0% found this document useful (0 votes)
19 views2 pages

Line-1,2 Cementing Daily RCM Inspection Findings, May-25

The document outlines findings from RCM inspections conducted on May 27, 2025, specifically for the GCD-Cementing assets. It includes details on issues identified, the execution department involved, and feedback related to the inspections. Criticality and work order numbers are referenced but not detailed in the provided text.

Uploaded by

Sarmad Elahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

Line-1,2 Cementing Daily RCM Inspection Findings, May-25

The document outlines findings from RCM inspections conducted on May 27, 2025, specifically for the GCD-Cementing assets. It includes details on issues identified, the execution department involved, and feedback related to the inspections. Criticality and work order numbers are referenced but not detailed in the provided text.

Uploaded by

Sarmad Elahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

RCM INSPECTIONS FINDINGS

S# Assets Code WO# Criticality

GCD-Cementing
RCM INSPECTIONS FINDINGS
27-May-25
Issues Execution Department Feedback

GCD-Cementing

You might also like