The inspection report for radiography conducted for M/S Swastik Furnace indicates that most joints were accepted with no significant defects (NSD), while several joints required repairs due to porosity (POR) and slag inclusion (SL). The report includes details on the film type, exposure time, and job specifications. It was interpreted by a qualified inspector and requires client acknowledgment.

Uploaded by

harshmawatwal549
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views4 pages

Repair

The inspection report for radiography conducted for M/S Swastik Furnace indicates that most joints were accepted with no significant defects (NSD), while several joints required repairs due to porosity (POR) and slag inclusion (SL). The report includes details on the film type, exposure time, and job specifications. It was interpreted by a qualified inspector and requires client acknowledgment.

Uploaded by

harshmawatwal549
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

INSPECTION REPORT FOR RADIOGRAPHY

CLIENT M/S: CONTRACTOR :M/S: SWASTIK FURNACE


Accepted Standard Asme Sec VIII Div 1 UW 51/52
job Details: Report no. 08
Film Type:LAZER D7 Date: 02/05/25
Lead Screen: F/B 0.01 mm Source Size: 2.7 m
S.F.D: 5" Mat :
Penetremeter: Wire Type: 1B 11 Hole Type: Type of Job:BUTT W
Sensitivity:2% Job Thick: 4+4 MM
Density: 2 to 4 Developer Temp: 2
Source Strength CI : 20 CI Developing Time :
Source: X-Ray/gamma Ray: ir-192 Exposure Time : 1
Technique : DWSI/SWSI/DWDI/PANAROMIC

SR.NO. Join No. Segment observat Result Remark


1 SFPL 23-04-CJ25 A NSD ACC
" B NSD ACC
2 SFPL 23-04-CJ26 A NSD ACC
" B NSD ACC
3 SFPL 23-04-CJ27 A NSD ACC
" B NSD ACC
4 SFPL 23-04-CJ28 A POR REPAIR
" B POR REPAIR
5 SFPL 23-04-CJ29 A SL REPAIR
" B SL REPAIR
6 SFPL 23-04-CJ30 A POR REPAIR
" B POR REPAIR
7 SFPL 23-04-CJ31 A POR REPAIR
" B POR REPAIR
8 SFPL 23-04-CJ32 A NSD ACC
" B NSD ACC

Interpreted by QII ASNT (LEVEL II) Interpreted by CLIENT


Sign: Sign:
Name: Name:
Date: Date:
Type of Job:BUTT WELD

Min
Exposure Time : 1 MIN

t Result Remark Film Size


5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"
5X4"