CHEC Lifting Plan B SHEET PILE

Uploaded by

joynula892
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views3 pages

CHEC Lifting Plan B SHEET PILE

Uploaded by

joynula892
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

中国港湾(新加坡)工程有限公司

China Harbour (Singapore) Engineering Company Pte Ltd 135T


(ISO 9001:2015, ISO 14001:2015, ISO 45001:2018) Co. Reg No.: 198600104W

Title: Form Identification: TKR-LP-001

Lifting Operation Permit Form Effective Date: 20/3/2024

Lifting Operation Permit Consist of Form A and B) Form B of Lifting Operation Permit Number :

A. Project : 27 Tanjong Kling

B. Date Lifting Plan Submitted : 18/02/2025 Lifting Permit No.:

C. Type of Lift : Routine

1 Parameters of Load

1.1 Load to be lifted : SHEET PILE


1.2 Dimension of Load (LxBxD in meter) : 25M*.6M*.2M

1.3 Centre of gravity : Estimate

1.4 Weight of Load : 3 ton

1.5 Load established by : Supplier OK

2 Particulars of Lifting Machine

2.1 Type of Crane : Crawler Crane Check 2.2 for Out-riggers Extension

2.2 Crane Serial Number GN03-02302

2.3 Out-riggers : N.A. Safe to lift

2.4 Crane Foundation : Steel Plates OK. Keep Sa:RC Ground Slab

2.5 Max Crane SWL : 12 m(R) 41 ton

2.6 Min Crane SWL : 40 m(R) 8 ton

2.7 LM Number : LM092582N LM Issue Date : 09/11/2024 Valid LM Cert

2.8 Data Logger : Yes OK

2 Actual Lifting Radius

2.1 Pick Up Radius, Rp : 20 m 21.9 ton (SWL)

2.2 Install / Unload Radius, Ru : 20 m 21.9 ton (SWL)

2.3 Load Chart Attached : Yes OK

3 Crane Utilisation

3.1 Total Weight of LGs : 0.1 ton

3.2 Weight of Hook Block : 1.2 ton

3.3 Weight of LG & Load : 4.3 ton

20%
Safe to proceed - to obtain PD's approval if crane utilization
3.4 Load versus Crane SWL at Rp :
20% exceeds 85%
Safe to proceed - to obtain PD's approval if crane utilization
3.5 Load versus Crane SWL at Ru :
exceeds 85%
4 Lifting Gears / Accessories Used

4.1 Description of Lifting Gear (1) W LG No. : LGD0104G43 G.R.Shackle


SWL of Lifting Gear : 7.5 ton LG Issue Date: 01/04/2024

Total no. of legs : 1 pcs SWL(per pc) 7.5 ton

4.2 Description of Lifting Gear (2) W LG No. : LGY 2712H50 SHACKE

SWL of Lifting Gear : 8.5 ton LG Issue Date: 27/12/24

Total no. of legs : 1 pcs SWL(per pc) 8.5 ton

4.3 Description of Lifting Gear (3) W LG No. : LGY0601J50-2 8M

SWL of Lifting Gear : 10 ton LG Issue Date: 06/01/2025

Total no. of legs : 1 pcs SWL(per pc) 10 ton

4.4 Description of Lifting Gear (4) W LG No. :

SWL of Lifting Gear : ton LG Issue Date:

Total no. of legs : pcs SWL(per pc) #DIV/0! ton

4.5 Description of Lifting Gear (5) W LG No. :

SWL of Lifting Gear : ton LG Issue Date:

Total no. of legs : pcs SWL(per pc) #DIV/0! ton

4.6 Description of Lifting Gear (6) W LG No. :

SWL of Lifting Gear : ton LG Issue Date:

Total no. of legs : pcs SWL(per pc) #DIV/0! ton

Weakest LG/LA SWL(per pc) : 7.5

5 Lifting Angle / Correction Factor

5.1 No of legs : 1 SWL(per pc) 7.5 ton

5.2 Sling length, Ls : 6 m

5.3 Lifting Point Space, L : 0.1 m

5.4 Lifting Angle, β : 0.76


5.5 Sling Angle, α 89.62 OK >45deg

5.6 Correction Factor : 0.995


5.7 Actual SWL (Ton) 7.46 Total SWL (Ton) 7.46 Safe to lift

Note: Image for illustration & reference purpose only

6 Others

6.1 Strength of unloading area : Others Ensure strength of receiving end

6.2 Obstruction along lifting path : No OK

6.3 Mode of Communication : Walkie Talkie


6.4 Rigging method (To provide sketch) (Reference to Section 3 for details of LG and Accessories)

SHEET PILE

6.5
Conclusion for Lifting Capacity Calucation Check

6.6 Can the lifting operation be carried out? : Yes. Ensure compliance of this plan at site

6.7 a
Prepared By (Lifting Supervisor / Eng): SAHIN Signature:

Designation: LIFTING SUPERVISOR Date: 18/02/2025

7.2b
Checked By(Subcon Competent Person): PARVAG Signature:

Designation: WSHC Date: 18/02/2025

7.2c
Reviewed By (CHEC Safety Assessor): FARUK Signature:

Designation: WSHC Date: 18/02/2025

Comments from CHEC EHS Team (If any):

Comments from CHEC Project Manager / Project Director (If any):