The document outlines a micro planning schedule for construction activities related to a water-proofing project from April 12 to May 26, 2025. It includes various tasks such as shuttering, concrete work, and installation of steel components for water tanks and walls. Specific activities are detailed for each day, indicating the materials and components required for the project.

Uploaded by

samarkoliwork
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

STP Microplanning (Completion Date 26.05.2025)

The document outlines a micro planning schedule for construction activities related to a water-proofing project from April 12 to May 26, 2025. It includes various tasks such as shuttering, concrete work, and installation of steel components for water tanks and walls. Specific activities are detailed for each day, indicating the materials and components required for the project.

Uploaded by

samarkoliwork
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

MICRO PLANNING FOR STP

DATE

12-04-2025

13-04-2025

14-04-2025

15-04-2025

16-04-2025

17-04-2025

18-04-2025

19-04-2025

20-04-2025

21-04-2025

22-04-2025

23-04-2025

24-04-2025

25-04-2025

26-04-2025

27-04-2025

28-04-2025

29-04-2025

30-04-2025

01-05-2025

02-05-2025

03-05-2025

04-05-2025

05-05-2025

06-05-2025

07-05-2025

08-05-2025

09-05-2025

10-05-2025

11-05-2025

12-05-2025

13-05-2025

14-05-2025

15-05-2025

16-05-2025

17-05-2025

18-05-2025

19-05-2025

20-05-2025

21-05-2025

22-05-2025

23-05-2025

24-05-2025

25-05-2025

26-05-2025
COMPONENT ACTIVITY

WATER- COLPHENE
PUMP TANK TANK TANK
PROOFING SHEET FOR SUNDAY HOLIDAY
ROOM AREA AREA AREA
(240 SQM) RAFT

SHUTTERING

RAFT BOTTOM BOTTOM BOTTOM BOTTOM TOP TOP TOP TOP


STEEL
MESH MESH MESH MESH MESH MESH MESH MESH

70
CONCRETE
CUM

WALL WALL WALL WALL DIST. DIST. DIST.


STEEL
VERTICAL VERTICAL VERTICAL VERTICAL BARS BARS BARS

EXT EXT EXT EXT EXT EXT TREATED


WALLS EQ ANT ANT EQ EQ
SHUTTERING EQ ANT/FMR TRETED SLUDGE PUMP PUMP WATER
TANK /FMR /FMR TANKS TANKS
TANK TANK TANK TANK ROOM ROOM TANK

CONCRETE 30 MTR 30 MTR 30 MTR 30 MTR

STEEL

STAIRCASE SHUTTERING

CONCRETE

EQ PUMP PUMP
SHUTTERING EQ TANK TANKS TANKS
TANK ROOM ROOM

SLAB PUMP PUMP


STEEL EQ TANK TANKS TANKS
ROOM ROOM

45
CONCRETE 3 CUM
CUM

EX. WATER-
PROOFING VANDEX 20 SQM 20 SQM 20 SQM 20 SQM 20 SQM 20 SQM 20 SQM 20 SQM 20 SQM
(200 SQM)