48A10108 - 0001 - 0I - MOC-278 Marked Up
48A10108 - 0001 - 0I - MOC-278 Marked Up
MASTER
3/4"
B9AM 48-RV021-B9AM-8"-N
3416 48-A-10255-1
C20MH LO FREE DRAINING
600# 48 3" K 4" TO FLARE
PSV - CONV
MOC
1005B 33.1 kg/cm^2g
48-PH071-C20MH-10"-N
PSE 3559 48-A-10110-1
+
3/4" FREE DRAINING TO 48C-111
1048 B9AM 8"
C20MH LO
600# FF NOTES
FI FT 0I
3/4" 013 013 1. ISOLATION VALVE CAN ONLY BE CLOSED UNDER TOTAL SHUTDOWN AND DEPRESSURISATION OF THE UNIT.
PSE SPECIFIC OPERATING PROCEDURES SHALL BE DEVELOPED TO PREVENT THE OVERPRESSURE OF ANY PIECE OF
+
1049 EQUIPMENT THAT MAY BE ISOLATED FROM THEIR CORRESPONDING RELIEF DEVICE AS A RESULT OF THE
2"
3/4" CLOSURE OF THE ISOLATION VALVE AROUND 48C-110.
PI
2. MINIMUM 10 DIAMETERS STRAIGHT HORIZONTAL PIPE RUN AFTER CONTROL VALVE TO BE SPECIFIED IN SS316L
1051 OR SS321.
3/4" FF
3. DELETED.
TT TI
4. COLUMN ELEVATION SET TO ENSURE FLUID IS LIQUID AT THE CONTROL VALVE INLET.
LO 033 033
LC B9AM RTD 5. DELETED.
3/4" 3/4" 6. HIGH POINT.
C20MH FF
H 7. DISSIMILAR CHECK VALVES.
PT PI
LO LC
046 046
6
48-PH070-C20MH-10"-Ist RTD
3581 48-A-10107-1
6" 300#
FROM 48C-109 FREE DRAINING
SRRF
300#
48C-110 2" LWNRF
O1
3/4" 10" V
300#
LWNRF
HOLDS
FF TI
6"
48-PH453-C20MH-6"-Ist RS PT PI 035
PSV PI1
LEGEND
047 047 1. DELETED.
FREE DRAINING 2"
2000 MIN
300#
SRRF FF
MH1 24" TT
7
SRRF RTD
6" 48-AS005-C20MH-4"-N
AFFECTED LINE
I1 48-A-10109-1 3632
20 4" LO CONT." FROM 48G-108A/B
300# 3/4" 48SP-011
TI 300# H A"
SRRF PDI
036 SRRF ESD
065 YC LAHH
24" MH2
300# 108 016
BLIND POINT
FF SRRF 1
TT
300# PI
1
48-A-10255-1
036
065 0I
48-A-10255-1
RTD LWNRF FF
FREE DRAINING LO 0I
I2 PT
PI2
10"
8468
3/4" 3/4" 065
MIN 2"
8470
0I
2800 MM MIN
134
FREE DRAINING
H
TI FI LC The present document or drawing is property of TECHNIP ITALY S.p.A. and shall not, under any circumstances, be totally or
partially, directly or indirectly, transferred, reproduced, copied, disclosed or used, without its prior written consent, for any
014 012 015 purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.
L
ZSO ZSC
DOC. TYPE DRAWING NO. SHEET REV.
FF FF PI 009 009
FF
TT FT
LV
1050
YV
PID 071973C-48-PID-0021-108 1 of 1 0I
014 012 4 +
RTD 0I 3/4"
3" 2" - 300# RF 3"
4" 48-AS007-B20MH-6"-N
FC 48-AS061-C20MH-4"-N FC
3664 48-A-10199-1
ENOC PROCESSING COMPANY L.L.C.
TO RICH AMINE TO B/L
3/4"
3/4"
TSO TYPE I2
2"
AD S AD AD
4B MOC-230
DRAWN: DRAWING TITLE
3612 3610 3619 3620
48-A-10258-3 48-A-10258-3 3" 48-A-10258-3 DATE:
PIPING AND INSTRUMENT DIAGRAM
LC UXCM14 C20MH NAPHTHA HYDROTREATER
2
SCALE:
C20MH UXCM14 NONE
PROJECT:
AMINE SCRUBBER
ESR00400
FILENAME DRAWING NO. SHEET REV.
48A10108_0001_0I
48-A-10108 1 of 1 0I