The JBBC Fire Protection and Prevention Plan outlines guidelines for recognizing, reporting, and controlling fire hazards at a glamping site, ensuring compliance with OSHA regulations. Responsibilities are assigned to project personnel for training, monitoring flammable materials, and maintaining fire safety equipment. The plan includes procedures for evacuation, fire extinguishing systems, and training on fire hazards, along with appendices detailing potential fire hazards and prevention methods.

Uploaded by

arshath.md95
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views10 pages

24.fire Protection Prevention Plan

The JBBC Fire Protection and Prevention Plan outlines guidelines for recognizing, reporting, and controlling fire hazards at a glamping site, ensuring compliance with OSHA regulations. Responsibilities are assigned to project personnel for training, monitoring flammable materials, and maintaining fire safety equipment. The plan includes procedures for evacuation, fire extinguishing systems, and training on fire hazards, along with appendices detailing potential fire hazards and prevention methods.

Uploaded by

arshath.md95
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT FIRE PROTECTION PREVENTION DETECTION PLAN

PROJECT: GLAMPING SITE – CIVIL, MEP & TENTS INSTALLATION WORKS

Prepared by: Reviewed by: Approved by:

MOHAMED ARSHATH RAJA PANDIAN RAJENTHIRAN PROJECT MANAGER


I. Purpose

The JBBC Fire Protection and Prevention Plan is to provide faculty, staff and
workforce with information and guidelines to recognize, report and control fire
hazards in accordance with Occupational Safety and Health Administration (OSHA)
29 Code of Federal Regulations (CFR) 1910.38.

II. Responsibilities

Project Incharge, Project Co-Ordinator, HSE Professionals, Site Team: Charge Hand, Foreman’s
Evacuate the building with sound of fire alarm, Emergency Whistle
and/or with verbal command(s)
• Ensure Site, staff, and Work force are trained on procedures, evacuation
routes and assembly areas.
• Ensure fire doors are always closed unless on a magnetic system(if any Maintenance
Works)
• Closely monitor the use and storage of flammable materials in the
site.
• Ensure flammable materials storage areas are properly maintained.
HSE Professionals
• Ensure fire suppression systems are inspected and maintained.(if available)
• Ensure fire alarm systems are inspected and maintained (if available)
• Ensure exit signs and emergency lights are periodically inspected and
operated properly.
• Ensure fire extinguishers are inspected monthly by visual inspection and
annually by a certified inspector.

JBBC Employees and Work force


• Evacuate the building with sound of fire alarm, Emergency
Whistle and/or with verbal command(s)
• Use, store, and transfer flammable materials in accordance with the
training provided.
• Control accumulation of flammable and combustible materials in offices, and
storage areas through proper housekeeping.
• Know how to report fires, hazardous chemical spills and other emergencies.
• Know evacuation routes, assembly areas, and Emergency Evacuation procedures.

III. Potential Fire Hazards

See Appendix A for the most common causes of fire and their associated hazard
prevention methods.

IV. Notification and Evacuation Procedures

In the event of a fire, explosion, or other emergency, call 997 from a safe location.
Evacuate the building if necessary by pulling the fire alarm, and call Security or JBBC
Fire Warden (Akhlan: +971569275528, Mohamed Arshath : +971501996945)

All occupants must evacuate a building when designated to Muster point and must
proceed to the assigned assembly area for the building. Reference the Emergency
Evacuation plan. Appendix

V. Fire Extinguishing Systems

Portable fire extinguishers are located in every building Area which was Same
Mentioned in the EEP.
• Refer to Appendix B for procedures on how to use a fire extinguisher (only
provided for awareness training.)
• Refer to Appendix C for a fire extinguisher selection guide.

Automatic fire sprinkler systems must be properly maintained according to the


manufacturers’ recommendations if it is Applicable. Refer to Appendix D for the
requirements.
VI. Maintenance

If an extinguisher needs service, it is sent to a contractor for repair or refilling.

Extinguishers are also on schedule for hydrostatic testing.

I. Flammable Material Handling and Storage

All flammable and combustible materials must be handled and stored in a safe
manner. Refer to Appendix E for definitions on flammable and combustible
materials. Minimize the amount of flammable liquids in the lab or shop. Excess
flammable materials may increase the risk of a fire or dangerous spills.

Store flammables in a UAE Approved flammable storage cabinet. Flammables must


be stored away from strong oxidizers, such as most strong acids. On a benchtop,
limit flammable liquids to only those for immediate use.

Always bond metal containers to metal receivers when transferring large


volumes of flammable liquids or gases.

Areas that contain flammable materials must follow the guidelines as per the DM
regulations and Building Code of practices for storage amounts. See Appendix F
for storage of flammable materials.

II. Housekeeping

All Contractors are responsible for routine clean-up of work areas. This includes
maintaining proper storage requirements, removal of flammable and/or
combustible materials, eliminating all fire ignition sources, etc. See Appendix A
for-fire hazards and precautions.

III. Training

Each new employee is trained on fire hazards.


Appendix A- Potential Hazards and Prevention Methods

Hazard Precautions
Overloaded electrical circuits, • Do not use Naked Wire or Looped Wires, Use Industrial Socket as per the
unsafe wiring and defective Safety procedure for electrical devices.
extension cords – all locations • Follow the colour coding of the Socket yellow 110 V, blue 230 V and red 440 V
Connect both side a Same Colour female and Male
• Regular inspection for the Electrical power tools and DB
• All portable generators must be in a working condition and inspected.
Smoking • Inside the Site Premises only allowed Smoke in the designated Areas
• Do not throw the Smoking buds or fire with out off in the floor areas
• Smoking Areas should be full covered and Signages required, and Free from the
combustible materials or Flammable Chemicals
Waste Management
• Keep garbage bins and flammable waste (e.g., cardboard, wood) away from
arson
buildings.
Fire • Empty bins regularly.
• Secure skips and waste containers with lockable lids.
Storage of Flammable Materials
• Store fuel, chemicals, and flammable liquids in secure, well-ventilated areas.
• Use fire-resistant cabinets for indoor storage.
• Limit the quantity stored on-site.

Welding, Cutting, Grinding • Before starting the activity of any fire related work must acquire the Permit from the
permit issuer
• All personnel should be trained for the power tools operations
• Incase of any welding / Gas cutting Activity need a Separate 3rd party training
• While doing the Hot Work activity: Separate fire blanket must be use , Required
Fire Extinguisher is mandatory, Water bucket should be next to the activity Area ,
Fire Blanket must be covered to avoid the Spreading of fires , Do not Stack the
Combustible Materials next to the welding Activity area, Suitable PPE.
• For Gas Cutting: Ensure the above precautions and additionally all cylinders must
be in the trolley with chain , Nozzle Cap , NRV in the torch, Soap liquid , and
Suitable PPE.
Improper use, storage and • Any flammable materials should be properly stored in a flammable
handling of flammable materials cabinet along with the recommendations of MSDS.
such as gasoline, solvents, • Ensure the Suitable Fire protection and prevention method
flammable chemicals, flammable • Provide Suitable Fire Extinguisher
gases, and paints As per the Site observations and Breaches : Do not stack the Flammable
materials such as Diesel , Gasoline does not store inside the site premises.
Poor housekeeping which • Keep all combustibles away from heat sources.
results in accumulation of • Recycle or throw away empty boxes, packing material and papers that are no
combustible materials such as longer needed.
paper, boxes, oil-soaked rags, • Place rags in a metal container and empty it every night.
and flammable liquids – all
buildings
Gas cylinders – Laboratories, • Must be stored upright and secured with chains or straps.
welding shops and labs • Caps must be replaced when gauges are removed.
• Keep away from heat and direct sunlight.
Appendix B: How to use a Fire Extinguisher
(Informational Purposes Only)

In the event of a small fire, and a fire extinguisher is used on a voluntary basis, follow these procedures:

• Always be in a position to exit at any time.


• If the fire isn’t out at this point, evacuate.

In Case of any Fire Emergency

Sl.no Name Designation Phone Number


1. Raja Pandiyan rajenthiran Project incharge +971566883381
2. Naseeb Project co-ordinator +971569909262
3. Mohamed Arshath HSE Officer +971501996945
4. Ahklam Site Supervisor +971563984405
5. Raja Ganesh Electrical Engineer +971502535503
6. Salman Sheik Mechanical Engineer +971504842496

Ambulance 998
Fire 997
Police 999
Electricity 991
Appendix C: Fire Extinguisher Selection Guide

Do not attempt to use a fire extinguisher if any of the following are met:
• Not trained,
• Have no escape route – call for help,
• Don’t know what is burning,
• The fire is spreading rapidly,
• Don’t have the appropriate equipment,
• The extinguisher is ineffective,
• Inhale toxic smoke, or
If drums, cylinders or chemicals are involved
Appendix D: Definitions

The OSHA Standard defines a flammable liquid as any liquid having a flashpoint below 100
degrees (o) Fahrenheit (F), except any mixture having components with flashpoints of 100oF
or higher, the total of which make up 99% or more of the total volume of the mixture. OSHA
further breaks down flammables into Class I liquids:
• Class A includes liquids having flashpoints below 73oF and boiling points below 100oF.
• Class B includes liquids having flashpoints below 73oF and boiling points above 100oF.
• Class C includes liquids having flashpoints at or above 73oF and boiling points below
100oF.

Flashpoint is defined as the minimum temperature at which a liquid gives off enough vapor
to ignite in the presence of an ignition source. The risk of a fire requires that the temperature
be above the flashpoint and the airborne concentration be in the flammable range above
the Lower Explosive Limit (LEL) and below the Upper Explosive Limit (UEL).

The OSHA Laboratory Standard defines a combustible liquid as any liquid having a flashpoint
at or above 100oF, but below 200oF, except any mixture having components with flashpoints
of 200oF, or higher, the total volume of which make up 99% or more of the total volume of
the mixture. OSHA further breaks down combustibles into Class II and Class III liquids:
• Class II includes liquids with flashpoints at or above 100o F and below 140o F.
• Class III includes liquids with flashpoints at or above 140oF and below 200o F.
• Class III includes liquids with flashpoints above 200o F
Fire Detection:

1. Manual Fire Watch


• Trained personnel perform regular patrols to monitor fire-prone areas, especially during and after hot works.
• A fire watch is required for at least 30-60 minutes after hot works is completed.
• Logbooks or checklists should be used to document fire watch rounds if it is necessary
2. Automatic Smoke and Heat Detectors (Temporary) if it is necessary
• Install temporary battery-powered or hard-wired smoke/heat detectors in key areas like:
o Temporary site offices
o Worker accommodations
o Material storage areas
• Choose detectors suitable for construction dust environments (heat detectors are preferred in dusty areas).
3. Fire Detection Alarm Systems (Temporary Alarms)
• Use temporary fire alarm systems with manual call points, bells or sirens that can be easily relocated.
• Interconnect alarms across different parts of the site to alert everyone in case of fire.
4. Hot Works Permit and Supervision
• Implement a hot works permit system for welding, cutting, and grinding.
• Ensure fire-resistant blankets, fire extinguishers, and supervision are present during such operations.
5. Thermal Imaging Cameras / Drones (Advanced Method)
• Periodic inspection using thermal cameras or drones to detect abnormal heat sources.
• Especially helpful for large-scale construction sites or during shutdown periods.
6. CCTV Monitoring with Fire Detection Software
• Install CCTV systems with built-in AI-based smoke/flame detection algorithms in critical areas.
• Can be integrated with alarm systems and mobile alerts

Supporting Measures for Effective Detection


• Clear access to fire alarms and detection devices at all times.
• Weekly testing of fire alarms and detection devices.
• Monthly inspections of fire extinguishers and fire watch logs.
• Fire drills conducted monthly or at least quarterly, depending on site size.
KEY PLAN:
SHEET 07 of 07 SHEET 02 of 07 SHEET 01 of 07

MATCH SHEET 02 of 07

MATCH SHEET 07 of 07

MATCH SHEET 01 of 07

MATCH SHEET 02 of 07
MATCH SHEET 06 of 07 MATCH SHEET 03 of 07

MATCH SHEET 07 of 07 MATCH SHEET 02 of 07


SHEET 06 of 07 SHEET 3 of 07

ENTRANCE
18
17
16
15
14
GUARD

13
PLOT LIMIT

12
11
10
HOUSE

09

MATCH SHEET 03 of 07

MATCH SHEET 06 of 07
07 08
06
05
03 04
02
01
PLO
T LIM
IT MATCH SHEET 05 of 07

MATCH SHEET 06 of 07

SHEET 05 of 07
MATCH SHEET 04 of 07

MATCH SHEET 03 of 07

SHEET 4 of 07

+15.40m
PLO
T LIM
+15.20m +15.20m +15.40m +15.40m IT 10% SLOPE

10%
SLOPE

10%
SLOPE
+15.20m

BBQ
GRILL

WORKING GOING ON OTHER

MATCH SHEET 04 of 07

MATCH SHEET 05 of 07
+15.20m
+15.70m
TENT
SUBCONTRACTORS
+15.20m

DN
8%

+15.40m
8%

BB

+15.20m
Q
GR
IL
L
V06-19 EXIT +15.40m
G+1
+15.40m

BBQ
+15.30m DMD +15.20m
+15.20m +15.40m

GR
ILL
+15.40m

PARKING
+15.40m
TENT GENERAL NOTES:
08 V06-18
+15.20m G+1
+15.40m +15.70m
IFU

+15.20m +15.40m
FEC

+15.20m +15.40m

ELV M PLUNGE +15.20m


+15.40m BBQ GRILL

O POOL
RO TENT
+15.40m
M V06-17
. ROO +15.40m

ELE TENT +15.40m


+15.70m +15.20m
T
+15.15m DMD CKE
PO STATIO
N
+15.20m
V04-20
SUB 17614
4
ENSE
PLAYS N 302
DESIG DB
DB
PLOT LIMIT
shade structure & play equipment
PARKING
SINGL
WAVE
E
SLIDE
SMDB

+15.20m DRAWING REFERENCES:


+15.40m
to be remove
07 (client to confirm) PLAY
DESCRIPTION DWG. REF. NO REV.

DOUB 16407
SPRINLE BOBB
+15.20m
AREA-5

G RIDER LE
+15.20m

5
+15.40m +15.40m GFL
+15.40m +15.70m
+15.20m
+15.15m DMD
PLUNGE
LE
DOUB
SLIDE

+15.20m
POOL FOSSIL HUNT +15.20m

BBQ
+15.40m
TENT

GR
BBQ
+15.40m
PARKING

ILL
+15.40m +15.20m

GR
TENT V06-37

ILL
+15.40m
06 +15.70m FLOATING TENT
+15.40m V06-16 +15.20m
FV06-08
+15.20m +15.70m +15.40m
POCKET BOX
SUBSTATION
PLUNGE
POOL +15.20m BB
Q GR +15.40m
ILL +15.20m +15.40m
+15.20m

BBQ
+15.20m
TENT TENT

GR
ILL
WORKING GOING ON JBBC
LIFTING
ST. 2 +15.40m V06-15 +15.40m V06-36 +15.40m
+15.20m
+15.00m DMD +15.70m
+15.40m +15.40m +15.20m
+15.70m
PLUNGE
PARKING POOL
+15.40m
YOU PARKING 05 BB
Q GR
IT

BBQ
+15.20m
LIM
ILL

GR
ARE 04

ILL
OT
+15.20m

HERE +15.20m +15.40m


1761
66
E +15.40m +15.40m PL
TENT
SENS
PLAY GN 403
+15.70m
shade structure & play equipment DESI

PLUNGE +15.20m TENT +15.70m


to be remove (client to confirm)
+15.00m DMD
POOL V06-35 +15.70m
+15.40m
V06-14 PLAY DOUB
LE

NTRY
SWIRL
SLIDE

AREA-4
+15.40m GFL
+15.20m
PARKING
E +15.20m
03
+15.20m
FEC IFU
DB SMDB

FLOATING TENT
+15.40m

EXIT
+15.20m

BBQ
+15.40m +15.40m +15.40m FV06-07

GR
+15.00m DMD TENT

ILL
+15.40m

+15.20m V06-13 +15.40m


+15.70m
PARKING +15.20m
+15.20m
02 +15.40m
+15.20m
+15.20m
+15.20m

DRINKING
+15.40m +15.20m
+15.40m
+15.40m PLUNGE +15.40m BBQ GRILL

+15.20m
POOL +15.70m
+15.70m
+15.20m +15.40m

+14.97m DMD
+15.20m +15.70m TENT
V06-12 +15.40m
UNIT TENT
V04-18
TENT
V04-19 TENT
+15.70m

TENT

IFU
BBQ GRILL

PARKING +15.40m +15.20m BBQ GRILL


V06-34

FEC
+15.20m +15.20m
V06-11

EDB
01 +15.40m
+15.70m
+15.20m
+15.20m
+15.243m FRL +15.20m
+15.40m +15.40m
+15.40m

BBQ GRILL
+15.20m
PLUNGE
+15.20m POOL +15.20m +15.20m
TENT +15.40m +15.40m
+15.40m +15.20m
+15.70m +15.20m
V04-03 +15.70m
+15.40m +15.40m +15.20m

+15.20m +15.70m
+15.40m
BBQ

RH
RH
GRILL
+15.70m
TENT TENT

STR
+15.40m
+15.20m +15.40m
+15.40m shade structure & play equipment
TENT

BBQ GRILL
+15.40m to be remove (client to confirm)
+15.20m
V04-16 V04-17
+15.20m
BBQ GRILL +15.20m BBQ GRILL V06-33
PLAY
ILL
Q GR

+15.20m
TENT BB
+15.40m

V06-10 +15.40m AREA-3


+15.40m GFL +15.20m
+15.20m +15.70m
DB

TENT EDB SMDB 600

+15.70m FEC IFU


IGN NSE
DES YSE 414

+15.20m
PLA 182

+15.40m
V06-07 FLOATING TENT
IT
+15.40m
TENT

BBQ GRILL
LIM
+15.70m +15.20m
FV06-06
WORKING GOING ON JBBC
m
0
0.0

+15.20m
OT V06-09
UP

PLUNGE
PL +15.70m POOL

8
+15.20m +15.40m
+15.20m +15.20m +15.40m
ILL +15.40m
Q GR
BB
0.3
0
m
+15.70m
+15.70m +15.40m
ATI
ON
+15.40m
+15.40m TENT

BB

BST
SU 36 m
0.30

Q
+15.20m
TENT

GR
V06-32

IL
1

BBQ GRILL
W

L
+15.70m

8
D

m
+15.20m V06-31

7
TE
W
0
0.0

+15.40m TENT

W7
TO
RA
BBQ GRILL
NE OM

+15.40m

²
GE RO m

m
24
0.30
D9
+15.20m

RE NG
OM
BBQ GRILL +15.20m
V04-15
. RO ²

m
L.V

32
m
0.30

13
w
+15.40m

D8
OM
RO

7
W

+15.20m

C
MP

W3

²
m m
PU

8
0.30 m
m IN E 0

+15.40m
0 MA ON 0.3

TENT
0.0 EPH OM

N I
TEL RO


9
+15.40m

CO ASH
m

D5
+15.20m
0.30

V04-02 TENT LIMIT


RE
STO


m
0.30
m 12
0.30

3
W

PLOT

D5
W1

3
W

+15.70m
+15.70m 1

V06-08

W
OM

D5
RO


VER

m
13

0.30
SER

+14.80m DMD
W WATER TANK
+16.00m FFL

+15.20m
+15.20m
+15.40m
+15.70m

+15.40m
+15.40m
+15.20m
+15.20m
+15.20m FLOATING TENT
FV06-05

FEC
+15.40m
+15.70m +15.40m

IFU
BB
+15.70m

SM
GR

DB
ILL
+15.40m +15.70m
+15.40m

DB
+15.70m
TENT TENT
OU
TDO
OR
AC
UNI
T

+15.40m
+15.40m +15.20m
+15.40m
TENT V04-13 V04-14
BBQ GRILL
0m
.0

TENT V04-12
+0

BBQ GRILL
LL
BBQ GRILL GRI
Q
+15.40m
V06-05
BB
8%

TENT
EN

+15.20m +15.20m
TR

+15.20m
AN

+15.70m +15.20m
CE
DN

V06-06
0m
.3
+0

+15.70m
30m
R
O

+0.

ID
74

+15.40m
13.
RR
CO

FEC
+15.20m
B.O.H
30m

IFU
+0.

30m

+15.40m
NE 2

+0.
M O 89 m²
IE ent
RO 54
LI OM

FA anag ffice
78.

22.
S
N

CIL em

+15.20m
IT
TO 4.20 m²
PO ILET

+15.40m GFL +15.20m


D

BB +15.40m +15.20m Q
BB
Q
GR +15.20m GRI
LL
ILL

BB
+15.40m +15.20m

Q
+15.40m

GR
D
D8

+15.70m +15.70m
RST 11 m²
AI

+15.40m

IL
24.

+15.70m

L
ENTRANCE / +15.40m
FI

GUARD +15.70m +15.40m


HOUSE
D1

EXIT TENT
DN

TENT
L
O
NTR
.C OM

+15.00m DMD
TV RO

TENT
O

ARD
PBO

V06-29
CC

8% CU

+15.40m +15.20m
TENT V06-30
LAGOON
18

S
m

KM

V04-11
.30

IT
+0

DRAWING SUBMITTAL STATUS


IC
PAN
2
1

BBQ GRILL

FIRE +14.40m FFL


P

T LIM
AC

+15.20m
V06-04 +15.40m BBQ GRILL
17

PLACE-4
(EXISTING)
+15.70m
TENT +15.20m +15.20m

PLO
+15.20m
V06-02
16

+15.40m +15.20m
+15.20m
+15.20m
+15.70m
LIFTING
15

ST. 1
+15.40m
+15.20m +15.20m A Approved B Approved as Noted
14

BB
Q
GR +15.40m +15.20m
ILL
+15.20m +15.20m
13

+15.40m +15.40m GFL


+15.20m +15.20m
+15.40m
TENT +15.70m
C D
+15.70m
12

BB
+15.40m

V04-10
TENT
+15.40m Revise and Resubmit Rejected
V06-28
Q
GR
ILL
11

CAR TENT WATER BBQ


GRILL

PARKING V06-03 FEATURE 01


10

GRILL
+15.40m +15.20m BBQ

TENT
+15.70m
+15.20m FLOATING TENT
+15.20m
09

+15.40m V04-01 +15.40m GFL FV06-04


+15.40m
+15.40m +15.70m
Reviewed By: Date:
08

+15.70m
+15.40m
+15.40m
+15.40m
+15.20m +15.20m +15.20m
07

+15.40m +15.40m
BB
Q
GR
ILL +15.20m +15.20m
+15.40m
6

+15.40m +15.40m
+15.40m
05 0

+15.20m

SMDB
+15.70m +15.70m
LIMIT

TENT TENT

DESIGN
PLAYSE 600
182414

EDB ESMDB DB
NSE
BB
+15.20m Q
GR
ILL +15.20m
+15.40m
V04-08 V04-09
shade structure & play equipment GRILL
PLOT

BBQ
04

FEC
GRILL
to be remove (client to confirm) BBQ

PLAY AREA-2 +15.20m

IFU
WORKING GOING ON OTHER
2 03

RH
+15.20m +15.20m
+15.40m
STR
RH

TENT
01 0

V06-01 +15.70m
+15.40m

+15.20m
SUBCONTRACTORS +15.20m
+15.20m +15.20m
+15.20m

+15.40m
+15.70m
FIRE +15.40m +15.70m +15.40m
+15.70m +15.40m TENT TENT
PLACE-2 FIRE +15.40m
TENT
+15.40m
V06-26 V06-27 +15.70m
PLACE-1 BB
V04-07 BBQ
GR ILL
BBQ
GRILL
+15.40m
Q

60.00 M TEMPORARY FENCING LINE


GR
ILL
+15.20m 0 01-03-2025 JN ISSUED FOR APPROVAL
SMDB
DB FEC IFU +15.20m
GRILL
BBQ
+15.20m
+15.20m
FIRE SCREEN
+15.40m
+15.40m
REV. DATE NAME DESCRIPTION
PLACE-3 CONTROL ROOM
15.0288 2.0x2.0M
+15.20m +15.20m PROJECT:
SLID BLE
DOU
E

D AREA +15.20m
STEEL YAR MULTI PU shade structure & play equipment
STORAGE)
(MAKING AND RPOSE to be remove (client to confirm) PLAY +15.20m +15.20m
+15.40m
+15.20m
AREA-1 +15.40m
+15.70m GR
IL
L
DES YSE144
PLA176

Q
IGN NSE

TENT BB
302

+15.20m

NEW THEMED GLAMPING SITE


DINING

+15.40m +15.20m
TEMPORARY

+15.40m V06-24 +15.70m +15.40m


+15.40m

WORKING GOING ON OTHER SCREEN TENT


LADDER
ENTRY/EXIT

WAV SING

EN
E
SLID

KITCH

ELECTRICAL CLOSET
LE
E

1.8x0.40M BBQ GRILL


BED
ROOM

V04-06 +15.40m
FLOATING TENT
6.0000 +15.20m +15.70m
6 M WIDE

FV06-03
UP

TENT
S.S
mm Handrail

SUBCONTRACTORS
1:12 1200

+15.20m GRILL
BBQ
V06-25 CLIENT:
EXISTING +15.20m +15.40m
IFU
C
FE

POCKET

IT
+15.20m
Office Room

T LIM
4.70X3.55
+15.40m +15.70m
SUB-STATION
A R E A

TENT +15.40m

PLO
Pantry
1.25X2.5 +15.20m
1.0000
Toilet
12.2500
V06-22 +15.40m
+15.20m
1.25X2.5 +15.40m
BBQ GRIL

+15.70m +15.20m
K I N G

TENT +15.40m
L

+15.20m
50.00 M TEMPORARY FENCING LINE Metting Room
4.70X3.55 EDB

V06-23
SMDB BBQ
DB GRILL
IFU
FEC

L
ION MATERIA +15.40m
CONSTRUCT E AREA
DINING

3.5500
. P A R

STORAG 28.9712 +15.20m +15.70m


+15.40m
TENT
LADDER

+15.40m
EN

+15.20m BBQ
KITCH

Material storage +15.20m +15.20m +15.40m


GRILL
4.70X3.55 +15.20m
V04-05
ROOM
BED

+15.40m

DXB PROJECT MANAGEMENT


T E M P

+15.70m
+15.70m UP

Toilet
S.S
mm Handrail

TENT
1:12 1200

1.25X2.5
1.0000 12.2500
Toilet +15.40m
1.25X2.5
+15.20m
V04-04
Workers Room
+15.40m
+15.20m
+15.40m
SERVICES LLC
DRINKING
4.70X3.55 +15.40m +15.70m
TENT +15.40m
+15.20m

GOLF C BBQ

A
GRILL
V06-20
PICK-U RT
3.5500 GRILL
WASH DRINKING
WATER

P/
BBQ
FLOATING TENT
CONSTRUCTIO
WASTE
N
UNIT
CONCRETE
WASTE
WATER TANK
GENERATOR
DROP-O
FF +15.70m
FV06-02
BBQ
GRILL
TENT
+15.40m
+15.40m +15.40m V06-21
+15.20m
+15.40m
PUMP ROOM
+15.20m
(UNDERGROUND)
+15.20m
T
IMI
+15.20m

TL
+15.20m
+15.20m +15.40m
PLO CONSULTANT:
+15.70m
WOODEN DECK +15.40m
+15.40m
ENTRANCE
GATE+15.40m TOWELS
+15.40m
PICK-UP "NEST"
0.02m DEEP
0.02m DEEP
WOODEN DECK
& DROP-OFF SUNKEN GOLF CART +15.40m
SEATING AREA +15.40m
PICK-UP POOL BAR FLOATING TENT
(12 SEATER)
+15.40m
FV06-01
GOLF CART
0.02m DEEP
PARKING
3 Nos Baggies +15.40m

Charging Spot
8% m²
5.40
11
GR
RAMP

DN

DE
10

ARCA

GR
9.59
+15.40m
DN

GOLF CART
+15.20m 10% SLOPE

DROP-OFF
1
2

m
+0.30

86.73
12 DN 10%
SLO
GR
LOBBY
ANCE PE

+15.20m
ENTR

FHC

RECEPTION
SWIMMING POOL MAIN CONTRACTOR:
E
OP
SL
%


10

5.12
04
IL GR
RETA

1.20m DEEP

12.76
01
GR
PTIONE
ON
PARTITI
RECE RANC
GLASS ENTE


+15.20m
+15.40m
4.85
03
GR LE T
FEMATOILE
ADA

90.00°

+15.70m
PLOT LIMIT
PARTITIO m²
GLASS 5.30
04
GR
IL
RETA

m
+0.30m²
m² 18.01
7.37 02
E GR
06
GR T STORAGE
TOILE LE
LUGG

+15.20m
FEMA

(‫م‬.‫م‬.‫ذ‬. ‫ءانبش مالا ءملااءام اءىطاش ) ء‬


1.50
09
GR
IDF

1.50

+15.20m
08
GR
ELV
8% Enclosed D12
Not m²
11 2.73
GR 07 m²
GR 4.90
RAMP ELE 03
GR
D12
MALE T
DN TOILE
ADA

D11

7.37
T 05
GR
TOILE
D11 MALE
m
+0.30
2

1
CE
ENTRAN
STAFF
8%

m
0.00 8%
DN
8%

pe

14.75
10
Slo m²
GR 4.51
DE 15
ARCA p RK
Ram

+15.40m DN
0m 1.8346
+15.40m
DN

0.3

DN
8%

8%

1
R
SHOWE

2
300
MEN

TOILET
300
MEN

0.30 m
DN

D3a
FEMALE ABLUTION

MALE ABLUTION
3 m²

+15.40m
0
50

3 m²
0m
ø1

0.3

2 120.29
ENTRANCE
0

0.30 m RK
A
50

ENTRANCE
Redundant Room ARE SEATING
ø1

3 m²
R
TOILET

DN DOO
OUT
POD.

MOSQUE
R
SHOWE
300
FEMALE

300

0.30 m

0.30 m

+15.70m +15.70m
E TOILET

N
STATIO
GE
300

BEVERA
FEMAL

NE
E MACHIATIC
COFFE AUTOM
FULLY

FEMAL PRAYER
ROOM
ROOM 20 m²
MALE PRAYER &
SINKWASH
20 m² N
HAND STATIO
W/ IL R&
8%

IDF
300
1 2

COCKTABLENDE
SS
COOLER
KEG m²
DES

ER U/C SLIDERT
R COUNT BASKE
A 171.14
DN

COOLE E SS
CHI P-IN

ARE
8%

SS T
DRO

BOTTL CABINE E
SER

U/C R
ING
STORAG DIN
LLE

DN

+15.20m
COOLE U/C
BOTTLE Bar
T

NE U/C
R

MACHI E COOLER
COFFE BOTTLE
NE U/C BIN
MACHI CUBER WASTE
COFFEE ICE SLIM R
U/C WASHE
UP GLASS 2
U/C TION 1
M NG INDUC IN FET
ION DROP-
SHELVI ER IN BUF
ROOCT. INDUCT
TION
4-TIER

4-TIER CRUSH DROP-


ICE
UP ELE INDUC IN HOT
ION DROP-
R NG INDUCT IN
SHELVI

LLE L ION DROP-


SHELVI N
CHI OHO 4-TIER TIONINDUCT
DROP-I

SUB CONTRACTOR:
NG

INDUC IN
ALC R ION DROP-
LLE INDUCT IN
CHI P-IN

NG KILLER TION DROP-


CHI GE INDUC N
DRO

SHELVI INSECT
ERA DROP-I
OUTDOOR AC UNIT

SAL

NOTES & LEGENDS


4-TIER
LLE

+15.40m +15.20m
BEV GRILL
NG STONE
AD

SHELF
R

SHELVI ED LAVA
m² MOUNT
5.62 4-TIER P AREA
LV WALL R PICK-U
NE
2-TIER AVE ED NTE MACHIRINK
HEATER FOOD
4-TIER

ICE

MICROW MOUNT COU SOFTD E


NE

GRILL CT
R SHELF MACHININK
KG
MACHI

CONTA E
KILLER

R CHILLE

RESTAURANT
INSECT

W SOFTDR
SHELV

300

DOUBL U/C
EZE GRILLCT 2-DOOR H WINDO
RACK FRE
2-DOO

R ED
ING

CONTA E
OUTDOOR AC UNIT

GE HROUG HEATER N
MOUNT
4-TIER

MOBILE

DUNNA DOUBL WARME


PLATE PASS-T STATIO
T
COLD

U/C SHELF GE
CABINE

R U/C

2-TIER S
SALAD

E R BEVERA
SHELVE
SHELV

WARME
PLATE ED
RAG
FREEZE

U/C MOUNT
CHILLE
4-TIER

STO
ING

2-TIER

UP WALL
MOBILE

DRY WAVE PASS


ET

G
HOT

R TABLE
SHELVI

MICRO 2-TIER
CABIN

WALL

GRATIN
DRAIN SINK
4-TIER

SH
NG

8%
3-DOOR
MOUNT

WA
TOP

N HOODNG
GN IARD
RG
MOBILE
SHELVI

0 KITCHE HOLDI SINK ASH


T

FRY
HOT
CABINE

ITA

ED

A 400x60
U/C

HANDW
N

FRENCH R
4-TIER

ARE G
SHELF
NG

3555x2
ROLLER G HOLDERGER
CHILLE

FRYER
KIN

+15.20m
1 HOTDO DEEP
HAMBU
UPRIGH E

COO 0
SHELVI

+15.70m
DOUBL

2 ER FRYER 600x90
TABLE
GN IARD
RG
CO

DEEP SS
TOAST AL
T CHILLE
NG

ITA

GRILL R
4-TIER

SER

VERTIC E
N
DOOR

RRI E

FRYER BURGE
R DEEP ELEC. MAL
LLE
1.20m

A
R
SHELVI

VIC

SCALE RM 0
DO

DN CHI ) ARE G
9-DRAW

SALAD

500x90 GRILL
2-TIER

PLATFO (15GN R TABLE KIN


LOW

GL-02 SS & H
NG

CHILLE
SMOOT LE COO
CHILLE MOUNT

BLAST T
WALL

ER

A
UPRIGH

WALL

GRIDD
UPRIGH
U/C
DOUBLE

ARE NG
SALAM
KILLER

EXISTING POCKET
R TABLE ED SHELF
INSECT

OVEN
EIVI
CHILLE

ER
GRATIN

ALE
T FREEZE

2600X7

WITH
DRAIN
ANDER

REC 6-BURN
G FEM
DOOR

SHELF
ED
R

GRATIN

GRATIN
TOP
G

00

BOX SUBSTATION
DRAIN SINK MOUNT
DRAIN
R

SINK
SS

N WALL
0 A 0
GLASS

N
DUMP

CURTAI
G

500x70 400x90 TABLE 2-TIER


AIR SINK ASH ARE ATIO R
SS
TABLE SS TABLE GRILL SS
NG
HANDW SINK
RACK
TABLE

PAR CHILLE STONE


LAVA
REF.
PREP.
WASHI
POT
BIN 00 PRE2-DOOR U/C NE PIZZA 00
KILLER
INSECT

TRASH 2400x7 KILLER

STAFF
SINKASH 2400x7 MACHI G KILLER G A
2050x1

SERVIC

R INSECT
TABLE PACKIN M G INSECT GRATIN ARE
PRE-W SS FREEZE E TABLE
VACCU MIXER R DRAIN NG
m² SINK SH R U/C GRATIN
MOBIL
200x60

DRAIN
E CORRID

55.53 SHELF CUTTE SHI TABLE SS


01 ED SINK ASH SHELF 2-DOO SS
PRE-WA ED
STB 05
H WA WASHING
GRATIN

AREAING MOUNT SINKASH HANDW MOUNT 1300x7OVEN


0 KITCHE

DIS
DRAIN

WALL G WALL SLICER SINK DISH


WAIT PRE-W KILLER PIZZA 00
OR

2-TIER R 2-TIER MEAT ED


GRATIN INSECT HEATER 2400x7
G

DISHW YOR

DRAIN
T CHILLE MOUNT
SINK

A N SHELF SHELF
CONVE
N HOOD

DOOR ED WALL ED
2-TIER

SHELF SINK
UPRIGH E ARE ATIO RACK MOUNT
MOUNT
ASHER

BUILDING
DOUBL 2-TIER DISH WALL
PREPAR

PAR 2 NOSABLE)
WALL

SINK SHELF 4-TIER 2-TIER


TABLE

PRE SINK ASH COOLER ED E (STACK


MEAT

TABLE OVEN T

+15.40m
ATION U/C MOUNT MACHIN
ATION

MOUNT

BIN HANDW BOTTLE R COMBI CABINE


PREPAR
FISH 2-DOO WALL RAIL COFFEE R ELEC GEN GE CAL
SHELF TRASH KILLER 6
ED 2-TIER SPEED E COOLE STORA
CHEMI
CH A R U/C SINK ASH
ED

MOUNT INSECT WITH


TRASH
BIN

BIN BOTTL
ARE E ICE 2-DOO HANDW
SHELF

WALL IN NE
CH 2-TIER VIC BUILT- G MACHI NG
COOLER HT GRATIN WASHI
SER ) NE GLASS
IN R MACHI BOTTLER UPRIG FFL. FROM
CM
DRAIN
2
PLOT LIMIT

m² CREAM G ICE 2-DOO H=40


2.42 CURTA (ICE U/C FREEZE GRATIN SINKING
STB
06 1 AIR
DRAIN
GING R 2-DOOR CLEAN
COOLE MOP
CHAN TABLE OL R U/C RACK
MALE E DISH
PICKUP ALCOH
SHELF 2-DOO MACHIN 4-TIER
ED POS
GRATIN

MOUNT
DRAIN

+15.40m
WALL
FRIDGE 2-TIER ER
G

R
BLEND
DISPENSE SILENT SINK RACK
WATER 240L POTS
0m warme
r)
BIN
GARBA
GE
240L
4-TIER
0.3 (food
9NUMB
ERS BIN
GARBA
GE

+15.40m
240L
REEL BIN GE
N HOSE OM T GARBA R
m² CH CURTAI
AIR
RO MEN G CHILLE
9.62 GE
05 AGE AL
M STB GRATIN GARBA
ROOGING CH MAN POS DRAIN
DIS STE
&

FEN

CHAN m²
WA N
T 4.99 m²

+15.70m
04 2.28 CURTAI
TOILE T STB
STB
02 AIR
CING

MALE TOILE GING DN


ADA
KILLER

CHAN LE
INSECT

FEMA 120L
BIN GE
120L E GARBA
BIN
120L GARBAG
BIN E

+15.40m

LABOR ACCESS
m² 120L GARBAG
9.61

885
GE BIN
03
STB GARBA
ROOM
GING
CHAN&
0
T
TOILE LE
FEMA Y
EZER/DR
+16.07m
E
RAG FOR
STO LER /FREUNITS
CHIL DOOR
+16.80m DMD OUT
E
8%

1
+16.78m
SLOP

RK-0AHU
8% CU-M
SLOP
E 7900

IT +15.64m
+15.40m

LIM
-01
ODU -RK
+15.20m
0

8% VRV
300

SLOP
T +16.80m OUTD
OOR

LOADING BAY
E

LO+16.95m DMD
AC
UNIT

3000
+16.86m +16.70m LPG

P
(500 TANK
8% GALL
ON)
SLOP +16.00m

PROJECT NO: DP12


+16.20m
+16.60m PARKING E
R900

300
0

8%
0
0

720
0

+16.75m
300

+16.05m
VP

VP

VP

VP

VEHICLE ACCESS AS PER


VP

VP

FENCIN
VP

G
+16.45m 01 +15.85m
+16.95m
02
+16.45m
03
+16.88m
04
05
STAGE:
+16.82m +16.25m 06

+16.72m

+16.63m
+16.05m

R5

+16.20m
320

+15.87m
AASA TEAM DRAWING TITLE:
+16.59m

+15.90m
LOGISTIC PLAN
PLO
+16.31m

T LIM
IT
+15.64m

+15.40m
WASTE
COLLECTION PLO
T LIM
WORKING GOING ON JBBC
AREA IT
+15.98m
+15.38m

+15.79m

ARCH. STRUCT. MECH. ELECT. HVAC APPROVED BY.


+15.52m +15.50m
LAGO (TM)
+15.54m +16.23m
ON W
ATER
+15.58m
+15.62m

+15.63m
+15.92m

+15.62m
+15.74m

+15.71m
WORKING GOING ON OTHER NAME

SIGN.

SUBCONTRACTORS
+15.68m

+15.68m
+15.70m
+15.68m DRAWING NUMBER: A
+15.69m

PROJECT PACKAGE ORIGINATOR DOC FLOOR DRAWING


ZONE VENUE DISCIPLINE
CODE CODE CODE TYPE LEVEL SERIES
+15.66m +15.58m

+15.23m

+15.62m
+15.41m
DP12 P6 DEC SHD - - GEN ZZ 2000
+14.94m
+15.00m DMD

SCALE: NTS DATE: 01-MAR-25


IT
LIM

+15.22m
+15.49m +14.96m
OT

PREPARED BY CHECKED PAPER SIZE DIMS IN SHEET No.


PL

+15.10m DMD

mm
JN JM A1 01
or as indicated

You might also like