SD 311 R2 - Hdpe-Pp

The document outlines minimum requirements for project details, including specifications for materials, dimensions, and construction methods for HDPE inspection chambers. Key points include the use of C40 concrete, specific dimensions in millimeters, and the need for structural integrity and approval from consultants. It emphasizes that all details must be checked and approved as part of the project drawing set.

Uploaded by

bnsmina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views1 page

SD 311 R2 - Hdpe-Pp

The document outlines minimum requirements for project details, including specifications for materials, dimensions, and construction methods for HDPE inspection chambers. Key points include the use of C40 concrete, specific dimensions in millimeters, and the need for structural integrity and approval from consultants. It emphasizes that all details must be checked and approved as part of the project drawing set.

Uploaded by

bnsmina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

THESE DETAILS REPRESENTS A MINIMUM REQUIREMENT

BUT MAY BE VARIED, SUBJECT TO APPROVAL, TO SUIT


PROJECT REQUIREMENTS, THEY ARE EXPECTED TO BE
INCORPORATED AS TYPICAL DETAILS WHICH SHALL BE
CHECKED AND APPROVED AS PART OF THE PROJECT
DRAWING SET.

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


OTHERWISE STATED.
2. ALL CONCRETE TO BE C40 UNLESS OTHERWISE STATED.
3. HDPE CHAMBER SHAFT AND BASE MATERIAL SHALL BE
PE-100, SATISFYING THE REQUIREMENTS AS SPECIFIED
IN SWS SPECIFICATIONS.
4. THE WEIGHT OF CHAMBER BASE SHALL BE
HIGH LEVEL ENTRY PORT
1000 PROPORTIONATE TO RESIST THE UPLIFTING FORCES.
Ø

Ø
5. ALL EXTERNAL FACES OF CONCRETE TO BE COATED
WITH EPOXY COATING.
6. FOR COVER AND ACCESS DETAILS REFER TO

HIGH LEVEL ENTRY PORT OUTLET PIPE PORT DRG. [Link] / PP-SD308.
7. SEWER GRADIENTS TO BE MAINTAINED THROUGH
HIGH LEVEL ENTRY PORT CHANNELS.
8. ALL CHAMBER UNITS SHALL INCORPORATE SAFE LIFTING

1:6

pe
POINTS WHICH SHALL BE CLEARLY MARKED.

Slo
A A BACKDROP HDPE Ø160mm

Slo
Ø600mm CLEAR OPENING 9. CEMENT CLASS FOR BASE AND COVER SLAB (C40) SHALL

1:6
p
e
FOR D.I. ACCESS COVER BE ACCORDING TO ACTUAL SITE CONDITION AND SOIL

Ø600mm CLEAR OPENING C C INVESTIGATION REPORT.

Ø160

1150
FOR D.I. ACCESS COVER SHAFT 10. MANHOLE SHAFT THICKNESS (t) SHALL BE AS PER
DESIGN CALCULATION.
1:6
pe
Slo

Slo 11. STRUCTURAL INTEGRITY OF THE CHAMBERS IS THE


1:6

1:6
e HDPE 'Y' Ø160mm RESPONSIBILITY OF THE MANUFACTURER.

Slo
pe

pe
12. THE MANHOLE / CHAMBERS SHALL BE CONSTRUCTED IN

Slo
Ø600mm CLEAR OPENING

1:6
FOR D.I. ACCESS COVER COMPLIANCE WITH THE REQUIREMENTS OF EN-13598.
13. THE DESIGN OF MANHOLE / CHAMBERS SHALL BE
OUTLET PIPE PORT
SUBMITTED TO CONSULTANT FOR REVIEW AND
APPROVAL PRIOR TO MANUFACTURING.
INLET PIPE PORT 14. ANY CHAMBER DEPTH < 1.35m > 2.20m SHALL BE
SUBMITTED FOR ENGINEER'S APPROVAL DURING DESIGN,
PRIOR TO MANUFACTURING.

Ø160 OUTLET PIPE PORT 15. DIMENSION X & Y SHALL BE CALCULATED AS PER ACTUAL
SITE CONDITION AND BUOYANCY CALCULATIONS.
Ø 16. Y-CONNECTION IS ONLY APPLICABLE IF APPROVED IN
THE DETAILED DESIGN AND SPECIAL APPROVAL FROM

SECTIONAL PLAN D-D SECTIONAL PLAN E-E


SWS O&M.

SECTIONAL PLAN B-B (N.T.S.) BACKDROP WITH "Y" CONNECTION DETAILS


17. BENCHING SHALL BE MOULDED.

HDPE CHAMBER DN900


SPECIAL CHANNEL FOR HIGH LEVEL DOUBLE LATERAL ENTRY PORTS WITH ACCESS OPENING Ø600mm

02 SWS New logo Updated May. 23


01 Construction Details Updated Apr. 23
1000 (max) 1000 (max)
D D 00 Final Issue

B B Rev Description Auth. Chk. App. Date

MACHINED SEATING CLIENT


50 BACKDROP HDPE Ø160mm DUCTILE CAST IRON COVER
ABU DHABI SUSTAINABLE
SPECIAL CHANNEL FOR

Ø160
WATER SOLUTIONS COMPANY
HIGH LEVEL ENTRY PORT
Ø

OUTLET PIPE PO BOX 10881


ABU DHABI, UAE
1:6 Slope
1:6 Slope

(varies)
280
HDPE 'Y' Ø160mm
Max. 280

IL= FRAME LIP FOR SEALING PLATE


IL= (4 LIPS) GAS TIGHT HDPE LINER CONSULTANT
EPDM RUBBER
200 HDPE 45° BEND Ø160mm
CLEAR OPENING
GRP Shear key C40 CONCRETE C40 CONCRETE FILL AT FACTORY A-----------+ B-----------
(see note 12) C40 CONCRETE C----------- COMPANY
HDPE BASE PLATE HDPE BASE PLATE LOGO
PO BOX -----
50mm SCREED 50mm SCREED ABU DHABI, UAE
100mm CONCRETE 100mm CONCRETE
DN 900 BLINDING (C20) DN 900 BLINDING (C20)

CONTRACTOR
MANHOLE TOP, FRAME & GRP SEALING PLATE DETIALS
SECTION A- A SECTION C-C
D------- + E------
LOGO F----COMPANY
PO BOX -----
ABU DHABI, UAE

PROJECT TITLE

STANDARD DETAILS
DRAWING TITLE

DN 900 HDPE INSPECTION CHAMBER


(WITH Y-CONNECTION)

CAD REFERENCE SCALE [A1]

CONTRACT No. DRAWING No.


Original Drawing Size A1 HDPE / PP-SD311 REV.02