0% found this document useful (0 votes)
16 views1 page

Fittings Notes

The document outlines specifications for construction materials and methods for a reservoir project, including requirements for steel fittings, flanges, and concrete finishes. It emphasizes the need for inspections and approvals by engineers at various stages of construction, as well as specific guidelines for reinforcement and environmental considerations. Additionally, it includes references to detailed drawings for further clarification on installation and connection points.

Uploaded by

manzi gratien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Fittings Notes

The document outlines specifications for construction materials and methods for a reservoir project, including requirements for steel fittings, flanges, and concrete finishes. It emphasizes the need for inspections and approvals by engineers at various stages of construction, as well as specific guidelines for reinforcement and environmental considerations. Additionally, it includes references to detailed drawings for further clarification on installation and connection points.

Uploaded by

manzi gratien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GENERAL NOTES:

1. ALL SPECIAL FITTINGS SHALL BE MADE OF STEEL API 5LX42 WITH WALL
THICKNESS 6mm OR AS SPECIFIED.
2. ALL FLANGES SHALL BE TO SABS 1123 TABLE 1000/3.
3. ALL BOLTS ON STAINLESS STEEL PIPES AND NUTS SHALL BE STAINLESS
SQUARE TRASH FRAME STEEL.
A SEE (DETAIL A) ON
DWG:JW14289-701 FOR
A 4. ALL CO-ORDINATES, DIMENSION AND LEVELS MUST BE VERIFIED BY THE
CONTRACTOR ON SITE BEFORE ANY WORK COMMENCES. ANY
DETAILS DISCREPANCIES MUST BE DISCUSSED WITH THE ENGINEER.
5. FINISHES
750 400 5.1. ALL CONCRETE BELOW GROUND LEVEL - F1

1 5.2. ALL CONCRETE ABOVE GROUND LEVEL - F2


760
6. ALL EXCAVATIONS MUST BE INSPECTED AND APPROVED BY THE
ENGINEER BEFORE ANY CONCRETE IS CAST.
7. STAINLESS STEEL TO BE OF GRADE 316

OUTLET ISOLATION
VALVE CHAMBER GENERAL NOTES (Concrete):
SEE DRAWING :
1. ALL REINFORCEMENT MUST BE INSPECTED AND APPROVED BY
JW14289-309 THE ENGINEER BEFORE ANY CONCRETE IS CAST.
2030

2 11 3 6 2. COVER TO REINFORCEMENT MUST BE 40 mm.


3. WHERE JOINTS ARE MADE IN THE ROOF SLAB, U-BARS MUST BE
USED TO JOIN TOP AND BOTTOM REINFORCEMENT IN ROOF SLAB.
4. CONTRACTOR SHALL ADVISE THE ENGINEER ABOUT THE ACTUAL
DEPTH FOR EACH INSTALLATION SO THAT REINFORCEMENT
DETAILS AND BENDING SCHEDULES CAN BE ISSUED.
5. ALL EXPOSED CORNERS TO BE CHAMFERED.
6. FOR CHAMBERS LOCATED IN AGGRESSIVE ENVIRONMENT (ACIDIC) THE
FOLLOWING SPECIFICATION TO BE USED.
6a. SULPHATE RESISTANT CEMENT TO BE USED.
CONNECTION TO STORMWATER MANHOLE 6b. DOLOMITE AGGREGATES OR SIMILAR FOR pH RESISTANT
SEE DETAIL DRAWING : JW14289-002 AGGREGATES TO BE USED.
4060 7. ALL ENCASED PIPES TO BE WRAPPED PRIOR TO ENCASEMENT BY AN
ENGINEER APPROVED WRAPPING MATERIAL.
8. NO REBAR TO TOUCH ANY PIPE.

CONNECTION TO STORMWATER MANHOLE


SEE DETAIL DRAWING : JW14289-202
SCOUR SECTION B-B
Scale 1:25
6 13

CONDUCTIVITY PROBE INSTALLED ON OVERFLOW PIPE 12


1200

4714
10
350

9 7 4
TYPICAL
INSULATING
Ø7
60
1200

8 GASKET MANHOLE
SEE DWG:
JW14289-310
350

E E
702 702

4000
NB. SEE DWG:JW14289-702 FOR PIPE NUMBER SCHEDULES

1
350

11 3 6

B B
1200

OUTLET ISOLATION
VALVE CHAMBER
350

SEE DRAWING :
SECTION PLAN A-A JW14289-309
(OVERFLOW & SCOUR CHAMBER)
Scale 1:25

DESIGNED L.D.J 20.07.2015 APPROVED


SCALE REV: AMENDMENTS DATE: DRAWING-No. JW14289-703-REV-T
DRAWN C.K 20.07.2015

CHECKED L.D.J 07/10/2019


17 HARRISON STREET AS SHOWN T ISSUE FOR TENDER 27/11/2015

APPROVED BY:
MARSHALLTOWN AS SHOWN T ISSUE FOR TENDER 08/06/2021
K. GOVENDER
SIGNATURE DATE
2107 AS SHOWN T FOR TENDER & NEW PROJECT NUMBER 15/09/2021 JW14289 703 T
Previously: ECSA REG. No. 201470227 DRAWING No. REV.
PROJECT No.
UWP CONSULTING (Pty) Ltd

P.O.Box 25549
CHECKED
TEL: (011) 688-1542 JW14289 : CONSTRUCTION OF 22 ML WOODMEAD RESERVOIR A1
Monument Park APPROVED BY:
SHEET
1 OF
1
0105 T. KABINI FAX: (011) 688-6604 RESERVOIR SCOUR AND OVERFLOW DETAILS ORIGINAL PAGE SIZE
TEL: +27 (0) 12 424 9700 SIGNATURE DATE FILE No.
FAX: +27 (0) 12 460 4071
ECSA REG. No.

You might also like