SAUDI ARAMCO ID/PIEU - 29-Jun-2017 - REV. 2017.02.00 (Standards Cutoff - February 28, 2017) Rev. 2017.02.
00 28-Feb-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Geotechnical Investigation Requirements SAIC-A-1007 29-Jun-17 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The geotechnical investigation Scope of Work is approved by the
Supervisor, Civil Engineering Unit, Consulting Services Department, prior SAES A-113
A1
to initiation of any field work. The Geotechnical File Number is assigned Sec. 5.1.2
by Consulting Services Department.
The geotechnical investigation must be conducted by a Contractor on
CSD list of Geotechnical Engineering Offices for, Engineering and SAES A-113
A2
Analysis; and for laboratory and field testing, by Third Party Laboratories Sec. 5.2.1
in the Inspection Department’s list
A site-specific geotechnical investigation is required for all new structures,
foundations, major roads , pipelines and significant earthworks unless SAES A-113
A3
exempt by Item A4 below or indicated in writing by Supervisor, Civil Sec. 4.2.1
Engineering Unit, CSD.
Geotechnical investigations are not required when all of the following
conditions have been met; a. when the footprint of the structure is less
than 4x4m (guard houses, sun shelters etc), b. the net bearing pressure
on the foundation does not exceed 100 kPa (2000 psf), c. the foundation SAES A-113
A4
will not be subjected to vibratory or dynamic loads, d. the supported Sec. 4.2.2
equipment or structure is not settlement sensitive, e. unusual soil
conditions, such as subkha or expansive clay are not present or observed
in nearby borings, f. no other special considerations apply.
The geotechnical contractor shall submit a statement endorsing the
SAES-A-113
A5 adequacy of the proposed investigation program or submit suggested
Sec. 5.2.2
modifications.
A risk assessment study, for potential underground cavities is required for SAES-A-113
A6
grass-root plants in the areas of predominantly limestone geology Sec.4.2.3
The geotechnical contractor shall comply with all aspects of the Saudi
SAES-A-113
A7 Aramco Construction Safety Manual and all safety programs and policies
Sec. 6.1.2
of Saudi Aramco.
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 16 March 2016
Saudi Aramco: Company General Use
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
Saudi Aramco: Company General Use