0% found this document useful (0 votes)
18 views1 page

Temple Roof Vertical Penetrations Ba N 2504 4

The document contains construction details for the Freetown Sierra Leone Temple, including revisions and updates related to rainwater outlet locations and plinth sizes. It outlines various architectural features such as dog boxes and drainage systems, along with specific measurements and notes for construction. The document is issued for construction and includes multiple revisions to accommodate design changes.

Uploaded by

luca0013
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Temple Roof Vertical Penetrations Ba N 2504 4

The document contains construction details for the Freetown Sierra Leone Temple, including revisions and updates related to rainwater outlet locations and plinth sizes. It outlines various architectural features such as dog boxes and drainage systems, along with specific measurements and notes for construction. The document is issued for construction and includes multiple revisions to accommodate design changes.

Uploaded by

luca0013
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

The Church of Jesus Christ

of Latter-day Saints
N
AA AB AC AD AE AF RAINWATER OUTLET DETAIL AG AH AJ
Scale 1 : 10 300

A1 A1
Rev Date Revision Description
300 349 0 18/03/2024 VACC ISSUED FOR
CONSTRUCTION WITH
UPDATED RAINWATER
E OUTLET LOCATIONS

300 532 287


1 03/05/2024 PLINTHS UPDATED AS
A2 A2

814
402 300 861 300 PER ARUP COMMENTS

400
300

300 433
300 1392 8620 RECIEVED
2 09/02/2024 VACC PLINTH SIZE

300

319
OUTLET POSITION MOVED TO ACCOMODATE UPDATED
OUTLET POSITION MOVED TO ACCOMODATE

300
345

318

319
GARGOYLE SPOUT AS PER ARCH LAYOUT 3 05/09/2024 VACC UPDATED AS PER
GARGOYLE SPOUT AS PER ARCH LAYOUT
ARCHITECTS

300

300

300
COMMENTS
4 22/10/2024 VACC PLINTH REMOVED
300 OUTLET POSITION MOVED TO ACCOMODATE 342 300 300 110 1177 300 3812 100 AND DOG BOXES
GARGOYLE SPOUT AS PER ARCH LAYOUT
UPDATED
WATER SUPPLY

DRAINAGE

RAINWATER DRAINAGE

MECHANICAL HVAC

TOC +41.945 m
275thk RC Slab
PENETRATION LEGEND
Scale 1 : 10

TOC +41.945 m
275thk RC Slab

NOTE:
ROOM NOT REQUIRED
ONLY DOG BOX NEEDED
FOR REFRIGERANT CABLE TRAY
TOP SLAB OF DOG
BOX TO SIT FLUSH
AH
WITH TOP OF
PARAPET WALL

495

100
350
D TOC +41.945 m
425mm x 425mm PENETRATION Level BA - First Floor
425 814
AND DOG BOX REQUIRED
FOR REFRIGERANT CABLE TRAY TOC +41.945 m
275thk RC Slab
OUTLET POSITION MOVED TO ACCOMODATE

425
CONCRETE PLINTH FOR WATER SUPPLY PIPING
SEE DETAIL 4

100 572 400 3257


79
300 300 2378 8620 220 300 1830 1032
SECTION 3 DOG BOX

692
Step 2580 213 300
Scale 1 : 50

240
100
100

278
90

300thk RC wall
A3 A3

300
224
230

250

300
192

58
203
300

400
1425
230

1433
1668
1016 4750

443 300
400

300
300

2009
2078
300 8458 767 400 133

300

170
791 300 732 315 800 755 605 732 300 795
55

300
Opening
PLINTH 1015 300 300 2394

1300

2280
Opening
2363

2374
PLINTH 4850X2280X200
2430

1400
4750x2430x200
79

3396

609
TOC +41.945 m

439
275thk RC Slab
4850 1461
1070 5261 300 644 700 927 400

Opening

Opening
250 624
1350

1350

400
400

181

89
EXTEND DOG BOX BY 1005
A4 A4

358
98

169
C
400 2513 1070
1335

TOC +41.945 m

1699
2909 400

1819
2700

300 300

1005
53
3894

3894

3894

400
1995 800 1293 PLINTH
1475x400x150

722
PLINTH
1305X625X150
1905

SEE DETAIL 4 347 2600 1443 TOC +42.170 m 300

625
500thk RC Slab
Opening
1700

448

300
210
PLINTH
900

30

300
2600x900x150
400 326

300 300 422


239 2112 300 300
881
766
881

300 300 2116


300 489

1305 2255

65
300 2774 1898

1107
300 300
857
269
300
300

609

300

144

40 160 300thk RC wall


A5 A5
270

300 363
90

154

100
90

140

90

100 2071 300 300 813 400 87

239
2782

2782

100 4958 331 69 7661 400 490 SEE SECTION


"DOG BOX DETAIL"
95
2988 400 5232 4793 400 100
B
400

400

400
613

613

BA-N-2504

75
A6 A6

400
9 Macgregor Rd, Ikoyi
2500

Lagos, 106104
PLINTH Tel +234 700 822 2123.
www.vacctechnical.com
3350X2500X150
TOC +41.945 m
TOC +41.945 m
Freetown Sierre Leone Temple
275thk RC Slab
Project Name: Freetown Sierre Leone

5647
Temple
2948

2950
Location:
3350

4964
300 631

TOC +41.945 m
161 OUTLET POSITION MOVED TO ACCOMODATE
OUTLET POSITION MOVED TO ACCOMODATE 122
100 4609 300 300 GARGOYLE SPOUT AS PER ARCH LAYOUT
GARGOYLE SPOUT AS PER ARCH LAYOUT
82 218 300 4648 100
Project: Temple
232 300 2714 135 2458 300 1537 135 2716 300 231 Project Type: New Construction
Arup Project #: 279824
214

300

218
300

300
207

300
213
1843

Submittal: Issued for Construction


524 300 Date: 09/04/2021
416 300

410 513 300

414 300
250x725 dp RC Beam 104 300 2842 135 2842 300 104
A7 A7
410

250x880 dp RC Beam

100
100

100
100
Steel Staircase
A UP AGAINST WALL

SINGLE SKIN WALL

TEMPLE ROOF VERTICAL


DOUBLE SKIN PENETRATIONS

BA-N-2504

DETAIL 4 VACC PROPOSED DOG BOX


Scale ROOF LEVEL BUILDERSWORK
Scale 1 : 50

1 2 3 4 5 6

You might also like