0% found this document useful (0 votes)
292 views1 page

APQP Example

The document outlines the status of various elements in the Phase APQP process, detailing the owner, planned and actual dates, and remarks for each task. Key tasks include customer requirements, feasibility study, design and process FMEAs, and PPAP submission, with some completed and others in progress or not started. The planned dates range from January to February 2025.

Uploaded by

Dinesh raja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
292 views1 page

APQP Example

The document outlines the status of various elements in the Phase APQP process, detailing the owner, planned and actual dates, and remarks for each task. Key tasks include customer requirements, feasibility study, design and process FMEAs, and PPAP submission, with some completed and others in progress or not started. The planned dates range from January to February 2025.

Uploaded by

Dinesh raja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PhaseAPQP Element Document Name Owner Status Planned Date Actual Date Remarks

1 Customer Requirements
Customer Specs Sheet Sales Engineer Completed 01-Jan-2025 02-Jan-2025 Updated

1 Feasibility Study Feasibility Checklist Design Engineer Completed 05-Jan-2025 05-Jan-2025 OK for m

2 Design FMEA [Link] Quality Engineer In Progress 10-Jan-2025 TBD Meeting s

3 Process Flow [Link] Process Engineer Completed 15-Jan-2025 14-Jan-2025

3 Process FMEA [Link] Quality Engineer In Progress 18-Jan-2025 TBD Review w

3 Control Plan [Link] QA Manager Not Started 20-Jan-2025 TBD

4 Production Trial Run Run@Rate Report Production Lead Not Started 25-Jan-2025 TBD

4 Measurement System MSA


Analysis
[Link]
(MSA) Quality Engineer Completed 22-Jan-2025 23-Jan-2025 GR&R do

4 PPAP Submission PPAP Level 3 [Link]


SQE Not Started 30-Jan-2025 TBD Waiting fo

5 Lessons Learned Feedback [Link] Project Manager Not Started 05-Feb-2025 TBD