Cp4197002 Ppap New
Cp4197002 Ppap New
4 DFMEA NA
5 PFD YES
6 PFMEA YES
13 AAR NA
18 PSW YES
Operation OUTSOUC
Operation Inspection Storage Move Special
Operation Cum Insp. E
S. No Characteristics
Description
(if any)
Receiving of 10
10
Raw Material
Insp. of Raw 11
11
Material
12
Storage of Raw
12
Material,
PRE MACHINING
20
1ST SET UP 20
PRE MACHINING
30
2ND SETUP
30
TURNING 1ST
40
SETUP
40
TURNING 2ND 50
50
SETUP
60 GRINDING
60
70 SIOT MILLING
70
80 DEBURRING 80
90 PLATING
90
91 Insp. of Plating 91
112 Dispatch
112
Legend
Symbols Activity Definition
When something is done to or by the subject being followed at a
Operation
changed added to or created.
Move When something is moving or being moved from one workspace
Inspection Operation Cum When something is being produce and inspected itself.
m REV. NO. :- 01
Org. DT. :- 31.03.2015
Customer Name
Key Product
Key Process Characteristics
Characteristics
Quantity/Weight as per
N/A
challan/Po.
No damage N/A
Outsource N/A
No damage, &
deformation during As per Work Instruction
transportation
Definition
o or by the subject being followed at a given work area. Something is being
ed.
g or being moved from one workspace or location to another.
produce outside
Approved BY:-
CUSTOMER : M/s. Continental Engines Limited PAR
DIA.
Function and Fitment Problem at
OP-60 GRINDING Ø20+0.075~Ø20+0.095 Dia U/S & O/S
customer end
S O
E C
POTENTIAL CAUSE(S) OF CURRENT PROCESS CONTROLS
POTENTIAL EFFECTS OF FAILURE V C
FAILURE PREVENTION
Function and Fitment Problem at (1) Setting not proper (1) Training plan should be made
6 2
customer end (2) Machine Variation (2) Machine preventive Maintainance
(3) Wrong Offset should be made
A type controls - Controls that Detect the failure mode after it happens
B type control - Controls that Detect the cause when it happens and in- turn prevents
C type control - Controls that prevent the cause
) Effects on next process
Incoming Inspection 5 70
er it happens
appens and in- turn prevents the failure mode
CHANGE
APPROVED BY:
CP4197002
14.04.2022
00/---
ACTION RESULTS
O D R
C E P
C T N
C/Plan No : - CP/CP4197002
CONTROL PLAN
Rev. No. : - 01
Prototype Pre Launch Production Org. Date : - 31.03.2015
Customer Name : - M/s. Continental Engines Limited. Mr. Hariom Sharan Approval/Sign./Date (If Req.)
Key Contact / Phone: -
Part Description : - SPACER DISTRIBUTION PIPE Mr. Kamal Supplier Plant Customer Engg. Customer Q.A
Part No. : – CP4197002
Core Team: - Mr.Hariom sharan,Mr. Kamal, Mr. Debender
Latest Drg. Change- '03 / Date - 17.07.2015
Characteristics Methods
Process Name / Machine, Sample
Part/ Special Char. Evaluation /
Operation Device, Jig, Product / Process Specification / Reaction Plan
Proc # Product Process Class. Control Method
description Tools For Mfg. Number Tolerance
Measurement Sample Sample
Technique Size Freq.
Verification As per
Receiving of raw No damage & deformation of Each Put Reject Tag & Material Send
10 Manual 1 Quantity & Packaging of Quantity N/A Visual Sampling As Per Instruction
material packing & product. Lot back to supplier.
& Packaging Plan
Each
2 OD N/A Ø 22±0.2 DVC
Lot
Third Party
5 Elongation 8% min
inspection
ANTI-RUST TREATMENT
Y2000- STD121-0004
Color-Bright Passivation
1 PLATING Time Until Basis Metal Supplier Test
Corrosion Appears-1.5 Report Inprocess Line Report To Incharge
Weeks(252 Hrs Min) Inspector Immediately
90 PLATING Outsourced
ANTI-RUST TREATMENT
Y2000- STD121-0004
Color-Bright Passivation
1 PLATING Time Until Basis Metal Supplier Test
Corrosion Appears-1.5 Report
Weeks(252 Hrs Min)
As Per Sampling Report To Incharge
91 INSPECTION OF PLATING Incoming Inspector
Plan IS2500 Immediately
∅20+0.120/+0.080
3 OD -------------- ARG
As Per Sampling Report To Incharge
100 FINAL INSPECTION Final Inspector
Plan IS2500 Immediately
4 PLATING THICKNESS 8-12 MICRON DFT METER
110 PACKING
Month & Year Code Shold Be Each Report To Incharge
VISUAL 1 N/A Visual 100%
111 STORAGE Available Lot Immediately
112 Dispatch
PREPARED BY:- CHECKED BY:- APPROVED BY:-
PMT/ENGG/F/006-00:10-JAN-2018
.PMT INNOTECH PVT. LTD
GAGE R&R(V
Part Number Gage Name Appraiser A
3 10 3
APPRAISER/ PART
TRIAL # 1 2 3 4 5 6 7 8 9
AVE 20.102 20.098 20.099 20.102 20.102 20.101 20.102 20.103 20.102
AVE 20.100 20.101 20.102 20.102 20.098 20.099 20.102 20.102 20.101
AVE 20.102 20.102 20.102 20.098 20.102 20.098 20.099 20.102 20.102
PART
AVE ( Xp ) 20.10 20.10 20.10 20.10 20.10 20.10 20.10 20.10 20.10
(Max x - Min x) =
R x D4* =
R x D3* =
PREPARED BY : CHECKED BY
Format No. PMT/ENGG/F/00
GE R&R(VARIABLE)
Rev No. 00
Date 10.01.2018
Reviewed Quality Head
Approval Quality Head
SPACER DISTRIBUTION
Sunil MM-01 0-25 Sunil
PIPE
Appraiser C Characteristic Specification GAGE TYPE L.C. Appraiser C
31.03.2015 3 10 3
UCLR= 0.001
LCLR= 0.000
ED BY APPROVED BY:
PMT/ENGG/F/008
00
10.01.2018
Quality Head
Quality Head
Appraiser A
Amit
Appraiser B
Sunil
Appraiser C
Bippin
Appraisers Date Performed
3 31.03.2015
% Tolerance (Tol)
= 100 (EV/TV)
= 0.00353
= 100 (AV/TV)
= 100(0.000/6.700)
= 0.00
n = number of parts
r = number of trials
= 100 (R&R/TV)
= 100(0.000/6.700)
= 0.004
Gage System OK
= 100 (PV/TV)
= 100(0.001/6.700)
= 0.01
= 5.17
QA - Inspection Standard / Report
Customer/Supplier’s Name : - M/s. Continental Engines Limited. Date : - 31.03.2015
Part Name : - SPACER DISTRIBUTION PIPE Lot Qty. : - 05 nos.
Part No : - CP4197002 Sample Qty.-05 NOS.
Bill / Invoice No. / Date : - VARIABLES QTY.
Your's P.O. No.:
S.
Observation
Parameter Specification Insp. Method
1 2
No
A Appearance Report
Free from dent,
A1 Appearance damage, and Visual OK OK
sharp edges
B Dimensional Report
B1 DIM 2±0.2 DVC 2.02 2.03
B3 ROUGHNESS 3.2 RT OK OK
B4 PERPENDICULARITY 0.2 A H.G 0.12 0.13
B5 TOTAL LENGTH 80±0.5 DVC 80.02 80.04
B6 2x CHAMFER 1±0.2x45° H.G 1.1 1.2
B7 PERPENDICULARITY 0.2 A H.G 0.12 0.13
B8 ID Ø14±0.3 DVC 14.1 14.2
B9 2x RADIUS 1±0.2 CONTRACER 1.15 1.2
EN1A WITHOUT
B10 Material Third Test certificates
LEAD
C-0.14% max,Si-
0.05% max, Mn-
B11 Chemical composition 0.9-1.3%,P-0.11% Third Test certificates
max, S-0.27-
0.33% max
Action Taken
Prepared By Checked By
PMT/ENGG/F/02-00-10 JAN 2018
Report No.: -
ard / Report Sample Insp.
Pilot Insp.
31.03.2015 Final Insp.
: - 05 nos. PRD Insp.
Sample Qty.-05 NOS. Layout Insp.
ATTRIBUTES QTY. Other
Observation
Judgement
3 4 5
OK OK OK OK
OK OK OK OK
0.12 0.1 0.12 OK
80.03 80.03 80.04 OK
1.15 1.11 1.2 OK
0.12 0.1 0.12 OK
14.15 14.2 14.1 OK
1.01 1.13 1.1 OK
est certificates OK
est certificates OK
est certificates OK
est certificates OK
est certificates OK
est certificates OK
est certificates OK
est certificates OK
Accepted OK OK
Rejected
Accepted as Deviation
seggregate
Sent to Vendor
Approved By
STATISTICAL PROCES
PART NAME: SPACER DISTRIBUTION PIPE INSTRUMENT: MICROMETER
PART NO & MODEL.: CP4197002 SPECIFIC: 20.000
SAMPLE SIZE: 50 NOS OPERATION: CNC SET UP
DATA COLLECTION: -
Sr.NO. 1 2 3 4 5 6 7
1 20.11 20.11 20.09 20.09 20.09 20.09 20.10
2 20.10 20.10 20.10 20.09 20.09 20.09 20.11
3 20.09 20.11 20.09 20.09 20.09 20.09 20.10
4 20.11 20.11 20.11 20.09 20.09 20.09 20.11
5 20.10 20.10 20.09 20.09 20.09 20.09 20.10
CALCULATIONS: -
FOR HISTOGRAM
XLARGE 20.1100 20.1100 20.1100 20.0900 20.0900 20.0900 20.1100
XSMALL 20.0900 20.1000 20.0900 20.0900 20.0900 20.0900 20.1010
RANGE 0.0200 0.0100 0.0200 0.0000 0.0000 0.0000 0.0090
AVG. 20.1020 20.1060 20.0960 20.0900 20.0900 20.0900 20.1046
Process Width ( P ) = 0.0200 Specification Width(S) =
Design Centre ( D ) = 20.1000 Interval =
Starting Point = 20.0900 No. of readings=
0
6.964 6.972 6.98 6.988 6.996 7.004 7.012 7.02 7.028 7.036 7.044 7.052
6.956 6.964 6.972 6.98 6.988 6.996 7.004 7.012 7.02 7.028 7.036 7.044
8 9 10 SAMPLE d2
20.10 20.11 20.10 1 --
20.11 20.10 20.11 2 1.128
20.11 20.10 20.11 U.S.L. 20.0800 3 1.693
20.10 20.11 20.10 4 2.059
20.11 20.10 20.11 5 2.326
6 2.534
7 2.704
8 2.847
9 2.97
L.S.L. 20.1200 10 3.078
11 3.173
12 3.258
13 3.336
L.C.L.
20.1020 20.1060
20.0996
6.975 20.0996 20.0996 Row 34 20.1060 20.1100
6.97
0.0086 1 20.0086
3 4 0.0086
5 6 7 8 9 10 20.1100 20.1140
20.1140 20.1180
20.1180 20.1220
0.045 R - CHART
0.04 20.1220 20.1260
0.035
0.03 U.C.L.XBAR =
0.025 RANG
0.02
E
U.C.L.
L.C.L.XBAR =
.052
0.015
.044
0.01
L.C.L.
U.C.L.RBAR =
R-BAR
0.005 L.C.L.RBAR =
0
1 2 3 4 5 6 7 8 9 10 Std.Dev."s"=
Cp=(S/6s)=
A2 D4
-- --
1.880 3.267
1.023 2.575
0.729 2.282
0.577 2.114
0.483 2.004
0.419 1.924
0.373 1.864
0.337 1.816
0.308 1.777
0.285 1.744
0.266 1.717
0.249 1.693
100 NOS.
50 NOS.
50 NOS.
FREQ. CU. FREQ.
0 0
0 0
0 0
19 19
0 19
0 19
15 34
0 34
16 50
0 50
0 50
0 50
20.10174
20.09746
0.0145597999999998
0
0.00370
1.80770
1.77160
Format No.:-PMT/ENGG/F/017
PMT INNOTECH PVT. LTD.
Rev. No.:- 01
Material EN1A
MSA Study
S. No Instruments / Gauge Ident. No. Range L.C. Calibration Date Calibration Due Date
YES/NO
4 ROUGHNESS TESTER
5 CONTRACER
10
4 Strength :- N/A X
5 Tranportation: - . By Road
Symbol :-
Shown on Drawing No. CP4197002 Purchase Order No. CS22-23-00443 Weight(kg) 0.097
SUBMISSION INFORMATION
SUPPLIER MANUFACTURING INFORMATION
Supplier Name & Supplier Code: PMT INNOTECH PVT LTD/0182
✘ Dimensional ✘ Materials / Functional ✘ Appearance
Opp. – Inderprasth colony (Sec-49) Badkhal – Pali road
Bhakri, Faridabad - 121005 (Haryana) INDIA, Customer Name / Division M/S Continental Engines Ltd.
Street Address
Note: Does this part contain any restricted or reportable substances Yes ✘ No
Are plastic parts identified with appropriate ISO marking codes Yes ✘ No
SUBMISSION RESULTS
The results for ✘
dimensional material and appearance statistical process
✘ ✘ ✘
measurements
These results meet all drawing requirements: functional tests Nocriteria (If "No" - package
Explanation
✘ Yes
Mold Cavity / Production Process Machining Required)
DECLARATION
I hereby affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable
Production Part Approval Process Manual 4Th Edition Requirements. I further warrant these samples were
Produced at the production rate of 250 Parts /8 hours. I have noted any deviations from this declaration below.
EXPLANATION / COMMENTS:
Print Name Mr. Aviral Rajwanshi Title Plant Head Phone No. 8826686658 FAX No. N/A
Supplier Authorised Signature Date 5/22/2022
Material