GENERAL NOTES LEGEND
ALL WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF THE LAV LAVATORY SP SOIL PIPE
PHILIPPINE NATIONAL PLUMBING CODE, THE NATIONAL BUILDING CODE OF THE WC WATER CLOSET CB CATCH BASIN
PHILIPPINES. FD FLOOR DRAIN SH SHOWER HEAD
CO CLEANOUT SV SHOWER VALVE
OTHER TRADES SHALL COORDINATE THE DRAWING WITH OTHER TRADE VSTR VENT STACK THRU ROOF SF FAUCET
DRAWINGS AND TECHNICAL SPECIFICATIONS. ST SEPTIC TANK HB HOSE BIBB
DS DOWNSPOUT MH MANHOLE
ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
HD HOUSE DRAINAGE GV GATE VALVE
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
KS KITCHEN SINK CV CHECK VALVE
DESIGNER.
ALL MATERIALS TO BE USED SHALL BE NEW AND OF APPROVED TYPE
APPROPRIATE FOR BOTH LOCATION AND INTENDED USE.
1 2 1 2 1 2
2 3 2 3 2 3
LANAI
WC
LAUNDRY
AREA
A A A
SH
FD CO FD
WC
KS
KS
BEDROOM 1
DINING KITCHEN LAV
SINK
AREA SH BEDROOM 2 BEDROOM 3
WC FD
4"Ø PPR SANTARY 4"Ø PPR SANTARY
4"Ø PPR SANTARY PIPE RISER TO PIPE RISER FROM PIPE RISER FROM
THIRD FLOOR GROUND FLOOR GROUND FLOOR
B HALLWAY B B
LAV
CO
FD
LIVING WC
AREA SH
HALLWAY LAV
CO
4"Ø PPR SANITARY PIPE
CO
HALLWAY HALLWAY
4"Ø PPR SANITARY PIPE
4"Ø PPR SANITARY PIPE
WC
LAV MASTER'S
BEDROOM
FAMILY/OFFICE/
GUEST ROOM
C C C
STORAGE
OPEN
SEPTIC VAULT
D D D
PORCH PORCH
FL-1
D' D' D'
1 4 1 4 1 4
5 5 5
GROUND FLOOR SECOND FLOOR THIRD FLOOR
SEWERLINE LAYOUT SEWERLINE LAYOUT SEWERLINE LAYOUT
SCALE 1:60M SCALE 1:60M SCALE 1:60M
PLUMBING/SANITARY ENGINEER PROJECT TITLE OWNER SHEET CONTENTS SHEET NO.
PROPOSED CONSTRUCTION OF THREE STOREY RESIDENTIAL BUILDING 2
SEWERLINE LAYOUT
P2 6
PROJECT LOCATION AISHA MAUNTING ALONTO GENERAL NOTES/LEGENDS AND SYMBOLS 21 25
LOT 23 BLOCK 76 PHASE 2 XAVIER ESTATE UPPER BALULANG CAGAYAN DE ORO PLUMBING