shall
include forming even grooves on the construction joint locations of m 2
307.44 2,105.52 647,320
the formwork of the fairfaced soffit.
-
Miscellaneous -
-
F.31 F.30 Precast concrete kerb (K-1) including excavation, backfilling, m
disposal of excavated materials, base and side concrete, form work 115.50 1,320.00 152,460
etc,. as per the detail drawing no. TP/TD/AR04
-
F.32 F.31 Precast concrete barrier (Jersey barrier) including excavation, m
backfilling, disposal of excavated materials, base and side concrete,
form work etc,. as per the detail drawing no. TP/TD/AR04 54.50 5,200.00 283,400

-
F.33 Provide kerb 1 along either sides of the concrete pavement in the m
177.45 2,320.00 411,684
Toll plazas
-
F.34 Filling tha gap of kerb line and retainning wall at Toll Plaza by m3
5.13 12,323.20 63,218
concrete shoulder pavement
-
-
Name Board and Provincial flags -
-
F.32 F.32 Art element of provincial flag (here southern province) embossed
in to the surface of RCC facia as per the detail drawings. 1.00 -

F.35 F.32 Supplying and fixing of apprx. 450mm height letters to the Toll
84.00 12,000.00 1,008,000
plaza
-
F.33 F.33 200mm high facia lettering form with suitable material matching
with the fair face concrete finish of the facia as per the drawing No. 1.00 -
TP/TD/AR/09.
F.36 F.33 Supplying and fixing of apprx. 200mm height letters to the Toll
84.00 11,200.00 940,800
plaza
-
F.37 Supplying and fixing of facia flower moulding (4'-0"x4'-0") to the
12.00 224,000.00 2,688,000
Toll plaza
-
F.38 Painting name board lettering of Toll plazas 1.00 160,000.00 160,000
-
Polythyne layer -
-
F.39 F.34 750 gauge polythyne layer under ground floor slab as per drawings
m2 23.00 71.20 1,638
and specifications
-
2 TOTAL FOR CONCRETE WORK CARRIED TO 17078028
SUMMARY
H H WATER PROOFING WORK

Rates shall include the protective screed screed, grounds, rules,


internal angles, fillet, external angles and exposed circular edges
chases for trucking in etc.

Rate shall include cutting top line, notching bending and extra
materials for lapping.

Contractor shall submit ten years guarantee for water proofing


material and workmanship through his specialist sub contractor in
the name of the Employer in an acceptable format.

The technical specifications and the methodology of the water


proofing system shall be submitted by the contractor to the
consultant structural engineer for approval.

The waterproofing membrain shall be "Rino lining" (Tuff stuff ) or


equivalent

Water Proofing

H.1 H.1 Apply 2 mm thick Polyurathene water proofing membrane on top


m2 335.50 3,560.80 1,194,648.40
of the roof slab as per the drawing and specification

3 TOTAL FOR WATER PROOFING WORK CARRIED TO 1,194,648.40


SUMMERY
P P ROOF PLUMBING

Rates shall include for all shop fabrication, transport to the site and
erection in the final position. Rates shall include for all site
welding, drilling, splay cutting, notching, etc.
No No Description Unit Qty Rate Amount
Rate shall include for all structural anchor bolts, nuts, washers and
bolts, unless stated as per detail drawing.

Rates shall include for all costs associated with undertaking all
precautions against fire while welding and cutting as specified.

Rates shall include for all establishment, plant, cartages,


scaffolding and hoisting equipment, two coats of anti corrosive
paint and two coats of enamel paint and for co-operating with other
trades.

Roof Plumbing

All down pipes shall be of Upvc type 400 with solvent welded
joints

P.1 P.1 110mm dia. Upvc down pipe fixed with Al brackets at 1000mm
m 72.00 350.00 25,200.00
centers to column
-
P.2 Supply and fixing of 110mm dia Upvc roof outlet at Toll Plaza
nr 16.00 354.40 5,670.40
Roof
-
P.3 110 dia. uPVC pipes between down pipe and drain laid to a
gradient of 1:80 including necessary excavation and back filling m 481.31 354.40 170,576.26

-
4.00 TOTAL FOR ROOF PLUMBING CARRIED TO TENDER
201,446.66
SUMMARY.
S S ELECTRICAL INSTALLATION

The Contractor shall submit following documents for Engineer's


prior approval before commencing installation

(1). Catalogue and sample submitting

(2). Manufacturer's shop drawings for distribution boards.

(3). Conduit layout drawings

The tenderer shall provide all dimensions, and technical


information of all builders work to the Consultant in advance in
relation to the program of work

Electrical Fittings ,wiring and accessories shall be following

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, ABB,


F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and Conduit
- Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or


equivalent

Cable - ACL or equivalent

Ceiling fan - KDK or equivalent

Exhaust fan and wall fan - woods, S&P or equivalent

Distribution Boards

S.1 S.1 Supply and installation of distribution boards DBR 1 ( Lighting


and Power in ramp -1) including MCCB's, MCB's, RCCB's internal
cabling, all in accordance with the specification and as per the nr 2 115272.8 230545.6
detail drawings.

Point wiring

The Contractor shall forward the conduit layout for prior approval
of the Consultant

Rates for point wiring shall include for all cables, switches, (1 way
or 2 way as necessary) junction boxes outlet boxes, conduits, pull
boxes, clips, earth cables, draw wires, wiring accessories, screws,
nails, hardware, fixing and insulating materials, cutting holes,
chases, make good the same in all trades, holders, ceiling boxes,
flexible codes and any other wirings accessories require up to the
final fixing point where ever necessary
No No Description Unit Qty Rate Amount
All lighting point wiring shall be in 2x1Cx1.5mm²Cu/PVC/PVC
cable and 2.5mm² protective earth in GI conduits including all
accessories
S.2 S.2 Wring for surface mounted luminaire with 70W metal halide lamp
with polished aluminium reflector die cast aluminium body, auto
balance fixing point for installation IP54 and integral control gear nr 16.00 9,280.80 148,492.80
suitable for installation in exposed surface, and other accessories as
shown in layout drawings

S.3 S.3 Wiring for spot light fitting out door type fixed to the beam at roof
level IP 65 and other accessories as shown in layout drawings nr 12.00 9,280.80 111,369.60

All socket and other point wiring (Except lighting point) shall be
in 1x2Cx2.5mm²Cu/PVC/PVC cable and 2.5mm² protective earth
in GI conduits including all accessories

S.4 S.4 Wiring for toll fee indicator with all accessories as shown in the
nr 2.00 2,016.80 4,033.60
layout drawing and specification.

S.5 S.5 Wiring for entry bar with all accessories as shown in the layout
nr 2.00 2,311.20 4,622.40
drawing and specification.

S.6 S.6 Wiring for TV camera with all accessories as shown in the layout
nr 4.00 8,712.00 34,848.00
drawing and specification.

S.7 S.7 Wiring for traffic signal as shown in layout drawings and
nr 4.00 9,280.80 37,123.20
specifications.

S.8 S.8 Wiring for loop coil with all accessories as shown in the layout
nr 2.00 2,311.20 4,622.40
drawing and specification.

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination point,
flexible wires, holders connect to power at the location as per
drawing and all accordance with the specification and the and the
approval of the Consultant.

S.9 S.9 Supply and install surface mounted luminaire with 70W metal
halide lamp with polished aluminium reflector die cast aluminium
body, auto balance fixing point for installation IP54 and integral nr 16.00 18,010.40 288,166.40
control gear suitable for installation in exposed surface as shown in
layout drawings

S.10 S.10 Supply and install spot light fitting out door type fixed to the beam
nr 12.00 7,911.20
at roof level IP 65 as shown in layout drawings

S.10 Supply and installation of 70W metal halide Bixton flood light
with Bixton accessories, Black colour (Lamp temperature 6000 K) nr 24.00 7,979.20 191,500.80

S.11 50mm dia medium duty steel pipe bracket welded to concrete beam
nr 24.00 11,410.40 273,849.60
for fixing flood light
S.12 Provide Covering of the service line channel of the Toll plaza
nr 48.00 13,200.00 633,600.00
column

S.13 Supply and Fixing Reflectors made out of Aluminum pasted high
intensity Prismatic reflective sheeting fixed to on concrete column nr 12.00 8,800.00 105,600.00
with anchor bolt
5 TOTAL FOR ELECTRICAL INSTALLATION CARRIED
1,837,828.80
TO SUMMARY
V V PAINTING WORK

The Contractor shall prepare a sample area or sample board bearing


finish coating and submit the same to the Engineer's for approval

Wall Painting

Prepare surface and apply two coats of colourless vax paint on fair
faced surfaces as directed

V.1 V.1 In column and middle beam m2 73.00 443.10 32,346.07

Ceiling Painting

Prepare surface and apply two coats of colourless vax paint on fair
faced surfaces as directed

V.2 V.2 In ground floor Sides and soffit of slab and beam m2 833.00 443.10 369,099.63
No No Description Unit Qty Rate Amount

6 TOTAL FOR PAINTING WORK CARRIED TO SUMMARY 401,445.70

W ARRANGEMENT OF LANE TRAFFIC SIGNAL SYSTEM

Supply and installation of Lane Signal System at Toll plazas

Following costs shall cover the all work associated with supply,
install, testing and comissioning of the traffic signal system

W.1 200mm "Red Cross" and "Green Arrow" in LED optical units,
nr 13.00 47,764.00 620,932.00
horizontally mounted on the upper beam of the toll plaza

W.2 200mm "Red Cross" and "Green Arrow" in LED optical units,
nr 13.00 49,256.80 640,338.40
vertically mounted at the entry point to the toll plaza

W.3 Manually operated switch nr 13.00 2,986.40 38,823.20

W.4 Installation Cost nr 13.00 67,164.80 873,142.40

7 TOTAL FOR ARRANGEMENT OF TRAFFIC SIGNAL


2,173,236.00
SYSTEM CARRIED TO SUMMARY
22,973,752.64
Bill No DESCRIPTION AMOUNT
1 PRILIMINARIES 500,000.00

TOTAL FOR EXCAVATION AND EARTH 87,120


2
WORK CARRIED TO SUMMARY

TOTAL FOR CONCRETE WORK CARRIED TO 17,078,028


SUMMARY we assumed concrete (ready-mix),
3 steel, will supply by the company (included here
exist price).

TOTAL FOR WATER PROOFING WORK 1,194,648


4
CARRIED TO SUMMERY

TOTAL FOR ROOF PLUMBING CARRIED TO 201,447


5 TENDER SUMMARY. Assumed material will
supply by the companey

TOTAL FOR ELECTRICAL INSTALLATION 1,837,829


6 CARRIED TO SUMMARY (not included our
qoute)

TOTAL FOR PAINTING WORK CARRIED TO 401,446


7
SUMMARY

TOTAL FOR ARRANGEMENT OF TRAFFIC 2,173,236


8 SIGNAL SYSTEM CARRIED TO SUMMARY not
included our quote
SUB TOTAL (A) 22,973,753

VAT COMPONENT AND PRILIMINARI


1,749,482
ITEMS

TOTAL CONTRACT AMOUNT 24,723,234.72


No Description Unit Qty Rate
F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item.

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary.

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately.

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval.

Work up to D.P.C. level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following.

F.1 Concrete filler under block wall m 7.15 512.55

Work above D.P.C. level

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.2 100 x 100 mm RCC beam on top of the block wall, Rate shall m 7.40 638.35
include formwork and R/F, 2Y10 + R6 stirrups @ 125mm
c/c, as per the detail drawings.

F.3 Edge of column m3 0.40 13,093.40

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY
G MASONRY WORK

Rate shall include for reinforcement concrete vertical and Note


horizontal stiffeners for all 100mm thk. walls exceeding 3m
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per Note


drawings and specifications
Rate shall include for scaffoldings. Note

Contractor shall finish the exterior and interior surface of Note


blocks

Work neatly strictly as per the instruction of the Engineer Note

Compressive strength of Hollow blocks shall be minimum 1.5 Note


N/ mm2

Hollow block work

G.1 100mm thk. Concrete hollow block wall in cement and sand
1:5 motar m2 6.08 1,107.55

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
K METAL WORK

All steel members to be hot dip galvanized and painted with Note
two coats of approved epoxy primer before appling the final
paint to architect's detail.

Where no camber is indicated, beams shall be fabricated so Note


that after erection, any natural camber is upward.

All copes, holes, openings and modifications required in Note


structural steel members for erection or the work of other
trades shall be shown on the shop drawings for approval by
the Engineer.

Field modification of structural steel is prohibited without Note


prior approval of the Engineer.

K.1 Supply fabricate and fix 50 x 100 x 6 mm channel base frame


m 7.40 3,504.55
at 600mm center as per detail drawings

K.2 Supply fabricate and fix 50 x 100 x 6mm thk tubular GI floor
joists as per detail drawings m 6.05 5,451.90

K.3 Supply fabricate and fix 50 X 100 x 6mm thk tubular GI


horizontal frame as per detail drawings m 7.40 5,451.90

K.4 Supply fabricate and fix aluminium cubical consist of 50 x


100 x 6 mm tubular GI vertical framing posts, 50 x 50 x 6 mm
tubular GI vertical framing posts, aluminum wall panels, M30
anchor bolt with 200 x 200 x 6mm thk metal plate, aluminum m2 10.75 9,150.25
sliding door and fixed windows with 6mm thick safety glass
with aluminum framing etc. as per detail drawings
K.5 Supply fabricate and fix pre-painted galvanized steel sheet
roofing on 50 x 50 x 6mm thk tubular steel frame and
minimum 12mm thick gypsum board ceiling as per detail m2 3.30 3,170.50
drawings

K.6 Supply fabricate and fix 300mm high composite aluminium


sheet cladding as per the detail and specification. m2 2.25 7,397.55

TOTAL FOR METAL WORK CARRIED TO


SUMMERY
R MECHANICAL INSTALLATION

AIR CONDITIONING SYSTEM

The tenderer is requested to refer the Preambles notes, Note


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items.

The tendere shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work.

Air conditioners shall be Daikin, McQuay, Hitachi, LG, Note


Mitsubishi, Panasonic, Hitachi or equivalent

Supply and Installation of Split Type Air Conditioners.

All piping (drain and refrigerant) shall be insulated. Power Note


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all
accessories.

R.1 Supply and installation of Split type Air Conditioner unit of


12000 BTU 230V/50Hz. including all accessories such as
mounting brackets, insulated refrigerant piping etc. and all the nr 1.00 74,800.00
civil works required for the completion of work.

Refrigerant piping

R.2 supply & install of wall embedded, insulated cupper


m 8.00 4,207.50
refrigerant piping for 12000BTU split AC.

Drain piping

R.3 32mm dia. PVC condensate drain lines from indoor units laid
up to ground floor drain m 8.00 467.50

Builders Work

R.4 Allow for provide all necessary builders work in connections


LS Item Allow
with including followings:
(a) Making opening in floor slabs
(b) Plinths.
(c) Masonry work in relation for fixing.
(d) Conduiting.
(e) Mounts for fixing fans
(e) Any other builders work etc.,
(f) All tenderers shall provide a schedule of builders work
along with the tender.
Testing and Commissioning

R.5 Testing and commissioning of the system by a chartered


Electrical/Mechanical engineer, rectification of any defect and
providing a certificate assuring the satisfaction of LS Item Allow
requirements given in the specification and proper functioning
of the system as per the CEB regulations.

"As Built" Drawings

R.6 Allow for the submission of three sets of as a built drawings


at commissioning of the system for approval of the LS Item Allow
consultant.

TOTAL FOR MECHANICAL INSTALLATION


CARRIED TO SUMMARY
S ELECTRICAL INSTALLATION

The contractor shall submit following documents for Note


Engineer's prior approval before commencing installation.

(1). Catalogue and sample submitting Note

(2). Manufacturerer's shop drawings for distribution boards. Note

(3). Conduit Layout Drawings Note

The tendere shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work.

Electrical Fittings ,wiring and accessories shall be following Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, Note


ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or Note


equivalent

Cable - ACL or equivalent Note


Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Distribution Boards

S.1 Supply and installation of distribution boards DB - 01


( Lighting and Power in single booth) including MCCB's,
MCB's, RCCB's internal cabling, all as accordance with the nr 1.00 80,729.60
specification and as per the detail drawings.

S.2 Supply and installation of Lane Terminal Switch Box (LTS),


all as accordance with the specification and as per the detail nr 1.00 14,025.00
drawings.

Point wiring
The contractor shall forward the conduit layout for prior Note
approval of the consultant

Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

All lighting point wiring shall be in


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth
in GI conduits including all accessories

S.3 Wring for 2x18WX600mm fluorescent lamp point with


diffuser and all accessories as shown in layout drawings nr 1.00 3,598.90

S.4 Wring for 1x18WX600mm fluorescent lamp point with


nr 1.00 3,598.90
diffuser and all accessories as shown in layout drawings

S.5 Wiring for ceiling recessed down light point with all
accessories as shown in the layout drawing and specification. nr 1.00 3,598.90

Socket outlet point wiring shall be in


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective
earth in GI conduits including all accessories

S.6 Wiring for 13A (raw power) Switched Socket Outlet as


shown in Layout drawings nr 2.00 5,066.85

S.7 Wiring for 15A Switched Socket Outlet for AC as shown in


Layout drawings nr 1.00 6,304.45
All Point terminated at the equipment, wiring shall be in
2Cx2.5mm2 Cu/PVC/PVC cable and 2.5mm2 protective earth
in GI conduits and terminated with 10A DP Isolator at the
equipment end and including all accessories

S.8 Wiring for Terminal Box (TB) with all accessories as shown
nr 1.00 2,545.75
in the layout drawing and specification.

S.9 Wiring for Toll Collector Terminal (TCT) with all


accessories as shown in the layout drawing and specification. nr 1.00 2,545.75

S.10 Wiring for 3KVA Unintertible Power Supply (UPS) point


with all accessories as shown in the layout drawing and nr 1.00 2,545.75
specification.

S.11 Wiring for lane controller (LCL) equipment with all


accessories as shown in the layout drawing and specification. nr 1.00 2,545.75

S.12 Wiring for Layer 2 Switch (L2 - SW) equipment with all
accessories as shown in the layout drawing and specification. nr 1.00 2,545.75

S.13 Wiring for Receipt Printer (RP exit only) equipment with all
accessories as shown in the layout drawing and specification. nr 1.00 2,545.75

S.14 Wiring for Loop coil Vehicle Detector (LVD) equipment with
all accessories as shown in the layout drawing and nr 1.00 2,545.75
specification.

S.15 Wiring for Card Reader (CR) equipment with all accessories
as shown in the layout drawing and specification. nr 1.00 2,545.75

S.16 Wiring for TV camera with all accessories as shown in the


layout drawing and specification. nr 1.00 4,449.75

S.17 Wiring for intercom extension as shown in Layout drawings


and specifications. nr 1.00 7,947.50

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant.

S.18 Supply and install 2x18WX600mm fluorescent lamp with


nr 1.00 4,793.15
diffuser and all accessories as shown in layout drawings
S.19 Supply and install 1x18WX600mm fluorescent lamp with
diffuser and all accessories as shown in layout drawings nr 1.00 2,961.40

S.20 Supply and install ceiling recessed down light with 11W CFL
and all accessories as shown in the layout drawing and nr 1.00 1,900.60
specification.

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided, Note


contractor shall prepare sample floor render until the
consultant is satisfied.

Rate for plastering shall include for providing expanded Note


joints, plastering the reveals, mouldings, etc; as per the
detailed drawings.

Rates shall include for preparation of surfaces for proper Note


bonding.

Rate shall include for measures to provide suitable bonding Note


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. Rates shall include for all tile
specials such as corners, edges etc.,

Floor Finishes

T.1 25mm thick Approved class I solid wood timber flooring


boards (should be able to remove when necessary) fix on 50
x 100 x 6mm thk tubular GI floor joists as per the detail m2 3.30 11,097.60
drawing No. TB/LT/AR01

Wall Finishes

External

T.2 600 x 600mm size, Porcelain tile in an approved color and


quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to m2 19.62 1,912.50
match the color of tiles laid for external walls at;

Internal

T.3 16mm thk. cement and sand 1:5 plaster finished smooth,
with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window m2 5.68 476.85
reveals
TOTAL FOR FLOOR, WALL AND CEILING
FINISHES CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in an Note


approved color and manufacture (C.I.C or equivalent ) and
color to suit with the environment, climate and location of this
project.

External painting shall be exterior quality weathersheild, Note


texture base paint in an approved color and manufacture
(C.I.C or equivalent ) and color to suit with the environment,
climate and location of this project and must be applied over
two coat of waterproof primer.

Rate for painting shall include for painting to door and Note
window reveals.

The Contractor shall prepare a sample area or sample board Note


bearing finish coating and submit the same to the Engineer's
for approval

Wall painting

External

V.1 Prepare surface and apply one coat of water proofing primer
and two coats of approved type weathershield paint to m2 6.30 371.45
external plastered surfaces of walls as directed
Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.1 In ground floor m2 5.68 302.60

Miscellaneous

V.2 Construction of Toll booth table make by Timber as per detail


nr 8.00 4,250.00
drawing

TOTAL FOR PAINTING WORK CARRIED TO


SUMMARY
Amount Unit Qty Rate Amount

Note

Note

Note

Note

3,664.73 m 7.15 545.53 3,900.55

4,723.79 m 7.40 524.80 3,883.52

5,237.36 m3 0.40 18,371.38 7,348.55

15,132.63
13,625.88 13,625.88 15,132.63

Note

Note
Note

Note

Note

Note

6,733.90 m2 6.08 1,255.05 7,630.68

7,630.68
6,733.90 6,733.90 7,630.68

Note

Note

Note

Note

25,933.67 m 7.40 3,504.55 25,933.67

32,983.99 m 6.05 5,451.90 32,983.99

40,344.06 m 7.40 5,451.90 40,344.06

98,365.19 m2 10.75 9,150.25 98,365.19


10,462.65 m2 3.30 3,170.50 10,462.65

16,644.49 m2 2.25 7,397.55 16,644.49

224,734.05
224,734.05 224,734.05 224,734.05

Note

Note

Note

Note

74,800.00 nr 1.00 74,800.00 74,800.00

33,660.00 m 8.00 4,207.50 33,660.00

3,740.00 m 8.00 467.50 3,740.00

3,400.00 LS Item Allow 3,400.00


14,025.00 LS Item Allow 14,025.00

2,337.50 LS Item Allow 2,337.50

131,962.50
131,962.50 131,962.50 131,962.50

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note
Note

Note

80,729.60 nr 1.00 80,729.60 80,729.60

14,025.00 nr 1.00 14,025.00 14,025.00

Note

3,598.90 nr 1.00 3,598.90 3,598.90

3,598.90 nr 1.00 3,598.90 3,598.90

3,598.90 nr 1.00 3,598.90 3,598.90

10,133.70 nr 2.00 5,066.85 10,133.70

6,304.45 nr 1.00 6,304.45 6,304.45


2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

2,545.75 nr 1.00 2,545.75 2,545.75

4,449.75 nr 1.00 4,449.75 4,449.75

7,947.50 nr 1.00 7,947.50 7,947.50

4,793.15 nr 1.00 4,793.15 4,793.15


2,961.40 nr 1.00 2,961.40 2,961.40

1,900.60 nr 1.00 1,900.60 1,900.60

164,407.85
164,407.85 164,407.85 164,407.85

Note

Note

Note

Note

36,622.08 m2 3.30 11,097.60 36,622.08

37,523.25 m2 19.62 1,912.50 37,523.25

2,708.51 m2 5.68 476.85 2,708.51


76,853.84
76,853.84 76,853.84 76,853.84

Note

Note

Note

Note

2,340.13 m2 6.30 371.45 2,340.13

1,718.77 m2 5.68 302.60 1,718.77

34,000.00 nr 8.00 4,250.00 34,000.00

38,058.90
38,058.90 38,058.90 38,058.90

656,376.93 656,376.93 658,780.45 658780.45


No Description Unit Qty Rate
F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval

Work up to D.P.C. level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Concrete filler under block wall m 10.50 512.55

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.2 100 x 100 mm RCC beam on top of the block wall, Rate shall m 10.50 638.35
include formwork and R/F, 2Y10 + R6 stirrups @ 125mm
c/c, as per the detail drawings.

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY
G MASONRY WORK

Rate shall include for reinforcement concrete vertical and Note


horizontal stiffeners for all 100mm thk. walls exceeding 3m
length and 3m height

All blocks shall be " Amtrad" or equivalent and as per Note


drawings and specifications

Rate shall include for scaffoldings Note


Contractor shall finish the exterior and interior surface of Note
blocks
Work neatly strictly as per the instruction of the Engineer Note

Compressive strength of Hollow blocks shall be minimum 1.5 Note


N/ mm2

Hollow block work

G.1 100mm thk. Concrete hollow block wall in cement and sand
m2 8.93 1,107.55
1:5 motar

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
K METAL WORK

All steel members to be hot dip galvanized and painted with Note
two coats of approved epoxy primer before applying the final
paint to architects detail

Where no camber is indicated, beams shall be fabricated so Note


that after erection, any natural camber is upward

All copes, holes, openings and modifications required in Note


structural steel members for erection or the work of other
trades shall be shown on the shop drawings for approval by
the Engineer

Field modification of structural steel is prohibited without Note


prior approval of the Engineer

K.1 Supply fabricate and fix 50 x 100 x 6 mm channel base frame


m 10.60 3,504.55
at 600mm center as per detail drawings

K.2 Supply fabricate and fix 50 x 100 x 6mm thk tubular GI floor
m 10.30 5,451.90
joists as per detail drawings

K.3 Supply fabricate and fix 50 X 100 x 6mm thk tubular GI


horizontal frame as per detail drawings m 10.60 5,451.90

K.4 Supply fabricate and fix aluminium cubical consist of 50 x


100 x 6 mm tubular GI vertical framing posts, 50 x 50 x 6 mm
tubular GI vertical framing posts, aluminum wall panels, M30
anchor bolt with 200 x 200 x 6mm thk metal plate, aluminum m2 15.70 9,150.25
sliding door and fixed windows with 6mm thick safety glass
with aluminum framing etc. as per detail drawings
K.5 Supply fabricate and fix pre-painted galvanized steel sheet
roofing on 50 x 50 x 6mm thk tubular steel frame and
minimum 12mm thick gypsum board ceiling as per detail m2 5.70 3,170.50
drawings

K.6 Supply fabricate and fix 300mm high composite aluminium


sheet cladding as per the detail and specification. m2 3.25 7,397.55

K.7 Provide aluminium composite panel instead of 6mm thick


toughen glass for the lower panel of the Toll Booth door m2 2.10 16,365.90

TOTAL FOR METAL WORK CARRIED TO


SUMMERY
R MECHANICAL INSTALLATION

AIR CONDITIONING SYSTEM

The tenderer is requested to refer the Preambles notes, Note


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items

The tendere shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Air conditioners shall be Daikin, McQuay, Hitachi, LG, Note


Mitsubishi, Panasonic, Hitachi or equivalent

Supply and Installation of Split Type Air Conditioners

All piping (drain and refrigerant) shall be insulated. Power Note


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories

R.1 Supply and installation of Split type Air Conditioner unit of


18000 BTU 230V/50Hz. including all accessories such as
mounting brackets, insulated refrigerant piping etc. and all the nr 1.00 88,825.00
Civil works required for the completion of work

Refrigerant piping

R.2 supply & install of wall embedded, insulated cupper


refrigerant piping for 18000BTU split AC m 12.00 4,675.00

Drain piping

R.3 32mm dia. PVC condensate drain lines from indoor units laid
m 12.00 467.50
up to ground floor drain

Builders Work
R.4 Allow for provide all necessary builders work in connections LS Item Allow
with including followings:

(a) Making opening in floor slabs


(b) Plinths.
(c) Masonry work in relation for fixing.
(d) Conducting.
(e) Mounts for fixing fans
(e) Any other builders work etc.,
(f) All tenderers shall provide a schedule of builders work
along with the tender

Testing and Commissioning

R.5 Testing and commissioning of the system by a chartered LS Item Allow


Electrical/Mechanical engineer, rectification of any defect and
providing a certificate assuring the satisfaction of
requirements given in the specification and proper functioning
of the system as per the CEB regulations.

"As Built" Drawings

R.6 Allow for the submission of three sets of as a built drawings LS Item Allow
at commissioning of the system for approval of the consultant

TOTAL OF AIRCONDITION SYSTEM CARRIED TO


SUMMARY
S ELECTRICAL INSTALLATION

The contractor shall submit following documents for Note


Engineer's prior approval before commencing installation

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards. Note

(3). Conduit Layout Drawings Note

The tendere shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, Note


ABB, F & G, Siemens or equivalent
Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or Note


equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Distribution Boards

S.1 Supply and installation of distribution boards DB - 01


( Lighting and Power in single booth) including MCCB's,
MCB's, RCCB's internal cabling, all as accordance with the nr 1.00 80,729.60
specification and as per the detail drawings

S.2 Supply and installation of Lane Terminal Switch Box (LTS),


all as accordance with the specification and as per the detail nr 1.00 14,025.00
drawings

Point wiring

All lighting point wiring shall be in


2x1Cx1mm²Cu/PVC/PVC cable and 2.5mm² protective earth Note
in GI conduits including all accessories

Socket outlet point wiring shall be in


1x2Cx2.5mm²Cu/PVC/PVC cable and 2.5mm² protective Note
earth in GI conduits including all accessories

All other point terminated at the equipment, wiring shall be


in 2Cx2.5mm²Cu/PVC/PVC cable and 2.5mm² protective Note
earth in GI conduits including all accessories

The contractor shall forward the conduit layout for prior


approval of the consultant Note

Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

All lighting point wiring shall be in


2x1Cx1mm²Cu/PVC/PVC cable and 2.5mm² protective earth
in GI conduits including all accessories
S.3 Wring for 2x18WX600mm fluorescent lamp point with
nr 2.00 3,636.30
diffuser and all accessories as shown in layout drawings

S.4 Wring for 1x18WX600mm fluorescent lamp point with


diffuser and all accessories as shown in layout drawings nr 2.00 3,636.30

S.5 Wiring for ceiling recessed down light point with all
accessories as shown in the layout drawing and specification nr 2.00 3,636.30

Socket outlet point wiring shall be in


1x2Cx2.5mm²Cu/PVC/PVC cable and 2.5mm² protective
earth in GI conduits including all accessories

S.6 Wiring for 13A (raw power) Switched Socket Outlet as


nr 4.00 4,671.60
shown in Layout drawings

S.7 Wiring for 15A Switched Socket Outlet for AC as shown in


Layout drawings nr 1.00 7,559.90

All Point terminated at the equipment, wiring shall be in


2Cx2.5mm2 Cu/PVC/PVC cable and 2.5mm2 protective earth
in GI conduits and terminated with 10A DP Isolator at the
equipment end and including all accessories

S.8 Wiring for Terminal Box (TB) with all accessories as shown
in the layout drawing and specification nr 2.00 2,545.75

S.9 Wiring for Toll Collector Terminal (TCT) with all


accessories as shown in the layout drawing and specification nr 2.00 2,545.75

S.10 Wiring for 3KVA Uninterruptible Power Supply (UPS) point


with all accessories as shown in the layout drawing and nr 2.00 2,545.75
specification

S.11 Wiring for lane controller (LCL) equipment with all


accessories as shown in the layout drawing and specification nr 2.00 2,545.75

S.12 Wiring for Layer 2 Switch (L2 - SW) equipment with all
accessories as shown in the layout drawing and specification nr 2.00 2,545.75

S.13 Wiring for Receipt Printer (RP exit only) equipment with all
accessories as shown in the layout drawing and specification nr 1.00 2,545.75

S.14 Wiring for Loop coil Vehicle Detector (LVD) equipment with
all accessories as shown in the layout drawing and nr 2.00 2,545.75
specification

S.15 Wiring for Card Reader (CR) equipment with all accessories
as shown in the layout drawing and specification nr 2.00 2,545.75
S.16 Wiring for TV camera with all accessories as shown in the
nr 2.00 4,449.75
layout drawing and specification

S.17 Wiring for intercom extension as shown in Layout drawings


and specifications nr 2.00 7,947.50

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

S.18 Supply and install 2x18WX600mm fluorescent lamp with


nr 2.00 4,793.15
diffuser and all accessories as shown in layout drawings

S.19 Supply and install 1x18WX600mm fluorescent lamp with


nr 2.00 2,961.40
diffuser and all accessories as shown in layout drawings

S.20 Supply and install ceiling recessed down light with 11W CFL
and all accessories as shown in the layout drawing and nr 2.00 1,900.60
specification.

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY

T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided, Note


contractor shall prepare sample floor render until the
consultant is satisfied

Rate for plastering shall include for providing expanded Note


joints, plastering the reveals, mouldings, etc; as per the
detailed drawings

Rates shall include for preparation of surfaces for proper Note


bonding

Rate shall include for measures to provide suitable bonding Note


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. Rates shall include for all tile
specials such as corners, edges etc,

Floor Finishes

T.1 25mm thick Approved class I solid wood timber flooring


boards (should be able to remove when necessary) fix on 50
x 100 x 6mm thk tubular GI floor joists as per the detail m2 5.70 11,097.60
drawing No. TB/LT/AR01
Wall Finishes

External

T.2 600 x 600mm size, Porcelain tile in an approved color and


quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to m2 17.26 1,912.50
match the color of tiles laid for external walls

Internal

T.3 Cement and sand mortar 1:5 Internal plaster finished


smooth, with wall putty to block walls and attached concrete m2 8.65 448.80
surfaces, rate shall including door and window reveals

TOTAL FLOOR, WALL AND CEILING FINISHES


CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in an Note


approved color and manufacture (C.I.C or equivalent ) and
color to suit with the environment, climate and location of this
project

External painting shall be exterior quality weathersheild, Note


texture base paint in an approved color and manufacture
(C.I.C or equivalent ) and color to suit with the environment,
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and Note
window reveals

The Contractor shall prepare a sample area or sample board Note


bearing finish coating and submit the same to the Engineer's
for approval

Wall painting

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.1 In ground floor m2 8.65 302.60


TOTAL FOR PAINTING WORK CARRIED TO
SUMMARY
Amount Unit Qty Rate Amount

Note

Note

Note

Note

5,381.78 m 10.50 512.55 5,381.78

6,702.68 m 10.50 787.20 8,265.60

12,084.45 12,084.45 13,647.37

Note

Note

Note
Note

Note

Note

9,890.42 m2 8.93 984.06 8,787.62

9,890.42 9,890.42 8,787.62

Note

Note

Note

Note

37,148.23 m 10.60 3,504.55 37,148.23

56,154.57 m 10.30 5,451.90 56,154.57

57,790.14 m 10.60 5,451.90 57,790.14

143,658.93 m2 15.70 9,150.25 143,658.93


18,071.85 m2 5.70 3,170.50 18,071.85

24,042.04 m2 3.25 7,397.55 24,042.04

34,368.39 m2 2.10 16,365.90 34,368.39

371,234.14 371,234.14 371,234.14

Note

Note

Note

Note

88,825.00 nr 1.00 88,825.00 88,825.00

-
-
-

56,100.00 m 12.00 4,675.00 56,100.00

-
-
-
5,610.00 m 12.00 467.50 5,610.00
-
-
-
3,400.00 LS Item Allow
3,400.00
-
-
-
-
-

14,025.00 LS Item Allow 14,025.00

2,337.50 LS Item Allow 2,337.50

170,297.50 170,297.50 170,297.50

Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

Note

Note

80,729.60 nr 1.00 80,729.60 80,729.60

14,025.00 nr 1.00 14,025.00 14,025.00

Note

Note

Note

Note
7,272.60 nr 2.00 3,636.30 7,272.60

7,272.60 nr 2.00 3,636.30 7,272.60

7,272.60 nr 2.00 3,636.30 7,272.60

18,686.40 nr 4.00 4,671.60 18,686.40

7,559.90 nr 1.00 7,559.90 7,559.90

5,091.50 nr 2.00 2,545.75 5,091.50

5,091.50 nr 2.00 2,545.75 5,091.50

5,091.50 nr 2.00 2,545.75 5,091.50

5,091.50 nr 2.00 2,545.75 5,091.50

5,091.50 nr 2.00 2,545.75 5,091.50

2,545.75 nr 1.00 2,545.75 2,545.75

5,091.50 nr 2.00 2,545.75 5,091.50

5,091.50 nr 2.00 2,545.75 5,091.50


8,899.50 nr 2.00 4,449.75 8,899.50

15,895.00 nr 2.00 7,947.50 15,895.00

9,586.30 nr 2.00 4,793.15 9,586.30

5,922.80 nr 2.00 2,961.40 5,922.80

3,801.20 nr 2.00 1,900.60 3,801.20

225,109.75 225,109.75 225,109.75

Note

Note

Note

Note

63,256.32 m2 5.70 11,097.60 63,256.32


33,009.75 m2 17.26 1,912.50 33,009.75

3,882.12 m2 8.65 448.80 3,882.12

100,148.19 100,148.19 100,148.19

Note

Note

Note

Note

2,617.49 m2 8.65 443.10 3,832.79


2,617.49 2,617.49 3,832.79

891,381.94 891,381.94 893,057.36


13,647.37
8,787.62
371,234.14
170,297.50
225,109.75
100,148.19
3,832.79

893057.363114
80%
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or


Note
machine digging as required for excavation

Rates and prices for excavation are to include for excavations


any hard materials excluding rock requiring blasting Note

Rates and prices of excavation are to include for backfilling


with selected excavated materials and compactions Note

Rates and prices for excavation are to include for cutting


through tree roots and for grubbing up all disused pipes and Note
drains encountered and sealing off ends

Payments for bulk excavation shall be made making use of


the spot level drawing to be submitted by the Contractor and Note
based on the final excavated depths

Rates and prices for filling are to include selection of filling


materials from excavated earth as well as use of imported Note
materials where necessary

No additional payments will be made for working space Note

Site Clearance

Clearing site including removal of top soil up to a depth of


150 mm including grubbing up roots, bushes and trees, filling
D.1 voids with selected excavated material and compacting and m2 200.00
disposal of all surplus excavated material away from the site
as directed

Excavation

Excavation for wall foundation trenches, not exceeding


1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
D.2 compactions, leveling and compacting the bottom of m3 21.00 925.60
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.

D.3 Excavation of rock by blasting m3 10,000.00

Filling
Imported hard earth filling, well rammed and consolidated
using suitable roller to achieve 95% maximum dry density ,
D.4 in make up levels under floors 150mm thick layers m3 26.22 973.60

Anti termite Treatment

Contractor shall submit ten years gurantee for entire building


through his specialist sub contractor in the name of the Client Note
in an acceptable format

Application of anti termite treatment under the ground floor


D.5 slab in accordance with the manufacture's specifications and m2 165.00 142.40
to the approval of Engineer
TOTAL FOR EXCAVATION AND EARTH WORK
CARRIED TO SUMMARY
CAST INSITU REINFORCED CONCRETE WORKING
E
PILES

The tenderers are requested to refer Bills of Quantities,


General Notes, Pricing Preambles, Drawings, Specifications,
Conditions of Contract, Contract Data and other relevant Note
documents prior to pricing of this section of work.

No extra payment will be made for any delay caused by


security or any other arrangement of the statutory-divisions,
Road Development Authority, Colombo Municipal Council, Note
Sri Lanka Police, Railway Authority etc.

Where there is a repetetion of Piling items in this trade the


tenderer is requested to price the item more detailed in Note
description.

Costs which are covered under Piling should not be repeated


Note
in any other trade in BOQ

The tenderer is advised to visit the site of the proposed work,


as it is his responsibility to ascertain the conditions
governing, actual amount of work involved, access to the Note
site, the external working space, storage area etc.,

The tenderers are specially requested to refer the soil


investigation report thoroughly prior to pricing this section.
Any discrepancies and or any suggestion to be forwarded Note
with the tender or prior to that to the Engineer for
clarification.

Tenderers are adivised that the soil investigation report


provided is for approximate onloy and the Contractor should
verify all the data by his own.

The Contractor shall insure against damage to adjoining


properties, adjacent structures, any existing over head and/or
under ground services that may cause damages as a result of Note
this piling worknot less than their prevailing market values of
the relevant
Rates shall include for mobilization and demobilization and
maintenance of all Rates shall include for mobilization and
piling equipments and other machineries. Note

If any damage is caused to any pile or piles due to the


installation of adjacent piles or due to any other work being
carried out by the Contractor the Contractor shall take such
remedial measures as may be ordered by the Engineer Note
including the installation of additional piles and the cost of
such measures to be borne entirely by the Contractor.

The price shall include for removal of all spoils including


removal of any cut lengths broken concrete of Laitance and
used fluid etc, away from the site. Concreting of piling shall
be terminated 1.0 m above the cut off level and then cut back Note
to the specified cut off level. Piling length will be measured
between the bottom level and up to the cut off level

Setting out of piles and dimensions of piles to be approved


by the Engineer on submission of a surveyor plan certified by
a licensed Surveyor in triplicate. Setting out piles and Note
dimensions of piles to be approved by Engineer prior to
commencement of work.

The tenderers shall submit the detail of the method of piling


work together with necessary shop drawing, equipment to be
used, duration, durability and method of erection etc., The
method of piling should take into consideration the
surroundingbuildings and other services etc., in the Note
vicinity,suitable to the type of soil strata method of removal
of temporary work and constructionchosen to adopt the
proposal given here in.

Payments for piling shall be evaluated as follows:


(a) Piling rate to be applicable from bottom level of pile to
cut off level.
(b) Empty boring has been measured separately from
existing ground level
(c) No payment will be made for any length of pile above cut
off level
(d) Boring through the rock has been measured as extra over
items. Each pile and to be casted into the rock for a length of Note
1.5 times diameter in hard basement rock.

The tenderers are requested to submit to the Engineer for


approval, full details of piles offered on how the calculation
and checking of the load bearing capacity and settlement of Note
the piles that will be carried out and the tests proposed to be
done at the site.
The Contractor shall submit the details of the temporary
works to the Engineer for approval prior to commencement Note
of such work.

Payment for concrete will be made on the theoratical volume


Note
calculated based on the nominal pile diameter

Rate shall include for temporary backfilling (Filled with spoil


) and steel casing ( minimum 6.0 m) and high strength Note
concrete grouting at cut-off level.

Rate shall include for breaking through obstruction if any


Note
required

CAST IN-SITU CONCRETE PILING

Empty Boring
Boring shall be carried out in accordance with the drawings
and specifications for following piles; approximate depth as
per drawings

E.1 Pile, 600mm diameter (12nr). m 162

"Extra over" for boring through hard basement rock as


E.2 m 36
specified in drawings.

Concrete grade 30 in piles

Reinforced concrete grade 30 in piles in accordance with the


drawings and specifications (reinforcement measured
seperately)

E.3 Pile, 600mm diameter (12nr). m3 53

Cutting off tops of piles

Prepare, clear and straighten bent reinforcement into pile


caps and cutting off (trimming) top of piles to cut off level.

E.4 Pile, 600mm diameter (12nr). nr 12

Reinforcement in piles

High yield deformed steel bar reinforcement, characteristic


strength 460 Mpa and Mild steel bar reinforcement,
characteristic strength 250 Mpa including bends, hooks, tying
wire, distance blocks and ordinary spacers

Tor Steel Bar Reinforcement


E.5 10mm diameter Kg 1082

E.6 20mm diameter Kg 2708

Testing

Test on piles in accordance with the drawings and


specifications

E.7 Pile, 600mm diameter nr 12

E.8 Disposal of excavated material away from site m3 46

Allow for disposal of ground and sub surface water


E.9 Item 1
(dewatering)
TOTAL FOR CAST INSITU REINFORCED
CONCRETE WORKING PILES CARRIED TO
SUMMARY
F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished


to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of Note
concreting of each item

Rates shall include for plant for mixing, handling, hoisting,


depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary Note

Rate for concrete shall include forming joints between new


concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately Note

Concrete mix design details to be submitted to consultant's/


Note
Engineer's approval

Work up to plinth level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Under footings and wall foundation m2 53.00

F.1 Under pile caps and floor slab m2 153.25 482.40

Grade 25 reinforced concrete as per drawings and


specifications in to the followings
F.2 In strip foundation m3 13.00

F.3 In column shafts m3 7.00

F.4 In 100mm thick wall foundation m3 3.10

F.5 In stair case footing and shafts m3 0.65

F.6 In plinth beam m3 4.85

F.7 In external plinth m3 5.10

F.2 In floor concrete m3 40.80 14,877.60

F.9 In entrance step m3 0.45


F.3 In pile caps m 3
10.20 12,323.20

F.4 In ground beams m3 11.40 12,323.20

Work from plinth level to 1st floor

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings

F.5 In column shafts up to 1st floor m3 3.30 12,323.20

F.6 In first floor slab m3 24.15 14,877.60

F.7 In first floor beams m3 8.50 14,877.60

F.8 In staircase including landings m3 2.50 14,877.60

Work from 1st floor level to roof

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings

F.9 In column shafts up to roof level m3 4.20 12,570.40

F.10 In roof beam m3 8.50 15,175.20

F.11 Water tank slab m3 0.95 12,570.40

F.12 Beam in water tank slab m3 0.80 12,570.40

Reinforcement
The size of reinforcement rods described in the drawing or
elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks Note
and laps have been measured with the quantities

All reinforcement shall be free from dirt, oil, paint, grease, or


loose rust before fixing in position and shall be brushed with Note
stiff wire brush

Reinforcement shall be bent cold by applying a slow even


pressure on an approved type of bending apparatus Note

Rate shall include for cutting, bending, fabricating, placing in


position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, Note
spaces, chairs

Characteristic strength of High Tor steel should be 460


Note
N/mm2

Characteristic strength of Mild steel should be 250 N/mm2


Note

Reinforcement as per drawings and specifications in to the


followings

Work up to plinth level

Tor Steel Bar Reinforcement

F.13 10mm Dia. Kg 2,145.00 152.00

F.18 12mm Dia. Kg 445.00

F.14 16mm Dia. Kg 1,683.00 152.00

F.15 20mm Dia. Kg 671.00 152.00

F.16 25mm Dia. Kg 563.00 152.00

Mild Steel Bar Reinforcement

F.19 6mm Dia. Kg 81.50


Mesh Reinforcement

Type A142 mesh laid with 150mm laps in ground floor slab
m2 119.00

Work from plinth level to 1st floor

Tor Steel Bar Reinforcement


F.17 10mm Dia. Kg 2,527.00 152.00

F.18 12mm Dia. Kg 447.00 152.00

F.19 16mm Dia. Kg 321.00 152.00

F.20 20mm Dia. Kg 904.00 152.00

Work from 1st floor level to roof

F.21 10mm Dia. Kg 772.00 155.20

F.22 12mm Dia. Kg 136.00 155.20

F.23 16mm Dia. Kg 776.00 155.20

Mild Steel Bar Reinforcement

F.24 6mm Dia. Kg 14.50 155.20

Formwork

Rate shall include for all necessary boarding, supporting,


application of mould oil as necessary erecting, framing,
cutting angles, cleaning, wetting and treatment before placing Note
concrete and striking or removal etc. construction joints

Work up to D.P.C. level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing

F.29 Sides of strip footing m2 30.00

F.30 Sides of column shafts m2 65.60

F.32 Sides of stair case footing and shafts m2 3.25

F.33 Sides of plinth beam m2 48.00

F.34 Sides of external plinth m2 44.50

F.35 Sides of entrance step m2 1.55

F.25 Sides of pile caps m2 44.00 924.00

F.26 Sides of ground beam m2 88.00 924.00


F.27 Sides of floor slab m2 15.00 924.00

Work from D.P.C. level to 1st Floor level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing

F.28 Sides of column shafts up to 1st floor m2 43.75 1,351.20

Formwork shall be in phenolic coated plywood - minimum


16mm thick to provide fair face natural concrete finished on
concrete surfaces where necessary, Rate shall including
grinding as necessary to achieve a smooth flat even surfaces
with out any defects, in the followings

Sides and soffit of first floor slab, rate shall include forming
F.29 even grooves on the construction joint locations of the m2 125.00 1,351.20
formwork of the fairfaced soffit.

F.30 Sides and soffit of first floor beams m2 76.25 1,351.20

F.31 Sides and soffit of staircase including landings m2 35.25 1,351.20

Work from 1st floor level to roof level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing

F.32 Sides of column shafts m2 57.25 1,385.60

F.33 Sides and soffit of in roof beam m2 90.00 1,385.60

F.34 Soffit of water tank slab m2 4.25 1,378.40

F.35 Sides and soffit of beam in water tank slab m2 12.75 1,385.60

Miscellaneous

Lintels

100x200mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following
F.36 In ground floor m 9.90 1,012.80

F.37 In 1st floor m 8.70


200x200mm size reinforced concrete lintels, rate including
2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.37 In ground floor m 1.50 1,617.60

F.39 In 1st floor m 1.60

200x225mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.40 In 1st floor m 48.60

200x300mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.38 In ground floor m 8.50 2,223.20

F.39 In 1st floor m 47.00


200x150mm size reinforced concrete sill beam, rate
including 2T10 for top + R6@ 125 and necessary form work
in the following

F.39 In ground floor m 26.50 1,213.60

F.41 In 1st floor m 48.60

RCC Pergola

Supply and place 75x200mm size fair faced finished RCC


pergolas on RCC arm at 150mm centers, rate including
necessary form work , R/F and placing in position ,grinding
F.40 as necessary to achieve a smooth flat even surfaces with out m 142.00 1,372.00
any defects as per the detail drawings STDP/TO/T1/S06 and
TO/T1/AR06 at 1st floor level

Fairfaced finished RCC arm supporting to the pergolas as per


the detail drawings STDP/TO/T1/S06 and TO/T1/AR06 Rate
F.41 shall include necessary form work , R/F and grinding as nr 28.00 2,920.00
necessary to achieve a smooth flat even surfaces with out
any defects
Supply and fix 300x100mm size prefabricated fairfaced
finished concrete moulding on to 200mm thick. cement
F.42 block wall by using 12mm dia. Steel rods with nuts at m 49.75 2,209.60
1000mm centers as per the detail drawing no. TO/T1/AR06

Polythyne layer

750 gauge polythyne layer under ground floor slab as per


F.43 m2 256.00 71.20
drawings and specifications
Expansion joint filled with compressible filler and sealant on
F.57 top in ground floor as per the detail drawings and m 135.50
specification

Form necessary construction joint in ground floor concrete as


F.58 m 14.20
per the detail drawing no TP/TD - 02

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY

G MASONRY WORK

Rate shall include for reinforcement concrete vertical and


horizontal stifners for all 100mm thk. walls exceeding 3m Note
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per


Note
drawings and specifications

Rate shall include for scaffoldings Note

Contractor shall finish the exterior and interior surface of


Note
blocks

Work neatly strictly as per the instruction of the Engineer


Note

Compressive strength of Hollow blocks shall be minimum


1.5 N/ mm2 Note

Rubble work

Random rubble (150 x 225mm size) masonry wall foundation


G.1 m3 6.00
in cement and sand 1:5 mortar

Hollow block work

Work up to D.P.C. level

G.1 200mm thick hollow block wall in cement and sand 1:5 m2 48.00 1,376.80
In ground floor

G.2 200mm thick. hollow block wall in cement and sand 1:5 m2 160.00 1,376.80

G.3 100mm thick. hollow block wall in cement and sand 1:5 m2 51.00 1,042.40

In first floor

G.4 200mm thick. hollow block wall in cement and sand 1:5 m2 288.00 1,407.20

G.5 100mm thick. hollow block wall in cement and sand 1:5 m2 98.00 1,064.00

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
WATER PROOFING WORK

Rates shall include the protective screed, grounds, rules,


internal angles, fillet, external angles and exposed circular Note
edges chases for trucking in etc;

Rate shall include cutting top line, notching bending and


Note
extra materials for lapping

Contractor shall submit ten years guarantee for water


proofing material and workmanship through his specialist
sub contractor in the name of the Employer in an acceptable Note
format

The technical specifications and the methodology of the


water proofing system shall be submitted by the contractor to
the consultant structural engineer for approval Note

Water Proofing

Application of approved suitable waterproofing material


"Barralastic" or equivalent as per manufacture's instruction to
floor/ wall in toilets and balconies
H.1 In ground floor toilet walls and floor m2 64.20 1,248.00

H.2 In first floor toilet wall and floor m2 42.00 1,273.60

H.3 In first floor balconies m2 1.80 1,273.60

TOTAL FOR WATER PROOFING WORK CARRIED


TO SUMMERY
J STRUCTURAL METAL WORK

Rates for railing shall for cutting, waste, welding, bending,


anti corrosive and spray paint etc; and all existing joints shall
be finished with and finishes as per drawings. Note

Hand rails

Supply and fix stainless steel handrail for stair case


consisting with 75mm dia. top rail,40mm dia. up rights and
J.1 up rights welded to 100x100mm steel plate which in fixed to m 16.40 8,539.20
the RCC steps with anchor bolts as per the detail and
specifications

Extra over cost for supply and fix stainless steel handrail for
stair case consisting with 75mm dia. top rail, 25mm dia. up
rights and up rights welded to 60x60mm steel plate which in m 9.00
fixed to the RCC steps with anchor bolts as per the detail and
specifications
Balcony guard rails

Supply and fix, Aluminium balcony guard rail as per detail


J.2 m 2.45 9,878.40
drawings and specifications
2 nrs of 3.0 x0.225x0.10m size RCC fair faced finish rail
J.3 fixed to the RCC column with nut & bolt in front of the Toll Item 1.00 13,290.40
Gate office

TOTAL FOR STRUCTURAL METAL WORK


CARRIED TO SUMMERY
K METAL WORK

ALUMINIUM DOORS AND WINDOWS WORK

Rates for all aluminum doors and windows shall include for
Note
all necessary ironmongery

All joints to be sealed in an appropriate manner with


Note
approved sealant with structural silicon

Rates shall include for aluminium paneling, glazing, framing,


fixing, beading, gaskets, sealant, high quality ironmongery
for windows and doors and precaution to prevent ingress of Note
water and water leaks, fixing accessories and hardware

Door locks should be Union or equivalent made Note


All aluminium sections to be powder coated Note

All glass shall be 12mm thick toughen glass / 6mm thick


Note
clear glass as directed

Frameless two way swing 12mm thick toughen glass door


type " D1", size 2425x2700mm with fixed 6mm thick
K.1 toughen glass panel on either side and top, complete as per nr 1.00 124,634.40
detail drawings. Rate shall include necessary approved
quality iron mongery and locking system

Two way swing sashes clear toughen glazed panel door with
aluminium frame type " D2 ", size 1500 x 2100mm with
K.2 necessary approved quality iron mongery and locking nr 3.00 63,620.00
system, complete as per detail drawings

Two way swing double sash composite Al. louver panel door
with aluminium frame type " W16 ", size 1000x700mm with
K.3 necessary approved quality iron monger and locking system, nr 1.00 10,949.60
complete as per detail drawings in Toll Gate office

One way swing single sash clear toughen glazed panel door
with aluminium frame type " D3 ", size 900 x 2100mm with
K.4 necessary approved quality iron mongery and locking nr 7.00 39,843.20
system, complete as per detail drawings

One way swing single sash and both side composite


aluminium panel door with aluminium frame type " D4 ",
K.5 size 900 x 2100mm with necessary approved quality iron nr 4.00 35,654.40
mongery and locking system, complete as per detail drawings

One way swing single sash and both side composite


aluminium panel door with aluminium frame type " D5 ",
K.6 size 750 x 2100mm with necessary approved quality iron nr 6.00 34,426.40
mongery and locking system, complete as per detail drawings

Window type " W1", size 1000 x 1875mm with aluminium


frame, top hung glazed window and top hung fan light with
K.7 necessary approved quality iron mongery, complete as per nr 15.00 25,352.80
detail drawings

Window type " W15", size 1000 x 1200mm with aluminium


frame top hung fan light with necessary approved quality iron
K.8 monger, complete as per detail drawings in Toll Gate office nr 1.00 16,860.80

Window type " W2", size 4685 x 1275mm + 4685 x 600mm


with aluminium frame, top hung glazed window and top
K.9 hung fan light with necessary approved quality iron mongery, nr 4.00 120,744.80
complete as per detail drawings
Window type " W3", size 2785 x 1275mm + 2785 x 600mm
with aluminium frame, top hung glazed window and top
K.10 hung fan light with necessary approved quality iron mongery, nr 3.00 71,933.60
complete as per detail drawings

Window type " W4", size 3735 x 1275mm + 3735 x 600mm


with aluminium frame, top hung glazed window and top
K.10 hung fan light with necessary approved quality iron mongery, nr 1.00 97,624.00
complete as per detail drawings

Window type " W5", size 1000 x 1275mm + 1000 x 600mm


with aluminium frame, top hung glazed window and top
K.11 hung fan light with necessary approved quality iron monger, nr 1.00 26,697.60
complete as per detail drawings in Toll Gate office

Window type " W7", size 1950 x 1275mm + 1950 x 600mm


with aluminium frame, top hung glazed window and top
K.12 hung fan light with necessary approved quality iron mongery, nr 1.00 52,060.80
complete as per detail drawings

Fan light Type "FL1", size 1000 x 600mm with aluminium


framed, top hung fixed glazed fanlight with necessary
K.13 approved quality iron mongery, complete as per detail nr 1.00 9,055.20
drawings

Fan light Type "FL2", size 2000 x 600mm with aluminium


framed, top hung fixed glazed fanlight with necessary
K.14 approved quality iron mongery, complete as per detail nr 1.00 17,688.00
drawings

K.15 Lintels in upper floor window with Al. Cladding m 34.72 2,200.00

Supply Only

Door lock type KC1 - key operated cylinder outtside and turn
K.16 nr 2.00 6,600.00
button inside

Door lock type KC2 - Locking button inside emergency


K.17 nr 2.00 6,800.00
release outside

K.18 Door lock type KC3 - Key operated cylinder both side nr 2.00 6,000.00

K.19 Door lock type BPL -Bottom patch lock nr 2.00 7,200.00

K.20 Provide stainless steel pull handle nr 33.00 2,530.40

Partition wall

Supply and install glazed partition wall with aluminium


frame work as per the detail drawings and specification.
(Height approximate 2500mm)
K.21 In ground floor m2 37.50 6,952.00

K.22 In first floor m2 11.30 6,952.00

Provide aluminium composite panel instead of MDF board


K.23 m2 19.18 7,592.80
for the lower part of the partition

DOORS AND WINDOWS WORK CARRIED TO


TENDER SUMMARY
P ROOF COVERING AND ROOF PLUMBING

Rates shall include for all shop fabrication, transport to the


site and erection in the final position. Rates shall include for
all site welding, drilling, splay cutting, notching, etc, Note

Rate shall include for all structural anchor bolts, nuts,


Note
washers and bolts, unless stated as per detail drawing

Rates shall include for all costs associated with undertaking


all precautions against fire while welding and cutting as Note
specified

Rates shall include for all establishment, plant, cartages,


scaffolding and hoisting equipment, two coats of anti
corrosive paint and two coats of enamel paint and for co- Note
operating with other trades

Roof Frame
Supply, fabricated and install steel roof beam 203x102x27 (I
section) fixed to column with 10mm thick. steel bracket,
10mm thick. base plate 10mm thick shoe plate with
P.1 necessary nut and bolts as per detail drawings, beam length nr 4.00 82,898.40
6925mm, rate shall include hot dip galvanized and painted
with two coats of approved epoxy primer before applying the
final paint to architects detail.

P.2 Ditto - but beam length 9845mm nr 4.00 110,848.80

P.3 Ditto - but beam length 7900mm nr 2.00 92,230.66

Supply and fix "C" purlins (C20019 lipped channel) to roof


P.4 beam with 100x100x6 cleat and necessary nut and bolts at m 310.00 3,185.60
1000mm centers as per the detail drawings

Supply and fix 6mm thick. 100x50 mm size "C" channel to


P.5 edge of roof beam, support to gutter as per the detail m 62.00 2,389.20
drawings

Supply and fix 2 raw of M12 sag rod to purlins for each bay
P.6 m 142.00 491.20
as per the detail drawings

Provide 11/2" flat iron to both sides of the hips to avoid


P.7 m 77.44 1,117.60
sagging of the roofing sheets at Toll Gate Office

Roof Covering

Supply and fix Zn/Al sheet roof covering (0.47mm thick) on


P.8 steel roof frame work as per detail drawings. Roof frame m2 252.00 1,121.60
work measured separately

Supply and lay 50mm thick. heat insulation layer to


underside of roof covering support with GI 50X50X0.3mm
P.9 mesh as per the detail drawing and specifications m2 252.00 852.00

Roof Plumbing

Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to


P.10 m 62.00 864.80
edge of the roof as per detail drawings

150 x 175 mm Zn/Al rectangular shape rain water eave gutter


(0.47mm thk.) with brackets at suitable centers as shown in
P.9 the detail fixed to fascia with all necessary gutter fittings m 62.00 115.60

Supply and installation of 0.47mm tk. Color bond Zn/Al


(girth 900mm) rain water eave gutter with brackets at
P.11 600mm centers as shown in the detail fixed to fascia with all m 62.00 1,258
necessary gutter fittings
Zn/Al circular shape rain water down pipes (0.47mm thk.)
P.10 fixed with fairfaced finish concrete holders and accessories as m 57.60
per drawings
Supply and installation of 0.47mm tk. Color bond
P.12 100x100mm Zn/Al square down pipe with brackets at m 58.00 796.80
600mm centers with all necessary accessories

TOTAL FOR ROOF WORK CARRIED TO TENDER


SUMMARY.
Q PLUMBING AND SANITARY INSTALLATION

Sanitary fixtures and Fittings

Unless otherwise specified all sanitary fittings and fixtures


shall be of American Standard or approved equivalent type Note

All fittings to be completed with water supply and disposal


Note
connections to working order

Color and model of sanitary fixtures and fittings shall be to


Note
the approval of Engineer

Rate for sanitary fixtures and fittings shall include supply and
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors, Note
screws, plugs, etc and complete to working order as per
specifications

Supply and fix pedestal type of water closet including cistern


colored to the Engineer's approval with all accessories such
Q.1 as WC connector, flush pipe, seat cover approved angle nr 4.00 20,264.80
valves and flexible connector installed etc. complete to
working order

Supply and fix eastern closet ( size approx. 550 mm) overall
with 'P' or 'S' trap and foot rest and high level cistern of an
Q.2 approved make to include flush pipe. Water supply and outlet nr 2.00 17,279.20
connections all complete to working order
Supply and fix pedestal wash basin ( size approx. 615 X 415
mm ) colored to the Engineer's approval with all accessories
Q.3 such as waste plug, chain approved type of plastic bottle trap, nr 5.00 17,480.80
angle valve, flexible connector, single tap connection
installed. complete to working order

Supply and fix vanity wash basin colored to the Engineer's


approval with all accessories such as waste plug, chain
Q.4 approved type of plastic bottle trap, angle valve, flexible nr 1.00 13,503.20
connector, single tap connection installed. complete to
working order

Supply and fix urinals, colored to the Engineer's approval


with all accessories such as angle valve, flexible connector
Q.5 etc,. installed. complete to working order nr 2.00 11,186.40

Supply and fix approved quality hand spray bidet comprising


Q.6 flexible chromium plated hose, angle valve and installed nr 4.00 2,712.80
complete to working order

Supply and fix approved quality 20mm bid tap comprising


Q.7 angle valve, and installed complete to working order nr 2.00 2,251.20

Supply and fix chromium plated head shower spray with


Q.8 nr 2.00 4,420.00
shower control valve installed complete to working order

Supply and fix chromium plated brass soap tray fixed to wall
Q.9 nr 6.00 1,875.20
with fiber plugs and chromium plated brass screws

Supply and fix chromium plated brass toilet paper holder


Q.10 fixed to wall with fiber plugs and chromium plated brass nr 4.00 2,561.60
screws

Q.11 Supply and fix chromium plated brass towel rail 32 dia. and
600mm. long including fixed to wall with fiber plugs and nr 2.00
chromium plated brass screws
Supply and fix hand shower and installed complete to
Q.11 nr 1.00 7,005.60
working order

Supply and fix approved quality, 960x960mm size shower


tray colored to the architect's approval with all as per the
Q.12 detail drawings and installed complete to working order nr 2.00 56,611.20

Supply and fix approved quality, 600x450mm size bath room


mirror to wall with raw pluge, colored to the architect's
Q.13 approval with all as per the detail drawings and installed nr 5.00 4,333.60
complete to working order
Supply and fix Robe hook and installed complete to working
Q14 nr 4.00 1,788.80
order

Water supply system from city main to over head tank

All water supply pipes shall be of uPVC type 1000 with


Note
solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles,


brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be Note
deemed to have included in the relevant items

Supply and install centrifugal electric water pump fixed with


Pegler or approved quality gate valves, non - return valves,
Q.15 including float switch, control panel, etc,. Delivery 75 lit/min nr 2.00 334,291.20
@ 60Ft. Head (one duty and one standby) (make Jinasena or
approved equivalent )

Supply and install plastic water tank to the capacity of


2000Ltr. Located inside the ceiling, As shown with over
Q.16 flow, wash out valve, ball valve etc. complete to working nr 1.00 27,020.80
order

Construction of a under ground R.C water sump capacity


6000 ltr. internal size 2000 X 2000 X 1500(water depth) as
Q.17 per detail drawings, complete with ball valve nr 1.00 174,984.00
300x300x300mm catch pit, 600x600mm RCC removable
access cover with handle, stainless steel footings etc,

Q.18 Supply and fix 32mm dia. pipe, city main to sump m 17.00 298.40

Q.19 Supply and fix 32mm dia. pipe, sump to overhead tank m 16.00 298.40

Q.20 Supply and fix 32mm dia. gate valve nr 2.00 4,132.80
Allow provisional sum for getting 25mm dia. water
Q.20
connection from NWS & DB. Approx. distance 15meters

Water supply system from over head tank

Piping shall be measured to the net length along the center


line of the pipes over all bends, junctions, tees and the similar Note
pipe fittings and shall be given in meter

The size of PVC pipes and specials are specified by the


external dimensions. All water supply pipes shall be of uPVC Note
type 1000 with solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles,
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately should be deemed to Note
have included in the relevant items

Distribution pipe system including fittings laid through ducts,


buried and chased in to walls as indicated from the storage
tank as per drawings and specifications

Q.21 50 mm. dia. pipe m 14.00 430.40

Q.22 40 mm. dia. pipe m 33.00 377.60

Q.23 32 mm. dia. pipe m 7.00 298.40

Q.24 25 mm. dia. pipe m 2.00 169.60

Q.25 20 mm dia. pipe m 16.00 114.40

Pegler or equivalent quality stop valves as indicated below

Q.26 32mm dia. gate valve nr 4.00 4,132.80

Q.27 40mm dia. gate valve nr 1.00 5,318.40

Internal Drainage

All drainage pipes shall be of uPVC type 600 with solvent


Note
welded joints

The prices to include for screws, nails, pipes hooks, saddles,


brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately should be deemed to Note
have included in the relevant items

Rates shall include excavation, sand/concrete bedding,


surrounding pipes with concrete where necessary and back
filling and pipe accessories etc. and complete as shown on Note
drawings and specifications

40 mm dia. waste pipes from wash basins to outlets, buried &


Q.28 m 3.00 312.80
chased in walls

50 mm dia. waste pipes from shower areas, sinks etc. to the 398.40
Q.29 m 23.00
outlets

63 mm dia. waste pipes including bends, tees and socket 740.00


Q.30 m 8.00
joints

110 dia. uPVC pipes from toilet to manhole laid above floors 1,779.20
Q.31 m 22.00
and buried as shown in the drawings
110 dia. uPVC pipes between manhole to manhole, to septic
Q.32 tank, soakage pits. Laid to a gradient of 1:80 including m 7.0
necessary excavation and back filling

110 dia. uPVC pipes between manhole to manhole, to septic


tank, soakage pits, and down pipe to drain laid to a gradient
Q.32 of 1:80 including necessary excavation and back filling m 68.12 1,779.2

Gullies

Construction of 150x150mm size uPVC trap moulded floor


gully of good quality, fixed to toilet floor slab with stainless
Q.33 steel grating with water proofing on top and sides complete nr 5.00 1,839.20
with no leak inlet and outlet connection.

Construction of storm water gully externally size


400 x 400 x 500mm depth, including excavation, backfilling
and removing surplus excavations, built in 150mm thick.
Q.34 base, 100mm thick R.C. walls, 1:3 cement :sand rendering nr 8.00 16,672.80
with benching and medium duty double seal C.I. man hole
cover with lifting hooks as per detail drawings

Manholes and septic tanks

Manhole construction including excavation, disposal, back


filling brick wall cover slab with opening and manhole base
slab, necessary finishes, connection of pipes, etc as shown on Note
drawings and specifications
Construction of sewer manhole internally size 450 x
450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
Q.34 100mm thick R.C. walls, 1:3 cement :sand rendering with nr 1.00
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Construction of sewer manhole internally size


450 x 450 x 450mm depth, including excavation, backfilling
and removing surplus excavations, built in 150mm thick.
Q.35 base, 100mm thick R.C. walls, 1:3 cement :sand rendering nr 1.00 17,184.00
with benching and medium duty double seal C.I. man hole
cover with lifting hooks as per detail drawings

Q.36 -Ditto- but 600 x 600x400mm depth sewer manhole nr 1.00 30,928.00

Construction of waste water manhole internally size 450 x


450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
Q.37 100mm thick R.C. walls, 1:3 cement: sand rendering with nr 1.00 16,064.00
benching, and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings
Q.37 As above but 450x450x450mm depth sewer manhole nr 1.00

Construction of brick soakage pit 1800mm dia. internally as


per detail drawings. liquid depth apporx.2000mm. Rate shall
include for excavation, backfilling and removing surplus
Q.38 excavations, 225x225mm RCC floor beam, 225mm thick nr 1.00 106,063.20
brick wall, 100mm thick cover slab with 600x600mm
removable access cover with handle, vent pipe, etc,

Construction of RCC septic tank internally 3600mm x


1200mm size and 1500mm liquid depth as per detail
Q.39 drawing no. TP/ST/S01 & TO/MEP/SW/03. Rate to include nr 1.00 467,066.40
for excavation, backfilling and removing surplus excavations

Vent Pipes

All vent pipes shall be of uPVC type 600 with solvent


welded joints

Q.40 63mm (2") dia. vent pipe up to above roof level m 6.00 613.60

Q.41 110mm (4") dia. vent pipe up to above roof level m 6.00 1,627.20

Q.42 Vent cowl in an approved make nr 2.00 762.40

TOTAL PLUMBING WORK CARRIED TO SUMMRY


R MECHANICAL INSTALLATIONS

AIR CONDITIONING SYSTEM

The tenderer is requested to refer the Preambles notes,


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to Note
pricing of the following items

The tendere shall provide all dimensions, and technical


information of all builders work to the Consultant in advance Note
in relation to the program of work
Air conditioners shall be Daikin, McQuay, Hitachi, LG,
Note
Mitsubishi, Panasonic, Hitachi or equivalent

Supply and Installation of Split Type Air Conditioners.

All piping (drain and refrigerant) shall be insulated. Power


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories Note

Ground Floor

Supply and installation of split type Air Conditioner unit of


24000 Btu 230V/50Hz. including all accessories such as
R.1 mounting brackets, insulated refrigerant piping etc. and all nr 2.00 101,200.00
the civil works required for the completion of work

Refrigerant piping

Supply & install wall embedded, insulated cupper refrigerant


R.2 m 8.00 5,280.00
piping for 24000Btu split AC

Drain piping

32mm dia. PVC condensate drain lines from indoor units laid
R.3 m 8.00 440.00
up to ground floor drain

First Floor
Supply and Installation of Split Type Air Conditioners

All piping (drain and refrigerant) shall be insulated. Power


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories Note

Supply and installation of Split type Air Conditioner unit of


24000 Btu 230V/50Hz. including all accessories such as
R.4 mounting brackets, conduits etc, and all the civil works nr 2.00 101,200.00
required for the completion of work.

Supply and installation of Split type Air Conditioner unit of


18000 BTU 230V/50Hz. including all accessories such as
R.5 mounting brackets, conduits etc. and all the Civil works nr 1.00 83,600.00
required for the completion of work

Supply and installation of Split type Air Conditioner unit of


12000 Btu 230V/50Hz. including all accessories such as
R.6 mounting brackets, conduits etc, and all the civil works nr 1.00 70,400.00
required for the completion of work

Refrigerant piping
Supply & install wall embedded, insulated cupper refrigerant
R.7 m 7.50 5,280.00
piping for 24000 Btu split AC

Supply & install wall embedded, insulated cupper refrigerant


R.8 m 12.00 4,400.00
piping for 18000 Btu split AC

Supply & install wall embedded, insulated cupper refrigerant


R.9 m 14.00 3,960.00
piping for 12000 Btu split AC

Drain piping

32mm dia. PVC condensate drain lines from indoor units laid
R.10 m 28.00 440.00
up to ground floor drain

Builders Work

Allow for providing all necessary builders work in


R.11
connections with including followings:

(a) Making opening in floor slabs


(b) Plinths
(c) Masonry work in relation for fixing
(d) Conduiting
(e) Mounts for fixing fans
(e) Any other builders work etc,
(f) All tenderers shall provide a schedule of builders work
LS Item Allow
along with the tender

Testing and Commissioning

Testing and commissioning of the system by a chartered


Electrical/Mechanical engineer, rectification of any defect
and providing a certificate assuring the satisfaction of
R.12 requirements given in the specification and proper LS Item Allow
functioning of the system as per the CEB regulations

"As Built" Drawings

Allow for the submission of three sets of as a built drawings


R.13 at commissioning of the system for approval of the LS Item Allow
consultant
TOTAL OF AIRCONDITION SYSTEM CARRIED TO
SUMMARY
S ELECTRICAL INSTALLATION

The Contractor shall submit following documents for


Note
Engineer's prior approval before commencing installation

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards


Note
(3). Conduit Layout Drawings Note

The tenderer shall provide all dimensions, and technical


information of all builders work to the consultant in advance Note
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following


Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki,


Note
ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and


Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or


Note
equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Sub Distribution Boards

Supply and installation of distribution boards UPS DB 2


(toll collection and processing equipment room) including
S.1 MCCB's, MCB's, RCCB's internal cabling, all in accordance nr 1.00 47,184.00
with the specification and as per the detail drawings

Supply and installation of distribution boards UPS DB 3


(toll teller staff room) including MCCB's, MCB's, RCCB's
S.2 internal cabling, all in accordance with the specification and nr 1.00 47,184.00
as per the detail drawings

Supply and installation of sub distribution boards SDB


(lighting and general purpose power in toll gate office -
S.3 ground floor) including MCCB's, MCB's, RCCB's internal nr 1.00 101,674.40
cabling, all in accordance with the specification and as per
the detail drawings

Supply and installation of sub distribution boards SDB


(lighting and general purpose power in toll gate office - upper
S.4 floor) including MCCB's, MCB's, RCCB's internal cabling, nr 1.00 90,382.40
all in accordance with the specification and as per the detail
drawings

Point wiring
The contractor shall forward the conduit layout for prior
Note
approval of the Consultant

Rates for point wiring shall include for all cables, switches,
(1 way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all Note
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

Ground floor

All lighting point wiring shall be in


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth Note
in GI conduits including all accessories

Wring for 300 dia. soffit mounted type lamp as shown in


S.5 nr 2.00 5,886.40
layout drawings

Wring for soffit mounted type 3x18Wx600x600mm


S.6 fluorescent lamp with double parabolic reflectors and other nr 20.00 5,886.40
accessories as shown in layout drawings

Wring for soffit mounted type 2x18Wx300x600mm


S.7 fluorescent lamp with double parabolic reflectors and other nr 8.00 5,886.40
accessories as shown in layout drawings

Wring for wall mounted type mirror lamp as shown in layout


S.8 nr 3.00 5,886.40
drawings

All socket outlets and other point wiring shall be in


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective Note
earth in GI conduits including all accessories

Wiring for ceiling fan point with regulator and series switch
S.9 nr 2.00 5,886.40
as shown in layout drawings

Wiring for 13A (raw power) switched socket outlet as shown


S.10 nr 24.00 4,396.80
in layout drawings

Wiring for 15A switched socket outlet for AC as shown in


S.11 nr 2.00 6,575.20
layout drawings
Wiring for 15A switched socket outlet for water pump as
S.12 nr 1.00 6,699.20
shown in layout drawings

Wiring for 15A (raw power) switched socket outlet as shown


S.13 nr 5.00 12,501.60
in layout drawings

Wiring for network socket outlet as shown in layout


S.14 nr 12.00 9,974.40
drawings
Wiring for intercom extension as shown in layout drawings 11,000.00
S.15 nr 7.00

S.16 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60

S.17 Wiring for TV outlet as shown in layout drawings nr 1.00 8,712.00

First floor

All lighting point wiring shall be in


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth Note
in GI conduits including all accessories

Wring for 300 dia. ceiling recessed type lamp as shown in 5,886.40
S.18 nr 2.00
layout drawings

Wring for ceiling recessed type 3x18Wx600x600mm


S.19 fluorescent lamp with double parabolic reflectors and other nr 25.00 5,886.40
accessories as shown in layout drawings

Wring for ceiling recessed type 2x18Wx300x600mm


S.20 fluorescent lamp with double parabolic reflectors and other nr 8.00 5,886.40
accessories as shown in layout drawings

Wiring for wall bracket lamp point as shown in layout


S.21 nr 2.00 5,886.40
drawings

Wiring for outdoor flood light point as shown in layout


S.22 nr 4.00 16,324.00
drawings

Wring for wall mounted type mirror lamp as shown in layout


S.23 nr 2.00 5,886.40
drawings

All socket outlets and other point wiring shall be in


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective Note
earth in GI conduits including all accessories

Wiring for ceiling fan point with regulator and series switch
S.24 nr 2.00 5,886.40
as shown in layout drawings

Wiring for 13A (raw power) switched socket outlet as shown


S.25 nr 21.00 4,396.80
in layout drawings

Wiring for 15A switched socket outlet for AC as shown in 7,115.20


S.26 nr 4.00
layout drawings

Wiring for network socket outlet as shown in layout


S.27 nr 13.00 9,974.40
drawings
Wiring for intercom extension as shown in layout drawings
S.28 nr 6.00 11,000.00

S.29 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60
S.30 Wiring for TV outlet as shown in layout drawings nr 2.00 8,712.00

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

Ground floor

Supply and install 300 dia. soffit mounted type lamp fitting
S.31 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings

Supply and install ceiling recessed type 3x18Wx600


x600mm fluorescent lamp fitting with double parabolic
S.32 reflectors and other accessories to architect's approval, as nr 20.00 5,310.40
shown in layout drawings

Supply and install ceiling recessed type


2x18Wx300x600mm fluorescent lamp fitting with double
S.33 parabolic reflectors and other accessories to architect's nr 8.00 4,463.20
approval, as shown in layout drawings

Supply and install ceiling recessed type mirror lamp as


S.34 nr 3.00 1,982.40
shown in layout drawings

Supply and install ceiling fan as shown in layout drawings


S.35 nr 2.00 7,434.40

First floor

Supply and install 300 dia. soffit mounted type lamp fitting
S.36 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings

Supply and install soffit mounted type 3x18Wx600 x600mm


fluorescent lamp fitting with double parabolic reflectors and
S.37 other accessories to architect's approval, as shown in layout nr 25.00 5,310.40
drawings

Supply and install soffit mounted type 2x18Wx300x600mm


fluorescent lamp fitting with double parabolic reflectors and
S.38 other accessories to architect's approval, as shown in layout nr 8.00 4,463.20
drawings

Supply and install wall bracket lamp fitting as shown in


S.39 nr 2.00 2,466.40
layout drawings
Supply and install outdoor flood light fitting as shown in
S.40 nr 4.00
layout drawings

Supply and installation of 70W metal halide Bixton flood


S.40 light with Bixton accessories, Black colour (Lamp nr 4.00 7,979.20
temperature 6000 K)

50mm dia medium duty steel pipe bracket welded to concrete


S.41 nr 12.00 10,769.60
beam for fixing flood light

Supply and install wall mounted type mirror lamp as shown


S.42 nr 3.00 1,982.40
in layout drawings

Supply and install ceiling fan as shown in layout drawings


S.43 nr 1.00 7,434.40

Allow for suitably designed earthling system complete with


all necessary earth rods, copper plates, copper tapes,
connectors, and all necessary materials and hardware to
S.44 achieve the regulations and shall be consultant's approval and nr 1.00 66,000.00
Ceylon Electricity Board approval

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided,


contractor shall prepare sample floor render until the Note
consultant is satisfied

Rate for plastering shall include for providing expanded


joints, plastering the reveals, mouldings, etc; as per the Note
detailed drawings
Rates shall include for preparation of surfaces for proper
Note
bonding

Rate shall include for measures to provide suitable bonding


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. rates shall include for all tile Note
specials such as corners, edges etc,

Floor and wall tile should be Lanka tile or equivalent Note

Floor Finishes

600 x 600mm size, homogenous porcelain tile in an approved


color and quality including 18mm thick 1:3 cement sand
bedding and pointing with tile grout to match the color of
tiles laid (Tile rate per m2 Rs. 2000.00 - 2250.00 including
VAT)

T.1 In ground floor m2 99.00 2,428.00

T.2 Entrance step m2 2.30 2,646.40

T.3 In 1st floor m2 102.50 2,476.80

300 x 300mm size, semi glazed homogenous ceramic tiles


with nosing tile in an approved color and quality including
18mm thick 1:3 cement sand bedding and pointing with tile
T.4 grout to match the color of tiles laid in staircase (Tile rate m2 14.30
per m2 Rs. 1500.00 - 1750.00 including VAT)

600 x 300mm size, Porcelain tile in an approved color and


quality including 18mm thick 1:3 cement sand bedding and
T.4 pointing with tile grout to match the color of tiles laid in m2 13.02 2,808.00
stair case

600 x 600mm size, non slip homogenous porcelain tiles in


an approved color and quality including 18mm thick 1:3
cement sand bedding and pointing with tile grout to match
the color of tiles laid in toilet floors (Tile rate per m2 Rs.
1250.00 - 1500.00 including VAT)

T.5 In ground floor m2 12.85 1,871.20

T.6 In 1st floor m2 22.30 1,908.80

Timber flooring
Timber raised floor consisting with 25mm thick. Approved
class I hardwood timber floor panels (1200 x 600mm) fix on
to 100x50mm timber joist placed at 600mm and 1200mm c/s
T.7 in both way and fixed to the RCC floor slab with 150mm m2 19.30 10,444.80
anchor bolt in cash collection room, as per the detail and
specifications

Skirting

Supply and fix 75mm high, 18mm thick polished approved


T.8 m 13.66 615.20
class I timber skirting in cash collection room

75mm high homogenous porcelain tile skirting in approved


design, color and quality including 16mm thick 1:3 cement
and sand bedding

T.9 In ground floor m 78.60 495.20

T.10 In 1st floor m 68.25 505.60

T.11 Balconies in 1st floor m 21.30 505.60

75mm high semi glazed homogenous porcelain tile skirting 495.20


T.12 in approved design, color and quality including 16mm thick m 14.20
1:3 cement and sand bedding in stair case

Wall Finishes

Internal Finishes

16mm thk. cement and sand 1:5 plaster finished smooth,


with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window
reveals

T.13 In ground floor m2 261.50 448.80

T.14 In 1st floor m2 315.50 458.40

Wall Tiling

600x300mm size, smooth glazed porcelain wall tiles up to


1800mm from finish floor level, approved color and quality
including 16mm thick 1:3 cement and sand bedding and
pointing with tile grout on toilet walls (Tile rate per m2 Rs.
1500.00 - 1750.00 including VAT)

T.15 In ground floor m2 51.30 2,145.60

T.16 In 1st floor m2 19.75 2,188.80

External Finishes
16mm thk. cement and sand 1:5 plaster to external faces of
block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals

T.17 In 1st floor m2 118.00 349.60


16 mm thk. smooth cement cut (cement mixed with titanium
powder 1:20) plaster for wall, rate shall include well grinded
and vertical line created with glass strip, and also rate shall
include door and window reveals

T.18 In ground floor m2 125.00

600 x 600 mm size, Porcelain tile in an approved color and


quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls at;

T.18 In ground floor m2 184.98 1,800.00

Plinth Plaster

20mm thick 1:3 cement sand rendering smooth finish with


T.19 m2 30.00 446.40
colored cement

Slab Soffit Finishes

10mm thick plastering to soffit slab with cement sand 1:3


including floating with lime putty

T.20 In Ground floor m2 124.46 439.20

T.21 Stair Case m2 11.79 439.20

Ceiling Finishes

Supply and fix 600x600mm size 15mm thk. natural white


color mineral fiber exposed type suspended ceiling with
powder coated aluminium exposed frame work and solid
aluminium thread bar suspension system as per the detail
drawings and specification

T.22 In 1st floor m2 131.00 2,860.00

Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
T.23 and specification. Rate shall include, Gap between roof sheet m2 86.00 1,000.00
and top edge of the wall covered with Zn/Al sheets,

Tile Supply only


T.24 600 x 600mm size, homogenous ceramic tile nr 25.00

T.25 300 x 300mm size, semi glazed homogenous ceramic tiles nr 25.00

T.26 600 x 600mm size, non slip homogenous ceramic tiles nr 25.00

T.27 600x300mm size, smooth glazed ceramic wall tiles nr 25.00

TOTAL FLOOR, WALL AND CEILING FINISHES


CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in


an approved color and manufacture (C.I.C or equivalent) and
color to suit with the environment, climate and location of Note
this project

External painting shall be exterior quality weathersheild,


texture base paint in an approved color and manufacture
(C.I.C or equivalent) and color to suit with the environment, Note
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and


Note
window reveals

The Contractor shall prepare a sample area or sample board


bearing finish coating and submit the same to the Engineer's Note
for approval

Wall Painting

External

Prepare surface and apply one coat of water proofing primer


V.1 and two coats of approved type weathershield paint to m2 118.00 349.60
external plastered surfaces of walls as directed

Prepare surface and apply two coats of colorless vax paint on


V.2 external smooth cut plaster surfaces of wall as directed m2 125.00 317.60

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.3 In ground floor m2 261.50 284.80

V.4 In 1st floor m2 315.50 291.20

Ceiling Painting
Prepare surface and apply two coats of colorless vax paint on
fair faced surfaces as directed

V.5 In ground floor soffit m2 124.00

Ditto - but in sides and soffit of staircase including soffit of


V.6 m2 13.25
landings
Slab Soffit Painting

Prepare and apply one coat of primer and two coats of


emulsion paint on soffit

V.5 In ground floor m2 124.46 356.00

Ditto - but in sides and soffit of staircase including soffit of


V.6 m2 11.79 356.00
landings
TOTAL FOR PAINTING WORK CARRIED TO
SUMMARY
80%
Amount Unit Qty Rate Amount

Note

Note

Note

Note

Note

Note

Note

m2 200.00 110.29 22,058.00

19,437.60 m3 21.00 815.00 17,115.00

Rate only m3 10,000.00 Rate only


25,527.79 m3 26.22 1,458.00 38,228.76

Note

23,496.00 m2 165.00 142.40 23,496.00


68,461.39 100,897.76
100,897.76

Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

Note

m 162 392.91 63,651.61

m 36
need to be dicuss with contractor for suppling price and m

m3 53 18,371.38 973,683.04

nr 12 required explanation
Kg 1082 203.96 220,684.72

Kg 2708 203.96 552,323.7

nr 12

m3 46

Item 1

Note

Note

Note

Note

- m2 53.00 545.53 28,913.20

73,927.80 m2 153.25 545.53 83,602.78


- m3 13.00 18,371.38 238,827.92

- m3 7.00 18,371.38 128,599.65

- m3 3.10 18,371.38 56,951.27

- m3 0.65 18,371.38 11,941.40

- m3 4.85 18,371.38 89,101.18

- m3 5.10 18,371.38 93,694.03

607,006.08 m3 40.80 14,877.60 607,006.08

- m3 0.45 18,371.38 8,267.12


125,696.64 m 3
10.20 18,371.38 187,388.06

140,484.48 m3 11.40 18,371.38 209,433.71

40,666.56 m3 3.30 18,371.38 60,625.55

359,294.04 m3 24.15 18,003.53 434,785.34

126,459.60 m3 8.50 18,003.53 153,030.04

37,194.00 m3 2.50 18,003.53 45,008.83

52,795.68 m3 4.20 20,208.52 84,875.77

128,989.20 m3 8.50 20,208.52 171,772.39

11,941.88 m3 0.95 20,208.52 19,198.09

10,056.32 m3 0.80 20,208.52 16,166.81


Note

Note

Note

Note

Note

Note

326,040.00 Kg 2,145.00 202.00 433,290.00

- Kg 445.00 -
- -
255,816.00 Kg 1,683.00 202.00 339,966.00

101,992.00 Kg 671.00 202.00 135,542.00

85,576.00 Kg 563.00 202.00 113,726.00

Kg 81.50

m2 119.00
384,104.00 Kg 2,527.00 202.00 510,454.00

67,944.00 Kg 447.00 202.00 90,294.00

48,792.00 Kg 321.00 202.00 64,842.00

137,408.00 Kg 904.00 202.00 182,608.00

119,814.40 Kg 772.00 202.00 155,944.00

21,107.20 Kg 136.00 202.00 27,472.00


202.00
120,435.20 Kg 776.00 202.00 156,752.00

2,250.40 Kg 14.50 202.00 2,929.00

Note

m2 30.00 1,895.59

m2 65.60 1,895.59

m2 3.25 1,895.59

m2 48.00 1,895.59

m2 44.50 1,895.59

m2 1.55 1,895.59

40,656.00 m2 44.00 1,895.59 83,405.92

81,312.00 m2 88.00 1,895.59 166,811.85


13,860.00 m2 15.00 1,895.59 28,433.84

59,115.00 m2 43.75 1,895.59 82,932.03

168,900.00 m2 125.00 1,895.59 236,948.65

103,029.00 m2 76.25 1,895.59 144,538.68

47,629.80 m2 35.25 1,895.59 66,819.52

79,325.60 m2 57.25 1,895.59 108,522.48

124,704.00 m2 90.00 1,895.59 170,603.03

5,858.20 m2 4.25 1,895.59 8,056.25

17,666.40 m2 12.75 1,895.59 24,168.76


10,026.72 m 9.90 787.20 7,793.28

m 8.70

2,426.40 m 1.50 787.20 1,180.80

m 1.60

m 48.60

18,897.20 m 8.50 787.20 6,691.20

m 47.00

32,160.40 m 26.50 787.20 20,860.80

m 48.60

194,824.00 m 142.00 1,372.00 194,824.00

81,760.00 nr 28.00 2,920.00 81,760.00


109,927.60 m 49.75 2,209.60 109,927.60

18,227.20 m2 256.00 71.20 18,227.20

- m 135.50 -

- -
- m 14.20 -

4,596,097.00 6,476,600.89
6,476,600.89

Note

Note

Note

Note

Note

Note

m3 6.00 9,531.80 57,190.81

66,086.40 m2 48.00 1,255.05 60,242.23


220,288.00 m2 160.00 1,255.05 200,807.42

53,162.40 m2 51.00 984.06 50,186.85

405,273.60 m2 288.00 1,255.05 361,453.36

104,272.00 m2 98.00 1,255.05 122,994.55

849,082.40 795,684.41
795,684.41

Note

Note

Note

Note
80,121.60 m2 64.20 1,153.85 74,076.92

53,491.20 m2 42.00 1,153.85 48,461.54

2,292.48 m2 1.80 1,153.85 2,076.92

135,905.28 124,615.38
124,615.38

Note

140,042.88 m 16.40 8,539.20 140,042.88

m 9.00 8,539.20 76,852.80

24,202.08 m 2.45 9,878.40 24,202.08


13,290.40 Item 1.00 13,290.40 13,290.40

177,535.36 254,388.16 254,388.16

Note

Note

Note

Note
Note

Note

124,634.40 nr 1.00 124,634.40 124,634.40

rate should be get

190,860.00 nr 3.00 63,620.00 190,860.00

10,949.60 nr 1.00 10,949.60 10,949.60

278,902.40 nr 7.00 39,843.20 278,902.40

142,617.60 nr 4.00 35,654.40 142,617.60

206,558.40 nr 6.00 34,426.40 206,558.40

380,292.00 nr 15.00 25,352.80 380,292.00

16,860.80 nr 1.00 16,860.80 16,860.80

482,979.20 nr 4.00 120,744.80 482,979.20


215,800.80 nr 3.00 71,933.60 215,800.80

97,624.00 nr 1.00 97,624.00 97,624.00

26,697.60 nr 1.00 26,697.60 26,697.60

52,060.80 nr 1.00 52,060.80 52,060.80

9,055.20 nr 1.00 9,055.20 9,055.20

17,688.00 nr 1.00 17,688.00 17,688.00

76,373.00 m 34.72 2,200.00 76,373.00

13,200.00 nr 2.00 6,600.00 13,200.00

13,600.00 nr 2.00 6,800.00 13,600.00

12,000.00 nr 2.00 6,000.00 12,000.00

14,400.00 nr 2.00 7,200.00 14,400.00

83,503.20 nr 33.00 2,530.40 83,503.20


260,700.00 m2 37.50 6,952.00 260,700.00

78,557.60 m2 11.30 6,952.00 78,557.60

145,629.90 m2 19.18 7,592.80 145,629.90

2,951,544.50 2,951,544.50
2,951,544.50

Note

Note

Note

Note
331,593.60 nr 4.00 82,898.40 331,593.60

- -
443,395.20 nr 4.00 110,848.80 443,395.20
- -
184,461.33 nr 2.00 92,230.66 184,461.33
- -

987,536.00 m 310.00 3,185.60 987,536.00

- -

148,130.40 m 62.00 2,389.20 148,130.40

- -
69,750.40 m 142.00 491.20 69,750.40
- -
86,546.94 m 77.44 1,117.60 86,546.94
- -
- -
- -

282,643.20 m2 252.00 1,121.60 282,643.20

- -

214,704.00 m2 252.00 852.00 214,704.00

- -
- -
- -
- -
53,617.60 m 62.00 864.80 53,617.60
- -

7,167.20 m 62.00 115.60 7,167.20

78,020.80 m 62.00 1,258 78,020.80

- -
- m 57.60 -

46,214.40 m 58.00 796.80 46,214.40

2,933,781.07 2,933,781.07
2,933,781.07

Note

Note

Note

Note

81,059.20 nr 4.00 31,262.00 125,048.00

- -

34,558.40 nr 2.00 17,279.20 34,558.40

- -
87,404.00 nr 5.00 17,480.80 87,404.00

- -

13,503.20 nr 1.00 26,650.00 26,650.00

- -

22,372.80 nr 2.00 15,037.50 30,075.00

- -

10,851.20 nr 4.00 2,850.00 11,400.00

- -
- -

4,502.40 nr 2.00 2,251.20 4,502.40

- -
8,840.00 nr 2.00 4,420.00 8,840.00
- -
11,251.20 nr 6.00 1,875.20 11,251.20
- -
- -

10,246.40 nr 4.00 2,025.00 8,100.00

- -

- nr 2.00 1,070.00 2,140.00

7,005.60 nr 1.00 6,850.00 6,850.00


- -

113,222.40 nr 2.00 52,950.00 105,900.00

- -

21,668.00 nr 5.00 4,333.60 21,668.00

- -
7,155.20 nr 4.00 1,788.80 7,155.20

Note

Note

668,582.40 nr 2.00 334,291.20 668,582.40

- -

27,020.80 nr 1.00 27,020.80 27,020.80

- -

174,984.00 nr 1.00 174,984.00 174,984.00

5,072.80 m 17.00 298.40 5,072.80

4,774.40 m 16.00 298.40 4,774.40

8,265.60 nr 2.00 4,132.80 8,265.60


- -

Note

Note
Note

6,025.60 m 14.00 430.40 6,025.60

12,460.80 m 33.00 377.60 12,460.80

2,088.80 m 7.00 298.40 2,088.80

339.20 m 2.00 169.60 339.20

1,830.40 m 16.00 114.40 1,830.40

16,531.20 nr 4.00 4,132.80 16,531.20

5,318.40 nr 1.00 5,318.40 5,318.40

Note

Note

Note

938.40 m 3.00 312.80 938.40

398.40
9,163.20 m 23.00 9,163.20

740.00
5,920.00 m 8.00 5,920.00

1,779.20
39,142.40 m 22.00 39,142.40
m 7.0

121,199.10 m 68.12 1,779.2 121,199.10

9,196.00 nr 5.00 1,839.20 9,196.00

133,382.40 nr 8.00 16,672.80 133,382.40

Note

nr 1.00

17,184.00 nr 1.00 17,184.00 17,184.00

30,928.00 nr 1.00 30,928.00 30,928.00

16,064.00 nr 1.00 16,064.00 16,064.00


- nr 1.00 -
- -
- -

106,063.20 nr 1.00 106,063.20 106,063.20

467,066.40 nr 1.00 467,066.40 467,066.40

3,681.60 m 6.00 613.60 3,681.60

9,763.20 m 6.00 1,627.20 9,763.20

1,524.80 nr 2.00 762.40 1,524.80

2,338,151.10 2,396,053.30 2,396,053.30

Note

Note
Note

Note

202,400.00 nr 2.00 101,200.00 202,400.00

- -
- -
- -
42,240.00 m 8.00 5,280.00 42,240.00
- -
- -
- -
3,520.00 m 8.00 440.00 3,520.00
- -
- -
- -
- -

- Note -

- -

202,400.00 nr 2.00 101,200.00 202,400.00

- -

83,600.00 nr 1.00 83,600.00 83,600.00

- -

70,400.00 nr 1.00 70,400.00 70,400.00

- -
- -
- -
39,600.00 m 7.50 5,280.00 39,600.00
- -
52,800.00 m 12.00 4,400.00 52,800.00
- -
55,440.00 m 14.00 3,960.00 55,440.00
- -
- -
- -
12,320.00 m 28.00 440.00 12,320.00

3,200.00 LS Item Allow 3,200.00

13,200.00 LS Item Allow 13,200.00

2,200.00 LS Item Allow 2,200.00

783,320.00 783,320.00 783,320.00

Note

Note

Note
Note

Note

Note

Note

Note

Note

Note

Note

Note

47,184.00 nr 1.00 47,184.00 47,184.00

- -

47,184.00 nr 1.00 47,184.00 47,184.00

- -

101,674.40 nr 1.00 101,674.40 101,674.40

- -

90,382.40 nr 1.00 90,382.40 90,382.40

- -
- -
- -
- Note -
- -

- Note -

- -
- -
- -

- Note -

- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -

117,728.00 nr 20.00 5,886.40 117,728.00

- -

47,091.20 nr 8.00 5,886.40 47,091.20

- -
17,659.20 nr 3.00 5,886.40 17,659.20
- -

- Note -

- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
105,523.20 nr 24.00 4,396.80 105,523.20

13,150.40 nr 2.00 6,575.20 13,150.40

6,699.20 nr 1.00 6,699.20 6,699.20

62,508.00 nr 5.00 12,501.60 62,508.00

119,692.80 nr 12.00 9,974.40 119,692.80


11,000.00
77,000.00 nr 7.00 77,000.00

30,328.80 nr 3.00 10,109.60 30,328.80

8,712.00 nr 1.00 8,712.00 8,712.00

Note

11,772.80 5,886.40 11,772.80


nr 2.00

147,160.00 nr 25.00 5,886.40 147,160.00

47,091.20 nr 8.00 5,886.40 47,091.20

11,772.80 11,772.80
nr 2.00 5,886.40

65,296.00 nr 4.00 16,324.00 65,296.00

11,772.80 nr 2.00 5,886.40 11,772.80

Note

11,772.80 nr 2.00 5,886.40 11,772.80

92,332.80 nr 21.00 4,396.80 92,332.80

28,460.80 7,115.20 28,460.80


nr 4.00

129,667.20 nr 13.00 9,974.40 129,667.20

66,000.00 nr 6.00 11,000.00 66,000.00


- -
30,328.80 nr 3.00 10,109.60 30,328.80
- -
17,424.00 nr 2.00 8,712.00 17,424.00
- -
- -
- -

- -

- -
- -
- -

5,900.80 nr 2.00 2,950.40 5,900.80

- -

106,208.00 nr 20.00 5,310.40 106,208.00

- -

35,705.60 nr 8.00 4,463.20 35,705.60

- -
5,947.20 nr 3.00 1,982.40 5,947.20
- -
14,868.80 nr 2.00 7,434.40 14,868.80
- -
- -
- -

5,900.80 nr 2.00 2,950.40 5,900.80

- -

132,760.00 nr 25.00 5,310.40 132,760.00

- -

35,705.60 nr 8.00 4,463.20 35,705.60

- -
4,932.80 nr 2.00 2,466.40 4,932.80
- -
- nr 4.00 -
- -

31,916.80 nr 4.00 7,979.20 31,916.80

- -
129,235.20 nr 12.00 10,769.60 129,235.20
- -
5,947.20 nr 3.00 1,982.40 5,947.20

7,434.40 nr 1.00 7,434.40 7,434.40

66,000.00 nr 1.00 66,000.00 66,000.00

2,175,378.40 2,175,378.40
2,175,378.40

Note

Note
Note

Note

Note

240,372.00 m2 99.00 2,428.00 240,372.00


- -
6,086.72 m2 2.30 2,646.40 6,086.72
- -
253,872.00 m2 102.50 2,476.80 253,872.00
- -

- m2 14.30 -

36,560.16 m2 13.02 2,808.00 36,560.16

- -

- -

- -
24,044.92 m 2
12.85 1,871.20 24,044.92
- -
42,566.24 m2 22.30 1,908.80 42,566.24
- -
- -
- -
- -
201,584.64 m2 19.30 10,444.80 201,584.64

- -
- -
- -
8,403.63 m 13.66 615.20 8,403.63
- -

- -

- -
38,922.72 m 78.60 495.20 38,922.72
- -
34,507.20 m 68.25 505.60 34,507.20
- -
10,769.28 m 21.30 505.60 10,769.28
- -
495.20
7,031.84 m 14.20 7,031.84

- -
- -
- -
- -
- -

- -

- -
117,361.20 m 2
261.50 448.80 117,361.20
- -
144,625.20 m2 315.50 458.40 144,625.20
- -
- -
- -

- -

- -
110,069.28 m2 51.30 2,145.60 110,069.28
- -
43,228.80 m2 19.75 2,188.80 43,228.80
- -
- -
- -

- -
41,252.80 m 2
118.00 349.60 41,252.80

- -

- -
- m2 125.00 -
- -

- -

- -
332,964.00 m 2
184.98 1,800.00 332,964.00
- -
- -
- -
13,392.00 m2 30.00 446.40 13,392.00
- -
- -
- -
- -
- -
54,662.83 m 2
124.46 439.20 54,662.83
- -
5,178.17 m2 11.79 439.20 5,178.17

374,660.00 m2 131.00 2,860.00 374,660.00


- -

86,000.00 m2 86.00 1,000.00 86,000.00

- -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -

2,228,115.63 2,228,115.63 2,228,115.63

Note

Note

Note

Note

41,252.80 m2 118.00 349.60 41,252.80

39,700.00 m2 125.00 317.60 39,700.00

74,475.20 m2 261.50 284.80 74,475.20

91,873.60 m2 315.50 291.20 91,873.60


m2 124.00

m2 13.25

44,307.76 m2 124.46 356.00 44,307.76

4,197.24 m2 11.79 356.00 4,197.24

295,806.60 295,806.60 295,806.60


19,533,178.744 1.20 *

22000000 26400000 4400000


r for suppling price and materials
80%
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or


Note
machine digging as required for excavation

Rates and prices for excavation are to include for excavations


any hard materials excluding rock requiring blasting Note

Rates and prices of excavation are to include for backfilling


with selected excavated materials and compactions Note

Rates and prices for excavation are to include for cutting


through tree roots and for grubbing up all disused pipes and Note
drains encountered and sealing off ends

Payments for bulk excavation shall be made making use of


the spot level drawing to be submitted by the Contractor and Note
based on the final excavated depths

Rates and prices for filling are to include selection of filling


materials from excavated earth as well as use of imported Note
materials where necessary

No additional payments will be made for working space Note

Site Clearance

Clearing site including removal of top soil up to a depth of


150 mm including grubbing up roots, bushes and trees, filling
D.1 voids with selected excavated material and compacting and m2 200.00
disposal of all surplus excavated material away from the site
as directed

Excavation

Excavation for wall foundation trenches, not exceeding


1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
D.2 compactions, leveling and compacting the bottom of m3 21.00 925.60
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.

D.3 Excavation of rock by blasting m3 10,000.00

Filling

Imported hard earth filling, well rammed and consolidated


using suitable roller to achieve 95% maximum dry density ,
D.4 in make up levels under floors 150mm thick layers m3 26.22 973.60
Anti termite Treatment

Contractor shall submit ten years gurantee for entire building


through his specialist sub contractor in the name of the Client Note
in an acceptable format

Application of anti termite treatment under the ground floor


D.5 slab in accordance with the manufacture's specifications and m2 165.00 142.40
to the approval of Engineer

TOTAL FOR EXCAVATION AND EARTH WORK


CARRIED TO SUMMARY
CAST INSITU REINFORCED CONCRETE WORKING
E
PILES
The tenderers are requested to refer Bills of Quantities,
General Notes, Pricing Preambles, Drawings, Specifications,
Conditions of Contract, Contract Data and other relevant Note
documents prior to pricing of this section of work.

No extra payment will be made for any delay caused by


security or any other arrangement of the statutory-divisions,
Road Development Authority, Colombo Municipal Council, Note
Sri Lanka Police, Railway Authority etc.

Where there is a repetetion of Piling items in this trade the


tenderer is requested to price the item more detailed in Note
description.

Costs which are covered under Piling should not be repeated


Note
in any other trade in BOQ

The tenderer is advised to visit the site of the proposed work,


as it is his responsibility to ascertain the conditions
governing, actual amount of work involved, access to the Note
site, the external working space, storage area etc.,

The tenderers are specially requested to refer the soil


investigation report thoroughly prior to pricing this section.
Any discrepancies and or any suggestion to be forwarded Note
with the tender or prior to that to the Engineer for
clarification.

Tenderers are adivised that the soil investigation report


provided is for approximate onloy and the Contractor should
verify all the data by his own.

The Contractor shall insure against damage to adjoining


properties, adjacent structures, any existing over head and/or
under ground services that may cause damages as a result of Note
this piling worknot less than their prevailing market values of
the relevant

Rates shall include for mobilization and demobilization and


maintenance of all Rates shall include for mobilization and
piling equipments and other machineries. Note

If any damage is caused to any pile or piles due to the


installation of adjacent piles or due to any other work being
carried out by the Contractor the Contractor shall take such
remedial measures as may be ordered by the Engineer Note
including the installation of additional piles and the cost of
such measures to be borne entirely by the Contractor.
The price shall include for removal of all spoils including
removal of any cut lengths broken concrete of Laitance and
used fluid etc, away from the site. Concreting of piling shall
be terminated 1.0 m above the cut off level and then cut back Note
to the specified cut off level. Piling length will be measured
between the bottom level and up to the cut off level

Setting out of piles and dimensions of piles to be approved


by the Engineer on submission of a surveyor plan certified by
a licensed Surveyor in triplicate. Setting out piles and Note
dimensions of piles to be approved by Engineer prior to
commencement of work.

The tenderers shall submit the detail of the method of piling


work together with necessary shop drawing, equipment to be
used, duration, durability and method of erection etc., The
method of piling should take into consideration the
surroundingbuildings and other services etc., in the Note
vicinity,suitable to the type of soil strata method of removal
of temporary work and constructionchosen to adopt the
proposal given here in.

Payments for piling shall be evaluated as follows:


(a) Piling rate to be applicable from bottom level of pile to
cut off level.
(b) Empty boring has been measured separately from
existing ground level
(c) No payment will be made for any length of pile above cut
off level
(d) Boring through the rock has been measured as extra over
items. Each pile and to be casted into the rock for a length of Note
1.5 times diameter in hard basement rock.

The tenderers are requested to submit to the Engineer for


approval, full details of piles offered on how the calculation
and checking of the load bearing capacity and settlement of Note
the piles that will be carried out and the tests proposed to be
done at the site.

The Contractor shall submit the details of the temporary


works to the Engineer for approval prior to commencement Note
of such work.

Payment for concrete will be made on the theoratical volume


Note
calculated based on the nominal pile diameter

Rate shall include for temporary backfilling (Filled with spoil


) and steel casing ( minimum 6.0 m) and high strength Note
concrete grouting at cut-off level.

Rate shall include for breaking through obstruction if any


Note
required

CAST IN-SITU CONCRETE PILING


Empty Boring
Boring shall be carried out in accordance with the drawings
and specifications for following piles; approximate depth as
per drawings

E.1 Pile, 600mm diameter (12nr). m 162

"Extra over" for boring through hard basement rock as


E.2 m 36
specified in drawings.

Concrete grade 30 in piles

Reinforced concrete grade 30 in piles in accordance with the


drawings and specifications (reinforcement measured
seperately)

E.3 Pile, 600mm diameter (12nr). m3 53

Cutting off tops of piles

Prepare, clear and straighten bent reinforcement into pile


caps and cutting off (trimming) top of piles to cut off level.

E.4 Pile, 600mm diameter (12nr). nr 12

Reinforcement in piles

High yield deformed steel bar reinforcement, characteristic


strength 460 Mpa and Mild steel bar reinforcement,
characteristic strength 250 Mpa including bends, hooks, tying
wire, distance blocks and ordinary spacers

Tor Steel Bar Reinforcement

E.5 10mm diameter Kg 1082

E.6 20mm diameter Kg 2708

Testing

Test on piles in accordance with the drawings and


specifications

E.7 Pile, 600mm diameter nr 12

E.8 Disposal of excavated material away from site m3 46

Allow for disposal of ground and sub surface water


E.9 Item 1
(dewatering)
TOTAL FOR CAST INSITU REINFORCED
CONCRETE WORKING PILES CARRIED TO
SUMMARY
F CONCRETE WORK

Concrete
All concrete shall be made dense with a vibrator and finished
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of Note
concreting of each item

Rates shall include for plant for mixing, handling, hoisting,


depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary Note

Rate for concrete shall include forming joints between new


concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately Note

Concrete mix design details to be submitted to consultant's/


Note
Engineer's approval

Work up to plinth level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Under footings and wall foundation m2 53.00

F.1 Under pile caps and floor slab m2 153.25 482.40

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.2 In strip foundation m3 13.00

F.3 In column shafts m3 7.00

F.4 In 100mm thick wall foundation m3 3.10

F.5 In stair case footing and shafts m3 0.65

F.6 In plinth beam m3 4.85

F.7 In external plinth m3 5.10

F.2 In floor concrete m3 40.80 14,877.60

F.9 In entrance step m3 0.45


F.3 In pile caps m 3
10.20 12,323.20

F.4 In ground beams m3 11.40 12,323.20

Work from plinth level to 1st floor

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings
F.5 In column shafts up to 1st floor m3 3.30 12,323.20

F.6 In first floor slab m3 24.15 14,877.60

F.7 In first floor beams m3 8.50 14,877.60

F.8 In staircase including landings m3 2.50 14,877.60

Work from 1st floor level to roof

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings

F.9 In column shafts up to roof level m3 4.20 12,570.40

F.10 In roof beam m3 8.50 15,175.20

F.11 Water tank slab m3 0.95 12,570.40

F.12 Beam in water tank slab m3 0.80 12,570.40

Reinforcement

The size of reinforcement rods described in the drawing or


elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks Note
and laps have been measured with the quantities

All reinforcement shall be free from dirt, oil, paint, grease, or


loose rust before fixing in position and shall be brushed with Note
stiff wire brush

Reinforcement shall be bent cold by applying a slow even


pressure on an approved type of bending apparatus Note

Rate shall include for cutting, bending, fabricating, placing in


position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, Note
spaces, chairs

Characteristic strength of High Tor steel should be 460


Note
N/mm2

Characteristic strength of Mild steel should be 250 N/mm2


Note

Reinforcement as per drawings and specifications in to the


followings

Work up to plinth level

Tor Steel Bar Reinforcement


F.13 10mm Dia. Kg 2,145.00 152.00

F.18 12mm Dia. Kg 445.00

F.14 16mm Dia. Kg 1,683.00 152.00

F.15 20mm Dia. Kg 671.00 152.00

F.16 25mm Dia. Kg 563.00 152.00

Mild Steel Bar Reinforcement

F.19 6mm Dia. Kg 81.50


Mesh Reinforcement

Type A142 mesh laid with 150mm laps in ground floor slab
m2 119.00

Work from plinth level to 1st floor

Tor Steel Bar Reinforcement

F.17 10mm Dia. Kg 2,527.00 152.00

F.18 12mm Dia. Kg 447.00 152.00

F.19 16mm Dia. Kg 321.00 152.00

F.20 20mm Dia. Kg 904.00 152.00

Work from 1st floor level to roof

F.21 10mm Dia. Kg 772.00 155.20

F.22 12mm Dia. Kg 136.00 155.20

F.23 16mm Dia. Kg 776.00 155.20

Mild Steel Bar Reinforcement

F.24 6mm Dia. Kg 14.50 155.20

Formwork

Rate shall include for all necessary boarding, supporting,


application of mould oil as necessary erecting, framing,
cutting angles, cleaning, wetting and treatment before placing Note
concrete and striking or removal etc. construction joints

Work up to D.P.C. level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing
F.29 Sides of strip footing m2 30.00

F.30 Sides of column shafts m2 65.60

F.32 Sides of stair case footing and shafts m2 3.25

F.33 Sides of plinth beam m2 48.00

F.34 Sides of external plinth m2 44.50

F.35 Sides of entrance step m2 1.55

F.25 Sides of pile caps m2 44.00 924.00

F.26 Sides of ground beam m2 88.00 924.00

F.27 Sides of floor slab m2 15.00 924.00

Work from D.P.C. level to 1st Floor level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing

F.28 Sides of column shafts up to 1st floor m2 43.75 1,351.20

Formwork shall be in phenolic coated plywood - minimum


16mm thick to provide fair face natural concrete finished on
concrete surfaces where necessary, Rate shall including
grinding as necessary to achieve a smooth flat even surfaces
with out any defects, in the followings

Sides and soffit of first floor slab, rate shall include forming
F.29 even grooves on the construction joint locations of the m2 125.00 1,351.20
formwork of the fairfaced soffit.

F.30 Sides and soffit of first floor beams m2 76.25 1,351.20

F.31 Sides and soffit of staircase including landings m2 35.25 1,351.20

Work from 1st floor level to roof level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at
edges complete as per the detailed drawing

F.32 Sides of column shafts m2 57.25 1,385.60


F.33 Sides and soffit of in roof beam m2 90.00 1,385.60

F.34 Soffit of water tank slab m2 4.25 1,378.40

F.35 Sides and soffit of beam in water tank slab m2 12.75 1,385.60

Miscellaneous

Lintels

100x200mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.36 In ground floor m 9.90 1,012.80

F.37 In 1st floor m 8.70


200x200mm size reinforced concrete lintels, rate including
2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.37 In ground floor m 1.50 1,617.60

F.39 In 1st floor m 1.60

200x225mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.40 In 1st floor m 48.60

200x300mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.38 In ground floor m 8.50 2,223.20

F.39 In 1st floor m 47.00


200x150mm size reinforced concrete sill beam, rate
including 2T10 for top + R6@ 125 and necessary form work
in the following

F.39 In ground floor m 26.50 1,213.60

F.41 In 1st floor m 48.60

RCC Pergola

Supply and place 75x200mm size fair faced finished RCC


pergolas on RCC arm at 150mm centers, rate including
necessary form work , R/F and placing in position ,grinding
F.40 as necessary to achieve a smooth flat even surfaces with out m 142.00 1,372.00
any defects as per the detail drawings STDP/TO/T1/S06 and
TO/T1/AR06 at 1st floor level
Fairfaced finished RCC arm supporting to the pergolas as per
the detail drawings STDP/TO/T1/S06 and TO/T1/AR06 Rate
F.41 shall include necessary form work , R/F and grinding as nr 28.00 2,920.00
necessary to achieve a smooth flat even surfaces with out
any defects

Supply and fix 300x100mm size prefabricated fairfaced


finished concrete moulding on to 200mm thick. cement
F.42 block wall by using 12mm dia. Steel rods with nuts at m 49.75 2,209.60
1000mm centers as per the detail drawing no. TO/T1/AR06

Polythyne layer

750 gauge polythyne layer under ground floor slab as per


F.43 m2 256.00 71.20
drawings and specifications
Expansion joint filled with compressible filler and sealant on
F.57 top in ground floor as per the detail drawings and m 135.50
specification

Form necessary construction joint in ground floor concrete as


F.58 m 14.20
per the detail drawing no TP/TD - 02

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY

G MASONRY WORK

Rate shall include for reinforcement concrete vertical and


horizontal stifners for all 100mm thk. walls exceeding 3m Note
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per


Note
drawings and specifications

Rate shall include for scaffoldings Note

Contractor shall finish the exterior and interior surface of


Note
blocks

Work neatly strictly as per the instruction of the Engineer


Note

Compressive strength of Hollow blocks shall be minimum


1.5 N/ mm2 Note

Rubble work

Random rubble (150 x 225mm size) masonry wall foundation


G.1 m3 6.00
in cement and sand 1:5 mortar

Hollow block work


Work up to D.P.C. level

G.1 200mm thick hollow block wall in cement and sand 1:5 m2 48.00 1,376.80

In ground floor

G.2 200mm thick. hollow block wall in cement and sand 1:5 m2 160.00 1,376.80

G.3 100mm thick. hollow block wall in cement and sand 1:5 m2 51.00 1,042.40

In first floor

G.4 200mm thick. hollow block wall in cement and sand 1:5 m2 288.00 1,407.20

G.5 100mm thick. hollow block wall in cement and sand 1:5 m2 98.00 1,064.00

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
WATER PROOFING WORK

Rates shall include the protective screed, grounds, rules,


internal angles, fillet, external angles and exposed circular Note
edges chases for trucking in etc;

Rate shall include cutting top line, notching bending and


Note
extra materials for lapping

Contractor shall submit ten years guarantee for water


proofing material and workmanship through his specialist
sub contractor in the name of the Employer in an acceptable Note
format

The technical specifications and the methodology of the


water proofing system shall be submitted by the contractor to
the consultant structural engineer for approval Note

Water Proofing

Application of approved suitable waterproofing material


"Barralastic" or equivalent as per manufacture's instruction to
floor/ wall in toilets and balconies

H.1 In ground floor toilet walls and floor m2 64.20 1,248.00


H.2 In first floor toilet wall and floor m2 42.00 1,273.60

H.3 In first floor balconies m2 1.80 1,273.60

TOTAL FOR WATER PROOFING WORK CARRIED


TO SUMMERY
J STRUCTURAL METAL WORK

Rates for railing shall for cutting, waste, welding, bending,


anti corrosive and spray paint etc; and all existing joints shall
be finished with and finishes as per drawings. Note

Hand rails

Supply and fix stainless steel handrail for stair case


consisting with 75mm dia. top rail,40mm dia. up rights and
J.1 up rights welded to 100x100mm steel plate which in fixed to m 16.40 8,539.20
the RCC steps with anchor bolts as per the detail and
specifications

Extra over cost for supply and fix stainless steel handrail for
stair case consisting with 75mm dia. top rail, 25mm dia. up
rights and up rights welded to 60x60mm steel plate which in m 9.00
fixed to the RCC steps with anchor bolts as per the detail and
specifications
Balcony guard rails

Supply and fix, Aluminium balcony guard rail as per detail


J.2 m 2.45 9,878.40
drawings and specifications

2 nrs of 3.0 x0.225x0.10m size RCC fair faced finish rail


J.3 fixed to the RCC column with nut & bolt in front of the Toll Item 1.00 13,290.40
Gate office
TOTAL FOR STRUCTURAL METAL WORK
CARRIED TO SUMMERY
K METAL WORK

ALUMINIUM DOORS AND WINDOWS WORK

Rates for all aluminum doors and windows shall include for
Note
all necessary ironmongery

All joints to be sealed in an appropriate manner with


Note
approved sealant with structural silicon

Rates shall include for aluminium paneling, glazing, framing,


fixing, beading, gaskets, sealant, high quality ironmongery
for windows and doors and precaution to prevent ingress of Note
water and water leaks, fixing accessories and hardware

Door locks should be Union or equivalent made Note

All aluminium sections to be powder coated Note

All glass shall be 12mm thick toughen glass / 6mm thick


Note
clear glass as directed

Frameless two way swing 12mm thick toughen glass door


type " D1", size 2425x2700mm with fixed 6mm thick
K.1 toughen glass panel on either side and top, complete as per nr 1.00 124,634.40
detail drawings. Rate shall include necessary approved
quality iron mongery and locking system
Two way swing sashes clear toughen glazed panel door with
aluminium frame type " D2 ", size 1500 x 2100mm with
K.2 necessary approved quality iron mongery and locking nr 3.00 63,620.00
system, complete as per detail drawings

Two way swing double sash composite Al. louver panel door
with aluminium frame type " W16 ", size 1000x700mm with
K.3 necessary approved quality iron monger and locking system, nr 1.00 10,949.60
complete as per detail drawings in Toll Gate office

One way swing single sash clear toughen glazed panel door
with aluminium frame type " D3 ", size 900 x 2100mm with
K.4 necessary approved quality iron mongery and locking nr 7.00 39,843.20
system, complete as per detail drawings

One way swing single sash and both side composite


aluminium panel door with aluminium frame type " D4 ",
K.5 size 900 x 2100mm with necessary approved quality iron nr 4.00 35,654.40
mongery and locking system, complete as per detail drawings

One way swing single sash and both side composite


aluminium panel door with aluminium frame type " D5 ",
K.6 size 750 x 2100mm with necessary approved quality iron nr 6.00 34,426.40
mongery and locking system, complete as per detail drawings

Window type " W1", size 1000 x 1875mm with aluminium


frame, top hung glazed window and top hung fan light with
K.7 necessary approved quality iron mongery, complete as per nr 15.00 25,352.80
detail drawings

Window type " W15", size 1000 x 1200mm with aluminium


frame top hung fan light with necessary approved quality iron
K.8 monger, complete as per detail drawings in Toll Gate office nr 1.00 16,860.80

Window type " W2", size 4685 x 1275mm + 4685 x 600mm


with aluminium frame, top hung glazed window and top
K.9 hung fan light with necessary approved quality iron mongery, nr 4.00 120,744.80
complete as per detail drawings

Window type " W3", size 2785 x 1275mm + 2785 x 600mm


with aluminium frame, top hung glazed window and top
K.10 hung fan light with necessary approved quality iron mongery, nr 3.00 71,933.60
complete as per detail drawings

Window type " W4", size 3735 x 1275mm + 3735 x 600mm


with aluminium frame, top hung glazed window and top
K.10 hung fan light with necessary approved quality iron mongery, nr 1.00 97,624.00
complete as per detail drawings
Window type " W5", size 1000 x 1275mm + 1000 x 600mm
with aluminium frame, top hung glazed window and top
K.11 hung fan light with necessary approved quality iron monger, nr 1.00 26,697.60
complete as per detail drawings in Toll Gate office

Window type " W7", size 1950 x 1275mm + 1950 x 600mm


with aluminium frame, top hung glazed window and top
K.12 hung fan light with necessary approved quality iron mongery, nr 1.00 52,060.80
complete as per detail drawings

Fan light Type "FL1", size 1000 x 600mm with aluminium


framed, top hung fixed glazed fanlight with necessary
K.13 approved quality iron mongery, complete as per detail nr 1.00 9,055.20
drawings

Fan light Type "FL2", size 2000 x 600mm with aluminium


framed, top hung fixed glazed fanlight with necessary
K.14 approved quality iron mongery, complete as per detail nr 1.00 17,688.00
drawings

K.15 Lintels in upper floor window with Al. Cladding m 34.72 2,200.00

Supply Only

Door lock type KC1 - key operated cylinder outtside and turn
K.16 nr 2.00 6,600.00
button inside

Door lock type KC2 - Locking button inside emergency


K.17 nr 2.00 6,800.00
release outside

K.18 Door lock type KC3 - Key operated cylinder both side nr 2.00 6,000.00

K.19 Door lock type BPL -Bottom patch lock nr 2.00 7,200.00

K.20 Provide stainless steel pull handle nr 33.00 2,530.40

Partition wall

Supply and install glazed partition wall with aluminium


frame work as per the detail drawings and specification.
(Height approximate 2500mm)

K.21 In ground floor m2 37.50 6,952.00

K.22 In first floor m2 11.30 6,952.00

Provide aluminium composite panel instead of MDF board


K.23 m2 19.18 7,592.80
for the lower part of the partition
DOORS AND WINDOWS WORK CARRIED TO
TENDER SUMMARY
P ROOF COVERING AND ROOF PLUMBING

Rates shall include for all shop fabrication, transport to the


site and erection in the final position. Rates shall include for
all site welding, drilling, splay cutting, notching, etc, Note

Rate shall include for all structural anchor bolts, nuts,


Note
washers and bolts, unless stated as per detail drawing

Rates shall include for all costs associated with undertaking


all precautions against fire while welding and cutting as Note
specified

Rates shall include for all establishment, plant, cartages,


scaffolding and hoisting equipment, two coats of anti
corrosive paint and two coats of enamel paint and for co- Note
operating with other trades

Roof Frame

Supply, fabricated and install steel roof beam 203x102x27 (I


section) fixed to column with 10mm thick. steel bracket,
10mm thick. base plate 10mm thick shoe plate with
P.1 necessary nut and bolts as per detail drawings, beam length nr 4.00 82,898.40
6925mm, rate shall include hot dip galvanized and painted
with two coats of approved epoxy primer before applying the
final paint to architects detail.

P.2 Ditto - but beam length 9845mm nr 4.00 110,848.80

P.3 Ditto - but beam length 7900mm nr 2.00 92,230.66

Supply and fix "C" purlins (C20019 lipped channel) to roof


P.4 beam with 100x100x6 cleat and necessary nut and bolts at m 310.00 3,185.60
1000mm centers as per the detail drawings

Supply and fix 6mm thick. 100x50 mm size "C" channel to


P.5 edge of roof beam, support to gutter as per the detail m 62.00 2,389.20
drawings

Supply and fix 2 raw of M12 sag rod to purlins for each bay
P.6 m 142.00 491.20
as per the detail drawings

Provide 11/2" flat iron to both sides of the hips to avoid


P.7 m 77.44 1,117.60
sagging of the roofing sheets at Toll Gate Office
Roof Covering

Supply and fix Zn/Al sheet roof covering (0.47mm thick) on


P.8 steel roof frame work as per detail drawings. Roof frame m2 252.00 1,121.60
work measured separately

Supply and lay 50mm thick. heat insulation layer to


underside of roof covering support with GI 50X50X0.3mm
P.9 mesh as per the detail drawing and specifications m2 252.00 852.00

Roof Plumbing

Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to


P.10 m 62.00 864.80
edge of the roof as per detail drawings

150 x 175 mm Zn/Al rectangular shape rain water eave gutter


(0.47mm thk.) with brackets at suitable centers as shown in
P.9 the detail fixed to fascia with all necessary gutter fittings m 62.00 115.60

Supply and installation of 0.47mm tk. Color bond Zn/Al


(girth 900mm) rain water eave gutter with brackets at
P.11 600mm centers as shown in the detail fixed to fascia with all m 62.00 1,258
necessary gutter fittings

Zn/Al circular shape rain water down pipes (0.47mm thk.)


P.10 fixed with fairfaced finish concrete holders and accessories as m 57.60
per drawings
Supply and installation of 0.47mm tk. Color bond
P.12 100x100mm Zn/Al square down pipe with brackets at m 58.00 796.80
600mm centers with all necessary accessories
TOTAL FOR ROOF WORK CARRIED TO TENDER
SUMMARY.
Q PLUMBING AND SANITARY INSTALLATION

Sanitary fixtures and Fittings

Unless otherwise specified all sanitary fittings and fixtures


shall be of American Standard or approved equivalent type Note

All fittings to be completed with water supply and disposal


Note
connections to working order

Color and model of sanitary fixtures and fittings shall be to


Note
the approval of Engineer

Rate for sanitary fixtures and fittings shall include supply and
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors, Note
screws, plugs, etc and complete to working order as per
specifications

Supply and fix pedestal type of water closet including cistern


colored to the Engineer's approval with all accessories such
Q.1 as WC connector, flush pipe, seat cover approved angle nr 4.00 20,264.80
valves and flexible connector installed etc. complete to
working order

Supply and fix eastern closet ( size approx. 550 mm) overall
with 'P' or 'S' trap and foot rest and high level cistern of an
Q.2 approved make to include flush pipe. Water supply and outlet nr 2.00 17,279.20
connections all complete to working order

Supply and fix pedestal wash basin ( size approx. 615 X 415
mm ) colored to the Engineer's approval with all accessories
Q.3 such as waste plug, chain approved type of plastic bottle trap, nr 5.00 17,480.80
angle valve, flexible connector, single tap connection
installed. complete to working order

Supply and fix vanity wash basin colored to the Engineer's


approval with all accessories such as waste plug, chain
Q.4 approved type of plastic bottle trap, angle valve, flexible nr 1.00 13,503.20
connector, single tap connection installed. complete to
working order

Supply and fix urinals, colored to the Engineer's approval


Q.5 with all accessories such as angle valve, flexible connector nr 2.00 11,186.40
etc,. installed. complete to working order
Supply and fix approved quality hand spray bidet comprising
Q.6 flexible chromium plated hose, angle valve and installed nr 4.00 2,712.80
complete to working order

Supply and fix approved quality 20mm bid tap comprising


Q.7 angle valve, and installed complete to working order nr 2.00 2,251.20

Supply and fix chromium plated head shower spray with


Q.8 nr 2.00 4,420.00
shower control valve installed complete to working order

Supply and fix chromium plated brass soap tray fixed to wall
Q.9 nr 6.00 1,875.20
with fiber plugs and chromium plated brass screws

Supply and fix chromium plated brass toilet paper holder


Q.10 fixed to wall with fiber plugs and chromium plated brass nr 4.00 2,561.60
screws

Q.11 Supply and fix chromium plated brass towel rail 32 dia. and
600mm. long including fixed to wall with fiber plugs and nr 2.00
chromium plated brass screws
Supply and fix hand shower and installed complete to
Q.11 nr 1.00 7,005.60
working order

Supply and fix approved quality, 960x960mm size shower


Q.12 tray colored to the architect's approval with all as per the nr 2.00 56,611.20
detail drawings and installed complete to working order

Supply and fix approved quality, 600x450mm size bath room


mirror to wall with raw pluge, colored to the architect's
Q.13 approval with all as per the detail drawings and installed nr 5.00 4,333.60
complete to working order

Supply and fix Robe hook and installed complete to working


Q14 nr 4.00 1,788.80
order

Water supply system from city main to over head tank

All water supply pipes shall be of uPVC type 1000 with


Note
solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles,


brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be Note
deemed to have included in the relevant items

Supply and install centrifugal electric water pump fixed with


Pegler or approved quality gate valves, non - return valves,
Q.15 including float switch, control panel, etc,. Delivery 75 lit/min nr 2.00 334,291.20
@ 60Ft. Head (one duty and one standby) (make Jinasena or
approved equivalent )
Supply and install plastic water tank to the capacity of
2000Ltr. Located inside the ceiling, As shown with over
Q.16 flow, wash out valve, ball valve etc. complete to working nr 1.00 27,020.80
order

Construction of a under ground R.C water sump capacity


6000 ltr. internal size 2000 X 2000 X 1500(water depth) as
Q.17 per detail drawings, complete with ball valve nr 1.00 174,984.00
300x300x300mm catch pit, 600x600mm RCC removable
access cover with handle, stainless steel footings etc,

Q.18 Supply and fix 32mm dia. pipe, city main to sump m 17.00 298.40

Q.19 Supply and fix 32mm dia. pipe, sump to overhead tank m 16.00 298.40

Q.20 Supply and fix 32mm dia. gate valve nr 2.00 4,132.80
Allow provisional sum for getting 25mm dia. water
Q.20
connection from NWS & DB. Approx. distance 15meters

Water supply system from over head tank

Piping shall be measured to the net length along the center


line of the pipes over all bends, junctions, tees and the similar Note
pipe fittings and shall be given in meter

The size of PVC pipes and specials are specified by the


external dimensions. All water supply pipes shall be of uPVC Note
type 1000 with solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles,


brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately should be deemed to Note
have included in the relevant items

Distribution pipe system including fittings laid through ducts,


buried and chased in to walls as indicated from the storage
tank as per drawings and specifications

Q.21 50 mm. dia. pipe m 14.00 430.40

Q.22 40 mm. dia. pipe m 33.00 377.60

Q.23 32 mm. dia. pipe m 7.00 298.40

Q.24 25 mm. dia. pipe m 2.00 169.60

Q.25 20 mm dia. pipe m 16.00 114.40

Pegler or equivalent quality stop valves as indicated below

Q.26 32mm dia. gate valve nr 4.00 4,132.80

Q.27 40mm dia. gate valve nr 1.00 5,318.40


Internal Drainage

All drainage pipes shall be of uPVC type 600 with solvent


Note
welded joints

The prices to include for screws, nails, pipes hooks, saddles,


brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately should be deemed to Note
have included in the relevant items

Rates shall include excavation, sand/concrete bedding,


surrounding pipes with concrete where necessary and back
filling and pipe accessories etc. and complete as shown on Note
drawings and specifications

40 mm dia. waste pipes from wash basins to outlets, buried &


Q.28 m 3.00 312.80
chased in walls

50 mm dia. waste pipes from shower areas, sinks etc. to the 398.40
Q.29 m 23.00
outlets

63 mm dia. waste pipes including bends, tees and socket 740.00


Q.30 m 8.00
joints

110 dia. uPVC pipes from toilet to manhole laid above floors 1,779.20
Q.31 m 22.00
and buried as shown in the drawings

110 dia. uPVC pipes between manhole to manhole, to septic


Q.32 tank, soakage pits. Laid to a gradient of 1:80 including m 7.0
necessary excavation and back filling

110 dia. uPVC pipes between manhole to manhole, to septic


tank, soakage pits, and down pipe to drain laid to a gradient
Q.32 of 1:80 including necessary excavation and back filling m 68.12 1,779.2

Gullies

Construction of 150x150mm size uPVC trap moulded floor


gully of good quality, fixed to toilet floor slab with stainless
Q.33 steel grating with water proofing on top and sides complete nr 5.00 1,839.20
with no leak inlet and outlet connection.

Construction of storm water gully externally size


400 x 400 x 500mm depth, including excavation, backfilling
and removing surplus excavations, built in 150mm thick.
Q.34 base, 100mm thick R.C. walls, 1:3 cement :sand rendering nr 8.00 16,672.80
with benching and medium duty double seal C.I. man hole
cover with lifting hooks as per detail drawings

Manholes and septic tanks

Manhole construction including excavation, disposal, back


filling brick wall cover slab with opening and manhole base
slab, necessary finishes, connection of pipes, etc as shown on Note
drawings and specifications
Construction of sewer manhole internally size 450 x
450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
Q.34 100mm thick R.C. walls, 1:3 cement :sand rendering with nr 1.00
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Construction of sewer manhole internally size


450 x 450 x 450mm depth, including excavation, backfilling
and removing surplus excavations, built in 150mm thick.
Q.35 base, 100mm thick R.C. walls, 1:3 cement :sand rendering nr 1.00 17,184.00
with benching and medium duty double seal C.I. man hole
cover with lifting hooks as per detail drawings

Q.36 -Ditto- but 600 x 600x400mm depth sewer manhole nr 1.00 30,928.00

Construction of waste water manhole internally size 450 x


450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
Q.37 100mm thick R.C. walls, 1:3 cement: sand rendering with nr 1.00 16,064.00
benching, and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Q.37 As above but 450x450x450mm depth sewer manhole nr 1.00

Construction of brick soakage pit 1800mm dia. internally as


per detail drawings. liquid depth apporx.2000mm. Rate shall
include for excavation, backfilling and removing surplus
Q.38 excavations, 225x225mm RCC floor beam, 225mm thick nr 1.00 106,063.20
brick wall, 100mm thick cover slab with 600x600mm
removable access cover with handle, vent pipe, etc,

Construction of RCC septic tank internally 3600mm x


1200mm size and 1500mm liquid depth as per detail
Q.39 drawing no. TP/ST/S01 & TO/MEP/SW/03. Rate to include nr 1.00 467,066.40
for excavation, backfilling and removing surplus excavations

Vent Pipes

All vent pipes shall be of uPVC type 600 with solvent


welded joints

Q.40 63mm (2") dia. vent pipe up to above roof level m 6.00 613.60

Q.41 110mm (4") dia. vent pipe up to above roof level m 6.00 1,627.20

Q.42 Vent cowl in an approved make nr 2.00 762.40


TOTAL PLUMBING WORK CARRIED TO SUMMRY
R MECHANICAL INSTALLATIONS

AIR CONDITIONING SYSTEM

The tenderer is requested to refer the Preambles notes,


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to Note
pricing of the following items

The tendere shall provide all dimensions, and technical


information of all builders work to the Consultant in advance Note
in relation to the program of work

Air conditioners shall be Daikin, McQuay, Hitachi, LG,


Note
Mitsubishi, Panasonic, Hitachi or equivalent

Supply and Installation of Split Type Air Conditioners.

All piping (drain and refrigerant) shall be insulated. Power


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories Note

Ground Floor

Supply and installation of split type Air Conditioner unit of


24000 Btu 230V/50Hz. including all accessories such as
R.1 mounting brackets, insulated refrigerant piping etc. and all nr 2.00 101,200.00
the civil works required for the completion of work

Refrigerant piping

Supply & install wall embedded, insulated cupper refrigerant


R.2 m 8.00 5,280.00
piping for 24000Btu split AC

Drain piping

32mm dia. PVC condensate drain lines from indoor units laid
R.3 m 8.00 440.00
up to ground floor drain

First Floor
Supply and Installation of Split Type Air Conditioners

All piping (drain and refrigerant) shall be insulated. Power


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories Note
Supply and installation of Split type Air Conditioner unit of
24000 Btu 230V/50Hz. including all accessories such as
R.4 mounting brackets, conduits etc, and all the civil works nr 2.00 101,200.00
required for the completion of work.

Supply and installation of Split type Air Conditioner unit of


18000 BTU 230V/50Hz. including all accessories such as
R.5 mounting brackets, conduits etc. and all the Civil works nr 1.00 83,600.00
required for the completion of work

Supply and installation of Split type Air Conditioner unit of


12000 Btu 230V/50Hz. including all accessories such as
R.6 mounting brackets, conduits etc, and all the civil works nr 1.00 70,400.00
required for the completion of work

Refrigerant piping

Supply & install wall embedded, insulated cupper refrigerant


R.7 m 7.50 5,280.00
piping for 24000 Btu split AC

Supply & install wall embedded, insulated cupper refrigerant


R.8 m 12.00 4,400.00
piping for 18000 Btu split AC

Supply & install wall embedded, insulated cupper refrigerant


R.9 m 14.00 3,960.00
piping for 12000 Btu split AC

Drain piping

32mm dia. PVC condensate drain lines from indoor units laid
R.10 m 28.00 440.00
up to ground floor drain

Builders Work

Allow for providing all necessary builders work in


R.11
connections with including followings:

(a) Making opening in floor slabs


(b) Plinths
(c) Masonry work in relation for fixing
(d) Conduiting
(e) Mounts for fixing fans
(e) Any other builders work etc,
(f) All tenderers shall provide a schedule of builders work
LS Item Allow
along with the tender

Testing and Commissioning

Testing and commissioning of the system by a chartered


Electrical/Mechanical engineer, rectification of any defect
and providing a certificate assuring the satisfaction of
R.12 requirements given in the specification and proper LS Item Allow
functioning of the system as per the CEB regulations

"As Built" Drawings


Allow for the submission of three sets of as a built drawings
R.13 at commissioning of the system for approval of the LS Item Allow
consultant
TOTAL OF AIRCONDITION SYSTEM CARRIED TO
SUMMARY
S ELECTRICAL INSTALLATION

The Contractor shall submit following documents for


Note
Engineer's prior approval before commencing installation

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards


Note

(3). Conduit Layout Drawings Note

The tenderer shall provide all dimensions, and technical


information of all builders work to the consultant in advance Note
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following


Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki,


Note
ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and


Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or


Note
equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Sub Distribution Boards

Supply and installation of distribution boards UPS DB 2


(toll collection and processing equipment room) including
S.1 MCCB's, MCB's, RCCB's internal cabling, all in accordance nr 1.00 47,184.00
with the specification and as per the detail drawings

Supply and installation of distribution boards UPS DB 3


(toll teller staff room) including MCCB's, MCB's, RCCB's
S.2 internal cabling, all in accordance with the specification and nr 1.00 47,184.00
as per the detail drawings

Supply and installation of sub distribution boards SDB


(lighting and general purpose power in toll gate office -
S.3 ground floor) including MCCB's, MCB's, RCCB's internal nr 1.00 101,674.40
cabling, all in accordance with the specification and as per
the detail drawings
Supply and installation of sub distribution boards SDB
(lighting and general purpose power in toll gate office - upper
S.4 floor) including MCCB's, MCB's, RCCB's internal cabling, nr 1.00 90,382.40
all in accordance with the specification and as per the detail
drawings

Point wiring

The contractor shall forward the conduit layout for prior


Note
approval of the Consultant

Rates for point wiring shall include for all cables, switches,
(1 way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all Note
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

Ground floor

All lighting point wiring shall be in


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth Note
in GI conduits including all accessories

Wring for 300 dia. soffit mounted type lamp as shown in


S.5 nr 2.00 5,886.40
layout drawings

Wring for soffit mounted type 3x18Wx600x600mm


S.6 fluorescent lamp with double parabolic reflectors and other nr 20.00 5,886.40
accessories as shown in layout drawings

Wring for soffit mounted type 2x18Wx300x600mm


S.7 fluorescent lamp with double parabolic reflectors and other nr 8.00 5,886.40
accessories as shown in layout drawings

Wring for wall mounted type mirror lamp as shown in layout


S.8 nr 3.00 5,886.40
drawings

All socket outlets and other point wiring shall be in


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective Note
earth in GI conduits including all accessories

Wiring for ceiling fan point with regulator and series switch
S.9 nr 2.00 5,886.40
as shown in layout drawings

Wiring for 13A (raw power) switched socket outlet as shown


S.10 nr 24.00 4,396.80
in layout drawings

Wiring for 15A switched socket outlet for AC as shown in


S.11 nr 2.00 6,575.20
layout drawings
Wiring for 15A switched socket outlet for water pump as
S.12 nr 1.00 6,699.20
shown in layout drawings
Wiring for 15A (raw power) switched socket outlet as shown
S.13 nr 5.00 12,501.60
in layout drawings

Wiring for network socket outlet as shown in layout


S.14 nr 12.00 9,974.40
drawings

Wiring for intercom extension as shown in layout drawings 11,000.00


S.15 nr 7.00

S.16 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60

S.17 Wiring for TV outlet as shown in layout drawings nr 1.00 8,712.00

First floor

All lighting point wiring shall be in


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth Note
in GI conduits including all accessories

Wring for 300 dia. ceiling recessed type lamp as shown in 5,886.40
S.18 nr 2.00
layout drawings

Wring for ceiling recessed type 3x18Wx600x600mm


S.19 fluorescent lamp with double parabolic reflectors and other nr 25.00 5,886.40
accessories as shown in layout drawings

Wring for ceiling recessed type 2x18Wx300x600mm


S.20 fluorescent lamp with double parabolic reflectors and other nr 8.00 5,886.40
accessories as shown in layout drawings

Wiring for wall bracket lamp point as shown in layout


S.21 nr 2.00 5,886.40
drawings

Wiring for outdoor flood light point as shown in layout


S.22 nr 4.00 16,324.00
drawings

Wring for wall mounted type mirror lamp as shown in layout


S.23 nr 2.00 5,886.40
drawings

All socket outlets and other point wiring shall be in


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective Note
earth in GI conduits including all accessories

Wiring for ceiling fan point with regulator and series switch
S.24 nr 2.00 5,886.40
as shown in layout drawings

Wiring for 13A (raw power) switched socket outlet as shown


S.25 nr 21.00 4,396.80
in layout drawings

Wiring for 15A switched socket outlet for AC as shown in 7,115.20


S.26 nr 4.00
layout drawings

Wiring for network socket outlet as shown in layout


S.27 nr 13.00 9,974.40
drawings
Wiring for intercom extension as shown in layout drawings
S.28 nr 6.00 11,000.00
S.29 Wiring for telephone outlet as shown in layout drawings nr 3.00 10,109.60

S.30 Wiring for TV outlet as shown in layout drawings nr 2.00 8,712.00

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

Ground floor

Supply and install 300 dia. soffit mounted type lamp fitting
S.31 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings

Supply and install ceiling recessed type 3x18Wx600


x600mm fluorescent lamp fitting with double parabolic
S.32 reflectors and other accessories to architect's approval, as nr 20.00 5,310.40
shown in layout drawings

Supply and install ceiling recessed type


2x18Wx300x600mm fluorescent lamp fitting with double
S.33 parabolic reflectors and other accessories to architect's nr 8.00 4,463.20
approval, as shown in layout drawings

Supply and install ceiling recessed type mirror lamp as


S.34 nr 3.00 1,982.40
shown in layout drawings

Supply and install ceiling fan as shown in layout drawings


S.35 nr 2.00 7,434.40

First floor

Supply and install 300 dia. soffit mounted type lamp fitting
S.36 c/w 18W CFL to architect's approval, as shown in layout nr 2.00 2,950.40
drawings

Supply and install soffit mounted type 3x18Wx600 x600mm


fluorescent lamp fitting with double parabolic reflectors and
S.37 other accessories to architect's approval, as shown in layout nr 25.00 5,310.40
drawings

Supply and install soffit mounted type 2x18Wx300x600mm


fluorescent lamp fitting with double parabolic reflectors and
S.38 other accessories to architect's approval, as shown in layout nr 8.00 4,463.20
drawings

Supply and install wall bracket lamp fitting as shown in


S.39 nr 2.00 2,466.40
layout drawings

Supply and install outdoor flood light fitting as shown in


S.40 nr 4.00
layout drawings
Supply and installation of 70W metal halide Bixton flood
S.40 light with Bixton accessories, Black colour (Lamp nr 4.00 7,979.20
temperature 6000 K)

50mm dia medium duty steel pipe bracket welded to concrete


S.41 nr 12.00 10,769.60
beam for fixing flood light

Supply and install wall mounted type mirror lamp as shown


S.42 nr 3.00 1,982.40
in layout drawings

Supply and install ceiling fan as shown in layout drawings


S.43 nr 1.00 7,434.40

Allow for suitably designed earthling system complete with


all necessary earth rods, copper plates, copper tapes,
connectors, and all necessary materials and hardware to
S.44 achieve the regulations and shall be consultant's approval and nr 1.00 66,000.00
Ceylon Electricity Board approval

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided,


contractor shall prepare sample floor render until the Note
consultant is satisfied

Rate for plastering shall include for providing expanded


joints, plastering the reveals, mouldings, etc; as per the Note
detailed drawings

Rates shall include for preparation of surfaces for proper


Note
bonding
Rate shall include for measures to provide suitable bonding
between different surfaces such as concrete and bricks/blocks
surfaces as per specification. rates shall include for all tile Note
specials such as corners, edges etc,

Floor and wall tile should be Lanka tile or equivalent Note

Floor Finishes

600 x 600mm size, homogenous porcelain tile in an approved


color and quality including 18mm thick 1:3 cement sand
bedding and pointing with tile grout to match the color of
tiles laid (Tile rate per m2 Rs. 2000.00 - 2250.00 including
VAT)

T.1 In ground floor m2 99.00 2,428.00

T.2 Entrance step m2 2.30 2,646.40

T.3 In 1st floor m2 102.50 2,476.80

300 x 300mm size, semi glazed homogenous ceramic tiles


with nosing tile in an approved color and quality including
18mm thick 1:3 cement sand bedding and pointing with tile
T.4 grout to match the color of tiles laid in staircase (Tile rate m2 14.30
per m2 Rs. 1500.00 - 1750.00 including VAT)

600 x 300mm size, Porcelain tile in an approved color and


quality including 18mm thick 1:3 cement sand bedding and
T.4 pointing with tile grout to match the color of tiles laid in m2 13.02 2,808.00
stair case

600 x 600mm size, non slip homogenous porcelain tiles in


an approved color and quality including 18mm thick 1:3
cement sand bedding and pointing with tile grout to match
the color of tiles laid in toilet floors (Tile rate per m2 Rs.
1250.00 - 1500.00 including VAT)

T.5 In ground floor m2 12.85 1,871.20

T.6 In 1st floor m2 22.30 1,908.80

Timber flooring

Timber raised floor consisting with 25mm thick. Approved


class I hardwood timber floor panels (1200 x 600mm) fix on
to 100x50mm timber joist placed at 600mm and 1200mm c/s
T.7 in both way and fixed to the RCC floor slab with 150mm m2 19.30 10,444.80
anchor bolt in cash collection room, as per the detail and
specifications

Skirting
Supply and fix 75mm high, 18mm thick polished approved
T.8 m 13.66 615.20
class I timber skirting in cash collection room

75mm high homogenous porcelain tile skirting in approved


design, color and quality including 16mm thick 1:3 cement
and sand bedding

T.9 In ground floor m 78.60 495.20

T.10 In 1st floor m 68.25 505.60

T.11 Balconies in 1st floor m 21.30 505.60

75mm high semi glazed homogenous porcelain tile skirting 495.20


T.12 in approved design, color and quality including 16mm thick m 14.20
1:3 cement and sand bedding in stair case

Wall Finishes

Internal Finishes

16mm thk. cement and sand 1:5 plaster finished smooth,


with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window
reveals

T.13 In ground floor m2 261.50 448.80

T.14 In 1st floor m2 315.50 458.40

Wall Tiling

600x300mm size, smooth glazed porcelain wall tiles up to


1800mm from finish floor level, approved color and quality
including 16mm thick 1:3 cement and sand bedding and
pointing with tile grout on toilet walls (Tile rate per m2 Rs.
1500.00 - 1750.00 including VAT)

T.15 In ground floor m2 51.30 2,145.60

T.16 In 1st floor m2 19.75 2,188.80

External Finishes
16mm thk. cement and sand 1:5 plaster to external faces of
block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals

T.17 In 1st floor m2 118.00 349.60


16 mm thk. smooth cement cut (cement mixed with titanium
powder 1:20) plaster for wall, rate shall include well grinded
and vertical line created with glass strip, and also rate shall
include door and window reveals

T.18 In ground floor m2 125.00


600 x 600 mm size, Porcelain tile in an approved color and
quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls at;

T.18 In ground floor m2 184.98 1,800.00

Plinth Plaster

20mm thick 1:3 cement sand rendering smooth finish with


T.19 m2 30.00 446.40
colored cement

Slab Soffit Finishes

10mm thick plastering to soffit slab with cement sand 1:3


including floating with lime putty

T.20 In Ground floor m2 124.46 439.20

T.21 Stair Case m2 11.79 439.20

Ceiling Finishes

Supply and fix 600x600mm size 15mm thk. natural white


color mineral fiber exposed type suspended ceiling with
powder coated aluminium exposed frame work and solid
aluminium thread bar suspension system as per the detail
drawings and specification

T.22 In 1st floor m2 131.00 2,860.00

Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
T.23 and specification. Rate shall include, Gap between roof sheet m2 86.00 1,000.00
and top edge of the wall covered with Zn/Al sheets,

Tile Supply only

T.24 600 x 600mm size, homogenous ceramic tile nr 25.00

T.25 300 x 300mm size, semi glazed homogenous ceramic tiles nr 25.00

T.26 600 x 600mm size, non slip homogenous ceramic tiles nr 25.00

T.27 600x300mm size, smooth glazed ceramic wall tiles nr 25.00

TOTAL FLOOR, WALL AND CEILING FINISHES


CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in


an approved color and manufacture (C.I.C or equivalent) and
color to suit with the environment, climate and location of Note
this project
External painting shall be exterior quality weathersheild,
texture base paint in an approved color and manufacture
(C.I.C or equivalent) and color to suit with the environment, Note
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and


Note
window reveals

The Contractor shall prepare a sample area or sample board


bearing finish coating and submit the same to the Engineer's Note
for approval

Wall Painting

External

Prepare surface and apply one coat of water proofing primer


V.1 and two coats of approved type weathershield paint to m2 118.00 349.60
external plastered surfaces of walls as directed

Prepare surface and apply two coats of colorless vax paint on


V.2 external smooth cut plaster surfaces of wall as directed m2 125.00 317.60

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.3 In ground floor m2 261.50 284.80

V.4 In 1st floor m2 315.50 291.20

Ceiling Painting

Prepare surface and apply two coats of colorless vax paint on


fair faced surfaces as directed

V.5 In ground floor soffit m2 124.00

Ditto - but in sides and soffit of staircase including soffit of


V.6 m2 13.25
landings
Slab Soffit Painting

Prepare and apply one coat of primer and two coats of


emulsion paint on soffit

V.5 In ground floor m2 124.46 356.00

Ditto - but in sides and soffit of staircase including soffit of


V.6 m2 11.79 356.00
landings
TOTAL FOR PAINTING WORK CARRIED TO
SUMMARY
80% 80%
Amount Unit Qty Rate Amount

Note

Note

Note

Note

Note

Note

Note

m2 200.00 234.37 46,873.25

19,437.60 m3 21.00 815.00 17,115.00

Rate only m3 10,000.00 Rate only

25,527.79 m3 26.22 1,458.00 38,228.76


Note

23,496.00 m2 165.00 142.40 23,496.00

68,461.39 125,713.01
Note

Note

Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

Note

Note

Note

Note

Note

Note
m 162

m 36

m3 53 18,371.38 973,683.04

nr 12

Kg 1082 202.00 218,564.00

Kg 2708 202.00 547,016.00

nr 12

m3 46 550.00 25,300.00

Item 1

1,764,563.04
Note

Note

Note

Note

- m2 53.00 547.68 29,027.25

73,927.80 m2 153.25 547.68 83,932.57

- m3 13.00 20,360.42 264,685.51

- m3 7.00 20,360.42 142,522.97

- m3 3.10 20,360.42 63,117.31

- m3 0.65 20,360.42 13,234.28

- m3 4.85 20,360.42 98,748.06

- m3 5.10 20,360.42 103,838.16

607,006.08 m3 40.80 20,360.42 830,705.30

- m3 0.45 -
125,696.64 m 3
10.20 20,360.42 207,676.33

140,484.48 m3 11.40 20,360.42 232,108.83


40,666.56 m3 3.30 20,360.42 67,189.40

359,294.04 m3 24.15 20,360.42 491,704.24

126,459.60 m3 8.50 20,360.42 173,063.60

37,194.00 m3 2.50 20,360.42 50,901.06

52,795.68 m3 4.20 20,360.42 85,513.78

128,989.20 m3 8.50 20,360.42 173,063.60

11,941.88 m3 0.95 20,360.42 19,342.40

10,056.32 m3 0.80 20,360.42 16,288.34

Note

Note

Note

Note

Note

Note
326,040.00 Kg 2,145.00 202.00 433,290.00

- Kg 445.00 -
- -
255,816.00 Kg 1,683.00 202.00 339,966.00

101,992.00 Kg 671.00 202.00 135,542.00

85,576.00 Kg 563.00 202.00 113,726.00

Kg 81.50 202.00 16,463.00

145.00 17,255.00
m2 119.00

384,104.00 Kg 2,527.00 202.00 510,454.00

67,944.00 Kg 447.00 202.00 90,294.00

48,792.00 Kg 321.00 202.00 64,842.00

137,408.00 Kg 904.00 202.00 182,608.00

119,814.40 Kg 772.00 202.00 155,944.00

21,107.20 Kg 136.00 202.00 27,472.00

120,435.20 Kg 776.00 202.00 156,752.00

2,250.40 Kg 14.50 202.00 2,929.00

Note
m2 30.00 2,105.52 63,165.50

m2 65.60 2,105.52 138,121.90

m2 3.25 2,105.52 6,842.93

m2 48.00 2,105.52 101,064.81

m2 44.50 2,105.52 93,695.50

m2 1.55 2,105.52 3,263.55

40,656.00 m2 44.00 2,105.52 92,642.74

81,312.00 m2 88.00 2,105.52 185,285.48

13,860.00 m2 15.00 2,105.52 31,582.75

59,115.00 m2 43.75 2,105.52 92,116.36

168,900.00 m2 125.00 2,105.52 263,189.60

103,029.00 m2 76.25 2,105.52 160,545.66

47,629.80 m2 35.25 2,105.52 74,219.47

79,325.60 m2 57.25 2,105.52 120,540.84


124,704.00 m2 90.00 2,105.52 189,496.51

5,858.20 m2 4.25 2,105.52 8,948.45

17,666.40 m2 12.75 2,105.52 26,845.34

10,026.72 m 9.90 2,105.52 20,844.62

m 8.70

2,426.40 m 1.50 865.92 1,298.88

m 1.60

m 48.60

18,897.20 m 8.50 865.92 7,360.32

m 47.00

32,160.40 m 26.50 865.92 22,946.88

m 48.60

194,824.00 m 142.00 1,372.00 194,824.00


81,760.00 nr 28.00 2,920.00 81,760.00

109,927.60 m 49.75 2,209.60 109,927.60

18,227.20 m2 256.00 71.20 18,227.20

- m 135.50 -

- -
- m 14.20 -

4,596,097.00 7,502,956.88

Note

Note

Note

Note

Note

Note

9,531.80 57,190.81
m3 6.00
66,086.40 m2 48.00 1,670.47 80,182.40

220,288.00 m2 160.00 1,670.47 267,274.68

53,162.40 m2 51.00 984.06 50,186.85

405,273.60 m2 288.00 1,670.47 481,094.43

104,272.00 m2 98.00 984.06 96,437.47

849,082.40 1,032,366.64

Note

Note

Note

Note

80,121.60 m2 64.20 1,248.00 80,121.60


53,491.20 m2 42.00 1,273.60 53,491.20

2,292.48 m2 1.80 1,273.60 2,292.48

135,905.28 135,905.28

Note

140,042.88 m 16.40 8,539.20 140,042.88

m 9.00

24,202.08 m 2.45 9,878.40 24,202.08

13,290.40 Item 1.00 13,290.40 13,290.40


177,535.36 177,535.36

Note

Note

Note

Note

Note

Note

124,634.40 nr 1.00 124,634.40 124,634.40


190,860.00 nr 3.00 63,620.00 190,860.00

10,949.60 nr 1.00 10,949.60 10,949.60

278,902.40 nr 7.00 39,843.20 278,902.40

142,617.60 nr 4.00 35,654.40 142,617.60

206,558.40 nr 6.00 34,426.40 206,558.40

380,292.00 nr 15.00 25,352.80 380,292.00

16,860.80 nr 1.00 16,860.80 16,860.80

482,979.20 nr 4.00 120,744.80 482,979.20

215,800.80 nr 3.00 71,933.60 215,800.80

97,624.00 nr 1.00 97,624.00 97,624.00


26,697.60 nr 1.00 26,697.60 26,697.60

52,060.80 nr 1.00 52,060.80 52,060.80

9,055.20 nr 1.00 9,055.20 9,055.20

17,688.00 nr 1.00 17,688.00 17,688.00

76,373.00 m 34.72 2,200.00 76,373.00

13,200.00 nr 2.00 6,600.00 13,200.00

13,600.00 nr 2.00 6,800.00 13,600.00

12,000.00 nr 2.00 6,000.00 12,000.00

14,400.00 nr 2.00 7,200.00 14,400.00

83,503.20 nr 33.00 2,530.40 83,503.20

260,700.00 m2 37.50 6,952.00 260,700.00

78,557.60 m2 11.30 6,952.00 78,557.60

145,629.90 m2 19.18 7,592.80 145,629.90


2,951,544.50 2,951,544.50

Note

Note

Note

Note

331,593.60 nr 4.00 82,898.40 331,593.60

- -
443,395.20 nr 4.00 110,848.80 443,395.20
- -
184,461.33 nr 2.00 92,230.66 184,461.33
- -

987,536.00 m 310.00 3,185.60 987,536.00

- -

148,130.40 m 62.00 2,389.20 148,130.40

- -
69,750.40 m 142.00 491.20 69,750.40
- -
86,546.94 m 77.44 1,117.60 86,546.94
- -
- -
- -

282,643.20 m2 252.00 1,121.60 282,643.20

- -

214,704.00 m2 252.00 852.00 214,704.00

- -
- -
- -
- -
53,617.60 m 62.00 864.80 53,617.60
- -

7,167.20 m 62.00 115.60 7,167.20

78,020.80 m 62.00 1,258 78,020.80

- -

- m 57.60 -

46,214.40 m 58.00 796.80 46,214.40


2,933,781.07 2,933,781.07

Note

Note

Note

Note

81,059.20 nr 4.00 20,264.80 81,059.20

- -

34,558.40 nr 2.00 17,279.20 34,558.40

- -

87,404.00 nr 5.00 17,480.80 87,404.00

- -

13,503.20 nr 1.00 13,503.20 13,503.20

- -

22,372.80 nr 2.00 11,186.40 22,372.80

- -
10,851.20 nr 4.00 2,712.80 10,851.20

- -
- -

4,502.40 nr 2.00 2,251.20 4,502.40

- -
8,840.00 nr 2.00 4,420.00 8,840.00
- -
11,251.20 nr 6.00 1,875.20 11,251.20
- -
- -

10,246.40 nr 4.00 2,561.60 10,246.40

- -

- nr 2.00 -

7,005.60 nr 1.00 7,005.60 7,005.60


- -

113,222.40 nr 2.00 56,611.20 113,222.40

- -

21,668.00 nr 5.00 4,333.60 21,668.00

- -
7,155.20 nr 4.00 1,788.80 7,155.20

Note

Note

668,582.40 nr 2.00 334,291.20 668,582.40

- -
27,020.80 nr 1.00 27,020.80 27,020.80

- -

174,984.00 nr 1.00 174,984.00 174,984.00

5,072.80 m 17.00 298.40 5,072.80

4,774.40 m 16.00 298.40 4,774.40

8,265.60 nr 2.00 4,132.80 8,265.60


- -

Note

Note

Note

6,025.60 m 14.00 430.40 6,025.60

12,460.80 m 33.00 377.60 12,460.80

2,088.80 m 7.00 298.40 2,088.80

339.20 m 2.00 169.60 339.20

1,830.40 m 16.00 114.40 1,830.40

16,531.20 nr 4.00 4,132.80 16,531.20

5,318.40 nr 1.00 5,318.40 5,318.40


Note

Note

Note

938.40 m 3.00 312.80 938.40

398.40
9,163.20 m 23.00 9,163.20

740.00
5,920.00 m 8.00 5,920.00

1,779.20
39,142.40 m 22.00 39,142.40

m 7.0

121,199.10 m 68.12 1,779.2 121,199.10

9,196.00 nr 5.00 1,839.20 9,196.00

133,382.40 nr 8.00 16,672.80 133,382.40

Note
nr 1.00

17,184.00 nr 1.00 17,184.00 17,184.00

30,928.00 nr 1.00 30,928.00 30,928.00

16,064.00 nr 1.00 16,064.00 16,064.00

- nr 1.00 -
- -
- -

106,063.20 nr 1.00 106,063.20 106,063.20

467,066.40 nr 1.00 467,066.40 467,066.40

3,681.60 m 6.00 613.60 3,681.60

9,763.20 m 6.00 1,627.20 9,763.20

1,524.80 nr 2.00 762.40 1,524.80


2,338,151.10 2,338,151.10

Note

Note

Note

Note

202,400.00 nr 2.00 101,200.00 202,400.00

- -
- -
- -
42,240.00 m 8.00 5,280.00 42,240.00
- -
- -
- -
3,520.00 m 8.00 440.00 3,520.00
- -
- -
- -
- -

- Note -

- -
202,400.00 nr 2.00 101,200.00 202,400.00

- -

83,600.00 nr 1.00 83,600.00 83,600.00

- -

70,400.00 nr 1.00 70,400.00 70,400.00

- -
- -
- -
39,600.00 m 7.50 5,280.00 39,600.00
- -
52,800.00 m 12.00 4,400.00 52,800.00
- -
55,440.00 m 14.00 3,960.00 55,440.00
- -
- -
- -
12,320.00 m 28.00 440.00 12,320.00

3,200.00 LS Item Allow 3,200.00

13,200.00 LS Item Allow 13,200.00


2,200.00 LS Item Allow 2,200.00

783,320.00 783,320.00

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note

47,184.00 nr 1.00 47,184.00 47,184.00

- -

47,184.00 nr 1.00 47,184.00 47,184.00

- -

101,674.40 nr 1.00 101,674.40 101,674.40


- -

90,382.40 nr 1.00 90,382.40 90,382.40

- -
- -
- -
- Note -
- -

- Note -

- -
- -
- -

- Note -

- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -

117,728.00 nr 20.00 5,886.40 117,728.00

- -

47,091.20 nr 8.00 5,886.40 47,091.20

- -
17,659.20 nr 3.00 5,886.40 17,659.20
- -

- Note -

- -
11,772.80 nr 2.00 5,886.40 11,772.80
- -
105,523.20 nr 24.00 4,396.80 105,523.20

13,150.40 nr 2.00 6,575.20 13,150.40

6,699.20 nr 1.00 6,699.20 6,699.20


62,508.00 nr 5.00 12,501.60 62,508.00

119,692.80 nr 12.00 9,974.40 119,692.80

11,000.00
77,000.00 nr 7.00 77,000.00

30,328.80 nr 3.00 10,109.60 30,328.80

8,712.00 nr 1.00 8,712.00 8,712.00

Note

11,772.80 5,886.40 11,772.80


nr 2.00

147,160.00 nr 25.00 5,886.40 147,160.00

47,091.20 nr 8.00 5,886.40 47,091.20

11,772.80 11,772.80
nr 2.00 5,886.40

65,296.00 nr 4.00 16,324.00 65,296.00

11,772.80 nr 2.00 5,886.40 11,772.80

Note

11,772.80 nr 2.00 5,886.40 11,772.80

92,332.80 nr 21.00 4,396.80 92,332.80

28,460.80 7,115.20 28,460.80


nr 4.00

129,667.20 nr 13.00 9,974.40 129,667.20

66,000.00 nr 6.00 11,000.00 66,000.00


- -
30,328.80 nr 3.00 10,109.60 30,328.80
- -
17,424.00 nr 2.00 8,712.00 17,424.00
- -
- -
- -

- -

- -
- -
- -

5,900.80 nr 2.00 2,950.40 5,900.80

- -

106,208.00 nr 20.00 5,310.40 106,208.00

- -

35,705.60 nr 8.00 4,463.20 35,705.60

- -
5,947.20 nr 3.00 1,982.40 5,947.20
- -
14,868.80 nr 2.00 7,434.40 14,868.80
- -
- -
- -

5,900.80 nr 2.00 2,950.40 5,900.80

- -

132,760.00 nr 25.00 5,310.40 132,760.00

- -

35,705.60 nr 8.00 4,463.20 35,705.60

- -
4,932.80 nr 2.00 2,466.40 4,932.80
- -
- nr 4.00 -
- -
31,916.80 nr 4.00 7,979.20 31,916.80

- -
129,235.20 nr 12.00 10,769.60 129,235.20
- -
5,947.20 nr 3.00 1,982.40 5,947.20

7,434.40 nr 1.00 7,434.40 7,434.40

66,000.00 nr 1.00 66,000.00 66,000.00

2,175,378.40 2,175,378.40

Note

Note

Note
Note

Note

240,372.00 m2 99.00 2,428.00 240,372.00


- -
6,086.72 m2 2.30 2,646.40 6,086.72
- -
253,872.00 m2 102.50 2,476.80 253,872.00
- -

- m2 14.30 -

36,560.16 m2 13.02 2,808.00 36,560.16

- -

- -

- -
24,044.92 m 2
12.85 1,871.20 24,044.92
- -
42,566.24 m2 22.30 1,908.80 42,566.24
- -
- -
- -
- -

201,584.64 m2 19.30 10,444.80 201,584.64

- -
- -
- -
8,403.63 m 13.66 615.20 8,403.63
- -

- -

- -
38,922.72 m 78.60 495.20 38,922.72
- -
34,507.20 m 68.25 505.60 34,507.20
- -
10,769.28 m 21.30 505.60 10,769.28
- -
495.20
7,031.84 m 14.20 7,031.84

- -
- -
- -
- -
- -

- -

- -
117,361.20 m2 261.50 448.80 117,361.20
- -
144,625.20 m2 315.50 458.40 144,625.20
- -
- -
- -

- -

- -
110,069.28 m 2
51.30 2,145.60 110,069.28
- -
43,228.80 m2 19.75 2,188.80 43,228.80
- -
- -

- -

- -
41,252.80 m 2
118.00 349.60 41,252.80

- -

- -
- m 2
125.00 -
- -
- -

- -
332,964.00 m 2
184.98 1,800.00 332,964.00
- -
- -
- -
13,392.00 m2 30.00 446.40 13,392.00
- -
- -
- -
- -
- -
54,662.83 m 2
124.46 439.20 54,662.83
- -
5,178.17 m2 11.79 439.20 5,178.17

374,660.00 m2 131.00 2,860.00 374,660.00


- -

86,000.00 m2 86.00 1,000.00 86,000.00

- -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -
- -
- nr 25.00 -

2,228,115.63 2,228,115.63

Note
Note

Note

Note

41,252.80 m2 118.00 349.60 41,252.80

39,700.00 m2 125.00 317.60 39,700.00

74,475.20 m2 261.50 284.80 74,475.20

91,873.60 m2 315.50 291.20 91,873.60

m2 124.00

m2 13.25

44,307.76 m2 124.46 356.00 44,307.76

4,197.24 m2 11.79 356.00 4,197.24

295,806.60 295,806.60
24,445,137.52
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation

Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting

Rates and prices of excavation are to include for backfilling Note


with selected excavated materials and compactions

Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends

Payments for bulk excavation shall be made making use of Note


the spot level drawing to be submitted by the Contractor and
based on the final excavated depths

Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary

No additional payments will be made for working space Note

Site Clearance

D.1 Clearing site including removal of top soil up to a depth of m2 234.00 87.00
150 mm including grubbing up roots, bushes and trees, filling
voids with selected excavated material and compacting and
disposal of all surplus excavated material away from the site
as directed

Excavation

D.2 Excavation for wall foundation trenches, not exceeding m3 16.80 984.00
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.

D.3 Excavation of rock by blasting 10,625.00


Filling
D.4 Imported hard earth filling, well rammed and consolidated m3 17.00 1,035.00
using suitable roller to achieve 95% maximum dry density , in
make up levels under floors 150mm thick layers

Anti termite Treatment

Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format

D.5 Application of anti termite treatment under the ground floor m2 164.00 152.00
slab in accordance with the manufacture's specifications and
to the approval of Engineer
TOTAL FOR EXCAVATION AND EARTH WORK
CARRIED TO SUMMARY
E CAST INSITU REINFORCED CONCRETE WORKING
PILES

The tenderers are requested to refer Bills of Quantities, Note


General Notes, Pricing Preambles, Drawings, Specifications,
Conditions of Contract, Contract Data and other relevant
documents prior to pricing of this section of work.

No extra payment will be made for any delay caused by Note


security or any other arrangement of the statutory-divisions,
Road Development Authority, Colombo Municipal Council,
Sri Lanka Police, Railway Authority etc.

Where there is a repetetion of Piling items in this trade the Note


tenderer is requested to price the item more detailed in
description.

Costs which are covered under Piling should not be repeated Note
in any other trade in BOQ

The tenderer is advised to visit the site of the proposed work, Note
as it is his responsibility to ascertain the conditions governing,
actual amount of work involved, access to the site, the
external working space, storage area etc.,

The tenderers are specially requested to refer the soil Note


investigation report thoroughly prior to pricing this section.
Any discrepancies and or any suggestion to be forwarded with
the tender or prior to that to the Engineer for clarification.

Tenderers are adivised that the soil investigation report


provided is for approximate onloy and the Contractor should
verify all the data by his own.

The Contractor shall insure against damage to adjoining Note


properties, adjacent structures, any existing over head and/or
under ground services that may cause damages as a result of
this piling worknot less than their prevailing market values of
the relevant

Rates shall include for mobilization and demobilization and Note


maintenance of all Rates shall include for mobilization and
piling equipments and other machineries.
If any damage is caused to any pile or piles due to the Note
installation of adjacent piles or due to any other work being
carried out by the Contractor the Contractor shall take such
remedial measures as may be ordered by the Engineer
including the installation of additional piles and the cost of
such measures to be borne entirely by the Contractor.

The price shall include for removal of all spoils including Note
removal of any cut lengths broken concrete of Laitance and
used fluid etc, away from the site. Concreting of piling shall
be terminated 1.0 m above the cut off level and then cut back
to the specified cut off level. Piling length will be measured
between the bottom level and up to the cut off level

Setting out of piles and dimensions of piles to be approved by Note


the Engineer on submission of a surveyor plan certified by a
licensed Surveyor in triplicate. Setting out piles and
dimensions of piles to be approved by Engineer prior to
commencement of work.

The tenderers shall submit the detail of the method of piling Note
work together with necessary shop drawing, equipment to be
used, duration, durability and method of erection etc., The
method of piling should take into consideration the
surroundingbuildings and other services etc., in the
vicinity,suitable to the type of soil strata method of removal
of temporary work and constructionchosen to adopt the
proposal given here in.

Payments for piling shall be evaluated as follows:


(a) Piling rate to be applicable from bottom level of pile to
cut off level.
(b) Empty boring has been measured separately from
existing ground level
(c) No payment will be made for any length of pile above cut
off level
(d) Boring through the rock has been measured as extra over Note
items. Each pile and to be casted into the rock for a length of
1.5 times diameter in hard basement rock.

The tenderers are requested to submit to the Engineer for Note


approval, full details of piles offered on how the calculation
and checking of the load bearing capacity and settlement of
the piles that will be carried out and the tests proposed to be
done at the site.

The Contractor shall submit the details of the temporary Note


works to the Engineer for approval prior to commencement of
such work.
Payment for concrete will be made on the theoratical volume Note
calculated based on the nominal pile diameter

Rate shall include for temporary backfilling (Filled with Note


spoil ) and steel casing ( minimum 6.0 m) and high strength
concrete grouting at cut-off level.

Rate shall include for breaking through obstruction if any Note


required

CAST IN-SITU CONCRETE PILING

Empty Boring

Boring shall be carried out in accordance with the drawings


and specifications for following piles; approximate depth as
per drawings

E.1 Pile, 600mm diameter (10nr). m 135 14,025.00

E.2 "Extra over" for boring through hard basement rock as m 30 34,408.00
specified in drawings.

Concrete grade 30 in piles

Reinforced concrete grade 30 in piles in accordance with the


drawings and specifications (reinforcement measured
seperately)

E.3 Pile, 600mm diameter (10nr). m3 44 26,180.00

Cutting off tops of piles

Prepare, clear and straighten bent reinforcement into pile caps


and cutting off (trimming) top of piles to cut off level.

E.4 Pile, 600mm diameter nr 10 26,180.00

Reinforcement in piles

High yield deformed steel bar reinforcement, characteristic


strength 460 Mpa and Mild steel bar reinforcement,
characteristic strength 250 Mpa including bends, hooks, tying
wire, distance blocks and ordinary spacers

Tor Steel Bar Reinforcement

E.5 10mm diameter Kg 1072 262.00

E.6 20mm diameter Kg 2903 262.00


Testing

Test on piles in accordance with the drawings and


specifications

E.7 Pile, 600mm diameter nr 10 7,013.00

E.8 Disposal of excavated material away from site m3 39 2,338.00

E.9 Allow for disposal of ground and sub surface water LS Item Allow
(dewatering)
TOTAL FOR CAST INSITU REINFORCED
CONCRETE WORKING PILES CARRIED TO
SUMMARY

F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval

Work up to plinth level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Under pile caps and floor slab m2 108.20 513.00

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.2 In floor concrete m3 28.72 13,094.00

F.3 In pile caps m3 8.60 13,094.00

F.4 In ground beams m3 8.70 13,094.00

Work from plinth level to roof level


Grade 25 Reinforced concrete as per drawings and
specifications in to the followings

F.5 In column shafts up to roof level m3 5.80 13,094.00

F.6 In roof beams m3 8.15 15,808.00

Reinforcement

The size of reinforcement rods described in the drawing or Note


elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks and
laps have been measured with the quantities

All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush

Reinforcement shall be bent cold by applying a slow even Note


pressure on an approved type of bending apparatus

Rate shall include for cutting, bending, fabricating, placing in Note


position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, spaces,
chairs

Characteristic strength of High Tor steel should be 460 Note


N/mm2

Characteristic strength of Mild steel should be 250 N/mm2 Note

Reinforcement as per drawings and specifications in to the


followings

Work up to plinth level

Tor Steel Bar Reinforcement

F.7 10mm Dia. Kg 1,368.61 162.00

F.8 12mm Dia. Kg 878.00 162.00

F.9 16mm Dia Kg 1,457.00 162.00

F.10 20mm Dia Kg 556.00 162.00


F.11 25mm Dia Kg 553.00 162.00

Work from plinth level to roof level

Tor Steel Bar Reinforcement

F.12 10mm Dia. Kg 740.00 162.00

F.13 12mm Dia. Kg 303.00 162.00

F.14 16mm Dia. Kg 610.00 162.00

Formwork

Rate shall include for all necessary boarding, supporting, Note


application of mould oil as necessary erecting, framing,
cutting angles, cleaning, wetting and treatment before placing
concrete and striking or removal etc. construction joints

Work up to plinth level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.15 Sides of pile caps m2 37.00 982.00

F.16 Sides of ground beam m2 67.00 982.00

F.17 Sides of floor slab m2 19.00 982.00

Work from plinth level to roof level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.18 Sides of column shafts up roof level m2 76.70 1,436.00


F.19 Sides and soffit of roof beams m2 72.20 1,436.00

Miscellaneous

Lintels

200x200mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.20 In ground floor m 36.50 1,719.00

200x300mm size reinforced concrete lintels, rate including


2T12 for bottom, 2T10 for top,R6@ 125 and necessary form
work in the following

F.21 In ground floor m 43.75 2,363.00

200x150mm size reinforced concrete sill beam, rate including


2T10 for top + R6@ 125 and necessary form work in the
following

F.22 In ground floor m 33.00 1,290.00

F.23 Supply and fix 300x100mm size prefabricated fairfaced m 50.00 2,348.00
finished concrete moulding on to 200mm thick. cement block
wall by using 12mm dia. Steel rods with nuts at 1000mm
centers as per the detail drawing no. PH/T2/AR06

F.24 Fairfaced finished RCC arm supporting to the roof as per the nr 12.00 3,103.00
detail drawings STDP/PH/T2/S06 and PH/T2/AR06 Rate
shall include necessary form work , R/F and grinding as
necessary to achieve a smooth flat even surfaces with out
any defects

F.25 Expansion joint filled with compressible filler and sealant on m 49.00 2,334.00
top in ground floor as per the detail drawings and
specification

Polythene layer
F.26 750 gauge polythyne layer under ground floor slab as per m2 177.00 76.00
drawings and specifications

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY
G MASONRY WORK

Rate shall include for reinforcement concrete vertical and Note


horizontal stifners for all 100mm thk. walls exceeding 3m
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per Note


drawings and specifications

Rate shall include for scaffoldings Note

Contractor shall finish the exterior and interior surface of Note


blocks

Work neatly strictly as per the instruction of the Engineer Note

Compressive strength of Hollow blocks shall be minimum 1.5 Note


N/ mm2

Hollow Block work

Work up to D.P.C level

G.1 200mm thick hollow block wall in cement and sand 1:5 m2 40.00 1,463.00

In ground floor

G.2 200mm thick hollow block wall in cement and sand 1:5 m2 59.60 1,463.00

G.3 100mm thick hollow block wall in cement and sand 1:5 m2 140.00 1,108.00
TOTAL FOR MASONRY WORK CARRIED TO
SUMMARY
H WATER PROOFING WORK

Rates shall include the protective screed, grounds, rules, Note


internal angles, fillet, external angles and exposed circular
edges chases for trucking in etc;

Rate shall include cutting top line, notching bending and extra Note
materials for lapping

Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format

The technical specifications and the methodology of the water Note


proofing system shall be submitted by the contractor to the
consultant structural engineer for approval

Water Proofing

H.1 Application of approved suitable waterproofing material m2 1.80 1,326.00


"Barralastic" or equivalent as per manufacture's instruction to
floor and wall up to 1800mm height in toilets
TOTAL FOR WATER PROOFING WORK CARRIED
TO SUMMERY
K METAL WORK

ALUMINIUM DOORS AND WINDOWS WORK


Rates for all aluminum doors and windows shall include for Note
all necessary ironmongery

All joints to be sealed in an appropriate manner with approved Note


sealant with structural silicon

Rates shall include for aluminium paneling, glazing, framing, Note


fixing, beading, gaskets, sealant, high ironmongery for
windows and doors and precaution to prevent ingress of water
and water leaks, fixing accessories and hardware

Door locks should be Union or equivalent made Note

All aluminium sections to be powder coated Note

All glass shall be 12mm thick toughen glass / 6mm thick clear Note
glass as directed

K.1 Two way swing double sash and both side composite nr 5.00 76,037.00
aluminium panel door with aluminium frame and aluminium
louver on top, type " D6", size 1500 x 2950mm with
necessary approved quality iron mongery and locking system,
complete as per detail drawings

K.2 Two way swing double sash composite Al. panel door with nr 2.00 155,005.00
louver panel door with aluminium frame type " W17 ", size
2800x3010 mm with necessary approved quality iron monger
and locking system, complete as per detail drawings in Power
House

K.3 One way swing single sash and both side composite nr 1.00 42,633.00
aluminium panel door with aluminium frame and aluminium
louver on top, type " D7 ", size 900 x 2950mm with
necessary approved quality iron mongery and locking system,
complete as per detail drawings
K.4 Window type " W11", size 2800 x 1275mm, 2800 x 910mm nr 7.00 85,027.00
with aluminium frame, glazed window and aluminium top
hung louver panel with fan light on top, rate shall include
necessary approved quality iron mongery, complete as per
detail drawings

K.5 Window type " W12", size 1800 x 1275mm, 1800 x 910mm nr 1.00 56,892.00
with aluminium frame, glazed window and aluminium louver
panel with necessary approved quality iron mongery,
complete as per detail drawings

K.6 Composite Al. louver panel top of the door as per detail m2 9.36 16,621.00
drawings in Power house

TOTAL FOR METAL WORK CARRIED TO TENDER


SUMMARY
P ROOF COVERING AND ROOF PLUMBING

Rates shall include for all shop fabrication, transport to the Note
site and erection in the final position. Rates shall include for
all site welding, drilling, splay cutting, notching, etc

Rate shall include for all structural anchor bolts, nuts, washers Note
and bolts, unless stated as per detail drawing

Rates shall include for all costs associated with undertaking Note
all precautions against fire while welding and cutting as
specified

Rates shall include for all establishment, plant, cartages, Note


scaffolding and hoisting equipment, two coats of anti
corrosive paint and two coats of enamel paint and for co-
operating with other trades

Roof Frame

Supply, fabricated and install steel roof beam 203x102x27 (I


section) fixed to column with 10mm thick steel bracket,
10mm thick base plate 10mm thick shoe plate with necessary
nut and bolts as per detail drawings, rate shall include hot dip
galvanized and painted with two coats of approved epoxy
primer before applying the final paint to architects detail

P.1 Beam length 4130mm nr 16.00 54,230.00

P.2 Beam length 5650mm nr 4.00 69,688.00

P.3 Supply and fix "C" purlins (C20019 lipped channel) to roof m 350.00 3,385.00
beam with 100x100x6 cleat and necessary nut and bolts at
1000mm centers as per the detail drawings
P.4 Supply and fix 6mm thick. 100x50 mm size "C" channel to m 84.00 2,539.00
edge of roof beam, support to gutter as per the detail
drawings

P.5 Supply and fix 2 raw of M12 sag rod to purlins for each bay m 158.00 522.00
as per the detail drawings

P.6 Provide 1"x1" angle iron to both sides of the hips to avoid m 46.00 1,264.00
sagging of the roofing sheets at power house

Roof Covering

P.7 Supply and fix Zn/Al roof sheet covering (0.47mm thick) on m2 284.00 1,200.00
steel roof frame work as per detail drawings. Roof frame work
measured separately

P.8 Supply and lay 50mm thick. heat insulation layer to m2 190.00 906.00
underside of roof covering support with GI 50X50X0.3mm
mesh as per the detail drawing and specifications

Roof Plumbing

P.9 Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to m 84.00 919.00
edge of the roof as per detail drawings

P.10 Supply and installation of 0.47mm tk. Color bond Zn/Al m 62.00 1,338.0
(girth 900mm) rain water eave gutter with brackets at 600mm
centers as shown in the detail fixed to fascia with all
necessary gutter fittings

P.11 Supply and installation of 0.47mm tk. Color bond m 31.00 847.0
100x100mm Zn/Al square down pipe with brackets at
600mm centers with all necessary accessories
TOTAL FOR ROOF COVERING AND ROOF
PLUMBINGCARRIED TO TENDER SUMMARY.

Q PLUMBING AND SANITARY INSTALLATION

Sanitary fixtures and Fittings

Unless otherwise specified all sanitary fittings and fixtures Note


shall be of American Standard or approved equivalent type

All fittings to be completed with water supply and disposal Note


connections to working order

Color and model of sanitary fixtures and fittings shall be to Note


the approval of Engineer

Rate for sanitary fixtures and fittings shall include supply and Note
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors,
screws, plugs, etc and complete to working order as per
specifications

Q.1 Supply and fix pedestal type of water closet including cistern Nos. 1.00 21,532.00
colored to the Engineer's approval with all accessories such as
WC connector, flush pipe, seat cover approved angle valves
and flexible connector installed etc. complete to working
order

Q.2 Supply and fix approved quality hand spray bidet comprising Nos. 1.00 2,883.00
flexible chromium plated hose, angle valve and installed
complete to working order

Water supply system from Toll gate office/ Traffic


operation centre
Piping shall be measured to the net length along the center Note
line of the pipes over all bends, junctions, tees and the similar
pipe fittings and shall be given in meter

The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of uPVC
type 1000 with solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately those should be deemed
to have included in the relevant items

Distribution pipe system including fittings laid through ducts,


buried and chased in to walls as indicated from the storage
tank as per drawings and specifications

Q.3 32 mm. dia. pipe m 2.50 318.00

Q.4 25 mm. dia. pipe m 1.00 181.00

Q.5 20 mm dia. pipe m 1.50 122.00

Pegler or equivalent quality stop valves as indicated below

Q.6 25mm dia. Gate valve Nos. 1.00 2,805.00

Internal Drainage

All drainage pipes shall be of uPVC type 600 with solvent Note
welded joints

Rates shall include excavation, sand/concrete bedding, Note


surrounding pipes with concrete where necessary and back
filling and pipe accessories etc. and complete as shown on
drawings and specifications

The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. separately those should be
deemed to have included in the relevant items

Q.7 63 mm dia. waste pipes including bends, tees and socketed m 3.00 1,891.00
joints

Q.8 110 dia. uPVC pipes from toilet to manhole laid above floors m 3.00 1,891.00
and buried as shown in the drawings
Q.9 110 dia. uPVC pipes between down pipe and drain ,manhole m 41.50 1,891.00
to manhole, to septic tank, soakage pits laid to a gradient of
1:80 including necessary excavation and back filling

Gullies

Q.10 Construction of 150x150mm size uPVC trap moulded floor nr 1.00 1,955.00
gully of good quality, fixed to toilet floor slab with stainless
steel grating with water proofing on top and sides complete
with no leak inlet and outlet connection.

Q.11 Construction of storm water gully externally size 400 x nr 6.00 17,715.00
400x500mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Manholes and septic tanks

Manhole construction including excavation, disposal, back Note


filling brick wall cover slab with opening and manhole base
slab, necessary finishes, connection of pipes, etc as shown on
drawings and specifications

Q.12 Construction of sewer manhole internally size nr 1.00 17,068.00


450x450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Q.13 Construction of brick soakage pit 1200mm dia. internally as nr 1.00 72,568.00
per detail drawings. liquid depth apporx.2000mm.Rate shall
include for excavation, backfilling and removing surplus
excavations, 225x225mm RCC floor beam, 225mm thick
brick wall, 100mm thick cover slab with 600x600mm
removable access cover with handle, vent pipe, etc.

Q.14 Construction of RCC septic tank internally 2700mm x Nos. 1.00 345,059.00
900mm size and 1200mm liquid depth as per detail drawing
no. TP/ST/S01 & PH/MEP/SW/03. Rate to include for
excavation, backfilling and removing surplus excavations
TOTAL FOR PLUMBING AND SANITARY
INSTALLATION CARRIED TO SUMMRY
R MECHANICAL INSTALLATIONS

AIR CONDITIONING SYSTEM

The tenderer is requested to refer the Preambles notes, Note


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items

The tendered shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Air conditioners shall be Daikin, McQuay, Hitachi, LG, Note


Mitsubishi, Panasonic, Hitachi or equivalent

Supply and Installation of Split Type Air Conditioners

All piping (drain and refrigerant) shall be insulated. Power Note


cables shall be drawn through embedded GI conduit of
appropriate size. Rate shall include the cost for all accessories

Ground Floor

R.1 Supply and installation of split type Air Conditioner unit of nr 1.00 107,525.00
24000 Btu 230V/50Hz. including all accessories such as
mounting brackets, insulated refrigerant piping etc. and all the
Civil works required for the completion of work

Refrigerant piping

R.2 supply & install wall embedded, insulated cupper refrigerant m 4.00 5,610.00
piping for 24000Btu split AC

Drain piping
R.3 32mm dia. PVC condensate drain lines from indoor units laid m 4.00 468.00
up to ground floor drain

Builders Work

Allow for provide all necessary builders work in connections


with including followings:

(a) Making opening in floor slabs


(b) Plinths
(c) Masonry work in relation for fixing
(d) Conduiting
(e) Mounts for fixing fans
(e) Any other builders work etc.

R.4 (f) All tenderers shall provide a schedule of builders work LS Item Allow
along with the tender

Testing and Commissioning

R.5 Testing and commissioning of the system by a chartered LS Item Allow


Electrical/Mechanical engineer, rectification of any defect and
providing a certificate assuring the satisfaction of
requirements given in the specification and proper functioning
of the system as per the CEB regulations

"As Built" Drawings

R.6 Allow for the submission of three sets of as a built drawings LS Item Allow
at commissioning of the system for approval of the consultant
TOTAL FOR MECHANICAL INSTALLATIONS
CARRIED TO SUMMARY
S ELECTRICAL INSTALLATIONS

The Contractor shall submit following documents for Note


Engineer's prior approval before commencing installation

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards Note

(3). Conduit Layout Drawings Note

The tenderer shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, Note


ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or Note


equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Sub Distribution Boards


S.1 Supply and installation of sub distribution boards SDB nr 1.00 87,256.00
(lighting and general purpose power in power house)
including MCCB's, MCB's, RCCB's internal cabling, all in
accordance with the specification and as per the detail
drawings

Point wiring

The contractor shall forward the conduit layout for prior Note
approval of the Consultant

Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

All lighting point wiring shall be in Note


2x1Cx1mm²Cu/PVC/PVC cable and 2.5mm² protective earth
in GI conduits including all accessories

S.2 Wring for 300 dia. soffit mounted type lamp as shown in nr 4.00 8,960.00
layout drawings

S.3 Wring for 1x36W fluorescent lamp with diffuser as shown in nr 24.00 8,960.00
layout drawings

S.4 Wring for 1x18W fluorescent lamp with diffuser as shown in nr 1.00 8,960.00
layout drawings

All other point wiring shall be in 1x2Cx2.5mm²Cu/PVC/PVC Note


cable and 2.5mm² protective earth in GI conduits including all
accessories

S.5 Wiring for ceiling fan point with regulator and series switch nr 2.00 8,773.00
as shown in layout drawings.

S.6 Wiring for 13A (raw power) switched socket outlet as shown nr 13.00 9,860.00
in Layout drawings

S.7 Wiring for 15A switched socket outlet for AC as shown in nr 1.00 9,118.00
Layout drawings

S.8 Wiring for intercom extension as shown in layout drawings nr 6.00 11,688.00

S.9 Wiring for TV outlet as shown in layout drawings nr 1.00 8,883.00

Fittings and Equipments


Rates installation of lamp fittings shall include for necessary
hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

S.10 Supply and install 300 dia. soffit mounted type lamp fitting nr 4.00 3,135.00
c/w 18W CFL to architect's approval, as shown in layout
drawings

S.11 Supply and install 1x36W fluorescent lamp fitting with nr 24.00 2,997.00
diffuser to architect's approval as shown in layout drawings

S.12 Supply and install 1x18W fluorescent lamp fitting with nr 1.00 2,763.00
diffuser to architect's approval as shown in layout drawings

S.13 Supply and install ceiling fan as shown in layout drawings nr 2.00 7,900.00

S.14 Allow for suitably designed earthling system complete with LS Item Allow
all necessary earth rods, copper plates, copper tapes,
connectors, and all necessary materials and hardware to
achieve the regulations and shall be consultant's approval and
Ceylon Electricity Board approval

S.15 Modification of Elelctrical Panel Boards at LAN Room in LS Item Allow


power House

Miscellaneous

S.16 Supply and Installation of Fire Fighting System LS Item Allow


TOTAL FOR ELECTRICAL INSTALLATIONS
CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided, Note


Contractor shall prepare sample floor render until the
Consultant is satisfied

Rate for plastering shall include for providing expanded Note


joints, plastering the reveals, mouldings, etc; as per the
detailed drawings

Rates shall include for preparation of surfaces for proper Note


bonding

Rate shall include for measures to provide suitable bonding Note


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. rates shall include for all tile
specials such as corners, edges etc.

Floor and wall tile should be Lanka tile or equivalent Note

Floor Finishes

600 x 600mm size, homogenous porcelain tile in an approved


color and quality including 18mm thick 1:3 cement sand
bedding and pointing with tile grout to match the color of
tiles laid (Tile rate per m2 Rs. 2000.00 - 2250.00 including
VAT)

T.1 In ground floor m2 141.00 2,580.00


600 x 600mm size, non slip homogenous porcelain tiles in
an approved color and quality including 18mm thick 1:3
cement sand bedding and pointing with tile grout to match
the color of tiles laid in toilet floors (Tile rate per m2 Rs.
1250.00 - 1500.00 including VAT)

T.2 In ground floor m2 2.10 2,280.00

Skirting

75mm high semi glazed homogenous porcelain tile skirting


in approved design, color and quality including 16mm thick
1:3 cement and sand bedding in stair case

T.3 In ground floor m 76.60 527.00

Wall Finishes

Internal finishes

16mm thk. cement and sand 1:5 plaster finished smooth,


with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window
reveals

T.4 In ground floor m2 307.80 477.00

Wall Tiling

600x300mm size, smooth glazed porcelain wall tiles up to


1800mm from finish floor level, approved color and quality
including 16mm thick 1:3 cement and sand bedding and
pointing with tile grout on toilet walls (Tile rate per m2 Rs.
1500.00 - 1750.00 including VAT)

T.5 In ground floor m2 8.95 2,280.00

External finishes

16mm thk. cement and sand 1:5 plaster to external faces of


block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals

T.6 In ground floor m2 98.00 426.00

600 x 600mm size, Porcelain tile in an approved color and


quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls

T.7 In ground floor m2 91.80 1,913.00

Plinth Plaster
T.8 20mm thick 1:3 cement sand rendering smooth finish with m2 64.00 475.00
colored cement

Plastering of Generator Room


T.9 20 mm thick rendering in cement sand 1:3 finished smooth in m2 7.95 486.00
Generator room

Ceiling Finishes

T.10 Supply and fix 600x600mm size 15mm thk. natural white m2 15.50 3,039.00
color mineral fiber exposed type suspended ceiling with
powder coated aluminium exposed frame work and solid
aluminium thread bar suspension system as per the detail
drawings and specification

T.11 Supply and fix 0.5mm thk. Zn/Al powder coated flat sheet m2 160.00 1,063.00
ceiling fixed on top of the roof members (Showing steel
beams), below the insulation layer as per the detail drawing
and specification. Rate shall include, Gap between roof sheet
and top edge of the wall covered with Zn/Al sheets,

TOTAL FOR FLOOR, WALL AND CEILING


FINISHES CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in an Note


approved color and manufacture (C.I.C or equivalent ) and
color to suit with the environment, climate and location of this
project

External painting shall be exterior quality weathershield, Note


texture base paint in an approved color and manufacture
(C.I.C or equivalent ) and color to suit with the environment,
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and Note
window reveals

The Contractor shall prepare a sample area or sample board Note


bearing finish coating and submit the same to the Engineer's
for approval

Wall Painting

External

V.1 Prepare surface and apply one coat of water proofing primer m2 98.00 372.00
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed
V.2 Prepare surface and apply two coats of colorless vax paint on m2 37.00 338.00
external smooth cut plaster surfaces of wall as directed

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.3 In ground floor m2 307.80 303.00

TOTAL FOR PAINTING WORK CARRIED TO


SUMMARY
Amount Unit Qty Rate Amount

Note

Note

Note

Note

Note

Note

Note

20,358.00 m2 234.00 87.00 20,358.00

16,531.20 m3 16.80 984.00 16,531.20

Rate only 10,625.00 Rate only


17,595.00 m3 17.00 1,035.00 17,595.00

Note

24,928.00 m2 164.00 152.00 24,928.00


79,412.20 79,412.20

Note

Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

Note

Note

Note

Note
Note

Note

Note

1,893,375.00 m 135 14,025.00 1,893,375.00


- -
1,032,240.00 m 30 34,408.00 1,032,240.00

1,151,920.00 m3 44 26,180.00 1,151,920.00

261,800.00 nr 10 26,180.00 261,800.00

280,864.00 Kg 1072 262.00 280,864.00

760,586.00 Kg 2903 262.00 760,586.00


70,130.00 nr 10 7,013.00 70,130.00
- -
91,182.00 m 3
39 2,338.00 91,182.00

233,750.00 LS Item Allow 233,750.00


5,775,847.00 5,775,847.00

Note

Note

Note

Note

55,506.60 m2 108.20 513.00 55,506.60

376,059.68 m3 28.72 13,094.00 376,059.68

112,608.40 m3 8.60 13,094.00 112,608.40

113,917.80 m3 8.70 13,094.00 113,917.80


75,945.20 m3 5.80 13,094.00 75,945.20

128,835.20 m3 8.15 15,808.00 128,835.20

Note

Note

Note

Note

Note

Note

221,714.82 Kg 1,368.61 162.00 221,714.82

142,236.00 Kg 878.00 162.00 142,236.00

236,034.00 Kg 1,457.00 162.00 236,034.00

90,072.00 Kg 556.00 162.00 90,072.00


89,586.00 Kg 553.00 162.00 89,586.00

119,880.00 Kg 740.00 162.00 119,880.00

49,086.00 Kg 303.00 162.00 49,086.00

98,820.00 Kg 610.00 162.00 98,820.00

Note

36,334.00 m2 37.00 982.00 36,334.00

65,794.00 m2 67.00 982.00 65,794.00

18,658.00 m2 19.00 982.00 18,658.00

110,141.20 m2 76.70 1,436.00 110,141.20


103,679.20 m2 72.20 1,436.00 103,679.20

62,743.50 m 36.50 1,719.00 62,743.50

103,381.25 m 43.75 2,363.00 103,381.25

42,570.00 m 33.00 1,290.00 42,570.00

117,400.00 m 50.00 2,348.00 117,400.00

- -
37,236.00 nr 12.00 3,103.00 37,236.00

114,366.00 m 49.00 2,334.00 114,366.00


13,452.00 m2 177.00 76.00 13,452.00

15,930,266.55 15,930,266.55

Note

Note

Note

Note

Note

Note

58,520.00 m2 40.00 1,463.00 58,520.00

87,194.80 m2 59.60 1,463.00 87,194.80

155,120.00 m2 140.00 1,108.00 155,120.00


300,834.80 300,834.80

Note

Note

Note

Note

2,386.80 m2 1.80 1,326.00 2,386.80


2,386.80 2,386.80

Note

Note

Note

Note

Note

Note

380,185.00 nr 5.00 76,037.00 380,185.00

- -
310,010.00 nr 2.00 155,005.00 310,010.00

- -
42,633.00 nr 1.00 42,633.00 42,633.00

- -
595,189.00 nr 7.00 85,027.00 595,189.00

56,892.00 nr 1.00 56,892.00 56,892.00

155,572.56 m2 9.36 16,621.00 155,572.56

1,540,481.56 1,540,481.56

Note

Note

Note

Note

867,680.00 nr 16.00 54,230.00 867,680.00


- -
278,752.00 nr 4.00 69,688.00 278,752.00
- -
1,184,750.00 m 350.00 3,385.00 1,184,750.00

- -
213,276.00 m 84.00 2,539.00 213,276.00

- -
82,476.00 m 158.00 522.00 82,476.00

- -
58,144.00 m 46.00 1,264.00 58,144.00

340,800.00 m2 284.00 1,200.00 340,800.00

- -
172,140.00 m 2
190.00 906.00 172,140.00

77,196.00 m 84.00 919.00 77,196.00

- -
82,956.00 m 62.00 1,338.0 82,956.00

- -
26,257.00 m 31.00 847.0 26,257.00
3,384,427.00 3,384,427.00

Note

Note

Note

Note

21,532.00 Nos. 1.00 21,532.00 21,532.00

- -
2,883.00 Nos. 1.00 2,883.00 2,883.00
Note

Note

Note

795.00 m 2.50 318.00 795.00


- -
181.00 m 1.00 181.00 181.00
- -
183.00 m 1.50 122.00 183.00

2,805.00 Nos. 1.00 2,805.00 2,805.00

Note

Note

Note

5,673.00 m 3.00 1,891.00 5,673.00

- -
5,673.00 m 3.00 1,891.00 5,673.00

- -
78,476.50 m 41.50 1,891.00 78,476.50

1,955.00 nr 1.00 1,955.00 1,955.00

- -
106,290.00 nr 6.00 17,715.00 106,290.00

Note

- -
17,068.00 nr 1.00 17,068.00 17,068.00

- -
72,568.00 nr 1.00 72,568.00 72,568.00

- -
345,059.00 Nos. 1.00 345,059.00 345,059.00
661,141.50 661,141.50

Note

Note

Note

Note

107,525.00 nr 1.00 107,525.00 107,525.00

22,440.00 m 4.00 5,610.00 22,440.00

- -
1,872.00 m 4.00 468.00 1,872.00

3,400.00 LS Item Allow 3,400.00

14,025.00 LS Item Allow 14,025.00

2,338.00 LS Item Allow 2,338.00


151,600.00 151,600.00

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note

Note
87,256.00 nr 1.00 87,256.00 87,256.00

Note

Note

35,840.00 nr 4.00 8,960.00 35,840.00

215,040.00 nr 24.00 8,960.00 215,040.00

8,960.00 nr 1.00 8,960.00 8,960.00

Note

- -
17,546.00 nr 2.00 8,773.00 17,546.00

- -
128,180.00 nr 13.00 9,860.00 128,180.00

- -
9,118.00 nr 1.00 9,118.00 9,118.00

- -
70,128.00 nr 6.00 11,688.00 70,128.00
- -
8,883.00 nr 1.00 8,883.00 8,883.00
12,540.00 nr 4.00 3,135.00 12,540.00

71,928.00 nr 24.00 2,997.00 71,928.00

- -
2,763.00 nr 1.00 2,763.00 2,763.00

- -
15,800.00 nr 2.00 7,900.00 15,800.00

70,125.00 LS Item Allow 70,125.00

14,025.00 LS Item Allow 14,025.00

25,500.00 LS Item Allow 25,500.00


793,632.00 793,632.00

Note

Note

Note

Note

Note

363,780.00 m2 141.00 2,580.00 363,780.00


4,788.00 m2 2.10 2,280.00 4,788.00

- -
40,368.20 m 76.60 527.00 40,368.20

146,820.60 m2 307.80 477.00 146,820.60


- -

- -
20,406.00 m2 8.95 2,280.00 20,406.00

- -
41,748.00 m2 98.00 426.00 41,748.00
- -

- -
175,603.84 m2 91.80 1,913.00 175,603.84
30,400.00 m2 64.00 475.00 30,400.00

3,863.70 m2 7.95 486.00 3,863.70

47,104.50 m2 15.50 3,039.00 47,104.50

- -
170,080.00 m2 160.00 1,063.00 170,080.00

1,044,962.84 1,044,962.84

Note

Note

Note

Note

36,456.00 m2 98.00 372.00 36,456.00


12,506.00 m2 37.00 338.00 12,506.00

93,263.40 m2 307.80 303.00 93,263.40

142,225.40 142,225.40
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation

Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting

Rates and prices of excavation are to include for backfilling Note


with selected excavated materials and compactions

Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends

Payments for bulk excavation shall be made making use of Note


the spot level drawing to be submitted by the Contractor and
based on the final excavated depths

Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary

No additional payments will be made for working space Note

Excavation

D.1 Excavation for wall foundation trenches, not exceeding m3 3.00 984.00
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.

D.2 Excavation of rock by blasting m3 10,625.00

Filling

D.3 Imported hard earth filling, well rammed and consolidated m3 0.45 1,035.00
using suitable roller to achieve 95% maximum dry density , in
make up levels under floors 150mm thick layers

D.4 50 mm thick sand fill on hard earth filling as per detail m2 2.25 636.00
drawings and specifications
Anti termite Treatment

Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format

D.5 Application of anti termite treatment under the ground floor m2 3.80 152.00
slab in accordance with the manufacture's specifications and
to the approval of Engineer

TOTAL FOR EXCAVATION AND EARTH WORK


CARRIED TO SUMMARY
F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval

Work up to plinth level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Under footings and wall foundation m2 3.11 513.00

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.2 In strip foundation m3 0.78 13,094.00

F.3 In column shafts m3 0.50 13,094.00

F.4 In plinth beam m3 0.35 13,094.00


F.5 In floor concrete m3 1.22 13,094.00

Work from plinth level to 1st floor

Grade 25 reinforced concrete as per drawings and


specifications in to the followings

F.6 In column shafts up to roof m3 0.81 13,094.00

F.7 In first floor slab m3 1.30 15,808.00

F.8 In first floor beams m3 0.70 15,808.00

Reinforcement

The size of reinforcement rods described in the drawing or Note


elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks and
laps have been measured with the quantities

All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush

Reinforcement shall be bent cold by applying a slow even Note


pressure on an approved type of bending apparatus

Rate shall include for cutting, bending, fabricating, placing in Note


position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, spaces,
chairs

Characteristic strength of High Tor steel should be 460 Note


N/mm2

Characteristic strength of Mild steel should be 250 N/mm2 Note

Reinforcement as per drawings and specifications in to the


followings

Work up to plinth level

Tor Steel Bar Reinforcement

F.9 10mm Dia. Kg 75.00 162.00

F.10 12mm Dia. Kg 43.00 162.00

Mild Steel Bar Reinforcement


F.11 6mm Dia. Kg 18.50 162.00

Mesh Reinforcement

F.12 Type A142 mesh laid with 150mm laps in ground floor slab m2 8.50 509.00

Work from plinth level to 1st floor

Tor Steel Bar Reinforcement

F.13 10mm Dia. Kg 176.00 161.50

F.14 12mm Dia. Kg 55.00 161.50

F.15 16mm Dia. Kg 22.00 161.50

Mild Steel Bar Reinforcement

F.16 6mm Dia. Kg 24.00 161.50

Formwork

Rate shall include for all necessary boarding, supporting, Note


application of mould oil as necessary erecting, framing,
cutting angles, cleaning, wetting and treatment before placing
concrete and striking or removal etc. construction joints

Work up to plinth level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.17 Sides of strip footing m2 3.45 981.75

F.18 Sides of column shafts m2 8.91 981.75

F.19 Sides of plinth beam m2 3.11 981.75

Work from plinth level to 1st floor

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.20 Sides of column shafts m2 13.23 1,435.65


Formwork shall be in phenolic coated plywood - minimum
16mm thick to provide fair face natural concrete finished on
concrete surfaces where necessary, Rate shall including
grinding as necessary to achieve a smooth flat even surfaces
with out any defects, in the followings

F.21 Sides and soffit of roof slab, rate shall include forming even m2 8.60 1,435.65
grooves on the construction joint locations of the formwork of
the fairfaced soffit.

F.22 Sides and soffit of roof beams m2 7.80 1,435.65

Miscellaneous

F.23 Supply and fix 300x100mm size prefabricated fairfaced m 7.80 1,457.75
finished concrete moulding on to 200mm thick. cement block
wall by using 12mm dia. Steel rods with nuts at 1000mm
centers as per the detail drawing no. SP/AR01

F.24 200x150mm size reinforced concrete sill beam, rate including m 3.17 1,289.45
2T10 for top + R6@ 125 and necessary form work in the
following at Security Hut

F.25 200x200mm size reinforced concrete lintels, rate including m 3.05 3,102.50
2T12 for bottom, 2T10 for top,R6 @ 125 and necessary form
work in the following at Security Hut

Polythene layer

F.26 750 gauge polythyne layer under ground floor slab as per m2 2.25 75.65
drawings and specifications

F.27 Expansion joint filled with compressible filler and sealant on m 6.00 2,333.25
top in ground floor as per the detail drawings and
specification

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY
G MASONRY WORK

Rate shall include for reinforcement concrete vertical and Note


horizontal stifners for all 100mm thk. walls exceeding 3m
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per Note


drawings and specifications

Rate shall include for scaffoldings Note


Contractor shall finish the exterior and interior surface of Note
blocks

Work neatly strictly as per the instruction of the Engineer Note

Compressive strength of Hollow blocks shall be minimum 1.5 Note


N/ mm2

Rubble work

G.1 Random rubble (150 x 225mm size) masonry wall foundation m3 1.12 7,462.15
in cement and sand 1:5 mortar

Hollow block work

In ground floor

G.2 100mm thick hollow block wall in cement and sand 1:5 m2 10.64 1,107.55

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
H WATER PROOFING WORK

Rates shall include the protective screed, grounds, rules, Note


internal angles, fillet, external angles and exposed circular
edges chases for trucking in etc;

Rate shall include cutting top line, notching bending and extra Note
materials for lapping

Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format

The technical specifications and the methodology of the water Note


proofing system shall be submitted by the contractor to the
consultant structural engineer for approval

The waterproofing membrane shall be "Rino lining" (Tuff Note


stuff ) or equivalent

Water Proofing

H.1 2mm thick polyurathene water proofing membrane on top of m2 15.00 3,783.35
the roof slab and wall as per the drawing and specification
TOTAL FOR WATER PROOFING WORK CARRIED
TO SUMMERY
K METAL WORK

ALUMINIUM DOORS AND WINDOWS WORK

Rates for all aluminum doors and windows shall include for Note
all necessary ironmongery

All joints to be sealed in an appropriate manner with approved Note


sealant with structural silicon

Rates shall include for aluminium paneling, glazing, framing, Note


fixing, beading, gaskets, sealant, high quality ironmongery for
windows and doors and precaution to prevent ingress of water
and water leaks, fixing accessories and hardware

Door locks should be Union or equivalent made Note

All aluminium sections to be powder coated Note

All glass shall be 12mm thick toughen glass / 6mm thick clear Note
glass as directed

K.1 One way swing single sash aluminium and clear glass door nr 1.00 49,506.55
with aluminium frame and aluminium 1500x600mm size
louver on top, type " D8 ", size 900x 2100mm with necessary
approved quality iron mongery and locking system, complete
as per detail drawings

K.2 Window type " W14", size 550 x 1275mm with aluminium nr 1.00 8,565.45
frame, glazed window with necessary approved quality iron
mongery, complete as per detail drawings

K.3 Window type " W13", size 900 x 1275mm with aluminium nr 1.00 16,147.45
frame, glazed window with necessary approved quality iron
mongery, complete as per detail drawings

TOTAL FOR METAL WORK CARRIED TO TENDER


SUMMARY
P ROOF PLUMBING

Roof Plumbing
P.1 Supply and fix gauge 20 Zn/Al flashing (0.47mm thk.) to m 7.00 918.85
edge of the roof as per detail drawings

P.2 110mm dia. uPVC down pipe fixed with Al brackets at m 17.23 376.55
Security Hut (Type 400)

TOTAL FOR ROOF PLUMBING CARRIED TO


TENDER SUMMARY.
S ELECTRICAL INSTALLATION
The Contractor shall submit following documents for Note
Engineer's prior approval before commencing installation.

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards. Note

(3). Conduit layout drawings Note

The tendere shall provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, Note


ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or Note


equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Sub Distribution Boards

S.1 Supply and installation of sub distribution boards SDB nr 1.00 34,743.75
( lighting and general purpose power in security hut)
including MCCB's, MCB's, RCCB's internal cabling, all in
accordance with the specification and as per the detail
drawings

Point wiring

The contractor shall forward the conduit layout for prior Note
approval of the Consultant
Rates for point wiring shall include for all cables, switches, (1
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

All lighting point wiring shall be in Note


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth
in GI conduits including all accessories

S.2 Wring for soffit mounted type 2x18Wx300x600mm nr 1.00 3,598.90


fluorescent lamp with double parabolic reflectors and other
accessories as shown in layout drawings

S.3 Wiring for outdoor flood light point as shown in layout nr 4.00 3,598.90
drawings

All socket outlets and other point wiring shall be in Note


1x2Cx2.5mm2Cu/PVC/PVC cable and 2.5mm2 protective
earth in GI conduits including all accessories

S.4 Wiring for wall mounted fan point with regulator and series nr 1.00 8,772.85
switch as shown in layout drawings

S.5 Wiring for 13A (raw power) switched socket outlet as shown nr 2.00 9,859.15
in layout drawings

S.6 Wiring for intercom extension as shown in layout drawings nr 1.00 11,687.50

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

S.7 Supply and install soffit mounted type 2x18Wx300x600mm nr 1.00 4,742.15
fluorescent lamp fitting with double parabolic reflectors and
other accessories to architect's approval, as shown in layout
drawings

S.8 Supply and installation of 70W metal halide Bixton flood nr 4.00 8,477.90
light with Bixton accessories, Black colour (Lamp
temperature 6000 K)
S.9 Supply and install wall mounted fan as shown in layout nr 1.00 10,336.85
drawings

S.10 50mm dia medium duty steel pipe bracket welded to concrete nr 12.00 12,123.55
beam for fixing flood light

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided, Note


Contractor shall prepare sample floor render until the
Consultant is satisfied

Rate for plastering shall include for providing expanded Note


joints, plastering the reveals, mouldings, etc; as per the
detailed drawings

Rates shall include for preparation of surfaces for proper Note


bonding

Rate shall include for measures to provide suitable bonding Note


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. Rates shall include for all tile
specials such as corners, edges etc,

Floor and wall tile should be Lanka tile or equivalent Note

Floor Finishes

T.1 600 x 600mm size, homogenous pocelain tile in an approved m2 2.25 2,579.75
color and quality including 18mm thick 1:3 cement sand
bedding and pointing with tile grout to match the color of
tiles laid (Tile rate per m2 Rs. 2000.00 - 2250.00 including
VAT)

Skirting

75mm high homogenous pocelain tile skirting in approved


design, color and quality including 16mm thick 1:3 cement
and sand bedding

T.2 In ground floor m 5.10 526.15

Wall Finishes

Internal wall finishes


16mm thk. cement and sand 1:5 plaster finished smooth,
with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window
reveals

T.3 In ground floor m2 13.35 476.85

External wall finishes

16mm thk. cement and sand 1:5 plaster to external faces of


block walls and attached concrete surfaces, finished semi
rough, rate shall include door and window reveals

T.4 In ground floor m2 15.00 425.85

T.5 600 x 600mm size, Porcelain tile in an approved color and m2 25.32 1,912.50
quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls at;

Plinth Plaster

T.6 20mm thick 1:3 cement sand rendering smooth finish with m2 6.00 474.30
colored cement

TOTAL FOR FLOOR, WALL AND CEILING


FINISHES CARRIED TO SUMMARY

V PAINTING WORK

Internal painting shall be interior quality emulsion paint in an Note


approved color and manufacture (C.I.C or equivalent ) and
color to suit with the environment, climate and location of this
project

External painting shall be exterior quality weathersheild, Note


texture base paint in an approved color and manufacture
(C.I.C or equivalent ) and color to suit with the environment,
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and Note
window reveals

The Contractor shall prepare a sample area or sample board Note


bearing finish coating and submit the same to the Engineer's
for approval

Wall Painting

External
V.1 Prepare surface and apply one coat of water proofing primer m2 15.00 371.45
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed

V.2 Prepare surface and apply two coats of colorless vax paint on m2 12.50 337.45
external smooth cut plaster surfaces of wall as directed

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.3 In ground floor m2 13.35 302.60

Ceiling Painting

Prepare surface and apply two coats of colorless vax paint on


fair faced surfaces as directed

V.4 In ground floor soffit m2 10.00 378.25

TOTAL FOR PAINTING WORK CARRIED TO


SUMMARY
Amount

2,952.00

Rate only

465.75

1,431.00
577.60

5,426.35

1,595.43

10,213.32
-
6,547.00
-
4,582.90
-
15,974.68
-
-
-
-

-
10,606.14
-
20,550.40
-
11,065.60

12,150.00
-
6,966.00
-
-
-
2,997.00
-
-
-
4,326.50
-
-
-
-
-
28,424.00
-
8,882.50
-
3,553.00
-
-
-
-
3,876.00

3,387.04
-
8,747.39
-
3,053.24

18,993.65
12,346.59

-
11,198.07
-
-
-
11,370.45

-
4,087.56

-
9,462.63

-
-
-
170.21

-
13,999.50

249,126.80
8,357.61

11,784.33

20,141.94

56,750.25
56,750.25

49,506.55

-
8,565.45

-
16,147.45

74,219.45
6,431.95

6,487.96

12,919.91

34,743.75
3,598.90

14,395.60

8,772.85

19,718.30

11,687.50

4,742.15

-
33,911.60

-
10,336.85

-
145,482.60

287,390.10

5,804.44

2,683.37
6,365.95

6,387.75

48,424.50

2,845.80

72,511.80
5,571.75

4,218.13

4,039.71

3,782.50

17,612.09
No Description Unit Qty Rate
D EXCAVATION & EARTH WORK

Excavation

Rates and prices for excavation are to include for hand or Note
machine digging as required for excavation

Rates and prices for excavation are to include for excavations Note
any hard materials excluding rock requiring blasting

Rates and prices of excavation are to include for backfilling Note


with selected excavated materials and compactions

Rates and prices for excavation are to include for cutting Note
through tree roots and for grubbing up all disused pipes and
drains encountered and sealing off ends

Payments for bulk excavation shall be made making use of Note


the spot level drawing to be submitted by the Contractor and
based on the final excavated depths

Rates and prices for filling are to include selection of filling Note
materials from excavated earth as well as use of imported
materials where necessary

No additional payments will be made for working space Note

Excavation

D.1 Excavation for wall foundation trenches, not exceeding m3 2.35 983.45
1000mm depth from formation level, in any material
excluding rock requiring blasting, back filling and
compactions, leveling and compacting the bottom of
excavation, dewatering, earth work supports and disposal of
any surplus excavated materials.

D.2 Excavation of rock by blasting m3 10,625.00

Filling

D.3 Imported hard earth filling, well rammed and consolidated m3 0.20 1,034.45
using suitable roller to achieve 95% maximum dry density , in
make up levels under floors 150mm thick layers

D.4 50 mm thick sand fill on hard earth filling as per detail m2 1.00 635.80
drawings and specifications
Anti termite Treatment

Contractor shall submit ten years gurantee for entire building Note
through his specialist sub contractor in the name of the Client
in an acceptable format

D.5 Application of anti termite treatment under the ground floor m2 2.54 151.30
slab in accordance with the manufacture's specifications and
to the approval of Engineer

TOTAL FOR EXCAVATION AND EARTH WORK


CARRIED TO SUMMARY
F CONCRETE WORK

Concrete

All concrete shall be made dense with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval

Work up to plinth level

Grade 15 lean concrete layer 50mm thick as per drawings and


specifications in to the following

F.1 Under footings and wall foundation m2 2.48 512.55

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings

F.2 In strip foundation m3 0.62 13,093.40

F.3 In column shafts m3 0.50 13,093.40


F.4 In plinth beam m3 0.28 13,093.40

F.5 In floor concrete m3 1.00 13,093.40

Work from plinth level to roof slab level

Grade 25 Reinforced concrete as per drawings and


specifications in to the followings

F.6 In column shafts up to roof m3 0.69 13,093.40

F.7 In roof slab m3 0.60 15,807.45

F.8 In roof beams m3 0.56 15,807.45

Reinforcement

The size of reinforcement rods described in the drawing or Note


elsewhere shall be minimum size and the rolling margin and
any other tolerance shall be wholly above this size. Hooks and
laps have been measured with the quantities

All reinforcement shall be free from dirt, oil, paint, grease, or Note
loose rust before fixing in position and shall be brushed with
stiff wire brush

Reinforcement shall be bent cold by applying a slow even Note


pressure on an approved type of bending apparatus

Rate shall include for cutting, bending, fabricating, placing in Note


position, holding and supporting including temporary fixing
supports, hangers and binding wire, cover blocks, ties, spaces,
chairs

Reinforcement as per drawings and specifications in to the


followings

Work up to plinth level

Tor Steel Bar Reinforcement

F.9 10mm Dia. Kg 67.00 161.50

F.10 12mm Dia. Kg 38.00 161.50

Mild Steel Bar Reinforcement

F.11 6mm Dia. Kg 16.50 161.50

Mesh Reinforcement
F.12 Type A142 mesh laid with 150mm laps in ground floor slab m2 6.75 508.30

Work from plinth level to roof slab level

Tor Steel Bar Reinforcement

F.13 10mm Dia. Kg 106.00 161.50

F.14 12mm Dia. Kg 44.50 161.50

F.15 16mm Dia. Kg 16.00 161.50

Mild Steel Bar Reinforcement

F.16 6mm Dia. Kg 20.00 161.50

Formwork

Rate shall include for all necessary boarding, supporting, Note


application of mould oil as necessary erecting, framing,
cutting angles, cleaning, wetting and treatment before placing
concrete and striking or removal etc. construction joints

Work up to plinth level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.17 Sides of strip footing m2 2.75 981.75

F.18 Sides of column shafts m2 8.95 981.75

F.19 Sides of plinth beam m2 2.50 981.75

Work from plinth level to roof slab level

Formwork shall be in plywood not less than 16mm thick,


application of mould oil or laid on polythene layer with
suitable laps to prevent leaking with suitable up stand at edges
complete as per the detailed drawing

F.20 Sides of column shafts up to roof m2 10.71 1,435.65

Formwork shall be in phenolic coated plywood - minimum


16mm thick to provide fair face natural concrete finished on
concrete surfaces where necessary, Rate shall including
grinding as necessary to achieve a smooth flat even surfaces
with out any defects, in the followings
F.21 Sides and soffit of roof slab, rate shall include forming even m2 5.00 1,435.65
grooves on the construction joint locations of the formwork of
the fairfaced soffit.

F.22 Sides and soffit of roof beams m2 6.35 1,435.65

Polythene layer

F.23 750 gauge polythyne layer under ground floor slab as per m2 1.00 75.65
drawings and specifications

F.24 Expansion joint filled with compressible filler and sealant on m 4.00 2,333.25
top in ground floor as per the detail drawings and
specification

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY
G MASONRY WORK

Rate shall include for reinforcement concrete vertical and Note


horizontal stifners for all 100mm thk. walls exceeding 3m
length and 3m height.

All blocks shall be " Amtrad" or equivalent and as per Note


drawings and specifications

Rate shall include for scaffoldings Note

Contractor shall finish the exterior and interior surface of Note


blocks

Work neatly strictly as per the instruction of the Engineer Note

Compressive strength of Hollow blocks shall be minimum 1.5 Note


N/ mm2

Rubble work

G.1 Random rubble (150 x 225mm size) masonry wall foundation m3 0.72 7,462.15
in cement and sand 1:5 mortar

Hollow block work

In ground floor

G.2 100mm thk. hollow block wall in cement and sand 1:5 m2 9.52 1,107.55

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY
H WATER PROOFING WORK

Rates shall include the protective screed, grounds, rules, Note


internal angles, fillet, external angles and exposed circular
edges chases for trucking in etc;

Rate shall include cutting top line, notching bending and extra Note
materials for lapping

Contractor shall submit ten years guarantee for water proofing Note
material and workmanship through his specialist sub
contractor in the name of the Employer in an acceptable
format

The technical specifications and the methodology of the water Note


proofing system shall be submitted by the contractor to the
consultant structural engineer for approval

Water Proofing

H.1 2 mm thick Polyurathene water proofing membrane on top of m2 4.80 3,783.35


the roof slab and wall as per the drawing and specification

The waterproofing membrane shall be "Rino lining" (Tuff Note


stuff ) or equivalent

H.2 Application of approved suitable waterproofing material m2 1.50 1,326.00


"Barralastic" or equivalent as per manufacture's instruction to
wall in toilets up to 300mm high

TOTAL FOR WATER PROOFING WORK CARRIED


TO SUMMERY
K METAL WORK

ALUMINIUM DOORS AND WINDOWS WORK

Rates for all aluminum doors and windows shall include for Note
all necessary ironmongery

All joints to be sealed in an appropriate manner with approved Note


sealant with structural silicon

Rates shall include for aluminium paneling, glazing, framing, Note


fixing, beading, gaskets, sealant, high quality ironmongery for
windows and doors and precaution to prevent ingress of water
and water leaks, fixing accessories and hardware

Door locks should be Union or equivalent made Note

All aluminium sections to be powder coated Note


All glass shall be 12mm thick toughen glass / 6mm thick clear Note
glass as directed

K.1 One way swing single sash and both side composite nr 1.00 36,012.80
aluminium panel door with aluminium frame type " D7 ",
size 750 x 2100mm with necessary approved quality iron
mongery and locking system, complete as per detail drawings

TOTEL FOR METAL WORK CARRIED TO TENDER


SUMMARY
Q PLUMBING AND SANITARY INSTALLATION WORK

Sanitary fixtures and Fittings

Unless otherwise specified all sanitary fittings and fixtures Note


shall be of American Standard or approved equivalent type.

All fittings to be completed with water supply and disposal Note


connections to working order

Color and model of sanitary fixtures and fittings shall be to Note


the approval of Engineer

Rate for sanitary fixtures and fittings shall include supply and Note
installation including necessary accessories such as
connectors, flush pipes, angle valves, flexible connectors,
screws, plugs, etc and complete to working order as per
specifications

Q.1 Supply and fix pedestal type of water closet including cistern Nos. 1.00 21,531.35
colored to the Engineer's approval with all accessories such as
WC connector, flush pipe, seat cover approved angle valves
and flexible connector installed etc. complete to working
order

Q.2 Supply and fix approved quality hand spray bidet comprising Nos. 1.00 2,882.35
flexible chromium plated hose, angle valve and installed
complete to working order

Water supply system from city main to over head tank

All water supply pipes shall be of uPVC type 1000 with Note
solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be
deemed to have included in the relevant items
Q.3 Supply and install plastic water tank to the capacity of Nos. 1.00 14,894.55
1000Ltr. Located inside the ceiling, As shown with over
flow, wash out valve, ball valve etc. complete to working
order
Q.4 Supply and fix 32mm dia. pipe, city main to overhead tank m 7.00 317.05

Q.5 Supply and fix 32mm dia. ball valve nr 1.00 4,391.10

Water supply system from over head tank

Piping shall be measured to the net length along the center Note
line of the pipes over all bends, junctions, tees and the similar
pipe fittings and shall be given in meter

The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of uPVC
type 1000 with solvent welded joints

The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. Separately should be deemed to
have included in the relevant items

Distribution pipe system including fittings laid through ducts,


buried and chased in to walls as indicated from the storage
tank as per drawings and specifications

Q.6 50 mm. dia. pipe m 6.00 457.30

Q.7 32 mm. dia. pipe m 2.50 317.05

Q.8 25 mm. dia. Pipe m 1.00 180.20

Q.9 20 mm dia. Pipe m 1.50 121.55

Pegler or equivalent quality stop valves as indicated below

Q.10 32mm dia. Gate valve nr 1.00 4,391.10

Q.11 50mm dia. Gate valve nr 1.00 7,351.65

Internal Drainage

All drainage pipes shall be of uPVC type 600 with solvent Note
welded joints

The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified. Separately should be deemed to
have included in the relevant items
Rates shall include excavation, sand/concrete bedding, Note
surrounding pipes with concrete where necessary and back
filling and pipe accessories etc. and complete as shown on
drawings and specifications

Q.12 63 mm dia. waste pipes including bends, tees and socketted m 3.00 786.25
joints

Q.13 110 dia. uPVC pipes from toilet to manhole laid above floors m 3.00 1,890.40
and buried as shown in the drawings

Q.14 110 dia. uPVC pipes between manhole to manhole, to septic m 1.5 1,890.4
tank, soakage pits. Laid to a gradient of 1:80 including
necessary excavation and back filling

Gullies

Q.15 Construction of 150x150mm size uPVC trap moulded floor nr 1.00 1,954.15
gully of good quality, fixed to toilet floor slab with stainless
steel grating with water proofing on top and sides complete
with no leak inlet and outlet connection.

Manholes and septic tanks

Manhole construction including excavation, disposal, back Note


filling brick wall cover slab with opening and manhole base
slab, necessary finishes, connection of pipes, etc as shown on
drawings and specifications

Q.16 Construction of sewer manhole internally size 450 x nr 1.00 17,068.00


450x350mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and medium duty double seal C.I. man hole cover
with lifting hooks as per detail drawings

Q.17 Construction of brick soakage pit 1200mm dia. internally as nr 1.00 77,102.65
per detail drawings. liquid depth apporx.2000mm.Rate shall
include for excavation, backfilling and removing surplus
excavations, 225x225mm RCC floor beam, 225mm thk.
brick wall, 100mm thk cover slab with 600x600mm
removable access cover with handle, vent pipe, etc.,

Q.18 Construction of RCC septic tank internally 2700mm x nr 1.00 345,058.35


900mm size and 1200mm liquid depth as per detail drawing.
Rate to include for excavation, backfilling and removing
surplus excavations
TOTAL FOR PLUMBING AND SANITARY
INSTALLATION WORK CARRIED TO SUMMRY
S ELECTRICAL INSTALLATION

The Contractor shall submit following documents for Note


Engineer's prior approval before commencing installation

(1). Catalogue and sample submitting Note

(2). Manufacturer's shop drawings for distribution boards Note

(3). Conduit Layout Drawings Note

The tenderer shall provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Electrical Fittings ,wiring and accessories shall be following Note

MCB, Isolator, RCCB and MCCB - Merlingerin, Terasaki, Note


ABB, F & G, Siemens or equivalent

Ceiling rose, Lamp holders, Switch box, Junction box and Note
Condute - Polycrome or equivalent

Fluorescent lamp, Lamp Fixtures, Starters - Osram, Philips or Note


equivalent

Cable - ACL or equivalent Note

Ceiling fan - KDK or equivalent Note

Exhaust fan and wall fan - woods, S&P or equivalent Note

Point wiring

The contractor shall forward the conduit layout for prior Note
approval of the Consultant

Rates for point wiring shall include for all cables, switches, (1 Note
way or 2 way as necessary) junction boxes outlet boxes,
conduits, pull boxes, clips, earth cables, draw wires, wiring
accessories, screws, nails, hardware, fixing and insulating
materials, cutting holes, chases, make good the same in all
trades, holders, ceiling boxes, flexible codes and any other
wirings accessories require up to the final fixing point where
ever necessary

All lighting point wiring shall be in Note


2x1Cx1mm2Cu/PVC/PVC cable and 2.5mm2 protective earth
in GI conduits including all accessories
S.1 Wring for soffit mounted type 2x18Wx600 x300mm nr 1.00 3,598.90
fluorescent lamp with double parabolic reflectors and other
accessories as shown in layout drawings

Fittings and Equipments

Rates installation of lamp fittings shall include for necessary


hanging system, fixing cables for the electrical termination
point, flexible wires, holders connect to power at the location
as per drawing and all accordance with the specification and
the and the approval of the consultant

S.2 Supply and install soffit mounted type 2x18Wx600 x300mm nr 1.00 4,742.15
fluorescent lamp fitting with double parabolic reflectors and
other accessories to architect's approval, as shown in layout
drawings

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
T FLOOR, WALL AND CEILING FINISHES

Areas in which color cement rendering will be decided, Note


contractor shall prepare sample floor render until the
consultant is satisfied

Rate for plastering shall include for providing expanded Note


joints, plastering the reveals, mouldings, etc; as per the
detailed drawings

Rates shall include for preparation of surfaces for proper Note


bonding

Rate shall include for measures to provide suitable bonding Note


between different surfaces such as concrete and bricks/blocks
surfaces as per specification. Rates shall include for all tile
specials such as corners, edges etc,

Floor and wall tile should be Lanka tile or equivalent Note

Floor Finishes

T.1 600 x 600mm size, Porcelain tile in an approved color and m2 5.00 1,988.15
quality including 18mm thick 1:3 cement sand bedding and
pointing with tile grout to match the color of tiles laid at
Toilet floor

Wall Finishes

Internal wall finishes


T.2 16mm thk. cement and sand 1:5 plaster finished smooth, m2 7.50 476.85
with wall putty to Internal faces of block walls and attached
concrete surfaces, rate shall including door and window
reveals

Wall Tiling

T.3 150mmx150mm size, unglazed ceramic tiles in an approved m2 4.60


colour and quality including 16mm thick 1:3 cement sand
bedding and pointing with tile grout on toilet walls (Tile rate
per m2 Rs. 1250.00 - 1500.00 including VAT)

T.3 600 x 300mm size, Porcelain tile in an approved color and m2 4.60 2,279.70
quality including 16mm thick 1:3 cement sand bedding and
pointing with tile grout to match the color of tiles laid at
internal wall at Toilet

External wall finishes

T.4 16mm thk. cement and sand 1:5 plaster to external faces of m2 2.50 425.85
block walls and attached concrete surfaces above plaster
groove, finished semi rough, rate shall include door and
window reveals

T.5 600 x 600mm size, Porcelain tile in an approved color and m2 4.90 1,912.50
quality including 16mm thick 1:3 cement sand bedding and
pointing with Polymer grouting or fluoride resistant grout to
match the color of tiles laid for external walls

Slab Soffit Plaster


T.6 10mm thick plastering to soffit slab with cement sand 1:3 466.65
m2 1.62
including floating with lime putty

Miscellaneous

T.7 Extra over to plaster Forming horizontal Grooves in m 5.75 102.00


External plastered walls. Rate shall include for painting

TOTAL FLOOR, WALL AND CEILING FINISHES


CARRIED TO SUMMARY
V PAINTING WORK

Internal painting shall be interior quality emulsion paint in an Note


approved color and manufacture (C.I.C or equivalent ) and
color to suit with the environment, climate and location of this
project
External painting shall be exterior quality weathersheild, Note
texture base paint in an approved color and manufacture
(C.I.C or equivalent ) and color to suit with the environment,
climate and location of this project and must be applied over
two coat of waterproof primer

Rate for painting shall include for painting to door and Note
window reveals

The Contractor shall prepare a sample area or sample board Note


bearing finish coating and submit the same to the Engineer's
for approval

Wall Painting

External

V.1 Prepare surface and apply one coat of water proofing primer m2 2.50 371.45
and two coats of approved type weathershield paint to
external plastered surfaces of walls as directed

Internal

Prepare surface and apply one coat of acralic filler and two
coats of approved type emulsion paint on internal plaster
surfaces as directed.

V.2 In ground floor m2 7.50 302.60

Soffit Painting

V.3 Prepare and apply one coat of primer and two coats of m2 1.62 378.25
emulsion paint on soffit

Ceiling Painting

Prepare surface and apply two coats of colorless vax paint on


fair faced surfaces as directed

V.4 In ground floor m2 3.50 337.45

TOTAL FOR PAINTING WORK CARRIED TO


SUMMARY
Amount

2,311.11

Rate only

206.89

635.80
384.30

3,538.10

1,271.12

8,117.91

6,546.70
3,666.15

13,093.40

9,034.45

9,484.47

8,852.17

10,820.50

6,137.00

2,664.75
3,431.03

17,119.00

7,186.75

2,584.00

3,230.00

2,699.81

8,786.66

2,454.38

15,375.81
7,178.25

9,116.38

75.65

9,333.00

168,259.34

5,372.75

10,543.88

15,916.62
18,160.08

1,989.00

20,149.08
36,012.80

36,012.80

21,531.35

2,882.35
14,894.55

-
2,219.35
-
4,391.10
-

2,743.80
-
792.63
-
180.20
-
182.33

4,391.10
-
7,351.65
2,358.75

-
5,671.20

-
2,835.60

1,954.15

17,068.00

77,102.65

345,058.35
513,609.10
3,598.90

4,742.15

8,341.05

9,940.75
3,576.37

10,486.62

1,064.63

9,371.25

755.97

586.50

35,782.09
928.63

2,269.50

612.77

1,181.08

4,991.96
No Description Unit Qty Rate
D EXCAVATION AND EARTH WORK

The tenderers are requested of refer the General Notes,


Pricing Preambles, Drawings, Specifications, Conditions of
contract, Special Conditions of Contract and all other relevant
documents prior to pricing of the following items

Rates and prices of excavations shall include for any working


space as required by the contractor

Rates and prices of excavations shall include dewatering,


earthwork supports and disposal of any excavated surplus
materials

The tenderer shall submit the following information together


with their bid

a) Method of Excavation
b) Equipment with details of capacities proposed for
excavation and
c) Method of removal ofifearth
dewatering, any
d) Details of temporary work
e) Method of earth work support, if any

The tenderer is requested to check ground water level and


limitation of transport, limitation of site, conditions of the
existing road for possibility of transportation of heavy
equipment etc., prior to pricing this section of work

The contractor shall arrange and obtain necessary permission


from authorities for disposal and dumping of earth

Contractor shall provide due protection to avoid any damages


to temporary work any new or old structures during
excavation

Rate shall include for removal and disposal of any


obstructions, such as artificial structure and rock boulders
etc., during excavation if encounted

Site Clearance

D.1 Clearing site including removal of top soil up to a depth of m2 1,010.00 86.70
150 mm including grubbing up roots, bushes and trees, filling
voids with selected excavated material and compacting and
disposal of all surplus excavated material away from the site
as directed

General Excavation
D.2 General excavation for cutting in making up levels to required m3 10,625.00
levels including transporting to proposed access road within
the land as shown in the drawings
General Filling

D.3 Sub-base type-1 as per the Specifications m3 241.52 1,258.85

D.4 Aggregate base as per the specifications m3 137.00 4,142.05

TOTAL FOR EXCATION AND EARTHWORKS


CARRIED TO SUMMERY
F CONCRETE WORKS

All concrete shall be made dence with a vibrator and finished Note
to receive respective finishes. The type and stability shall be
agreed with the consultant prior to commencement of
concreting of each item

Rates shall include for plant for mixing, handling, hoisting, Note
depositing, compacting, vibrating, curing, making good after
removal of formwork and for any tests as necessary

Rate for concrete shall include forming joints between new Note
concrete and old concrete, separation joints as per drawings
and specification unless otherwise measured separately

Concrete mix design details to be submitted to consultant's/ Note


Engineer's approval

Concrete Pavement

Rate shall include for necessary form work, reinforcement, Note


polythene layer, joints etc. as per the detail drawings

Reinforced concrete (Grade 35) poured on well compacted


leveled earth in following pavements as per the detail
drawings and specifications

F.1 250 mm thick in tolling area m2 1,076.20 4,230.45

F.2 150 mm thick in approach road (Provisional Qty.) m2 345.00 2,538.10

F.3 150 mm thick in parking area m2 57.54 2,538.10

F.4 Pre cast concrete fence panels laid and fixed all as per detail m 53.00 12,554.50
drawings
TOTAL FOR CONCRETE WORKS CARRIED TO
SUMMERY
G MASONARY
The tenderer is requested to refer the Preambles notes, Note
General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items

Work neatly strictly as per the instruction of the Engineer Note

Rate shall include for scaffoldings Note

Retaining Wall

G.1 Random rubble (225 x 150 mm size) masonry in cement sand m3 7,462.15
mortar (1:5) in Retaining walls as per the detail drawing no.
TP/TD - 02 and specifications. Rate shall included geotextile
layer, 50mm thk. G 15 concrete screed, placing weep holes,
etc.
TOTAL FOR MASONARY CARRIED TO SUMMERY

J METAL WORKS

PCV coated wire chain link fence

J.1 1.8m high security fence fixed on 50mm dia. G.I. pipe post at m 7,085.60
boundary, comprising of gauge 10 green colour uPVC coated
galvanized chain link wire mesh (50mm x50mm) fencing as
per the detail drawings. Rate shall include for providing
25mm dia. GI pipe tie on top with application of 2 coats of
anticorrosive paint in all exposed surfaces and as per the
detail drawings and specification. The strut also to be
provided with start/end and every 18m intervals. Rate shall
include excavation, rubble foundation, and bottom of the
fence post to be embedded in concrete pockets. All G.I. pipe
should be medium quality

J.2 Supply erect and install grantry structure in entrance road of


toll plaza as per the detaill drawings and the specifications LS Item Allow

TOTAL FOR METAL WORKS CARRIED TO


SUMMERY
Q EXTERNAL PLUMBING WORK

Piping shall be measured to the net length along the center Note
line of the pipes over all bends, junctions, tees and the similar
pipe fittings and shall be given in feet

The size of PVC pipes and specials are specified by the Note
external dimensions. All water supply pipes shall be of UPVC
type 1000 with solvent welded joints
The prices to include for screws, nails, pipes hooks, saddles, Note
brackets connections nipples and the like holes, chasing etc.
Unless otherwise specified separately, those should be
deemed to have included in the relevant items

Main Water Supply

Q.1 Allow for main water supply including connection to building LS Item Allow
from the water meter

Q.2 32 mm dia. Pipe, overhead tank to ramp from well including m 700.00 317.05
suction

Q.3 Supply and fix 25mm dia. gate valve nr 1.00 2,804.15

Q.4 50 dia. uPVC pipes from sump to Toll Plaza laid to a 555.90
m 118.72
gradient of 1:80 including necessary excavation and back
filling
Pipe Distribution System

Q.5 25mm dia Distribution pipe system including fittings laid m 256.01 184.45
through ducts to flower trough in Toll Plazas

Q.6 32mm dia Distribution pipe system including fittings from m 260.50 323.85
water suply to Toll plaza flower trough

Storm water

Q.7 Construction of 150mm wide, RCC drain with 75mm thick. m 111.00 13,368.80
base slab, 75mm thick, side walls and hot dip galvanized
gratting as per the layout to includes pricing, necessary R/F,
form work, cement rendering, excavation, backfilling, etc,

Q.8 Construction of Strom water middle drain (500mm width m 82.60 17,147.90
600mm height)

Q.9 Construction of Strom water Retainng wall side drain m 35.00 11,504.75
(300mm width 430mm height" L" - shape drain)
Q.10 Construction of storm water man hole externally size 450 x nr 14.00 12,282.50
450x1000mm depth, including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and 75mm tk concrete manhole cover at Toll Plaza

Q.11 Construction of storm water man hole externally size nr 3.00 13,447.85
700x700mm x 450mm , including excavation, backfilling and
removing surplus excavations, built in 150mm thick. base,
100mm thick R.C. walls, 1:3 cement :sand rendering with
benching and 75mm tk concrete manhole cover at Toll Plaza
Q.12 Supply and lay 225mm dia. R.C Hume pipe in trench to m 10.00 3,247.85
including collar joints, excavation, placing concrete
surrounding at 1200mtr. Intervals, back filling and removing
surplus excavations.

Q.13 Provision of 100x 100x 6mm tk. angle iron for manhole cover nr 41.00 4,289.10

Concrete Drains

Q.14 400mm width conrete drain from middle drain to retaining m 5.50 3,351.55
wall

Q.15 Supply and fixing of 400mm width steel grating to cover m 5.50 9,062.70
concrete drain

Q.16 Supply and fixing of 300mm width steel grating to cover m 10.70 6,796.60
concrete drain

Q.17 Allow for the submission of three sets of as built drawings for LS Item Allow
all plumbing detail of the interchange at commissioning of the
system for approval of the consultant

Fittings Supply only

Q.18 Approved quality 20mm bid tap comprising angle valve nr 2.00 2,305.20

Q.19 Approved quality hand spray bidet comprising flexible nr 3.00 2,686.85
chromium plated hose, angle valve

Q.20 Approved quality stainless steel flexible hose nr 2.00 495.55

Q.21 Approved quality 20mm dia Angle valve nr 5.00 1,150.90

TOTAL PLUMBING WORK CARRIED TO SUMMRY

S ELECTRICAL INSTALLATION

The tenderer is requested to refer the Preambles notes, Note


General notes, Specifications, Condition of contract, Special
condition of contract and relevant information prior to pricing
of the following items

Connection from CEB transformer and builders work by main Note


contractor
The contractor shall submit following documents for Note
Engineer's prior approval before commencing installation

(1). Catalogue and sample submittals Note


(2). Manufacturerer's shop drawings for distribution boards Note

(3). Conduit Layout Drawings Note

It is the contractors responsibility to obtain the certification Note


for the complete electrical installation by a chartered Engineer

Automatic change over switch by the generator contractor Note

The tenderer shall be provide all dimensions, and technical Note


information of all builders work to the Consultant in advance
in relation to the program of work

Commercial Power Supply From CEB

Contractor shall coordinate the above work with CEB for Note
obtaining the above power supply and and provide necessary
support for the CEB personnel and client

S.1 Allow for coordination work with CEB for obtaining above LS Item Allow
Power supply

Main Power Distribution System

Main Distribution panel

S.2 Main distribution panel shall include for supply and nr 1.00 476,671.50
installation of all necessary MCCB's, MCB's, EFR's,
ELCB's/RCCB's auxiliary contacts, surge arrestor, Volt
meters, ammeter meters, indicator lamps, selector switches,
inter connecting copper bus bars, inter locks aligning and
grounding the panel, interconnections, internal wiring
instrument, wiring loops, connecting to switch gears, cable
gland lugs, steel channels and necessary hardware fixing and
installation materials with fully enclosed metal enclose
complete as shown in drawings and comply with the
specification and as per BS standards given in the relevant
items, I.E.E. regulation 17th edition and all complete to
working order to the approval of the Consultant

Power Control Centre


S.3 Power Control Centre (PCC) shall be include for supply and nr 1.00 786,826.30
installation of all necessary MCCB's, MCB's, RCCB's
auxiliary contacts, AST, Surge arrestor, indicator lamps,
selector switches, inter connecting copper bus bars, inter locks
aligning and grounding the panel, interconnections, internal
wiring instrument, wiring loops, connecting to switch gears,
cable gland lugs, steel channels and necessary hardware fixing
and installation materials with fully enclosed metal enclose
complete as shown in drawings and comply with the
specification and as per BS standards given in the relevant
items, I.E.E. regulation 17th edition and all complete to
working odder to the approval of the Consultant

Main Cables and Sub Main Cables


Rates for all cables shall include for all waste, fixing looping, Note
cable supports, termination both end and necessary
accessories for completion of the work
Rates for all cables shall include for cable trays and cable Note
ladders to the sizes as required unless other wise measured
separately
S.4 1 x 4C x 150mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 15.00 12,270.60
ground from SS to MDB

S.5 1 x 4C x 70mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 45.00 7,119.60


trench from MDB to PCC

S.6 1 x 4C x 70mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 15.00 7,119.60


trench from PCC to emergency generator

S.7 1 x 4C x 10mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 20.00 2,320.50


trench from PCC to DB1R1 in ramp 01

S.8 1 x 4C x 10mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 30.00 2,320.50


trench from PCC to DB2R1 in ramp 01

S.9 1 x 4C x 50mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 630.00 4,202.40


trench from PCC to DB1R2 in ramp 02

S.10 1 x 4C x 50mm² Cu/XLPE//PVC/SWA/PVC cable direct in m 655.00 4,202.40


trench from PCC to DB2R2 in ramp 02

S.11 1 x 4C x 16mm² Cu/XLPE//PVC/SWA/PVC +16mm2 E m 35.00 2,696.20


cable direct in a GI conduit from PCC to SDB in toll plaza
office ground floor

S.12 1 x 4C x 10mm² Cu/XLPE//PVC/SWA/PVC +10mm2 E m 15.00 2,559.35


cable direct in a GI conduit from toll plaza office g.f. SDB to
SDB in toll plaza office first floor
S.13 1 x 2C x 6mm² Cu/PVC/PVC+6mm2 E cable direct in a GI m 33.00 1,017.45
conduit from PCC to UPS DB2 in tool collection and
processing equipment room UPS
S.14 1 x 2C x 6mm² Cu/PVC/PVC+6mm2 E cable direct in a GI m 30.00 1,017.45
conduit from PCC to UPS DB3 in tool teller starf room UPS

S.15 1 x 4C x 6mm² Cu/PVC/PVC+6mm2 E cable direct in a GI m 5.00 1,251.20


conduit from PCC to SDB in power house

S.16 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 8.00 1,556.35


GI conduit from DB1RI to DB in single toll booth - 01

S.17 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 18.00 1,556.35


GI conduit from DB1RI to DB in long toll booth - 01

S.18 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 8.00 1,556.35


GI conduit from DB2RI to DB in single toll booth - 02

S.19 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 8.00 1,556.35


GI conduit from DB1R2 to DB in single toll booth - 01

S.20 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 18.00 1,556.35


GI conduit from DB1R2 to DB in long toll booth - 01

S.21 1 x 2C x 10mm² Cu/PVC/PVC+10mm2 E cable direct in a m 8.00 1,556.35


GI conduit from DB2R2 to DB in single toll booth - 02

S.22 1 x 2Cx6mm CU/PVC/PVC/SWA/PVC+6mm E cable direct m 45.00 1,017.45


in a GI conduit from PCC to SDB in security hut ground floor

Cable Trenches

S.23 Construction of cable trench for laid under ground power m 36.00 8,882.50
cables as per the detail and specifications

S.24 Construction of electrical manhole type A, as per the detail nr 7.00 14,025.00
drawings and specifications

Earth System

S.25 Allow for suitably designed earthling system connecting all


armoured cable outer armour and all earth terminals of SDB
and DBs complete with all necessary earth rods, copper
plates, copper tapes (25x3mm), connectors, joints, saddles
and all necessary materials and hardware to achieve the LS Item Allow
regulations and shall be consultant's approval and Ceylon
Electricity Board approval. (earth reading to be maintain less
than 10Ω)
Lighting Protection System

S.26 Allow for the suitably selected lightening protection system


complete with franking rod air terminal fixed to 3m high
50mm dia. GI mast fixed on to the roof slab and connected to
the cupper down conductor (25x3mm) complete with cupper
tape (25x3mm) insulated fixing bracketed and support
including air terminal, cupper doen conductors and earthing
electrodes, test clamps and all necessary accessories LS Item Allow
complete to working order as per the detail drawings and
specifications for protection of the entire building from direct
lighting strokes (earth reading to be maintain less than 10Ω)

High mast lighting system

S.27 Supply, errect and installation of 13.5 m high mast lighting nr 4.00 546,391.05
column with 2 nos of 400 Watt metal helide lamp as per the
detail and specifications

S.28 Additional Cost for Construction of high mast light nr 2.00 23,375.00
foundation as per detail drawing

Testing and Commissioning

S.29 Allow for testing and commissioning of the total system to


the entire satisfaction of the Consultant and submission of
commissioning report in triplicate as per the CEB Regulations LS Item Allow

Shop Drawings

S.30 Allow for the submission of two sets of shop drawings


including conduit lay outs, cable plan, panel details prior to
commencement of construction work. for approval of the LS Item Allow
consultant

AS built Drawings / Maintenance Manuals

S.31 Allow for the submission of three sets of as a built drawings


at commissioning of the system for approval of the consultant LS Item Allow

S.32 Allow for the submission of three sets of maintenance


manuals and other technical literature for approval of the LS Item Allow
consultant

Fittings Supply only

S.33 Approved type 300 dia. soffit mounted type lamp fittings with nr 2.00 2,764.20
18W CFL
S.34 Approved type soffit mounted type 3x18Wx600x600mm nr 5.00 5,207.10
fluorescent lamp with double parabolic reflectors and other
accessories

S.35 Approved type soffit mounted type 2x18Wx300x600mm nr 3.00 4,500.75


fluorescent lamp with double parabolic reflectors and other
accessories

S.36 Approved type wall mounted type mirror lamp nr 1.00 2,668.15

S.37 Approved Type ceiling fan with regulator nr 2.00 7,457.05

S.38 Approved type 1x36W fluorescent lamp fitting with diffuser nr 2.00 2,924.85

S.39 Approved type 1x18W fluorescent lamp fitting with diffuser nr 2.00 2,924.85

S.40 Approved type switches (2 Gang) nr 5.00 1,120.30

S.41 Approved type socket out lets (13A) nr 5.00 1,474.75

S.42 Approved type socket out lets (15A) nr 3.00 2,164.95

S.43 Approved type telephone socket out lets nr 1.00 947.75

S.44 Approved type TV socket out lets nr 1.00 884.00

S.45 Approved type indicater lamps (red yelow blue) nr 1.00 116.45

S.46 Approved type 16A 2P MCB nr 5.00 1,016.60

S.47 Approved type 10A 2P MCB nr 5.00 1,016.60

S.48 Approved type 20A 4P MCB nr 5.00 2,568.70

S.49 Approved type 30A 4P MCB nr 5.00 2,568.70

S.50 Approved type 160A 4P MCCB nr 1.00 13,004.15

S.51 Approved type 40A 4P MCCB nr 2.00 7,322.75

ELECTRICAL WORK

TOTAL OF ELECTRICAL INSTALLATION


CARRIED TO SUMMARY
Amount

87,567.00
Rate only

304,037.45

567,460.85

959,065.30 959,065.30

4,552,810.29

875,644.50

146,042.27

665,388.50

6,239,885.56 6,239,885.56
Rate only

Rate only

148,750.00

148,750.00 148,750.00
85,000.00

221,935.00

2,804.15

65,998.12

47,221.04

84,362.92

1,483,936.80

1,416,416.54

402,666.25

171,955.00

-
40,343.55
32,478.50

175,853.10

-
18,433.52

49,844.85

72,723.62

16,000.00

4,610.40

8,060.55

991.10

5,754.50

4,407,389.52 4,252,799.30
46,750.00

476,671.50
786,826.30

184,059.00

320,382.00

106,794.00

46,410.00

69,615.00

2,647,512.00

2,752,572.00

94,367.00

-
38,390.25

-
33,575.85

30,523.50

6,256.00

12,450.80

28,014.30

12,450.80

12,450.80

28,014.30

12,450.80

45,785.25

319,770.00

98,175.00

70,125.00
163,625.00

2,185,564.20

46,750.00

32,725.00

9,350.00

9,350.00

9,350.00

5,528.40
26,035.50

13,502.25

2,668.15

14,914.10

5,849.70

-
5,849.70

-
5,601.50

7,373.75

6,494.85

947.75

884.00

116.45

5,083.00

5,083.00

12,843.50

12,843.50

13,004.15

14,645.50

10,896,374.40 10,511,796.48
No Description Unit Qty Rate
DAY WORKS

The day work is defined as the additional or varied work not Note
envisaged at the time of tendering, which may be ordered to
be carried out by the Engineer under the contract provided in
the opinion of the Engineer, that such work cannot be
adequately measured in the normal way.

The day work shall be carried out under and incidental to the Note
contract.

LABOUR

The rate shall include for all cost relating to employment of Note
labor including

1. Subsistence payments
1. Conditions payments
2. Working on public holidays, weekends after normal
working hours
3. Transport of labour and travelling allowances
4. Supervision costs and expenses
5. Over heads and profits
6. Use of hand tools and protective gear
7. Any other statutory and incidental charges levied on the
employment of labor
8. Bonus payments

1 Carpenter & Joiner Day 11.00

2 Mason Day 55.00

3 Plumber Day 28.00

4 Painter Day 17.00

5 Electrician Day 11.00

6 Unskilled worker Day 138.00

7 Ganger Day 11.00

8 Bar Bender Day 11.00

9 Welder Day 17.00

10 Steel work erector Day 11.00

11 Driver of vehicle up to 10 Ton Day 83.00

12 Operator for Excavator, Shovel, Crane Day 83.00

13 Operator for Tractor Day 55.00


TOTAL FOR LABOUR CARRIED TO SUMMARY

MATERIALS

The contractor shall state in schedule 11.2 below the Note


percentage required to be added to the net invoice cost
including delivery to site of the under mentioned materials
which may be ordered to be used in Day work.

The percentage to be quoted as above shall include for all Note


costs relating to

1. Unloading into site stock or storage


2. Protection
3. Over heads and profits

1 Portland Cement Bag 83.00

2 Sand Cube 2.00

3 Coarse aggregate Cube 2.00

4 Reinforcement steel Kg 275.00

5 Rubble (150-250mm) Cube 3.00

6 Timber for temporary works m2 83.00

7 Timber for permanent works m3 6.00

8 Joinery timber m3 3.00

9 Bricks Nos 550.00

10 Cement sand blocks Nos 275.00

11 Glass m2 28.00
TOTAL FOR MATERIALS CARRIED TO SUMMARY

PLANT AND MACHINERY

The contractor shall state in schedule 11.3 below the hourly Note
rates of plant which may be ordered to be used under Day
works.

The rates shall include for the following Note

1. Cost of fuel, lubrication


2. Transport to and from site
3. Wages of operators attendants
4. Insurance
5. Any other cost in connection with use
6. Overheads and profits

1 Plumbing set of any type and drive Day 11.00

2 Concrete mixer 10/7 Day 28.00

3 Vibrator Day 28.00

4 Lorry 5 ton Day 28.00

5 Tractor with trailer Day 55.00

6 Oxy-acetylene welding set Day 11.00

7 Electrical welding set Day 6.00

8 Mobile crane Day 11.00

9 Dumper Day 55.00


TOTAL FOR PLANT AND MACHINERY CARRIED