0% found this document useful (0 votes)
194 views16 pages

Sample Estimate-Fps System

The document outlines the Bill of Quantities (BOQ) for the Galaxy City residential project in Guwahati, detailing the costs associated with various fire safety and plumbing systems across three towers. It includes itemized descriptions, quantities, unit rates, and total costs for equipment, hydrant systems, sprinklers, and other miscellaneous works. The grand total for the project amounts to 24,416,816.00, excluding GST.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views16 pages

Sample Estimate-Fps System

The document outlines the Bill of Quantities (BOQ) for the Galaxy City residential project in Guwahati, detailing the costs associated with various fire safety and plumbing systems across three towers. It includes itemized descriptions, quantities, unit rates, and total costs for equipment, hydrant systems, sprinklers, and other miscellaneous works. The grand total for the project amounts to 24,416,816.00, excluding GST.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

PROJECT: Galaxy City GUWAHATI


PACKAGE:FF BOQ
DATE: 18-06-2024

TOWER 1 TOWER 1 INFRA


Sr.No. Description
Supply Installation Total Supply Installation Total Supply Installation Total

A. EQUIPMENTS AND PUMP 149,835.00 29,636.00 179,471.00 143,017.00 25,036.00 168,053.00 2,899,312.00 370,147.00 3,269,459.00

B. HYDRANT SYSTEM 1,020,424.00 155,478.00 1,175,902.00 1,062,284.00 157,778.00 1,220,062.00 2,035,914.96 489,204.12 2,525,120.00

C. SPRINKLERS SYSTEM 3,563,163 902,894 4,466,057 3,587,186.00 904,958.00 4,492,144.00 3,274,855.00 746,895.00 4,021,750.00

D. MISCELLANEOUS WORKS 243,705.40 19,683.60 263,389.00 261,057.00 19,694.00 280,751.00 1,419,171.00 251,090.00 1,670,261.00

E. PORTABLE FIRE EXTINGUISHERS 36,520.00 5,760.00 42,280.00


### 36,520.00 5,760.00 42,280.00 170,932.00 63,101.00 234,033.00

F. DRENCHER SYSTEM 308,807.00 32,790.00 341,597.00

G. EVACUATION AND FIRE SAFETY 17,577.00 6,630.00 24,207.00

TOTAL (Excluding GST) 5,013,647.40 1,113,451.60 6,127,099.00 5,090,064.00 1,113,226.00 6,203,290.00 10,126,568.96 1,959,857.12 12,086,427.00
PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

Grand total

3,616,983.00

4,921,084.00

12,979,951.00

2,214,401.00

318,593.00

341,597.00

24,207.00

24,416,816.00
PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

PROJECT: Galaxy City GUWAHATI


PACKAGE:FF BOQ
Unloadi
DATE: 18-06-2024 ng/Math
adi/Pow
Wastag Freight er/water Supply Remark for
Unit Rate Amount Basic Labour OHP Rate
Sr. No DESCRIPTION Unit Qty Make Discounte Accessori e /equipm Rate
Supply Installation Supply Installation Total Rate 3% 5% 0.04 Rate Basic 0.15 Supply Labour
d Rate es ents & reference
A. EQUIPMENTS AND PUMP
machina
BOOSTER PUMP
ries.
A.1 Supply, installation, testing and commissioning of Terrace Booster pump comprising of
the following:
Horizontal mono-block centrifugal pumps. The installation shall be complete with flexible
coupling and coupling guard as required. Fire pump shall have C.I. casing, bronze
impeller (hard finished and dynamically balanced) and S.S. (410) Shaft with mechanical
seal, capable to ensure a minimum pressure of 3.5 Kg/Sqcm at the farthest or top most
a hydrant / sprinkler. The installation shall be complete with necessary gun metal shut off
cock on along with flanges, nut & bolt, washer, rubber gasket, on delivery side. (The pump
should be tested for duty point test at factory and shall be got approved by the Local Fire
Authority).
Cost to be considered to protect the pump assembly from rains on terrace if not under
roof. shall be capable of furnishing not less than 150% of rated capacity at a head of not
Pump
b less than 65% of the rated head. The shut off head shall not exceed 140% of rated head.
Squirrel cage induction motor TEFC type for operation on 415 V, 3 phase 50 HZ AC supply
c for the above pump with speed of 2900 R.P.M.
Suitable cement concrete foundation with plaster, (design and drawing to be provided by
d the Contractor while the foundation will be done by others) complete with Antivibration
arrangement of cushy foot mounting with long anchor - bolt.
e For pump defined above & of duty as follows :
FLOW RATE : 900 LPM Quotated by
shanbhag
PUMP HEAD : 35 Mtr. Nos. 1 68,172.00 11,500.00 68,172.00 11,500.00 79,672.00 Kirloskar 51700 51,700.00 2,585.00 - ### ### 59,279 10000 ### ###
engineering
- - - - - - - - company
Note: Vendor Should submit the pump selection curve along with the technical bid. - - - - - - - -
- - - - - - - -
BUTTERFLY TYPE ISOLATION VALVES - - - - - - - -
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly
Valve PN 16 Rating with flanges, nut - bolts, washer & gaskets complete required.
A.2 Butterfly valve shall be with pad locking arrangement. Vendor to include in his quote all - - - - - - - -
fittings, consumables, supports, rigging & other accessories necessary to bring the system
to satisfactory working condition.
a 80 mm dia. Nos. R.O 2,451.00 368.00 - - - 3085 1,696.75 254.51 - 97.56 81.95 2,131 320 2,451.00 368.00
b 100mm dia Nos. 4 3,966.00 598.00 15,864.00 2,392.00 18,256.00 Zoloto 4992 2,745.60 411.84 - 157.87 132.61 3,448 520 3,966.00 598.00
c 150mm dia Nos. R.O 6,233.00 897.00 - - - 7846 4,315.30 647.30 - 248.13 208.43 5,419 780 6,233.00 897.00
- - - - - - - -
Supply, installation, testing and commissioning of Cast Iron (C.I) `Y' strainer PN 16 with bronze perforated
sheet basket including rubber gasket, flanges, nuts, bolts and washers etc. Vendor to include in his quote all
fittings, consumables, supports, rigging & other accessories necessary to bring the system to satisfactory - - - - - - - -
working condition.

a 80 mm dia. Nos. R.O 7,140.00 368.00 - - - 8988 4,943.40 741.51 - 284.25 238.77 6,208 320 7,140.00 368.00
Zoloto
b 100 mm dia Nos. 1 9,791.00 2,300.00 9,791.00 2,300.00 12,091.00 12326 6,779.30 1,016.90 - 389.81 327.44 8,513 2000 9,791.00 ###
- - - - - - - -
NON RETURN VALVES - - - - - - - -
Supplying, installing, testing and commissioning of C.I. Dual Plate Wafer type Non-return
A.4 Valves PN 16 with SS 304 discs with Nitrile rubber lining as per IS:5312 (Part I) 1984, with - - - - - - - -
required flanges, nuts, bolts, washer and gaskets etc. complete.
a 80mm dia. Nos. R.O 2,836.00 368.00 - - - 3570 1,963.50 294.53 - 112.90 94.84 2,466 320 2,836.00 368.00
Lehry
b 100mm dia Nos. 1 4,020.00 1,150.00 4,020.00 1,150.00 5,170.00 5060 2,783.00 417.45 - 160.02 134.42 3,495 1000 4,020.00 ###
- - - - - - - -
A.5 EXPANSION JOINTS - - - - - - - -
Supply, installation, testing and commissioning of heavy duty double flanged flexion
S.S expansion joint PN 16 (suitable for system test pressure) of standard length as per
manufacturers specs including rubber gaskets, flanges, nuts, bolts and washers. Vendor to - - - - - - - -
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
a 80mm dia. Nos. R.O 874.00 368.00 - - - 1100 605.00 90.75 - 34.79 29.22 760 320 874.00 368.00
b 100mm dia Nos. 2 1,192.00 368.00 2,384.00 736.00 3,120.00 Lehry 1500 825.00 123.75 - 47.44 39.85 1,036 320 1,192.00 368.00
c 150mm dia Nos. R.O 1,589.00 552.00 - - - 2000 1,100.00 165.00 - 63.25 53.13 1,381 480 1,589.00 552.00
- - - - - - - -
A.6 PRESSURE GUAGE - - - - - - - -
Supplying & fixing dial type (100 mm) liquid filled pressure gauge with U-Type syphon
isolation ball valve suitable for working pressure of 250 PSI. Cost shall be inclusive of
providing any short pieces, GI socket, nipples, elbows etc as required. Vendor to include in Nos. 1 3,434.00 518.00 3,434.00 518.00 3,952.00 Lehry 4323 2,377.65 356.65 - 136.71 114.84 2,986 450 3,434.00 518.00
his quote all fittings, consumables, supports, rigging & other accessories necessary to
bring the system to satisfactory working condition.

- - - - - - - -
A.7 SUCTION & DELIVERY HEADERS - - - - - - - -
Supply, installation, laying, jointing, hydraulic testing and commissioning of following
sizes of MS (Mild Steel ERW) Pipes conforming to IS - 1239 Part - I with malleable specials confirming to
IS:1239 part - II accessories like all fittings (standard MS fitting with welded joint shall be used on the pipes)
including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts - bolts, washer including MS Angle
with primer & black paint supporting / fixing the pipe on floor / wall /ceiling with clamps, hangers (using anchor
fasteners) as per specification. All hangers, clamps, brackets etc. shall be of galvanized iron unless specified
otherwise and then supply of the same shall also be included for rates under this head. Welding of any kind on
the galvanized support / hanger shall not be permitted. Vendor to include in his quote all fittings, consumables, - - - - - - - -
supports, rigging & other accessories necessary to bring the system to satisfactory working condition.
NOTE : Vendor to consider The pipe fittings shall be Socket up to 50 mm dia and Welded type for 65 mm dia &
above.

Providing two coats of synthetic enamel black paint of approved shade over two coats of
primer. Prior to application of primer the surface should be cleaned for any dirt, rusts, - - - - - - - -
rough substance etc. Including painting of legends both direction arrow as per the
approval of the Project Manager.
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not - - - - - - - -
be allowed.
a 80 mm dia Mtr R.O 1,054.00 295.00 - - - 1180.3 708.18 106.23 24.43 41.94 35.23 916 256 1,054.00 295.00 Quoted by
b 100 mm dia Mtr 30 1,539.00 368.00 46,170.00 11,040.00 57,210.00 Jindal 1723.7 1,034.22 155.13 35.68 61.25 51.45 1,338 320 1,539.00 368.00 Vijay sales
150 mm dia. corporation
c Mtr R.O 2,256.00 552.00 - - - 2526.7 1,516.02 227.40 52.30 89.79 75.42 1,961 480 2,256.00 552.00
- - - - - - - -
Total : "A" (A.1 to A.7) 116,547.00 20,570.00 149,835.00 29,636.00 179,471.00 - - - - - - - -
- - - - - - - -
B HYDRANT SYSTEM - - - - - - - -
Supply, installation, laying, jointing, hydraulic testing and commissioning of following
sizes of MS (Mild Steel ERW) Pipes conforming to IS - 1239 part - I with all accessories
like all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts -
bolts, washer including supporting / fixing the pipe on floor / wall /ceiling with clamps,
Swivel hangers (using anchor fastners) as per specification. Wherever the pipes are
crossing the walls / floors and sealing the sleeves with glass wool in between & fire
sealent compound at either end all as per site requirements including cutting holes and
chases in brick, R.C.C work and making good the same to original conditions complete in
all respects. The Rates shall include all the suitable type of supports which shall be fabricated by M.S.
Channel / Angle / Flat for above 50 mm dia pipes, anchor fasteners, bolts nuts, clamps, "U" bolts, fittings as per
B.1 IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting, Welding, fixing in / on walls, ceiling by using
suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with 7 tank process, hot
dip galvanizing shall be confirming to IS:2629/2633/4759/6745
Contractor shall perform appropriate calculations and design the structural pipe supports. Universal clamps and
Clevis hangers shall be selected for the appropriate load. Welding of any kind on the galvanized support /
hanger shall not be permitted. Pipe Fittings -Below 65mm GI forged socket weld & 65mm and above Seamless
schedule 40. Vendor to include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.

Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel Post Office red paint and for painting of pipe above ground piping as per the
NBC / IS standards and local fire service department requirement . Prior to application of
primer the surface should be cleaned for any dirt, rusts, rough substance etc. Including
White painting of legends both direction arrow marking and TEXT (Size : 4") to be on the
pipe for their identification as per the approval of the Project Manager.

Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not
be allowed.
a 150 mm dia. Mtr 115 2,551.00 552.00 293,365.00 63,480.00 356,845.00 2857.2 1,714.32 257.15 59.14 101.53 85.29 2,217 480 2,551.00 552.00
Quoted by
b 100 mm dia. Mtr 40 1,740.00 368.00 69,600.00 14,720.00 84,320.00 Jindal 1948.8 1,169.28 175.39 40.34 69.25 58.17 1,512 320 1,740.00 368.00 Vijay sales
c 80 mm dia. Mtr R.O 1,193.00 295.00 - - - 1335.6 801.36 120.20 27.65 47.46 39.87 1,037 256 1,193.00 295.00 corporation
d 50 mm dia. Mtr R.O 746.00 184.00 - - - 835.2 501.12 75.17 17.29 29.68 24.93 648 160 746.00 184.00
- - - - - - - -
Providing protection to embedded MS pipes and fittings by applying protective
primer (@ 100 gm/sqm) thereafter wrapping 4 mm thick protection / pypkote coating coal
B.2 tar based material. Overlap shall be maintained at 15 mm. The application process shall - - - - - - - -
be strictly according to manufacturer’s specification. Including thrust block below the
pipes which are burried.
a 150 mm dia. Mtr R.O 718.00 - - - - 571.44 571.44 - - 28.57 24.00 624 718.00 -
b 80 mm dia. Mtr R.O 336.00 - - - - 267.12 267.12 - - 13.36 11.22 292 336.00 -
- - - - - - - -
B.3 Ball valve - - - - - - - -
Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size : - - - - - - - -
Vendor to include in his quote all fittings, consumables, supports, rigging & other
a 50 mm dia. Nos. R.O 2,933.00 230.00 - - - 3692 2,030.60 304.59 - 116.76 98.08 2,550 200 2,933.00 230.00
accessories necessary to bring the system to satisfactory working condition.
b 40 mm dia. Nos. R.O 2,043.00 184.00 - - - 2572 1,414.60 212.19 - 81.34 68.33 1,776 160 2,043.00 184.00
c 32 mm dia. Nos. R.O 1,403.00 148.00 - - - Zoloto 1766 971.30 145.70 - 55.85 46.91 1,220 128 1,403.00 148.00
25 mm dia.
d Nos. 20 840.00 115.00 16,800.00 2,300.00 19,100.00 1057 581.35 87.20 - 33.43 28.08 730 100 840.00 115.00

- - - - - - - -

B.4 Butterfly valve - - - - - - - -


Supply, installation, testing and commissioning of C.I Lever Operated Butterfly Valve
PN 16 Rating with flanges, nut bolts, washer & gaskets complete required. Butterfly
B.4.1 valve shall be with pad locking arrangement. Vendor to include in his quote all fittings, - - - - - - - -
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 150 mm dia. Nos. 2 6,233.00 966.00 12,466.00 1,932.00 14,398.00 7846 4,315.30 647.30 - 248.13 208.43 5,419 840 6,233.00 966.00
b 100 mm dia. Nos. R.O 3,966.00 506.00 - - - Zoloto 4992 2,745.60 411.84 - 157.87 132.61 3,448 440 3,966.00 506.00
c 80 mm dia. Nos. R.O 2,451.00 368.00 - - - 3085 1,696.75 254.51 - 97.56 81.95 2,131 320 2,451.00 368.00
- - - - - - - -
B.5 Internal Hydrant Valves - - - - - - - -
Supply, installation, testing and commissioning of SS-304 fire hydrant double
Nos. 20 7,046.00 1,150.00 140,920.00 23,000.00 163,920.00 Newage 8,500.00 5,100.00 510.00 - 280.50 235.62 6,126 1000 7,046.00 ###
headed landing valve with 100 mm N.B. flanged inlet, brass spindle controlled 63
mm dia female instantaneous outlet type. S.S. coupling, blank cap, chain, twist release - - - - - - - -
B.6 type
Hoselug & all accessories Conforming to IS:5290. Including fixing with anchor fastner and
Pipe - - - - - - - -
Supply, installation, testing and commissioning of non-percolating rubber reinforced
lined fire Hose pipe Type A (as per IS:636) of 63 mm dia and 15 meter length rated for
brust pressure of 35.7 Kg/sqcm. The hose shall be tested for flame resistance test in
accordance to IS:8423. Hose shall be complete with ISI marked SS male & female coupling
Nos. 20 3,459.00 288.00 69,180.00 5,760.00 74,940.00 Newage 4,500.00 2,700.00 54.00 - 137.70 115.67 3,007 250 3,459.00 288.00
bound & riveted to hose pipe with copper rivets & 1.5 mm copper wire (Location : External
fire hydrant).Vendor to include in his quote all fittings, consumables, supports, rigging &
other accessories necessary to bring the system to satisfactory working condition.

- - - - - - - -
B.7 Hexagonal Nozzle - - - - - - - -
Providing and Supplying S.S Nozzle Branch pipe fitted detachable hexagonal nozzle Rate ref from
conforming to IS : 903. Complete in all respect as per spec Nos. 20 1,741.00 115.00 34,820.00 2,300.00 37,120.00 Newage 2,200.00 1,320.00 66.00 - 69.30 58.21 1,514 100 1,741.00 115.00
Birla BOQ
- - - - - - - -
B.8 First Aid Hose Reel Drum - - - - - - - -
Supply, installation, testing and commissioning of swinging (180 Degree) type First Aid
hose reel in red colour drum with 36 mts long and 20 mm dia heavy duty rubber water
hose, 20 mm dia ball valve, (IS:778, class - II) terminating with G.M. coupling & nozzle of
6mm outlet with shut off valve confirming to IS 8090 - 1976 complete with MS socket for
tap-off, drum and brackets (including painting) for fixing on wall with anchor fastner, bolts Rate ref from
Nos. 20 5,516.00 748.00 110,320.00 14,960.00 125,280.00 Newage 6,100.00 3,660.00 732.00 - 219.60 184.46 4,796 650 5,516.00 748.00
& nuts conforming to IS:884-1985 (Reaffirmed 2000) complete as required.Vendor to Birla BOQ
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.

- - - - - - - -
B.9 Orifice Plate - - - - - - - -
Supply, installation, testing and commissioning of Orifice plate at Fire Hydrant main
tappings and made out of stainless steel plate (thickness as per specification) for following
size of pipe to reduce pressure to a minimum of 3.5 Kg/sq.cm OR maximum of 5.5 - - - - - - - -
kg/Sq.cm at hydrant outlet. Vendor to include in his cost all fittings, accessories,
consumables, rigging equipment & accessories necessary to bring the system to
satisfactory working condition.
a 80 mm Dia, Thickness -3mm Nos. R.O 3,846.00 518.00 - - - Newage 4,860.00 2,916.00 145.80 - 153.09 128.60 3,343 450 3,846.00 518.00
100mm Dia, Thickness -6mm QRate ref from
b Nos. 13 4,273.00 1,150.00 55,549.00 14,950.00 70,499.00 5,400.00 3,240.00 162.00 - 170.10 142.88 3,715 1000 4,273.00 ###
Birla BOQ
c 150mm Dia, Thickness -6mm Nos. R.O 4,747.00 1,380.00 - - - 6,000.00 3,600.00 180.00 - 189.00 158.76 4,128 1200 4,747.00 ###
- - - - - - - -
B.10 Hose Box / Cabinets For Internal Hydrant - - - - - - - -
Supply, installation, testing and commissioning of weather proof lockable cabinet of
size not less than 0.6x 0.75 x 0.25 mtr ( L x H x D) made out of MS sheet of 16 gauge
thickness having central opening and 4 mm thick glazed glass doors (Two nos.)
suitably marked on the outside with the letters "FIRE HOSE" including necessary locking Rate ref from
Nos. 20 7,799.00 345.00 155,980.00 6,900.00 162,880.00 9000 5,400.00 810.00 - 310.50 260.82 6,781 300 7,799.00 345.00
arrangement and shall be painted with one coat of primer and two coats of synthetic Birla BOQ
enamel paint of approved shade.Vendor to include in his quote all fittings, consumables,
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.
The cabinet shall be suitable to accommodate 2 nos. 15 mtr long Hose pipe & 1 No
branch pipe nozzle. It shall be mounted on raised Brick platform complete as required. - - - - - - - -

Fire Fighting BOQ TOWER-1 3


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

(Cost shall be inclusive of providing break glass box containing key for the cabinet along
with hammer). - - - - - - - -

- - - - - - - -
Supply, installation, testing and commissioning of single orifice Air release valve with
isolation ball valve of 25mm NB as per IS 14845 with screwed ends suitable for
Rate ref from
B.11 working pressure of 10kg. Body shall be of Cast iron, seat ring shall be of EPDM rubber & Nos. 2 1,692.00 288.00 3,384.00 576.00 3,960.00 Zoloto 2,332.00 1,282.60 64.13 - 67.34 56.56 1,471 250 1,692.00 288.00
orifice shall be LTB or SS. Vendor to include in his cost all fittings, accessories & Birla BOQ
consumables required for the satisfactory installation & working of the valve.

- - - - - - - -
Supply and fixing of standard Fireman Axe with heavy rubber handle which can sustain Rate ref from
B.12 (20000 Volt). Nos. 20 1,319.00 115.00 26,380.00 2,300.00 28,680.00 1000 1,000.00 50.00 - 52.50 44.10 1,147 100 1,319.00 115.00
Birla BOQ
- - - - - - - -
Providing, fabricating & fixing 150 x 100 welded and fabricated Tee to the Wet riser at
B.13 each floor with 100 dia standard flange welded to the branch tee and drilled for fixing the Nos. 20 1,583.00 115.00 31,660.00 2,300.00 33,960.00 1500 1,200.00 60.00 - 63.00 52.92 1,376 100 1,583.00 115.00
twin hydrant valve with nuts and bolts.
- -
- - - - - - - -
Total : "B" (B.1 to B.14) 70,174.00 10,128.00 ### 155,478.00 ### - - - - - - - -
- - - - - - - -
C SPRINKLERS SYSTEM - - - - - - - -
Supply, installation, hydraulic testing and commissioning of following sizes of MS Pipes
(Mild steel ERW) conforming to IS-1239 Part - I with all accessories like fittings including tees, elbows,
reducers, union, flanges, rubber gaskets, GI nuts - bolts, washer including supporting / fixing the pipe on wall /
ceiling with clamps, Swivel hangers (using anchor fastners) as per specification. Suitable type of supports Shall
be fabricated by M.S. Channel / Angle / Flat for above 50 mm dia, anchor fasteners, bolts - nuts, clamps, "U"
bolts, fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting, Welding, fixing in / on
walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with 7 tank process, hot
C.1 dip galvanizing shall be confirming to IS:2629/2633/4759/6745 - - - - - - - -
Pipe Fittings - Below 65mm GI forged socket weld & 65 mm and above Seamless schedule 40.
Contractor shall perform appropriate calculations and design the structural pipe supports. Universal clamps and
Clevis hangers shall be selected for the appropriate load.

Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel PO red paint and for painting of pipe & brackets and clamps as per IS-5 for
above ground piping as per the NBC / IS standards and local fire service department
requirement complete including supply and installation of G.I. Rods, clamps and ,
- - - - - - - -
fasteners etc. . Prior to application of primer the surface should be cleaned for any dirt,
rusts, rough substance etc. Including White painting of legends both direction arrow
marking and TEXT (Size : 4") to be on the pipe for their identification as per the approval
of the Project Manager.
Rate quoted shall include factory made, seismic support for zone 5 at distance
- - - - - - - -
as per technical specifications. Welding of the components at the site shall not
a be allowed.
150 NB Mtr 115 2,551.00 690.00 293,365.00 79,350.00 372,715.00 2857.2 1,714.32 257.15 59.14 101.53 85.29 2,217 600 2,551.00 690.00
b 100 NB Mtr 125 1,740.00 460.00 217,500.00 57,500.00 275,000.00 1948.8 1,169.28 175.39 40.34 69.25 58.17 1,512 400 1,740.00 460.00
c 80 NB Mtr 560 1,193.00 295.00 668,080.00 165,200.00 833,280.00 1335.6 801.36 120.20 27.65 47.46 39.87 1,037 256 1,193.00 295.00
d 65 NB Mtr 290 955.00 184.00 276,950.00 53,360.00 330,310.00 1069.2 641.52 96.23 22.13 37.99 31.91 830 160 955.00 184.00 Quoted by
Jindal Vijay sales
e 50 NB Mtr 225 746.00 184.00 167,850.00 41,400.00 209,250.00 835.2 501.12 75.17 17.29 29.68 24.93 648 160 746.00 184.00 corporation
f 40 NB Mtr 405 530.00 148.00 214,650.00 59,940.00 274,590.00 592.8 355.68 53.35 12.27 21.07 17.69 460 128 530.00 148.00
g 32 NB Mtr 280 520.00 118.00 145,600.00 33,040.00 178,640.00 514.8 308.88 92.66 12.05 20.68 17.37 452 102 520.00 118.00
h 25 NB Mtr 2830 404.00 92.00 1,143,320.00 260,360.00 1,403,680.00 399.6 239.76 71.93 9.35 16.05 13.48 351 80 404.00 92.00
- - - - - - - -
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly Valve
PN 16 Rating with flanges, nut - bolts, washer & gaskets complete required. Butterfly
C.2 valve shall be with pad locking arrangement. Vendor to include in his quote all fittings, - - - - - - - -
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 150 NB Nos. R.O 6,233.00 897.00 - - - 7846 4,315.30 647.30 - 248.13 208.43 5,419 780 6,233.00 897.00
b 100 NB Nos. 20 3,966.00 598.00 79,320.00 11,960.00 91,280.00 4992 2,745.60 411.84 - 157.87 132.61 3,448 520 3,966.00 598.00
c 80 NB Nos. R.O 2,451.00 368.00 - - - Zoloto 3085 1,696.75 254.51 - 97.56 81.95 2,131 320 2,451.00 368.00
d 65 NB Nos. R.O 1,541.00 230.00 - - - 1940 1,067.00 160.05 - 61.35 51.54 1,340 200 1,541.00 230.00
- - - - - - - -
Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size :
C.3 Vendor to include in his quote all fittings, consumables, supports, rigging & other - - - - - - - -
accessories necessary to bring the system to satisfactory working condition.
a 50 NB (For Sprinkler drain) Nos. 20 2,933.00 230.00 58,660.00 4,600.00 63,260.00 3692 2,030.60 304.59 - 116.76 98.08 2,550 200 2,933.00 230.00
b 40 NB Nos. R.O 2,043.00 184.00 - - - 2572 1,414.60 212.19 - 81.34 68.33 1,776 160 2,043.00 184.00
Zoloto
c 32 NB Nos. R.O 1,403.00 148.00 - - - 1766 971.30 145.70 - 55.85 46.91 1,220 128 1,403.00 148.00
d 25 NB Nos. R.O 2,043.00 115.00 - - - 2572 1,414.60 212.19 - 81.34 68.33 1,776 100 2,043.00 115.00
- - - - - - - -
C.4 Air Release Valve - - - - - - - -
Supply, installation, testing and commissioning of single orifice Air release valve with
isolation ball valve of 25mm NB as per IS 14845 with screwed ends suitable for working
pressure of 10kg. Body shall be of Cast iron, seat ring shall be of EPDM rubber & orifice Nos. 2 1,013.00 288.00 2,026.00 576.00 2,602.00 Zoloto 1,275.00 701.25 105.19 - 40.32 33.87 881 250 1,013.00 288.00
shall be LTB or SS. Vendor to include in his cost all fittings, accessories & consumables
required for the satisfactory installation & working of the valve.

- - - - - - - -
Supply, installation, testing and commissioning of standard response glass bulb type
sprinklers made out of forged brass in nickel chrome finish suitable for a maximum
C.5 working pressure of 12kg/cm2. Vendor to include in his quote all fittings, consumables, - - - - - - - -
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.

a Pendent sprinklers, 68°C Nos. 1117 175.00 92.00 195,475.00 102,764.00 298,239.00 165 132.00 6.60 - 6.93 5.82 151 80 175.00 92.00
b Pendent sprinklers, 79°C Nos. 117 291.00 92.00 34,047.00 10,764.00 44,811.00 275 220.00 11.00 - 11.55 9.70 252 80 291.00 92.00
c Quick Throw sidewall sprinklers, 68°C Nos. R.O 206.00 92.00 - - - 195 156.00 7.80 - 8.19 6.88 179 80 206.00 92.00 Rate ref from
d Quick Throw sidewall sprinklers, 79°C Nos. R.O 354.00 92.00 - - 335 268.00 13.40 - 14.07 11.82 307 80 354.00 92.00 Birla BOQ
-
e Extended Throw sidewall sprinklers, 68°C Nos. R.O 538.00 92.00 - - - HD fire (UL 510 408.00 20.40 - 21.42 17.99 468 80 538.00 92.00
g Upright sprinklers, 68°C Nos. R.O 175.00 92.00 - - - listed) 165 132.00 6.60 - 6.93 5.82 151 80 175.00 92.00
- - - - - - - -
Supply, installation, testing and commissioning of Quick response Pendent conceilied
sprinklers made out of forged brass in nickel chrome finish suitable for a maximum Rate ref from
C.5.1 working pressure of 12kg/cm2. Vendor to include in his quote all fittings, consumables, Nos. R.O 1,583.00 115.00 - - - 1500 1,200.00 60.00 - 63.00 52.92 1,376 100 1,583.00 115.00
Birla BOQ
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.
- - - - - - - -
Suppy and installation of Rossette plates of MS plate of minimum 1 mm thick. Vendor to
include in his quote powder coating of the same to a colour/shade as desired by the
Rate ref from
C.6 architect. Vendor to include in his quote all fittings, consumables, supports, rigging & Nos. R.O 264.00 115.00 - - - 200 200.00 10.00 - 10.50 8.82 229 100 264.00 115.00
Birla BOQ
other accessories necessary to bring the system to satisfactory working condition. (For
False Ceiling Area)
- - - - - - - -
Supply, installation, testing and commissioning of of U.L. listed / FM approved corrugated
SS-304 Braided flexible sprinkler pipe droplet for 12 kg/ sq. cm. working pressure with
C.7 1/2" or 3/4" BSP threaded outlet & 1" BSP threaded inlet with reducer, barrel nipple, - - - - - - - -
elbow, snap, clamp, T-bar bracket etc. with necessary fitting complete as required.
1000 mm length HD fire (UL
a Nos. R.O 871.00 173.00 - - - 825 660.00 33.00 - 34.65 29.11 757 150 871.00 173.00 Rate ref from
listed)
Birla BOQ
b 1200 mm length Nos. R.O 924.00 173.00 - - - 875 700.00 35.00 - 36.75 30.87 803 150 924.00 173.00
- - - - - - - -
Supply, installation, testing and commissioning of Electrically operated water flow
switches (vane type) including all accessories, complete with tap off socket
C.8 arrangement as required, with potential free contact with 2 Nos. NO NC. Vendor to Nos. 20 3,316.00 1,104.00 66,320.00 22,080.00 88,400.00 Honeywell 4000 2,400.00 240.00 - 132.00 110.88 2,883 960 3,316.00 ###
include in his quote all fittings, consumables, supports, & other accessories necessary to
bring the system to satisfactory working condition. (At each tapping from sprinkler
Riser on each floor).
- - - - - - - -
Total : "C" (C.1 to C.9) 40,962.00 7,461.00 ### 902,894.00 ### - - - - - - - -
- - - - - - - -
D MISCELLANEOUS WORKS - - - - - - - -
D.1 Control Panel for Fire Booster Pump: - - - - - - - -
Supply, installation, testing and commissioning of DOL starter panel (IP - 55) for Fire
Rate ref from
Booster pump as per technical specification. Electrical supply upto panel shall be in Nos. 1 68,673.00 5,750.00 68,673.00 5,750.00 74,423.00 65100 52,080.00 2,604.00 - ### ### 59,715 5000 ### ###
Birla BOQ
electrical contractor and further scope is of fire contractor.
- - - - - - - -
Providing and laying cables for individual pumps upto pump panel and allied control
cables with necessary accessories including terminations at both ends. (Cables to be :
Cu/Al XLPE Insulated, cores laid up, PVC tape/Extruded Innersheathed for Multicore Cables
D.2 , Armour (Aluminium wire / Aluminium strip/ Glavanised wire/ galvanised steel strip), - - - - - - - -
extruded PVC Type ST2 sheathed, 650/1100V grade as per IS 7098(Part 1) 1988 and
Outer sheath of extruded FRLSH PVC.) The unit cost of the cable shall include clamps,
fasteners etc. as required for proper and standard installation.
4C x 10 Sqmm Armoured Copper Cable For Booster Pumps. Mtr 152 918.00 52.00 139,352.40 7,893.60 147,246.00 Polycab 1290 645.00 64.50 21.29 36.54 30.69 798 45 918.00 52.00
2C x 1.5 Sqmm Armoured Copper Cable For Booster Pumps remote switch. Mtr 100 126.00 46.00 12,600.00 4,600.00 17,200.00 177 88.50 8.85 2.92 5.01 4.21 109 40 126.00 46.00
- - - - - - - -
Supplying, installation Testing and Commissioning of Remote starting switch at terrace Rate ref from
D.3 Nos. 5 4,616.00 288.00 23,080.00 1,440.00 24,520.00 3500 3,500.00 175.00 - 183.75 154.35 4,013 250 4,616.00 288.00
floor , top 3 floors and ground floor booster pump to start pump. Birla BOQ
- - - - - - - -
Total : "D" (D.1 to D.3) 74,333.00 6,136.00 243,705.40 19,683.60 263,389.00 - - - - - - - -
- - - - - - - -
E PORTABLE FIRE EXTINGUISHERS - - - - - - - -
Supply, installation, testing and commissioning of following types of extinguisher with
provision of wall bracket (fixed with anchor fastner). - - - - - - - -

- - - - - - - -
Supplying, installing, testing and commissioning of 4 Kg Capacity (ABC) dry chemical
powder based (Spot Pressure) fire extinguisher conforming to IS: 15683 : 2001
E.1 with powder coated finish complete with gun metal union, equipped with Safety Valve and Nos. 20 1,826.00 288.00 36,520.00 5,760.00 42,280.00 1978 1,384.60 69.23 - 72.69 61.06 1,588 250 1,826.00 288.00
Pressure Relief Valve, discharge hose and wall mounting bracket etc.

- - - - - - - -
Supplying, installing, testing and commissioning of 9 Kg Capacity dry chemical
E.2 powder type fire extinguisher conforming to IS: 15683 : 2001 with powder coated Nos. R.O 2,756.00 403.00 - - - 2,322.00 2,089.80 104.49 - 109.71 92.16 2,396 350 2,756.00 403.00
finish complete with gun metal union, safety valve, discharge hose and wall mounting
bracket etc.
- - - - - - - -
Supplying, installing, testing and commissioning of 9Kg Capacity CO2 type fire
extinguisher conforming to IS: 15683 : 2001 with powder coated finish manganese Rate ref from
Kanex
E.3 steel complete with wheel type control valve operating mechanism with cce approved Nos. R.O 8,931.00 - - - 7525 6,772.50 338.63 - 355.56 298.67 7,765 350 8,931.00 403.00 Birla BOQ
cylinder, discharge nozzle, 1m wire braided rubber hose, bend and horn and wall
mounting bracket filled with CO2 gas etc.
- - - - - - - -
Supplying & Fixing, of GI sheet of 16 gauge OR 18 gauge thickness Fire bucket with
clean sand & stand in accordance with IS 2546. Fire bucket shall have two coats of anti
corrosive paint, two coats of fire red paint on its outside & two coats of white paint on the
inside. The word "FIRE" shall be clearly stencilled on it in accordance with IS 2546. Vendor
E.4 Nos. R.O 660.00 575.00 - - - 500 500.00 25.00 - 26.25 22.05 573 500 660.00 575.00
to include in his quote all costs relating to mounting of MS Stand the bucket at locations
stated by the Fire NOC & the architect. Vendor to include in his quote all costs all
accessories, consumables, fittings & rigging equipments necessary for the satisfactory
installation of the same.

Total : "E" (E.1 to E.4) 14,173.00 1,266.00 36,520.00 5,760.00 42,280.00

Fire Fighting BOQ TOWER-1 4


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

PROJECT: Galaxy City GUWAHATI


PACKAGE:FF BOQ
DATE: 18-06-2024 Unloadin
g/Mathad
i/Power/w Remark for
Unit Rate Amount Freight Supply Labour OHP Rate
Sr. No DESCRIPTION Unit Qty Make Basic Rate Discounte Accessori Wastage ater/equi Rate
Supply Installation Supply Installation Total 0.03 0.05 0.04 Rate Basic 0.15 Supply Labour
d Rate es pments & reference
A. EQUIPMENTS AND PUMP machinar
BOOSTER PUMP ies.
A.1 Supply, installation, testing and commissioning of Terrace Booster pump comprising of
the following:
Horizontal mono-block centrifugal pumps. The installation shall be complete with flexible
coupling and coupling guard as required. Fire pump shall have C.I. casing, bronze
impeller (hard finished and dynamically balanced) and S.S. (410) Shaft with mechanical
seal, capable to ensure a minimum pressure of 3.5 Kg/Sqcm at the farthest or top most
hydrant / sprinkler. The installation shall be complete with necessary gun metal shut off
a
cock on along with flanges, nut & bolt, washer, rubber gasket, on delivery side. (The pump
should be tested for duty point test at factory and shall be got approved by the Local Fire
Authority).
Cost to be considered to protect the pump assembly from rains on terrace if not under
roof.
Pump shall be capable of furnishing not less than 150% of rated capacity at a head of not
b
less than 65% of the rated head. The shut off head shall not exceed 140% of rated head.
Squirrel cage induction motor TEFC type for operation on 415 V, 3 phase 50 HZ AC supply
c
for the above pump with speed of 2900 R.P.M.
Suitable cement concrete foundation with plaster, (design and drawing to be provided by
d the Contractor while the foundation will be done by others) complete with Antivibration
arrangement of cushy foot mounting with long anchor - bolt.
e For pump defined above & of duty as follows :
FLOW RATE : 900 LPM
PUMP HEAD :35 Mtr. Quotated by
shanbhag
Nos. 1 61,354.00 6,900.00 61,354.00 6,900.00 68,254.00 Kirloskar 51,700.00 46,530.00 2,326.50 - ### 2,051.97 ### 6,000.00 61,354.00 6,900.00
engineering
company
- - - - - - - - -
Note: Vendor Should submit the pump selection curve along with the technical bid. - - - - - - - - -
- - - - - - - - -
BUTTERFLY TYPE ISOLATION VALVES - - - - - - - - -
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly
Valve PN 16 Rating with flanges, nut - bolts, washer & gaskets complete required.
A.2 Butterfly valve shall be with pad locking arrangement. Vendor to include in his quote all - - - - - - - - -
fittings, consumables, supports, rigging & other accessories necessary to bring the system
to satisfactory working condition.
a 80 mm dia. Nos. R.O 2,451.00 368.00 - - - 3,085.00 1,696.75 254.51 - 97.56 81.95 2,130.78 320.00 2,451.00 368.00
b 100mm dia Nos. 4 3,966.00 598.00 15,864.00 2,392.00 18,256.00 Zoloto 4,992.00 2,745.60 411.84 - 157.87 132.61 3,447.92 520.00 3,966.00 598.00
c 150mm dia Nos. R.O 6,233.00 897.00 - - - 7,846.00 4,315.30 647.30 - 248.13 208.43 5,419.15 780.00 6,233.00 897.00
- - - - - - - - -
Y-STARINER - - - - - - - - -
Supply, installation, testing and commissioning of Cast Iron (C.I) `Y' strainer PN 16
with bronze perforated sheet basket including rubber gasket, flanges, nuts, bolts and
A.3
washers etc. Vendor to include in his quote all fittings, consumables, supports, rigging &
other accessories necessary to bring the system to satisfactory working condition.
a 80 mm dia. Nos. R.O 7,140.00 368.00 - - - 8,988.00 4,943.40 741.51 - 284.25 238.77 6,207.92 320.00 7,140.00 368.00
Zoloto
b 100 mm dia Nos. 1 9,791.00 2,300.00 9,791.00 2,300.00 12,091.00 12,326.00 6,779.30 1,016.90 - 389.81 327.44 8,513.44 2,000.00 9,791.00 2,300.00
- - - - - - - - -
NON RETURN VALVES - - - - - - - - -
Supplying, installing, testing and commissioning of C.I. Dual Plate Wafer type Non-return
A.4 Valves PN 16 with SS 304 discs with Nitrile rubber lining as per IS:5312 (Part I) 1984, with - - - - - - - - -
required flanges, nuts, bolts, washer and gaskets etc. complete.
a 80mm dia. Nos. R.O 2,836.00 368.00 - - - 3,570.00 1,963.50 294.53 - 112.90 94.84 2,465.76 320.00 2,836.00 368.00
Lehry
b 100mm dia Nos. 1 4,020.00 1,150.00 4,020.00 1,150.00 5,170.00 5,060.00 2,783.00 417.45 - 160.02 134.42 3,494.89 1,000.00 4,020.00 1,150.00
R.O - - - - - - - - -
A.5 EXPANSION JOINTS - - - - - - - - -
Supply, installation, testing and commissioning of heavy duty double flanged flexion
S.S expansion joint PN 16 (suitable for system test pressure) of standard length as per
manufacturers specs including rubber gaskets, flanges, nuts, bolts and washers. Vendor to - - - - - - - - -
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
a 80mm dia. Nos. R.O 874.00 368.00 - - - 1,100.00 605.00 90.75 - 34.79 29.22 759.76 320.00 874.00 368.00
b 100mm dia Nos. 2 1,192.00 368.00 2,384.00 736.00 3,120.00 Lehry 1,500.00 825.00 123.75 - 47.44 39.85 1,036.04 320.00 1,192.00 368.00
c 150mm dia Nos. R.O 1,589.00 552.00 - - - 2,000.00 1,100.00 165.00 - 63.25 53.13 1,381.38 480.00 1,589.00 552.00
- - - - - - - - -
A.6 PRESSURE GUAGE - - - - - - - - -
Supplying & fixing dial type (100 mm) pressure gauge with isolation ball valve suitable for working pressure of
250 PSI. Cost shall be inclusive of providing any short pieces, nipples, elbows etc as required. Vendor to include
in his quote all fittings, consumables, supports, rigging & other accessories necessary to bring the system to Nos. 1 3,434.00 518.00 3,434.00 518.00 3,952.00 Lehry 4,323.00 2,377.65 356.65 - 136.71 114.84 2,985.85 450.00 3,434.00 518.00
satisfactory working condition.

- - - - - - - - -
A.7 SUCTION & DELIVERY HEADERS - - - - - - - - -

Supply, installation, laying, jointing, hydraulic testing and commissioning of following


sizes of MS (Mild Steel ERW) Pipes conforming to IS - 1239 Part - I with malleable specials confirming to
IS:1239 part - II accessories like all fittings (standard MS fitting with welded joint shall be used on the pipes)
including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts - bolts, washer including MS Angle
with primer & black paint supporting / fixing the pipe on floor / wall /ceiling with clamps, hangers (using anchor
fasteners) as per specification. All hangers, clamps, brackets etc. shall be of galvanized iron unless specified - - - - - - - - -
otherwise and then supply of the same shall also be included for rates under this head. Welding of any kind on
the galvanized support / hanger shall not be permitted. Vendor to include in his quote all fittings, consumables,
supports, rigging & other accessories necessary to bring the system to satisfactory working condition.
NOTE : Vendor to consider The pipe fittings shall be Socket up to 50 mm dia and Welded type for 65 mm dia &
above.

Providing two coats of synthetic enamel black paint of approved shade over two coats of
primer. Prior to application of primer the surface should be cleaned for any dirt, rusts,
- - - - - - - - -
rough substance etc. Including painting of legends both direction arrow as per the
approval
Rate of theshall
quoted Project Manager.
include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not - - - - - - - - -
be allowed.
a 80 mm dia Mtr R.O 1,054.00 295.00 - - - 1,180.30 708.18 106.23 24.43 41.94 35.23 916.01 256.00 1,054.00 295.00 Quoted by
b 100 mm dia Mtr 30 1,539.00 368.00 46,170.00 11,040.00 57,210.00 Jindal 1,723.70 1,034.22 155.13 35.68 61.25 51.45 1,337.74 320.00 1,539.00 368.00 Vijay sales
c 150 mm dia. Mtr R.O 2,256.00 552.00 - - - 2,526.70 1,516.02 227.40 52.30 89.79 75.42 1,960.93 480.00 2,256.00 552.00 corporation
- - - - - - - - -
Total : "A" (A.1 to A.7) 109,729.00 15,970.00 143,017.00 25,036.00 168,053.00 - - - - - - - - -
- - - - - - - - -
B HYDRANT SYSTEM - - - - - - - - -
Supply, installation, laying, jointing, hydraulic testing and commissioning of following sizes of MS (Mild Steel
ERW) Pipes conforming to IS - 1239 part - I with all accessories like all fittings including tees, elbows, reducers,
union, flanges, rubber gaskets, GI nuts - bolts, washer including supporting / fixing the pipe on floor / wall
/ceiling with clamps, Swivel hangers (using anchor fastners) as per specification. Wherever the pipes are
crossing the walls / floors and sealing the sleeves with glass wool in between & fire sealent compound at either
end all as per site requirements including cutting holes and chases in brick, R.C.C work and making good the
same to original conditions complete in all respects. The Rates shall include all the suitable type of supports
which shall be fabricated by M.S. Channel / Angle / Flat for above 50 mm dia pipes, anchor fasteners, bolts
nuts, clamps, "U" bolts, fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting,
Welding, fixing in / on walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with 7 tank process, hot
dip galvanizing shall be confirming to IS:2629/2633/4759/6745
B.1 Contractor shall perform appropriate calculations and design the structural pipe supports. Universal clamps and - - - - - - - - -
Clevis hangers shall be selected for the appropriate load. Welding of any kind on the galvanized support /
hanger shall not be permitted. Pipe Fittings -Below 65mm GI forged socket weld & 65mm and above Seamless
schedule 40. Vendor to include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.

Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel Post Office red paint and for painting of pipe above ground piping as per the
NBC / IS standards and local fire service department requirement . Prior to application of
- - - - - - - - -
primer the surface should be cleaned for any dirt, rusts, rough substance etc. Including
White painting of legends both direction arrow marking and TEXT (Size : 4") to be on the
pipe for their identification as per the approval of the Project Manager.
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not - - - - - - - - -
be allowed.
a 150 mm dia. Mtr 115 2,551.00 552.00 293,365.00 63,480.00 356,845.00 2,857.20 1,714.32 257.15 59.14 101.53 85.29 2,217.43 480.00 2,551.00 552.00 Quoted by
b 100 mm dia. Mtr 40 1,740.00 368.00 69,600.00 14,720.00 84,320.00 1,948.80 1,169.28 175.39 40.34 69.25 58.17 1,512.43 320.00 1,740.00 368.00 Vijay sales
Jindal corporation
c 80 mm dia. Mtr R.O 1,193.00 295.00 - - - 1,335.60 801.36 120.20 27.65 47.46 39.87 1,036.54 256.00 1,193.00 295.00
d 50 mm dia. Mtr R.O 746.00 184.00 - - - 835.20 501.12 75.17 17.29 29.68 24.93 648.19 160.00 746.00 184.00
- - - - - - - - -
Providing protection to embedded MS pipes and fittings by applying protective
primer (@ 100 gm/sqm) thereafter wrapping 4 mm thick protection / pypkote coating coal
B.2 tar based material. Overlap shall be maintained at 15 mm. The application process shall - - - - - - - - -
be strictly according to manufacturer’s specification. Including thrust block below the
pipes which are burried.
a 150 mm dia. Mtr R.O 718.00 - - - - 571.44 571.44 - - 28.57 24.00 624.01 718.00 -
b 80 mm dia. Mtr R.O 336.00 - - - - 267.12 267.12 - - 13.36 11.22 291.70 336.00 -
- - - - - - - -
B.3 Ball valve - - - - - - - -
Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size :
- - - - - - - -
Vendor to include in his quote all fittings, consumables, supports, rigging & other
accessories necessary to bring the system to satisfactory working condition.
a 50 mm dia. Nos. 20 2,933.00 230.00 58,660.00 4,600.00 63,260.00 3,692.00 2,030.60 304.59 - 116.76 98.08 2,550.03 200.00 2,933.00 230.00
Zoloto
b 25 mm dia. Nos. R.O 840.00 115.00 - - - 1,057.00 581.35 87.20 - 33.43 28.08 730.06 100.00 840.00 115.00
- - - - - - - -
B.4 Butterfly valve - - - - - - - -
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly Valve
PN 16 Rating with flanges, nut bolts, washer & gaskets complete required. Butterfly
B.4.1 valve shall be with pad locking arrangement. Vendor to include in his quote all fittings, - - - - - - - -
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 150 mm dia. Nos. 2 6,233.00 966.00 12,466.00 1,932.00 14,398.00 7,846.00 4,315.30 647.30 - 248.13 208.43 5,419.15 840.00 6,233.00 966.00
b 100 mm dia. Nos. R.O 3,966.00 506.00 - - - Zoloto 4,992.00 2,745.60 411.84 - 157.87 132.61 3,447.92 440.00 3,966.00 506.00
c 80 mm dia. Nos. R.O 2,451.00 368.00 - - - 3,085.00 1,696.75 254.51 - 97.56 81.95 2,130.78 320.00 2,451.00 368.00
- - - - - - - - -
B.5 Internal Hydrant Valves - - - - - - - - -
Supply, installation, testing and commissioning of SS-304 fire hydrant double headed landing valve with 100
mm N.B. flanged inlet, brass spindle controlled 63 mm dia female instantaneous outlet type. S.S. coupling,
blank cap, chain, twist release type lug & all accessories Conforming to IS:5290. Including fixing with anchor Rate ref
fastner and flanged tapping from wet riser. (For Internal) Vendor to include in his quote all fittings,
consumables, supports, rigging & other accessories necessary to bring the system to satisfactory working Nos. 20 7,046.00 1,150.00 140,920.00 23,000.00 163,920.00 Newage 8,500.00 5,100.00 510.00 - 280.50 235.62 6,126.12 1,000.00 7,046.00 1,150.00 from Birla
condition. BOQ

- - - - - - - - -
B.6 Hose Pipe - - - - - - - - -
Supply, installation, testing and commissioning of non-percolating rubber reinforced
lined fire Hose pipe Type A (as per IS:636) of 63 mm dia and 15 meter length rated for
brust pressure of 35.7 Kg/sqcm. The hose shall be tested for flame resistance test in Rate ref
accordance to IS:8423. Hose shall be complete with ISI marked SS male & female coupling Nos. 20 3,459.00 288.00 69,180.00 5,760.00 74,940.00 Newage 4,500.00 2,700.00 54.00 - 137.70 115.67 3,007.37 250.00 3,459.00 288.00 from Birla
bound & riveted to hose pipe with copper rivets & 1.5 mm copper wire (Location : External BOQ
fire hydrant).Vendor to include in his quote all fittings, consumables, supports, rigging &
other accessories necessary to bring the system to satisfactory working condition.
- - - - - - - - -
B.7 Hexagonal Nozzle - - - - - - - - -
Rate ref
Providing and Supplying S.S Nozzle Branch pipe fitted detachable hexagonal nozzle
Nos. 20 1,741.00 115.00 34,820.00 2,300.00 37,120.00 Newage 2,200.00 1,320.00 66.00 - 69.30 58.21 1,513.51 100.00 1,741.00 115.00 from Birla
conforming to IS : 903. Complete in all respect as per spec
BOQ
- - - - - - - - -
B.8 First Aid Hose Reel Drum - - - - - - - - -
Supply, installation, testing and commissioning of swinging (180 Degree) type First Aid
hose reel in red colour drum with 36 mts long and 20 mm dia heavy duty rubber water
hose, 20 mm dia ball valve, (IS:778, class - II) terminating with G.M. coupling & nozzle of
Rate ref
6mm outlet with shut off valve confirming to IS 8090 - 1976 complete with MS socket for
Nos. 20 5,516.00 748.00 110,320.00 14,960.00 125,280.00 Newage 6,100.00 3,660.00 732.00 - 219.60 184.46 4,796.06 650.00 5,516.00 748.00 from Birla
tap-off, drum and brackets (including painting) for fixing on wall with anchor fastner, bolts
BOQ
& nuts conforming to IS:884-1985 (Reaffirmed 2000) complete as required.Vendor to
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
- - - - - - - - -
B.9 Orifice Plate - - - - - - - - -
Supply, installation, testing and commissioning of Orifice plate at Fire Hydrant main
tappings and made out of stainless steel plate (thickness as per specification) for following
size of pipe to reduce pressure to a minimum of 3.5 Kg/sq.cm OR maximum of 5.5
- - - - - - - - -
kg/Sq.cm at hydrant outlet. Vendor to include in his cost all fittings, accessories,
consumables, rigging equipment & accessories necessary to bring the system to
satisfactory working condition.
a 80 mm Dia, Thickness -3mm Nos. R.O 3,846.00 518.00 - - - 4,860.00 2,916.00 145.80 - 153.09 128.60 3,343.49 450.00 3,846.00 518.00 Rate ref
b 100mm Dia, Thickness -6mm Nos. 13 4,273.00 1,150.00 55,549.00 14,950.00 70,499.00 Newage 5,400.00 3,240.00 162.00 - 170.10 142.88 3,714.98 1,000.00 4,273.00 1,150.00 from Birla
c 150mm Dia, Thickness -6mm Nos. R.O 4,747.00 1,380.00 - - - 6,000.00 3,600.00 180.00 - 189.00 158.76 4,127.76 1,200.00 4,747.00 1,380.00 BOQ
- - - - - - - - -
B.10 Hose Box / Cabinets For Internal Hydrant - - - - - - - - -
Supply, installation, testing and commissioning of weather proof lockable cabinet of
size not less than 0.6x 0.75 x 0.25 mtr ( L x H x D) made out of MS sheet of 16 gauge
thickness having central opening and 4 mm thick glazed glass doors (Two nos.)
Rate ref
suitably marked on the outside with the letters "FIRE HOSE" including necessary locking
Nos. 20 7,799.00 345.00 155,980.00 6,900.00 162,880.00 9,000.00 5,400.00 810.00 - 310.50 260.82 6,781.32 300.00 7,799.00 345.00 from Birla
arrangement and shall be painted with one coat of primer and two coats of synthetic
BOQ
enamel paint of approved shade.Vendor to include in his quote all fittings, consumables,
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.

Fire Fighting BOQ TOWER-2 5


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

The cabinet shall be suitable to accommodate 2 nos. 15 mtr long Hose pipe & 1 No
- - - - - - - - -
branch pipe nozzle. It shall be mounted on raised Brick platform complete as required.
(Cost shall be inclusive of providing break glass box containing key for the cabinet along
- - - - - - - - -
with hammer).
- - - - - - - - -
Supply, installation, testing and commissioning of single orifice Air release valve with
isolation ball valve of 25mm NB as per IS 14845 with screwed ends suitable for
B.11 working pressure of 10kg. Body shall be of Cast iron, seat ring shall be of EPDM rubber & Nos. 2 1,692.00 288.00 3,384.00 576.00 3,960.00 Zoloto 2,332.00 1,282.60 64.13 - 67.34 56.56 1,470.63 250.00 1,692.00 288.00
orifice shall be LTB or SS. Vendor to include in his cost all fittings, accessories &
consumables required for the satisfactory installation & working of the valve.
- - - - - - - - -
Rate ref
Supply and fixing of standard Fireman Axe with heavy rubber handle which can sustain
B.12 Nos. 20 1,319.00 115.00 26,380.00 2,300.00 28,680.00 1,000.00 1,000.00 50.00 - 52.50 44.10 1,146.60 100.00 1,319.00 115.00 from Birla
(20000 Volt).
BOQ
- - - - - - - - -
Providing, fabricating & fixing 150 x 100 welded and fabricated Tee to the Wet riser at
B.13 each floor with 100 dia standard flange welded to the branch tee and drilled for fixing the Nos. 20 1,583.00 115.00 31,660.00 2,300.00 33,960.00 1,500.00 1,200.00 60.00 - 63.00 52.92 1,375.92 100.00 1,583.00 115.00
twin hydrant valve with nuts and bolts.
- - - - - - - - -
Total : "B" (B.1 to B.14) 66,728 9,796 1,062,284 157,778 1,220,062 - - - - - - - - -
- - - - - - - - -
C SPRINKLERS SYSTEM - - - - - - - - -

Supply, installation, hydraulic testing and commissioning of following sizes of MS Pipes


(Mild steel ERW) conforming to IS-1239 Part - I with all accessories like fittings including tees, elbows,
reducers, union, flanges, rubber gaskets, GI nuts - bolts, washer including supporting / fixing the pipe on wall /
ceiling with clamps, Swivel hangers (using anchor fastners) as per specification. Suitable type of supports Shall
be fabricated by M.S. Channel / Angle / Flat for above 50 mm dia, anchor fasteners, bolts - nuts, clamps, "U"
C.1 bolts, fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting, Welding, fixing in / on - - - - - - - - -
walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with 7 tank process, hot
dip galvanizing shall be confirming to IS:2629/2633/4759/6745
Pipe Fittings - Below 65mm GI forged socket weld & 65 mm and above Seamless schedule 40.
Contractor shall perform appropriate calculations and design the structural pipe supports. Universal clamps and
Clevis hangers shall be selected for the appropriate load.

Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel PO red paint and for painting of pipe & brackets and clamps as per IS-5 for
above ground piping as per the NBC / IS standards and local fire service department
requirement complete including supply and installation of G.I. Rods, clamps and ,
- - - - - - - - -
fasteners etc. . Prior to application of primer the surface should be cleaned for any dirt,
rusts, rough substance etc. Including White painting of legends both direction arrow
marking and TEXT (Size : 4") to be on the pipe for their identification as per the approval
of the Project Manager.
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not - - - - - - - - -
be allowed.
a 150 NB Mtr 115 2,551.00 690.00 293,365.00 79,350.00 372,715.00 2,857.20 1,714.32 257.15 59.14 101.53 85.29 2,217.43 600.00 2,551.00 690.00
b 100 NB Mtr 125 1,740.00 460.00 217,500.00 57,500.00 275,000.00 1,948.80 1,169.28 175.39 40.34 69.25 58.17 1,512.43 400.00 1,740.00 460.00
c 80 NB Mtr 540 1,193.00 295.00 644,220.00 159,300.00 803,520.00 1,335.60 801.36 120.20 27.65 47.46 39.87 1,036.54 256.00 1,193.00 295.00
d 65 NB Mtr 290 955.00 184.00 276,950.00 53,360.00 330,310.00 1,069.20 641.52 96.23 22.13 37.99 31.91 829.79 160.00 955.00 184.00 Quoted by
Jindal Vijay sales
e 50 NB Mtr 245 746.00 184.00 182,770.00 45,080.00 227,850.00 835.20 501.12 75.17 17.29 29.68 24.93 648.19 160.00 746.00 184.00 corporation
f 40 NB Mtr 470 530.00 148.00 249,100.00 69,560.00 318,660.00 592.80 355.68 53.35 12.27 21.07 17.69 460.06 128.00 530.00 148.00
g 32 NB Mtr 280 520.00 118.00 145,600.00 33,040.00 178,640.00 514.80 308.88 92.66 12.05 20.68 17.37 451.64 102.40 520.00 118.00
h 25 NB Mtr 2785 404.00 92.00 1,125,140.00 256,220.00 ### 399.60 239.76 71.93 9.35 16.05 13.48 350.57 80.00 404.00 92.00
- - - - - - - - -
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly
Valve PN 16 Rating with flanges, nut bolts & gaskets complete required. Butterfly
C.2 valve shall be with pad locking arrangement. Vendor to include in his quote all fittings, - - - - - - - - -
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 150 NB Nos. R.O 6,233.00 897.00 - - - 7,846.00 4,315.30 647.30 - 248.13 208.43 5,419.15 780.00 6,233.00 897.00
b 100 NB Nos. 20 3,966.00 598.00 79,320.00 11,960.00 91,280.00 4,992.00 2,745.60 411.84 - 157.87 132.61 3,447.92 520.00 3,966.00 598.00
Zoloto
c 80 NB Nos. R.O 2,451.00 368.00 - - - 3,085.00 1,696.75 254.51 - 97.56 81.95 2,130.78 320.00 2,451.00 368.00
d 65 NB Nos. R.O 1,541.00 230.00 - - - 1,940.00 1,067.00 160.05 - 61.35 51.54 1,339.94 200.00 1,541.00 230.00
- - - - - - - - -
Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size :
C.3 - - - - - - - - -
Vendor to include in his quote all fittings, consumables, supports, rigging & other
accessories necessary to bring the system to satisfactory working condition.
a 50 NB ( For Sprinkler drain) Nos. 20 2,933.00 230.00 58,660.00 4,600.00 63,260.00 3,692.00 2,030.60 304.59 - 116.76 98.08 2,550.03 200.00 2,933.00 230.00
b 40 NB Nos. R.O 2,043.00 184.00 - - - 2,572.00 1,414.60 212.19 - 81.34 68.33 1,776.45 160.00 2,043.00 184.00
Zoloto
c 32 NB Nos. R.O 1,403.00 148.00 - - - 1,766.00 971.30 145.70 - 55.85 46.91 1,219.76 128.00 1,403.00 148.00
d 25 NB Nos. R.O 2,043.00 115.00 - - - 2,572.00 1,414.60 212.19 - 81.34 68.33 1,776.45 100.00 2,043.00 115.00
- - - - - - - - -
C.4 Air Release Valve - - - - - - - - -
Supply, installation, testing and commissioning of single orifice Air release valve with isolation ball valve of
25mm NB as per IS 14845 with screwed ends suitable for working pressure of 10kg. Body shall be of Cast iron,
seat ring shall be of EPDM rubber & orifice shall be LTB or SS. Vendor to include in his cost all fittings,
accessories & consumables required for the satisfactory installation & working of the valve. Nos. 2 1,013.00 288.00 2,026.00 576.00 2,602.00 Zoloto 1,275.00 701.25 105.19 - 40.32 33.87 880.63 250.00 1,013.00 288.00

- - - - - - - - -
Supply, installation, testing and commissioning of standard response glass bulb type sprinklers made out of
forged brass in nickel chrome finish suitable for a maximum working pressure of 12kg/cm2. Vendor to include
C.5 in his quote all fittings, consumables, supports, rigging & other accessories necessary to bring the system to - - - - - - - - -
satisfactory working condition.

a Pendent sprinklers, 68°C Nos. 1131 175.00 92.00 197,925.00 104,052.00 301,977.00 165.00 132.00 6.60 - 6.93 5.82 151.35 80.00 175.00 92.00
b Pendent sprinklers, 79°C Nos. 90 291.00 92.00 26,190.00 8,280.00 34,470.00 275.00 220.00 11.00 - 11.55 9.70 252.25 80.00 291.00 92.00
c Quick Throw sidewall sprinklers, 68°C Nos. R.O 206.00 92.00 - - - 195.00 156.00 7.80 - 8.19 6.88 178.87 80.00 206.00 92.00 Rate ref
from Birla
d Quick Throw sidewall sprinklers, 79°C Nos. R.O 354.00 92.00 - - - 335.00 268.00 13.40 - 14.07 11.82 307.29 80.00 354.00 92.00 BOQ
e Extended Throw sidewall sprinklers, 68°C Nos. R.O 538.00 92.00 - - - 510.00 408.00 20.40 - 21.42 17.99 467.81 80.00 538.00 92.00
HD fire (UL
f Upright sprinklers, 68°C Nos. R.O 175.00 92.00 - - - 165.00 132.00 6.60 - 6.93 5.82 151.35 80.00 175.00 92.00
listed)
- - - - - - - - -
Supply, installation, testing and commissioning of Quick response Pendent conceilied sprinklers Rate ref
C.5.1 made out of forged brass in nickel chrome finish suitable for a maximum working pressure of 12kg/cm2. Nos. R.O 1,583.00 115.00 - - - 1,500.00 1,200.00 60.00 - 63.00 52.92 1,375.92 100.00 1,583.00 115.00 from Birla
Vendor to include in his quote all fittings, consumables, supports, rigging & other accessories necessary to bring
the system to satisfactory working condition. BOQ

- - - - - - - - -
Suppy and installation of Rossette plates of MS plate of minimum 1 mm thick. Vendor to
include in his quote powder coating of the same to a colour/shade as desired by the Rate ref
C.6 architect. Vendor to include in his quote all fittings, consumables, supports, rigging & Nos. R.O 264.00 115.00 - - - 200.00 200.00 10.00 - 10.50 8.82 229.32 100.00 264.00 115.00 from Birla
other accessories necessary to bring the system to satisfactory working condition. (For BOQ
False Ceiling Area)
- - - - - - - - -
Supply, installation, testing and commissioning of of U.L.listed/ FM approved corrugated
SS-304 Braided flexible sprinkler pipe droplet for 12 kg/ sq. cm. working pressure with
C.7 - - - - - - - - -
1/2" or 3/4" BSP threaded outlet & 1" BSP threaded inlet with reducer nipple, snap, clamp,
T-bar bracket etc. with necessary fitting complete as required.
1000 mm length Nos. R.O 871.00 173.00 - - - 825.00 660.00 33.00 - 34.65 29.11 756.76 150.00 871.00 173.00 Rate ref
HD fire (UL listed) from Birla
1200 mm length Nos. R.O 924.00 173.00 - - - 875.00 700.00 35.00 - 36.75 30.87 802.62 150.00 924.00 173.00
BOQ
- - - - - - - - -
Supply, installation, testing and commissioning of Electrically operated water flow
switches (vane type) including all accessories, complete with tap off socket
arrangement as required, with potential free contact with 2 Nos. NO NC. Vendor to
C.8 Nos. 20 4,421.00 1,104.00 88,420.00 22,080.00 110,500.00 Honeywell 4,000.00 3,200.00 320.00 - 176.00 147.84 3,843.84 960.00 4,421.00 1,104.00
include in his quote all fittings, consumables, supports, & other accessories necessary to
bring the system to satisfactory working condition. (At each tapping from sprinkler
Riser on each floor).
- - - - - - - - -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Total : "C" (C.1 to C.9) 42,067 7,461 3,587,186 904,958 4,492,144 - - - - - - - - -
- - - - - - - - -
D MISCELLANEOUS WORKS - - - - - - - - -
D.1 Control Panel for Fire Booster Pump: - - - - - - - - -
Supply, installation, testing and commissioning of DOL starter panel (IP - 55) for Fire Booster pump as per Rate ref
technical specification. Electrical supply upto panel shall be in electrical contractor and further scope is of fire Nos. 1 85,841.00 5,750.00 85,841.00 5,750.00 91,591.00 65,100.00 65,100.00 3,255.00 - ### 2,870.91 ### 5,000.00 85,841.00 5,750.00 from Birla
contractor. BOQ
- - - - - - - - -
Providing and laying cables for individual pumps upto pump panel and allied control
cables with necessary accessories including terminations at both ends. (Cables to be :
Cu/Al XLPE Insulated, cores laid up, PVC tape/Extruded Innersheathed for Multicore Cables
D.2 , Armour (Aluminium wire / Aluminium strip/ Glavanised wire/ galvanised steel strip), - - - - - - - - -
extruded PVC Type ST2 sheathed, 650/1100V grade as per IS 7098(Part 1) 1988 and
Outer sheath of extruded FRLSH PVC.) The unit cost of the cable shall include clamps,
fasteners etc. as required for proper and standard installation.
4C x 10 Sqmm Armoured Copper Cable For Booster Pumps. Mtr 152 918.00 52.00 139,536.00 7,904.00 147,440.00 1,290.00 645.00 64.50 21.29 36.54 30.69 798.02 45.00 918.00 52.00
Polycab
2C x 1.5 Sqmm Armoured Copper Cable For Booster Pumps remote switch. Mtr 100 126.00 46.00 12,600.00 4,600.00 17,200.00 177.00 88.50 8.85 2.92 5.01 4.21 109.50 40.00 126.00 46.00
- - - - - - - - -
Rate ref
Supplying, installation Testing and Commissioning of Remote starting switch at terrace floor, top 3 floors and
D.3 ground floor booster pump to start pump. Nos. 5 4,616.00 288.00 23,080.00 1,440.00 24,520.00 3,500.00 3,500.00 175.00 - 183.75 154.35 4,013.10 250.00 4,616.00 288.00 from Birla
BOQ
- - - - - - - - -
Total : "D" (D.1 to D.3) 91,501 6,136 261,057 19,694 280,751 - - - - - - - - -
- - - - - - - - -
E PORTABLE FIRE EXTINGUISHERS - - - - - - - - -
Supply, installation, testing and commissioning of following types of extinguisher with
- - - - - - - - -
provision of wall bracket (fixed with anchor fastner).
- - - - - - - - -
Supplying, installing, testing and commissioning of 4 Kg Capacity (ABC) dry chemical
powder based (Spot Pressure) fire extinguisher conforming to IS: 15683 : 2001
E.1 Nos. 20 1,826.00 288.00 36,520.00 5,760.00 42,280.00 1,978.00 1,384.60 69.23 - 72.69 61.06 1,587.58 250.00 1,826.00 288.00
with powder coated finish complete with gun metal union, equipped with Safety Valve and
Pressure Relief Valve, discharge hose and wall mounting bracket etc.
- - - - - - - -
Supplying, installing, testing and commissioning of 9 Kg Capacity dry chemical
powder type fire extinguisher conforming to IS: 15683 : 2001 with powder coated
E.2 Nos. R.O 2,756.00 403.00 - - - 2,322.00 2,089.80 104.49 - 109.71 92.16 2,396.16 350.00 2,756.00 403.00
finish complete with gun metal union, safety valve, discharge hose and wall mounting
bracket etc.
- - - - - - - -
Supplying, installing, testing and commissioning of 9Kg Capacity CO2 type fire
extinguisher conforming to IS: 15683 : 2001 with powder coated finish manganese Rate ref
Kanex
E.3 steel complete with wheel type control valve operating mechanism with cce approved Nos. R.O 8,931.00 403.00 - - - 7,525.00 6,772.50 338.63 - 355.56 298.67 7,765.35 350.00 8,931.00 403.00 form Birla
cylinder, discharge nozzle, 1m wire braided rubber hose, bend and horn and wall BOQ
mounting bracket filled with CO2 gas etc.
- - - - - - - -
Supplying & Fixing, of GI sheet of 16 gauge OR 18 gauge thickness Fire bucket with
clean sand & stand in accordance with IS 2546. Fire bucket shall have two coats of anti
corrosive paint, two coats of fire red paint on its outside & two coats of white paint on the
inside. The word "FIRE" shall be clearly stencilled on it in accordance with IS 2546. Vendor
E.4 Nos. R.O 660.00 575.00 - - - 500.00 500.00 25.00 - 26.25 22.05 573.30 500.00 660.00 575.00
to include in his quote all costs relating to mounting of MS Stand the bucket at locations
stated by the Fire NOC & the architect. Vendor to include in his quote all costs all
accessories, consumables, fittings & rigging equipments necessary for the satisfactory
installation of the same.
Total : "E" (E.1 to E.4) 14,173 1,669 36,520 5,760 42,280

Fire Fighting BOQ TOWER-2 6


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

PROJECT: Galaxy City GUWAHATI


PACKAGE:FF BOQ
DATE: 18-06-2024 Unloading/
Mathadi/Po
wer/water/
Existing Rate Amount Discounted Wastage Freight Supply Labour
Sr. No DESCRIPTION Unit Make Basic Rate equipment
Qty Supply Installation Supply Installation Total Rate Accessories 3% 3% Rate Basic
s &0.05
A. EQUIPMENTS AND PUMP machinarie
Supply, Fabrication, Installation, Testing, Balancing and Commissioning of the following s.
equipment and materials in accordance with Specifications and Tender Drawings and
inclusive of taxes, duties, transportation, scaffolding, and insurance till commissioning +
additional 3 months.
All electricals on terrace / exposed to weather to have IP 55 protection and cables laid on
G.I perforated trays.

HYDRANT & SPRINKLER PUMP


Supply, installation, testing and commissioning of electrically driven high pressure
A 1.1
centrifugal fire hydrant / sprinkler pump, suitable for automatic operation consisting of
the following:

Horizontal, high pressure multistage, multioutlet, Positive Suction centrifugal pump. The
installation shall be complete with flexible coupling and coupling guard as required. Fire
pump shall have C.I. casing, CS diffusers, bronze impeller (hard finished and dynamically
balanced) and S.S. (410) Shaft with mechanical seal, capable to ensure a minimum
a
pressure of 3.5 Kg/Sqcm at the farthest or topmost hydrant / sprinkler. The installation
shall be complete with necessary pressure gauge with gun metal shut off cock on delivery
side. (The pump should be tested for duty point test at factory and shall be got approved
by the Local Fire Authority).
Pump shall be capable of furnishing not less than 150% of rated capacity at a head of not
b
less than 65% of the rated head. The shut off head shall not exceed 140% of rated head.

Squirrel cage induction motor, TEFC type suitable for operation on 415 volts, 3 phase 50
HZ A.C supply, for the above pump with synchronous speed of 2900 RPM, conforming to
c
IP 55 protection & class F insulation. The motor shall conform to IS 325-1978 (up to date)
with flexible coupling and coupling guard, complete as required.
d Common base plate for (a) and (C) from M.S. Channel for required size.
Suitable cement concrete foundation with cement concrete plaster (design and drawing
e to be provided by the Plumbing Contractor while the foundation will be done by Civil
Contractor) complete with anti-vibration arrangement of cushy foot mountings.
For pump defined above & of duty as follows :

FLOW RATE : 2850 LPM

PUMP HEAD : 132 Mtr (High Zone) and 95 Mtr (Low Zone). Nos. 2 460,726.00 28,750.00 921,452.00 57,500.00 978,952.00 Kirloskar 588000 352,800.00 17,640.00 - 11,113.20 19,077.66 400,631 25000

DIESEL ENGINE DRIVEN PUMP


A 1.2 Supply, installation, testing and commissioning of Diesel Engine driven fire pump
comprising of the following and confirming to BS 649/IS 10002 all amended up to date.
Horizontal, high pressure multistage, multioutlet, Positive Suction centrifugal pump. The
installation shall be complete with flexible coupling and coupling guard as required. Fire
pump shall have C.I. casing, CS diffusers, bronze impeller (hard finished and dynamically
balanced) and S.S. (410) Shaft with mechanical seal, capable to ensure a minimum
a
pressure of 3.5 Kg/Sqcm at the farthest or topmost hydrant / sprinkler. The installation
shall be complete with necessary pressure gauge with gun metal shut off cock on delivery
side. (The pump should be tested for duty point test at factory and shall be got approved
by the Local Fire Authority).
Pump shall be capable of furnishing not less than 150% of rated capacity at a head of not
b
less than 65% of the rated head. The shut off head shall not exceed 140% of rated head.
Radiator cooled (secondary cooling) diesel engine of speed 1500 RPM suitable for the
above pump with automatic starting mechanism and other accessories including fuel tank
(fabricated from 3mm MS sheet, painted with two coats of synthetic enamel paint over 2
coats of primer) of capacity adequate to sustain pump operation for 8 hours continuous
c
working. The tank shall be fitted with Magnetic oil level indicator, MH with cover, drain
valve, air vent including structural supports (painted with approved shade), 2 Nos. x 12
volt battery, radiator with necessary piping connections & fittings, flexible coupling,
coupling guard & exhaust pipe connection complete as required.
d Common base plate for (a) and (c) from M.S. channel of required size.
Suitable cement concrete foundation with plaster, (design and drawing to be provided by
e the Contractor while the foundation will be done by Civil Contractor) complete with
antivibration arrangement of cushy foot mountings.
For pump defined above & of duty as follows :

FLOW RATE : 2850 LPM

PUMP HEAD : 132 Mtr (High Zone) and 95 Mtr (Low Zone). Nos. 1 532,421.00 20,700.00 532,421.00 20,700.00 553,121.00 Kirloskar 679500 407,700.00 20,385.00 - 12,842.55 22,046.38 462,974 18000

A 1.3 DIESEL ENGINE EXHAUST PIPE


Supply, installation, testing and commissioning of 150 mm dia MS Class ‘B’ Diesel engine
exhaust pipe (including all fittings, clamps, steel support) of suitable dia for the engine.
The pipe shall be provided with 12 mm thick supercera ceramic fibre rope. Chicken wire
mess, cement sand plaster to be required for the burried pipe. Vendor to include in his
Mtrs 20 2,212.00 552.00 44,240.00 11,040.00 55,280.00 Jindal 2131 1,278.60 447.51 51.78 53.34 91.56 1,923 480
quote all fittings, consumables, supports, rigging & other accessories necessary to bring
the system to satisfactory working condition.
Excavation and Back filling including thrust block for pipe on rest to be considered in the
cost for External area Burrired MS Pipe.

JOCKEY PUMP
A 1.4 Supply, installation, testing and commissioning of jockey pump (pressurisation pump)
comprising of the following:
Vertical, high pressure multistage, multioutlet, Positive Suction centrifugal pump. The
installation shall be complete with flexible coupling and coupling guard as required. Fire
pump shall have C.I. casing, CS diffusers, bronze impeller (hard finished and dynamically
balanced) and S.S. (410) Shaft with mechanical seal, capable to ensure a minimum
a
pressure of 3.5 Kg/Sqcm at the farthest or topmost hydrant / sprinkler. The installation
shall be complete with necessary pressure gauge with gun metal shut off cock on delivery
side. (The pump should be tested for duty point test at factory and shall be got approved
by the Local Fire Authority).
Squirrel cage induction motor TEFC type for operation on 415 V, 3 phase 50 HZ AC
b supply for the above pump with a synchronous speed of 2900 R.P.M. With coupling and
coupling guard etc. as required.
c Common base plate for (a) and (b) from M.S. channel as required size.
Suitable cement concrete foundation with plaster, (design and drawing to be provided by
d the fire Contractor while the foundation will be done by Civil Contractor) complete with
antivibration arrangement of cushy foot mountings.
For pump defined above & of duty as follows :

FLOW RATE : 180 LPM

PUMP HEAD : 132 Mtr (High Zone) and 95 Mtr (Low Zone). Nos. 2 77,154.00 17,250.00 154,308.00 34,500.00 188,808.00 Kirloskar 84400 59,080.00 2,954.00 - 1,861.02 3,194.75 67,090 15000

Note: Vendor Should submit the pump selection curve along with the technical bid.

A.2 PRECHARGED AIR VESSEL


Supply, installation, testing and commissioning of precharged air vessel (450mm in
diameter, 1.5m height and 6mm thickness) for pressurization of hydrant / sprinkler system
complete with adequate pressure switches (as per design / requirement) with valves to
operate as per operating sequences including 25 mm dia drain valve, Pressure releif
valve with stop cock on the top, minimum 50 mm dia inlet with isolating valve duly
Nos. 4 64,363.00 3,450.00 257,452.00 13,800.00 271,252.00 45000 45,000.00 6,750.00 - 1,552.50 2,665.13 55,968 3000
painted from inside and outside with two coats of synthetic enamel paint over a coat of
primer confirming to IS : 4736-1968 complete as required. (Vessel should be suitable for
rated working pressure). Vendor to include in his quote all fittings, consumables, supports,
rigging & other accessories necessary to bring the system to satisfactory working
condition.

SLUICE VALVES
Supply, installation, testing and commissioning of extended Spindle type sluice valve
PN 16 of following dia complete with flanges, nuts, bolt, swasher & gaskets complete
A.3 required. Vendor to include in his quote all fittings, consumables, supports, rigging & other
accessories necessary to bring the system to satisfactory working condition.(Suction &
Discharge side)
a 250mm dia Nos. 4 30,837.00 6,325.00 123,348.00 25,300.00 148,648.00 39200 21,560.00 3,234.00 - 743.82 1,276.89 26,815 5500
b 200mm dia Nos. 7 19,135.00 4,600.00 133,945.00 32,200.00 166,145.00 26641 14,652.55 732.63 - 461.56 792.34 16,639 4000
c 150mm dia Nos. 6 11,741.00 3,174.00 70,446.00 19,044.00 89,490.00 Zoloto 16346 8,990.30 449.52 - 283.19 486.15 10,209 2760
d 100mm dia Nos. 2 7,641.00 1,840.00 15,282.00 3,680.00 18,962.00 10637 5,850.35 292.52 - 184.29 316.36 6,644 1600
e 80mm dia Nos. 6 - - - - - - - -

BUTTERFLY VALVES
Supply, installation, testing and commissioning of C.I Lever Operated Butterfly
Valve PN 16 Rating with flanges, nut bolts, washer & gaskets complete required.
A.4 Butterfly valve shall be with pad locking arrangement. Vendor to include in his quote all
fittings, consumables, supports, rigging & other accessories necessary to bring the system
to satisfactory working condition.
c 80 mm dia. Nos. R.O 1,642.00 368.00 - - - 2087 1,147.85 172.18 - 39.60 67.98 1,428 320
b 100mm dia Nos. R.O 2,132.00 552.00 - - - 2710 1,490.50 223.58 - 51.42 88.27 1,854 480
Zoloto
c 150mm dia Nos. 6 3,351.00 828.00 20,106.00 4,968.00 25,074.00 4259 2,342.45 351.37 - 80.81 138.73 2,913 720
d 200Mmm dia Nos. R.O 3,686.00 1,104.00 - - - 4684.9 2,576.70 386.50 - 88.90 152.60 3,205 960

Supply, installation, testing and commissioning of C.I Gear Operated Butterfly Valve
PN 16 Rating with flanges, nut bolts, washer & gaskets complete required. Butterfly
A.4.1 valve shall be with pad locking arrangement. Vendor to include in his quote all fittings,
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 200mm dia Nos. R.O 13,953.00 4,048.00 - - - 17737 9,755.35 1,463.30 - 336.56 577.76 12,133 3520
b 250mm dia Nos. R.O 22,712.00 6,325.00 - - - Zoloto 28871 15,879.05 2,381.86 - 547.83 940.44 19,749 5500
c 300mm dia Nos. R.O 27,019.00 7,590.00 - - - 34346 18,890.30 2,833.55 - 651.72 1,118.78 23,494 6600

Y-STARINER
Supply, installation, testing and commissioning of Cast Iron (C.I) `Y' strainer PN 16
with bronze perforated sheet (3 mm minimum perforation) basket including rubber
A.5 gasket, flanges, nuts, bolts and washers etc. Vendor to include in his quote all fittings,
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 80 mm dia. Nos. R.O 3,128.00 552.00 - - - 3976 2,186.80 328.02 - 75.44 129.51 2,720 480
b 100 mm dia. Nos. R.O 4,193.00 782.00 - - - 5330 2,931.50 439.73 - 101.14 173.62 3,646 680
c 150 mm dia. Nos. R.O 8,396.00 1,449.00 - - - Zoloto 10673 5,870.15 880.52 - 202.52 347.66 7,301 1260
d 200 mm dia. Nos. R.O 16,800.00 4,048.00 - - - 21356 11,745.80 1,761.87 - 405.23 695.65 14,609 3520
e 250 mm dia Nos. 2 27,018.00 6,325.00 54,036.00 12,650.00 66,686.00 34345 18,889.75 2,833.46 - 651.70 1,118.75 23,494 5500

NON RETURN VALVES

Fire Fighting BOQ INFRA 7


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

Supplying, installing, testing and commissioning of C.I. Dual Plate Wafer type Non-return
A.6 Valves PN 16 with SS 304 discs with Nitrile rubber lining as per IS:5312 (Part I) 1984,
with required flanges, nuts, bolts and gaskets etc. complete.
a 80mm dia. Nos. 4 2,809.00 442.00 11,236.00 1,768.00 13,004.00 3570 1,963.50 294.53 - 67.74 116.29 2,442 384
b 100mm dia Nos. R.O 3,981.00 782.00 - - - 5060 2,783.00 417.45 - 96.01 164.82 3,461 680
c 150mm dia Nos. 6 4,777.00 1,311.00 28,662.00 7,866.00 36,528.00 Lehry 6072 3,339.60 500.94 - 115.22 197.79 4,154 1140
d 200mm dia Nos. 3 5,732.00 1,748.00 17,196.00 5,244.00 22,440.00 7286.4 4,007.52 601.13 - 138.26 237.35 4,984 1520
e 250mm dia Nos. R.O 6,879.00 2,185.00 - - - 8743.68 4,809.02 721.35 - 165.91 284.81 5,981 1900

BALL VALVES
Supply, installation, testing and commissioning of forged brass ball valve PN 16 of
the following size : Vendor to include in his quote all fittings, consumables, supports,
A.7
rigging & other accessories necessary to bring the system to satisfactory working
condition.
(Cost shall be inclusive of providing necessary threaded connection).
a 25 mm dia Nos. 15 738.00 115.00 11,070.00 1,725.00 12,795.00 1027 564.85 28.24 - 17.79 30.54 641 100
b 32 mm dia Nos. R.O 1,828.00 148.00 - - - Zoloto 2545 1,399.75 69.99 - 44.09 75.69 1,590 128
c 50 mm dia Nos. R.O 2,652.00 230.00 - - - 3692 2,030.60 101.53 - 63.96 109.80 2,306 200

PRESSURE RELIEF VALVES


Providing, fixing and commissioning of Spring Loaded Relief Valve on Delivery Header
A.8 suitable for pressure of 13.0 Kg / sq.cm including flanges, nuts, bolts, washers etc.
complete as required.
a 100 mm dia Nos. 1 3,065.00 782.00 3,065.00 782.00 3,847.00 3895 2,142.25 321.34 - 73.91 126.87 2,664 680
zoloto
b 25 mm dia Nos. 1 1,890.00 150.00 1,890.00 150.00 2,040.00 2402 1,321.10 198.17 - 45.58 78.24 1,643 130

EXPANSION JOINTS
Supply, installation, testing and commissioning of heavy duty double flanged flexion
S.S expansion joint PN 16 (suitable for system test pressure) of standard length as per
A.9 manufacturers specs including rubber gaskets, flanges, nuts, bolts and washers. Vendor to
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
a 80mm dia. Nos. 4 866.00 295.00 3,464.00 1,180.00 4,644.00 1100 605.00 90.75 - 20.87 35.83 752 256
b 100mm dia Nos. 2 1,180.00 368.00 2,360.00 736.00 3,096.00 1500 825.00 123.75 - 28.46 48.86 1,026 320
Lehry
c 150mm dia Nos. 6 1,574.00 552.00 9,444.00 3,312.00 12,756.00 2000 1,100.00 165.00 - 37.95 65.15 1,368 480
d 200mm dia Nos. 3 2,439.00 736.00 7,317.00 2,208.00 9,525.00 3100 1,705.00 255.75 - 58.82 100.98 2,121 640

PRESSURE SWITCHES
Supply, installation, testing and commissioning of Pressure switches with 20mm dia
isolation ball valve suitable. Vendor to include in his quote all fittings, consumables,
A.10 Nos. 10 1,001.00 184.00 10,010.00 1,840.00 11,850.00 Sant 1,095.00 766.50 38.33 - 24.14 41.45 870 160
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition. shall include in his rates for providing level controllers, pressure
NOTE : Contractor
switches, wiring, cabling from level controller / pressure switch to panel etc. complete as
required to operate the system automatic/manual. Pump shall be protected against
running dry.

PRESSURE GUAGE
Supply, installation, testing and commissioning of dial type of below mentioned size
pressure gauge should be glycerine / gell filled with isolation ball valve suitable for
working pressure of 0 - 40 Kg/Sq.cm. Cost shall be inclusive of providing of SS Syphon U -
A.11
Type, any short pieces, nipples, elbows etc . Vendor to include in his quote all fittings,
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a 100mm Nos. R.O 3,105.00 288.00 - - - 4323 2,377.65 118.88 - 74.90 128.57 2,700 250
Lehry
b 150mm Nos. 12 3,726.00 386.00 44,712.00 4,632.00 49,344.00 5187.6 2,853.18 142.66 - 89.88 154.29 3,240 335

AUTO AIR VENT


Supply, installation, testing and commissioning of single orifice Air release valve PN
16 with isolation ball valve of 25 mm NB as per IS 14845 with screwed ends suitable for
A.12 working pressure of 10 kg/cm2. Body shall be of Cast iron, seat ring shall be of EPDM Nos. 8 1,675.00 288.00 13,400.00 2,304.00 15,704.00 Zoloto 2,332.00 1,282.60 64.13 - 40.40 69.36 1,456 250
rubber & orifice shall be LTB or SS. Vendor to include in his cost all fittings, accessories &
consumables required for the satisfactory installation & working of the valve.

FLOW METER
Supply, Installation, testing and commissioning of Flow metre( Electronic type) on Test line
to measure 150 % of pump flow and suitable for below mentioned size. Vendor to include
A.13
in his quote all fittings, consumables, supports, rigging & other accessories necessary to
bring the system to satisfactory working condition.
a 80 mm dia Nos. R.O 6,982.00 207.00 - - - 5,346.00 5,346.00 267.30 - 168.40 289.08 6,071 180
b 100 mm dia Nos. R.O 7,758.00 242.00 - - - HD Fire 5,940.00 5,940.00 297.00 - 187.11 321.21 6,745 210
c 150 mm dia Nos. 1 8,620.00 288.00 8,620.00 288.00 8,908.00 6,600.00 6,600.00 330.00 - 207.90 356.90 7,495 250

A.14 SUCTION & DELIVERY HEADERS


Providing and fixing heavy class MS Suction & delivery headers of required length
conforming to IS: 1239 / IS:3589 class C with welded joints standard MS Fittings and with
end flange connections having inlet & outlet flanged connections including MS Angle
supports from wall/ floors & ceiling complete as required. Cost should be inclusive of all
supports / clamps / brackets, anchor fastner etc. as required (all in MS as per project
specs). Pipes upto 200 mm dia shall be GI & above 200 mm shall be M.S.
Providing two coats of synthetic enamel paint of approved shade over a coat of primer.
Prior to application of primer the surface should be cleaned for any dirt, rusts, rough
substance etc. Including painting of legends both direction arrow as per the approval of
the Project Manager. Complete as required as per relevant Standards, manufacturers
recommendation for installation and project tech specs. Contractor shall include in his
rates for providing level controllers, wastages, ON/OFF Valve, pressure switches, wiring,
cabling from level controller / pressure switch to panel etc. complete as required to
operate the system automatic / manual. Pump shall be protected against running dry.
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not
be allowed.
a 25 mm dia. Mtr R.O 367.00 92.00 - - - 366.3 219.78 65.93 8.57 8.83 15.16 318 80
b 80 mm dia. Mtr 30 1,224.00 295.00 36,720.00 8,850.00 45,570.00 1224.3 734.58 220.37 28.65 29.51 50.66 1,064 256
c 100 mm dia. Mtr 60 1,580.00 368.00 94,800.00 22,080.00 116,880.00 1786.4 1,071.84 160.78 36.98 38.09 65.38 1,373 320
d 150 mm dia. Mtr 30 2,316.00 552.00 69,480.00 16,560.00 86,040.00 Jindal 2619.1 1,571.46 235.72 54.22 55.84 95.86 2,013 480
e 200 mm dia. Mtr 40 2,828.00 736.00 113,120.00 29,440.00 142,560.00 3198.8 1,919.28 287.89 66.22 68.20 117.08 2,459 640
f 250 mm dia Mtr 20 3,498.00 920.00 69,960.00 18,400.00 88,360.00 3956.7 2,374.02 356.10 81.90 84.36 144.82 3,041 800
g 300 mm dia Mtr R.O 4,122.00 1,104.00 - - - 4662.9 2,797.74 419.66 96.52 99.42 170.67 3,584 960

Providing, fabricating & fixing MS angle, flats, channels fabricated brackets / Supports for
A.15 supporting the pipes with 10mm 'U' bolts as per requirement,over & above piping Kg. 150 105.00 36.00 15,750.00 5,400.00 21,150.00 75 75.00 9.00 - 2.52 4.33 91 31
supports. ( For work within wet riser & Pump room )

Total : "A" (A.1 to A15) ### 136,442.00 2,899,312.00 370,147.00 3,269,459.00

B HYDRANT SYSTEM
Supply, installation, laying, jointing, testing and commissioning of following sizes of MS
Pipes (Mild steel ERW) pipes conforming to IS-1239 with all accessories like all
fittings including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts bolts,
washer including supporting/fixing the pipe on floor / wall /ceiling with clamps, hangers
(using anchor fastners) as per specification. Wherever the pipes are crossing the
walls/floors and sealing the sleeves with glass wool in between & fire sealent compound at
either end all as per site requirements including cutting holes and chases in brick, R.C.C
work and making good the same to original conditions complete in all respects. The Rates
shall include all the suitable type of supports which shall be fabricated by M.S. Channel /
Angle / Flat for above 50 mm dia pipes, anchor fasteners, bolts nuts, clamps, "U" bolts,
B.1
fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting, Welding,
fixing in / on walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with
7 tank process, hot dip galvanizing shall be confirming to IS:2629/2633/4759/6745
Contractor shall perform appropriate calculations and design the structural pipe supports.
Universal clamps and Clevis hangers shall be selected for the appropriate load. Welding
of any kind on the galvanized support / hanger shall not be permitted. Pipe Fittings -Below
65mm GI forged socket weld & 65mm and above Seamless schedule 40. Vendor to
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel PO red paint and for painting of pipe & brackets and clamps as per IS-5 for
above ground piping as per the NBC / IS standards and local fire service department
requirement complete including supply and installation of G.I. Rods, clamps and ,
fasteners etc. . Prior to application of primer the surface should be cleaned for any dirt,
rusts, rough substance etc. Including painting of legends both direction arrow as per the
approval of the Project Manager
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not
be allowed.
a 150 mm dia. Mtr 620.56 2,316.00 552.00 1,437,216.96 342,549.12 1,779,767.00 2619.1 1,571.46 235.72 54.22 55.84 95.86 2,013 480

b 100 mm dia. Mtr 40 1,580.00 368.00 63,200.00 14,720.00 77,920.00 Jindal 1786.4 1,071.84 160.78 36.98 38.09 65.38 1,373 320

c 80 mm dia. Mtr 40 1,083.00 295.00 43,320.00 11,800.00 55,120.00 1224.3 734.58 110.19 25.34 26.10 44.81 941 256

d 50 mm dia. Mtr R.O 677.00 184.00 - - - 765.6 459.36 68.90 15.85 16.32 28.02 588 160

Providing protection to MS pipes and fittings by applying protective primer (@ 100


gm/sqm) thereafter wrapping 4 mm thick protection / pypkote coating coal tar based
B.2 material. Overlap shall be maintained at 15 mm. The application process shall be strictly
according to manufacturer’s specification. Including thrust block below the pipes which
are burried.
a 150 mm dia. Mtr 30 672.00 included 20,160.00 - 20,160.00 523.82 523.82 - 15.71 16.19 27.79 584
b 100 mm dia. Mtr 40 458.00 included 18,320.00 - 18,320.00 357.28 357.28 - 10.72 11.04 18.95 398
C 80 mm dia. Mtr 40 314.00 included 12,560.00 - 12,560.00 244.86 244.86 - 7.35 7.57 12.99 273

B.3 Ball valve


Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size :
Vendor to include in his quote all fittings, consumables, supports, rigging & other
accessories necessary to bring the system to satisfactory working condition.
a 50 mm dia. Nos. R.O 2,905.00 230.00 - - - 3692 2,030.60 304.59 - 70.06 120.26 2,526 200
b 32 mm dia. Nos. R.O 1,390.00 148.00 - - - 1766 971.30 145.70 - 33.51 57.53 1,208 128
zoloto
c 25 mm dia. Nos. 7 2,905.00 115.00 20,335.00 805.00 21,140.00 3692 2,030.60 304.59 - 70.06 120.26 2,526 100

B.4 Butterfly valve


Supply, installation, testing and commissioning of C.I Lever Operated Butterfly Valve
PN 16 Rating with flanges, nut bolts & gaskets complete required. Butterfly valve shall
B.4.1 be with pad locking arrangement. Vendor to include in his quote all fittings, consumables,
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.
a 150 mm dia. Nos. 2 3,351.00 690.00 6,702.00 1,380.00 8,082.00 4259 2,342.45 351.37 - 80.81 138.73 2,913 600

Fire Fighting BOQ INFRA zoloto 8


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

b 100 mm dia. Nos. R.O 2,132.00 460.00 - - - 2710 1,490.50 223.58 - 51.42 88.27 1,854 400
zoloto
c 80 mm dia. Nos. R.O 1,731.00 368.00 - - - 2200 1,210.00 181.50 - 41.75 71.66 1,505 320
d 65 mm dia. Nos. R.O 1,527.00 230.00 - - - 1940 1,067.00 160.05 - 36.81 63.19 1,327 200

B.5 Internal Hydrant Valves


Providing, fixing, testing and commissioning of Double head SS 304, ISI marked oblique
pattern hydrant landing valve Type B' with 80mm dia flanged inlet & 63mm dia
Nos. 6 6,661.00 2,875.00 39,966.00 17,250.00 57,216.00 Newage 8,500.00 5,100.00 255.00 - 160.65 275.78 5,791 2500
instanteous type female outlet complete with SS cap and chain, twist release type lug and
all accessories as per (IS : 5290:1983)

B.6 Courtyard Yard Hydrants


Providing oblique SS 304 Hydrant valve, 75 mm dia. Inlet and 63 mm dia.
Instantaneous type female outlet conforming to IS 5290 with SS Hand wheel, SS blank cap
& chain, twist release type plug including nuts, bolts, washers, gaskets with necessary
Nos. 14 3,526.00 748.00 49,364.00 10,472.00 59,836.00 4500 2,700.00 135.00 - 85.05 146.00 3,066 650
fittings like Tee, elbow etc including painting the Hydrant valve and the exposed portion of
GI pipe with 2 coats of signal red paint over a coat of primer and all as per specification
and as directed by Consultant.

B.7 Fire Service Inlet


Providing & fixing SS 304 Fire Brigade 150mm Breaching Connection consisting of 4 Way
Suction Collecting Head cosisting of 63 mm dia. Instantaneous type male coupling with
built-in Check valves and 100mm dia flanged outlet complete with bolts, nuts and rubber
insertions including testing the joints as required all as per IS:904. including nuts, bolts, Nos. 1 5,970.00 included 5,970.00 - 5,970.00 Newage 8,000.00 4,800.00 - - 144.00 247.20 5,191
washers, gaskets with necessary fittings like Tee, elbow etc including painting the
Hydrant valve and the exposed portion of MS pipe with 2 coats of signal red paint over a
coat of primer and testing, all as per specification and as directed by Consultant.

B.8 Fire Brigade Inlet Connection


Providing & fixing SS 304 Fire Brigade 150mm Breaching Connection consisting of 2 Way
Suction Collecting Head cosisting of 63 mm dia. Instantaneous type male coupling with
built-in Check valves and 100mm dia flanged outlet complete with bolts, nuts and rubber
insertions including testing the joints as required all as per IS:904. including nuts, bolts, Nos. 1 4,105.00 included 4,105.00 - 4,105.00 Newage 5,500.00 3,300.00 - - 99.00 169.95 3,569
washers, gaskets with necessary fittings like Tee, elbow etc including painting the
Hydrant valve and the exposed portion of MS pipe with 2 coats of signal red paint over a
coat of primer and testing, all as per specification and as directed by Consultant.

B.9 Drawout Connection


Providing & fixing SS fire brigade Draw out connection Consisting of 2 way suction
collection head of 63mm dia Instantaneous type male coupling (draw-out connection) with
nut as per IS: 902-1974 complete with 100 mm dia MS suction pipe and 100 mm dia foot Nos 1 4,310.00 978.00 4,310.00 978.00 5,288.00 Newage 5,500.00 3,300.00 165.00 - 103.95 178.45 3,747 850
valve (to be connected to static tank). (MS pipe to be paid separately through appropriate
item while cost of foot valve to be included).

B.10 Hose Pipe


Providing & fixing Rubberized Fabric Reinforced Rubber Lined RRL FIRE hose type A
conforming to IS 636I.S.I 63mm dia 2x15m long with SS male & female couplings (IS:903) Nos. 6 3,426.00 288.00 20,556.00 1,728.00 22,284.00 Newage 4,500.00 2,700.00 54.00 - 82.62 141.83 2,978 250
bound & riveted to hose pipes with copper rivets and copper wire.

B.11 Hexagonal Nozzle


Providing and Supplying S.S Nozzle Branch pipe fitted detachable hexagonal nozzle
Nos. 6 2,299.00 115.00 13,794.00 690.00 14,484.00 Newage 2,200.00 1,760.00 88.00 - 55.44 95.17 1,999 100
conforming to IS : 903. Complete in all respect as per spec

B.12 First Aid Hose Reel Drum


Supplying and installing testing and commissing of wall mounting swinging hose reel drum
(180 Degree) as per IS 884 and fitted with 20 mm dia x 30 meter long thermoplastic hose
pipe as per IS 444 with 6 mm outlet with shut off nozzle with necessary MS bracket for
Nos. 6 5,463.00 7,475.00 32,778.00 44,850.00 77,628.00 Newage 6,100.00 3,660.00 732.00 - 131.76 226.19 4,750 6500
holding hose reel drum fitted in position on wall with anchor fastner in approved manner
etc., complete as required inside the hose box including 25 mm MS pipe from stub to
hose reel.

B.13 Orifice Plate


Supply, installation, testing and commissioning of Orifice plate at Fire Hydrant main
tappings and made out of stainless steel plate (thickness as per specification) for following
size of pipe to reduce pressure to a minimum of 3.5 Kg/sq.cm OR maximum of 5.5
kg/Sq.cm at hydrant outlet. Vendor to include in his cost all fittings, accessories,
consumables, rigging equipment & accessories necessary to bring the system to
satisfactory working condition.
a 80 mm Dia, Thickness -3mm Nos. 14 3,809.00 1,093.00 53,326.00 15,302.00 68,628.00 4,860.00 2,916.00 145.80 - 91.85 157.68 3,311 950
Newage
b 100mm Dia, Thickness -6mm Nos. 6 4,232.00 1,265.00 25,392.00 7,590.00 32,982.00 5,400.00 3,240.00 162.00 - 102.06 175.20 3,679 1100
c 150mm Dia, Thickness -6mm Nos. R.O 4,702.00 1,380.00 - - - 6,000.00 3,600.00 180.00 - 113.40 194.67 4,088 1200

B.14 Hose Box / Cabinets


Providing and fixing weather proof hose cabinet fabricated from 1.6mm M.S. sheet with
front glass door and locking arrangement, suitable to accommodate all the necessary
pipes, accessories, fittings etc. as per drawing. The cabinet shall be painted with one coat
of primer and 2 more coats of synthetic enamel paint of approved shade and shall be
suitably mounted on concrete bases.
a Size - 750 x 600 x 250 (For Internal Hydrant) Nos. 6 6,866.00 345.00 41,196.00 2,070.00 43,266.00 8000 4,800.00 720.00 - 165.60 284.28 5,970 300

B.15 Hose Box / Cabinets


Providing and fixing weather proof hose cabinet fabricated from 1.6mm M.S. sheet with
front glass door and locking arrangement, suitable to accommodate all the necessary
pipes, accessories, fittings etc. as per drawing. The cabinet shall be painted with one coat
9000 5,400.00 810.00 - 186.30 319.82 6,716 300
of primer and 2 more coats of synthetic enamel paint of approved shade and shall be
suitably mounted on concrete bases. The sign, \HOSE BOX etc. shall be painted
in \"CAPITAL LETTERS in white synthetic paint.
Size - 750 x 600 x 250 (For Yard Hydrant) Nos. 14 7,724.00 345.00 108,136.00 4,830.00 112,966.00 9000 5,400.00 810.00 - 186.30 319.82 6,716 300

Supply, installation, testing and commissioning of single orifice Air release valve with
isolation ball valve of 25mm NB as per IS 14845 with screwed ends suitable for working
B.16 pressure of 10kg/cm2. Body shall be of Cast iron, seat ring shall be of EPDM rubber & Nos. R.O 1,675.00 288.00 - - - Zoloto 2,332.00 1,282.60 64.13 - 40.40 69.36 1,456 250
orifice shall be LTB or SS. Vendor to include in his cost all fittings, accessories &
consumables required for the satisfactory installation & working of the valve.

Providing, fabricating & fixing 150 x 100 welded and fabricated Tee to the Wet riser at
B.17 each floor with 100 dia standard flange welded to the branch tee and drilled for fixing the Nos. 6 1,568.00 115.00 9,408.00 690.00 10,098.00 1500 1,200.00 60.00 - 37.80 64.89 1,363 100
twin hydrant valve with nuts and bolts.

Providing, fabricating & fixing MS angle, flats, channels fabricated brackets / Supports for
B.18 supporting the pipes with 10mm 'U' bolts as per requirement,over & above piping 100 58.00 115.00 5,800.00 11,500.00 17,300.00 120 120.00 - - 3.60 6.18 50 100
supports. ( For Horizontal running pipe)

Total : "B" (B.1 to B.19) 89,435 21,065 2,035,915 489,204 2,525,120

C SPRINKLERS SYSTEM
Supply, installation, laying, jointing, testing and commissioning of following sizes of MS
( Miled steel ERW) pipes conforming to IS-1239 with all accessories like all fittings
including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts bolts, washer
including supporting / fixing the pipe on floor / wall /ceiling with clamps, hangers (using
anchor fastners) as per specification. Wherever the pipes are crossing the walls / floors
and sealing the sleeves with glass wool in between & fire sealent compound at either end
all as per site requirements including cutting holes and chases in brick, R.C.C work and
making good the same to original conditions complete in all respects. The Rates shall
include all the suitable type of supports which shall be fabricated by M.S. Channel /
Angle / Flat for above 50 mm dia pipes, anchor fasteners, bolts nuts, clamps, "U" bolts,
C.1
fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting, Welding,
fixing in / on walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with
7 tank process, hot dip galvanizing shall be confirming to IS:2629/2633/4759/6745
Contractor shall perform appropriate calculations and design the structural pipe supports.
Universal clamps and Clevis hangers shall be selected for the appropriate load. Welding of
any kind on the galvanized support / hanger shall not be permitted. Pipe Fittings - Below
65mm GI forged socket weld & 65mm and above Seamless schedule 40. Vendor to
include in his quote all fittings, consumables, supports, rigging & other accessories
necessary to bring the system to satisfactory working condition.
Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel PO red paint and for painting of pipe & brackets and clamps as per IS-5 for
above ground piping as per the NBC / IS standards and local fire service department
requirement complete including supply and installation of G.I. Rods, clamps and ,
fasteners etc. Prior to application of primer the surface should be cleaned for any dirt,
rusts, rough substance etc. Including painting of legends both direction arrow as per the
approval of the Project Manager
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not
be allowed.
a 150 NB Mtr 565 2,526.00 552.00 1,427,190.00 311,880.00 1,739,070.00 2857.2 1,714.32 257.15 59.14 60.92 104.58 2,196 480
b 100 NB Mtr 120 1,723.00 368.00 206,760.00 44,160.00 250,920.00 1948.8 1,169.28 175.39 40.34 41.55 71.33 1,498 320
c 80 NB Mtr 135 1,181.00 295.00 159,435.00 39,825.00 199,260.00 1335.6 801.36 120.20 27.65 28.48 48.88 1,027 256
d 65 NB Mtr 90 946.00 240.00 85,140.00 21,600.00 106,740.00 1069.2 641.52 96.23 22.13 22.80 39.13 822 208
Jindal
e 50 NB Mtr 235 739.00 184.00 173,665.00 43,240.00 216,905.00 835.2 501.12 75.17 17.29 17.81 30.57 642 160
f 40 NB Mtr 185 524.00 148.00 96,940.00 27,380.00 124,320.00 592.8 355.68 53.35 12.27 12.64 21.70 456 128
g 32 NB Mtr 125 535.00 118.00 66,875.00 14,750.00 81,625.00 514.8 308.88 108.11 12.51 12.88 22.12 465 102
h 25 NB Mtr 1355 415.00 92.00 562,325.00 124,660.00 686,985.00 399.6 239.76 83.92 9.71 10.00 17.17 361 80

Supply, installation, testing and commissioning of C.I Lever Operated Butterfly Valve
PN 16 Rating with flanges, nut bolts & gaskets complete required. Butterfly valve shall
C.2 be with pad locking arrangement. Vendor to include in his quote all fittings, consumables,
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.
a 150 NB Nos. 2 3,351.00 690.00 6,702.00 1,380.00 8,082.00 4259 2,342.45 351.37 - 80.81 138.73 2,913 600
b 100 NB Nos. 4 2,132.00 460.00 8,528.00 1,840.00 10,368.00 2710 1,490.50 223.58 - 51.42 88.27 1,854 400
Zoloto
c 80 NB Nos. R.O 1,642.00 368.00 - - - 2087 1,147.85 172.18 - 39.60 67.98 1,428 320
d 65 NB Nos. R.O 1,527.00 230.00 - - - 1940 1,067.00 160.05 - 36.81 63.19 1,327 200

Supply, installation, testing and commissioning of forged brass ball valve with forged
brass ball (suitable for test pressure of not less than 30 kg / sq.cm of the following size :
C.3
Vendor to include in his quote all fittings, consumables, supports, rigging & other
accessories necessary to bring the system to satisfactory working condition.
a 50 NB ( For Sprinkler drain) Nos. 6 2,905.00 230.00 17,430.00 1,380.00 18,810.00 3692 2,030.60 304.59 - 70.06 120.26 2,526 200
Zoloto
b 25 NB Nos. R.O 832.00 115.00 - - - 1057 581.35 87.20 - 20.06 34.43 723 100

Fire Fighting BOQ INFRA 9


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

Supply, installation, testing and commissioning of 150mm Installation Control Valve


with turbine type automatic Alarm water motor Gong, Ductile Iron body, Bronze seat to be
connected with test and drain valves, trims and all other necessary components with
C.4 bronze clapper, S.S shaft, C.I handhole cover, Nitile rubber bushing and seat O ring, Nos. 2 26,537.00 1,380.00 53,074.00 2,760.00 55,834.00 25400 20,320.00 1,016.00 - 640.08 1,098.80 23,075 1200
Flanged End connections as per manufacturer's specifications complete as
required.Complete as required as per relevant Standards , manufacturers
recommendation for installation and Tech Specs.Rates shall be inclusive of all wastages.

Supply, installation, testing and commissioning of standard response glass bulb type
conceilied sprinklers made out of forged brass in nickel chrome finish suitable for a
C.5 maximum working pressure of 12kg/cm2. Vendor to include in his quote all fittings,
consumables, supports, rigging & other accessories necessary to bring the system to
satisfactory working condition.
a Pendent sprinklers, 68°C Nos. 423 151.00 92.00 63,873.00 38,916.00 102,789.00 165 115.50 5.77 - 3.64 6.25 131 80
b Pendent sprinklers, 79°C Nos. 5 252.00 92.00 1,260.00 460.00 1,720.00 275 192.50 9.63 - 6.06 10.41 219 80
c Quick Throw sidewall sprinklers, 68°C Nos. RO 179.00 92.00 - - - 195 136.50 6.83 - 4.30 7.38 155 80
d Quick Throw sidewall sprinklers, 79°C Nos. R.O 307.00 92.00 - - - 335 234.50 11.73 - 7.39 12.68 266 80
e Extended Throw sidewall sprinklers, 68°C Nos. R.O 467.00 92.00 - - - 510 357.00 17.85 - 11.25 19.30 405 80
HD fire (UL
f Upright sprinklers, 68°C Nos. 118 151.00 92.00 17,818.00 10,856.00 28,674.00 listed) 165 115.50 5.77 - 3.64 6.25 131 80
- - - - - -
Supply, installation, testing and commissioning of Quick response Pendent conceilied
sprinklers made out of forged brass in nickel chrome finish suitable for a maximum
C.5.1 working pressure of 12kg/cm2. Vendor to include in his quote all fittings, consumables, Nos. 128 1,150.00 115.00 147,200.00 14,720.00 161,920.00 1100 880.00 44.00 - 27.72 47.59 999 100
supports, rigging & other accessories necessary to bring the system to satisfactory
working condition.

Suppy and installation of Rossette plates of MS plate of minimum 1 mm thick. Vendor to


include in his quote powder coating of the same to a colour/shade as desired by the
C.6 architect. Vendor to include in his quote all fittings, consumables, supports, rigging & Nos. 128 262.00 115.00 33,536.00 14,720.00 48,256.00 200 200.00 10.00 - 6.30 10.82 227 100
other accessories necessary to bring the system to satisfactory working condition. (For
False Ceiling Area)

Supply, installation, testing and commissioning of of U.L. listed / FM approved corrugated


SS-304 Braided flexible sprinkler pipe droplet for 12 kg/ sq. cm. working pressure with
C.7
1/2" or 3/4" BSP threaded outlet & 1" BSP threaded inlet with reducer, barrel nipple,
elbow, snap, clamp, T-bar bracket etc. with necessary fitting complete as required.

a 1000 mm length Nos. 128 862.00 173.00 110,336.00 22,144.00 132,480.00 HD fire (UL 825 660.00 33.00 - 20.79 35.69 749 150
listed)
b 1200 mm length Nos. R.O 915.00 173.00 - - - 875 700.00 35.00 - 22.05 37.85 795 150

Supply, installation, testing and commissioning of Electrically operated water flow


switches (vane type) including all accessories, complete with tap off socket
arrangement as required, with potential free contact with 2 Nos. NO NC. Vendor to
C.8 Nos. 6 4,378.00 1,104.00 26,268.00 6,624.00 32,892.00 Honeywell 4000 3,200.00 320.00 - 105.60 181.28 3,807 960
include in his quote all fittings, consumables, supports, & other accessories necessary to
bring the system to satisfactory working condition. (At each tapping from sprinkler
Riser on each floor).
- - - - - -
Supplying, installing, testing and commissioning of Pilot operated Ductile iron body PRV
station (Item described below) ,PRV shall be with Ductile iron body & cover and internal
bypass line, isolation valves and pressure gauges before and after PRV with bypass
C.10 arrangement and shall be provided as indicated on schematic and drawings and suitable
for upstream operating pressure of max. 12 bar.
(1PRV station consists of 2 PRVs which include total of 6 Butterfly Valves, 1 Y-strainer and
1 Pressure relief valve,2 pressure switch) refer Typical installation detail.
PRV (Diaphrame type -Flanged Type ) - 150 mm dia Nos. R.O 47,013.00 5,750.00 - - - Lehry 45000 36,000.00 1,800.00 - 1,134.00 1,946.70 40,881 5000

Providing, fabricating & fixing MS angle, flats, channels fabricated brackets / Supports for
A.11 supporting the pipes with 10mm 'U' bolts as per requirement,over & above piping Kg. 100 105.00 36.00 10,500.00 3,600.00 14,100.00 75 75.00 9.00 - 2.52 4.33 91 31
supports. ( For Horizontal running pipe)

Total : "C" (C.1 to C.11) 103,707 13,488 3,274,855 746,895 4,021,750

D MISCELLANEOUS WORKS
Excavation of trenches up to 1.5 mts. in depth, for laying pipes upto 150/100/80mm dia.
Including forming bottom surface to required level, refilling the trenches with selected
D.1 Mtr 110 - 161.00 - 17,710.00 17,710.00 - - - - - - 140
excavated earth around the pipe.

Liasoning work with statutary Authorities(CFO/etc.) for obtaining approval by preparing


D.2 plans for submittal etc. Identical expences connected with approval from statutary L.S RO 150,000.00 150,000.00 150,000.00 - - - - - - 150000
Authorities Like CFO / MC, All official fees/deposits will be paid by the client.

Providing, Installing, testing and Commisioning Fire Pump Panels suitable for 415V, 3
phase, 4 wire, 50Hz distribution system comprising of Sheet steel clad floor mounting
Control Panel as per below specified switchgears and equipment for control of fire
pumps, booster pumps, jockey pumps having incoming isolating switch, branch HRC fuses,
incoming voltmeter with selector switch and fuses, auto star delta starters with hand reset
overload cum single phase preventor type relay for fire pump and DOL starters with hand
D.3 323000 226,100.00 11,305.00 - 7,122.15 12,226.36 256,754 30000
reset overload cum single phase preventor type relay for jockey pumps, ammeters to read
current in any one phase, OFF/AUTO/MANUAL selector switches, various fault indicating
lights such as pump trip due to overload, pressure switches, fuse blow out etc., and
alarms with hand reset push button which will automatically reset for the next cycle. The
alarm shall start when the fire hydrant starts on fire duty the fire pump once started shall
run continuously till manually switched off.

The panel shall be free standing, floor mounting, sheet metal enclosed, flush front with
aluminium busbars, separate earth bus shall be provided throughout the length of the
panel. The incoming and the outgoing feeder breakers, switch fuse units, change over
switches, indicating lamps, meters etc. shall be accommodated in a modular multi tier
arrangement. A minimum of 400mm clearance shall be given from the floor level to the
bottom most teRMination point. The Powerder coating / painting shall be done in
confoRMity with IS code. Adequate size cable alley shall be provided all round the panel
and at the back for easy bending and teRMinations. The outgoing feeders inside the panel
shall be connected through solid busbars. Flexible cable links are not acceptable. Busbars
shall be provided with PVC heat shrinkable sleeves or heat resistant insulated paint. The
panels shall be suitable for cable entry from top.

The panel shall be fabricated only after the approval of fabrication drawings by the
consultant. Nos 1 295,267.00 34,500.00 295,267.00 34,500.00 329,767.00
The Rates shall include the Followings :
a. Preperation & submission of G.A. Drawings, Power & Control wiring Diagrams, section,
details, Bill of Materials etc and to get the approvals from Client's/Consultant's
representative.
b. Manufacturing,Assembling and Testing of panels at manufacturer's Premises at
different stage of construction. Loading of all panels at Manufacturereing place,
transporation in Proper packaging and safe unloading at site.
c.Shifting of panels from site store to intended locations, assembly and wiring of
components supplied seperately, Earthing of all components, frame etc to common interal
earth bar.
d. Supply and fixing of all accessories and supporting MS Structure, any minor civil works,
checking of internal connection and wiring, operation of MCCBs, Switches, Starters, relays,
contactors etc.
e. Providing necessary tools,hardwares,testing equipments etc during testing and
commissioning at site.
For more details kindly refer fire fighting Panel SLD
Incomer Details:-
Incomer-One (1) - 400A FP, 18 KA MCCB with thermal magnetic release with overcurrent ,
short circuit release. Indication lamps etc.
Busbar:
415V,400A Sleeved 4 Pole 18KA, AL. Bus Bars.
Outgoing Feeders :
250 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit with
soft starter suitable for 103 KW pumps- 1 Nos (Hydrant main Pump)
250 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit with
soft starter suitable for 103 KW pumps- 1 Nos (Sprinkler main Pump)
63 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit with
DOL starter suitable for 7.5 KW pumps- 1 Nos (Hydrant Jockey Pump)
63A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit with
DOL starter suitable for 7.5 KW pumps- 1 Nos (Sprinkler Jockey Pump)
63 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit with
DOL starter suitable for 9.0 KW pumps- 2 Nos (Booster Pump)
63 A TPN MCCB, 18KA for Battery charging circuit of deisel pump)- 1 Nos
250 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit -1
No Spare
63 A TPN MCCB, 18KA with thermal magnetic release with overcurrent , short circuit -1
No Spare

Providing and laying earthing conductors of Copper strip/GI Strip /wire including necessary
accessories, clamping to walls, cables etc. as required and interconnection between
D.4
lengths as per specifications and as per good installation practice. The rate shall include
all supports, accessories and hardware necessary for proper installation.
a 50 x 6 mm GI Strip Mtr R.O 80.00 58.00 - - - 196 58.80 2.94 1.85 1.91 3.27 69 50

b 32 x 6 mm GI Strip Mtr 150 51.00 58.00 7,650.00 8,700.00 16,350.00 125 37.50 1.88 1.18 1.22 2.09 44 50

c 25 x 3 mm GI Strip Mtr R.O 24.00 58.00 - - - PARMAR 58 17.40 0.87 0.55 0.56 0.97 20 50
d 12 x 6 mm GI Strip Mtr R.O 19.00 58.00 - - - 45 13.50 0.68 0.43 0.44 0.75 16 50

e 8 SWG Cu wire Mtr R.O 49.00 23.00 - - - 120 36.00 1.80 1.13 1.17 2.01 42 20

Supplying and installing hot dip galvanised MS cable trays manufactured as per the
specifications given in the tender & drawings. The rate shall include providing all the tray
D.5
accessories as per described under the specifications. The structural tray supports for the
trays are to be provided .
Supplying & Erection of 100mm wide 16guage Perforated G.I trays with supports, bends
a Mtr R.O 78.00 81.00 - - - 161.6 48.48 12.12 1.82 1.87 3.21 68 70
& required hardware.

Supplying & Erection of 150mm wide 16guage Perforated G.I trays with supports, bends
b Mtr 20 83.00 81.00 1,660.00 1,620.00 3,280.00 172.4 51.72 12.93 1.94 2.00 3.43 72 70
& required hardware.
PARMAR
Supplying & Erection of 300mm wide 16guage Perforated G.I trays with supports, bends &
c Mtr 20 99.00 98.00 1,980.00 1,960.00 3,940.00 204.4 61.32 15.33 2.30 2.37 4.07 85 85
required hardware.

Supplying & Erection of 450mm wide 16guage Perforated G.I trays with supports, bends &
d Mtr R.O 114.00 98.00 - - - 236.8 71.04 17.76 2.66 2.74 4.71 99 85
required hardware.

Supply and Installation of following cables with Stranded Annealed Bare Copper Conductor
/950° Mica Tape Wrapped/Cross Linkable Zero Halogen
D.6 Insulation/Cores Laid up together/Zero Halogen Inner Sheathed/GI Wire Strip Armoured/
Zero Halogen
Outersheathed Fire Survival Cables.

Fire Fighting BOQ INFRA 10


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

a 3C x 185 A2XFY Aluminium cable for main pumps Mtr 60 9,866.00 72.00 591,960.00 4,320.00 596,280.00 14669 7,334.50 366.73 231.04 237.97 408.51 8,579 60
b 3C x 10 2XFY Copper cable for jockey pumps Mtr 40 845.00 60.00 33,800.00 2,400.00 36,200.00 1256 628.00 31.40 19.78 20.38 34.98 735 50
Polycab
c 4C x 10 2XFY Copper cable for booster pumps Mtr R.O 1,077.00 60.00 - - - 1600 800.00 40.00 25.20 25.96 44.56 936 50
d 4C x 1.5 sq.mm Copper Armored for Instrumentation Mtr 100 374.00 48.00 37,400.00 4,800.00 42,200.00 555 277.50 13.88 8.74 9.00 15.46 325 40

Supplying, installation Testing and Commissioning of Remote starting Panel at Ground


D.7 Nos. 2 4,571.00 300.00 9,142.00 600.00 9,742.00 3500 3,500.00 175.00 - 110.25 189.26 3,975 250
floor level for sets of underground pumps.

Supply & installation of Fire Sealant Materials with glasswool along with other
D.8 required items of approved make at each floor crossings of Fire - Fighting Pipes, all Lot 1 316,250.00 6,480.00 316,250.00 6,480.00 322,730.00 Nugreen 275000 275,000.00 - 275,000 162000
internal Fire Shaft, Electrical & ELV shafts etc.

Panel Suppression System with clean agent gas, tube along with all required accessories
D.9 Lot. 1 124,062.00 18,000.00 124,062.00 18,000.00 142,062.00 95000 95,000.00 4,750.00 - 2,992.50 5,137.13 107,880 15000
to be system functional for Fire LT Panel.
Total : "D" (D.1 to D.9) 752,909 210,294 1,419,171 251,090 1,670,261 - -

E PORTABLE FIRE EXTINGUISHERS


Supply, installation, testing and commissioning of following types of extinguisher with
provision of wall bracket (fixed with anchor fastner).

Supplying, installing, testing and commissioning of 4Kg Capacity (ABC) dry chemical
powder type fire extinguisher conforming to IS: 15683 : 2001 with powder coated
E.1 Nos. 6 1,516.00 288.00 9,096.00 1,728.00 10,824.00 1658 1,160.60 58.03 - 36.56 62.76 1,318 250
finish complete with gun metal union, discharge hose and wall mounting bracket etc... of
capacity 6 KG
- - - - - -

Supplying, installing, testing and commissioning of 9Kg Capacity AFFF type fire
E.2 extinguisher conforming to IS: 15683 : 2001 with powder coated finish complete with gun Nos. 2 2,216.00 403.00 4,432.00 806.00 5,238.00 1,885.00 1,696.50 84.83 - 53.44 91.74 1,927 350
metal union, discharge hose and wall mounting bracket etc. For DG.

- - - - - -
Supplying, installing, testing and commissioning of 9Kg Capacity dry chemical
Kanex
E.3 powder type fire extinguisher conforming to IS: 15683 : 2001 with powder coated Nos. 39 2,730.00 403.00 106,470.00 15,717.00 122,187.00 2,322.00 2,089.80 104.49 - 65.83 113.01 2,373 350
finish complete with gun metal union, discharge hose and wall mounting bracket etc.
- - - - - -
Supplying, installing, testing and commissioning of GI sheet of 18 gauge thickness Fire
bucket with clean sand & stand in accordance with IS 2546. Fire bucket shall have two
coats of anti corrosive paint, two coats of fire red paint on its outside & two coats of white
paint on the inside. The word "FIRE" shall be clearly stencilled on it in accordance with IS
E.4 Nos. 78 653.00 575.00 50,934.00 44,850.00 95,784.00 500 500.00 25.00 - 15.75 27.04 568 500
2546. Vendor to include in his quote all costs relating to mounting of the bucket at
locations stated by the Fire NOC & the architect. Vendor to include in his quote all costs all
accessories, consumables, fittings & rigging equipments necessary for the satisfactory
installation of the same.
Total : "E" (E.1 to E.4) 7,115 1,669 170,932 63,101 234,033

F DRENCHER SYSTEM

Supply, installation, testing and commissioning of following sizes of Galvanised Iron


(G.I.) "C" Class pipes conforming to IS-1239 (Galavnised) with all accessories like
fittings including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts bolts,
washer including supporting/fixing the pipe on wall /ceiling with clamps, hangers (using
anchor fastners) as per specification. Suitable type of supports Shall be fabricated by M.S.
Channel / Angle / Flat for above 50 mm dia , anchor fasteners, bolts nuts, clamps, "U"
bolts, fittings as per IS 1239 such as Reducers, Tees, elbows, flanges. Including cutting,
F.1
Welding, fixing in / on walls, ceiling by using suitable supports etc.
All supports shall be hot dip galvanized in the range of DFT of micron 80 to 90 micron with
7 tank process, hot dip galvanizing shall be confirming to IS:2629/2633/4759/6745
Pipe Fittings -Below 65mm GI forged socket weld & 65mm and above Seamless
schedule 40
Contractor shall perform appropriate calculations and design the structural pipe supports.
Universal clamps and Clevis hangers shall be selected for the appropriate load.
Providing painting with one coat of zinc cromet primer & 2 coats of synthetic
enamel PO red paint and for painting of pipe & brackets and clamps as per IS-5 for
above ground piping as per the NBC / IS standards and local fire service department
requirement complete including supply and installation of G.I. Rods, clamps and ,
fasteners etc. . Prior to application of primer the surface should be cleaned for any dirt,
rusts, rough substance etc. Including painting of legends both direction arrow as per the
approval of the Project Manager
Rate quoted shall include factory made, seismic support for zone 5 at distance
as per technical specifications. Welding of the components at the site shall not
be allowed.
a 150 NB Mtr R.O 2,526.00 552.00 - - - 2857.2 1,714.32 257.15 59.14 60.92 104.58 2,196 480
b 100 NB Mtr R.O 3,765.00 368.00 - - - 4259 2,555.40 383.31 88.16 90.81 155.88 3,274 320
c 80 NB Mtr 70 2,396.00 295.00 167,720.00 20,650.00 188,370.00 2710 1,626.00 243.90 56.10 57.78 99.19 2,083 256
d 65 NB Mtr R.O 946.00 240.00 - - - 1069.2 641.52 96.23 22.13 22.80 39.13 822 208
Jindal
e 50 NB Mtr R.O 9,403.00 184.00 - - - 10637 6,382.20 957.33 220.19 226.79 389.33 8,176 160
f 40 NB Mtr R.O 524.00 148.00 - - - 592.8 355.68 53.35 12.27 12.64 21.70 456 128
g 32 NB Mtr R.O 535.00 118.00 - - - 514.8 308.88 108.11 12.51 12.88 22.12 465 102
h 25 NB Mtr R.O 415.00 92.00 - - - 399.6 239.76 83.92 9.71 10.00 17.17 361 80

Supply, installation, testing and commissioning of Open spray Gunmetal Water Spray
F.2 Nozzles K23 required angle 90 degree as per the standard specafication with necessary Nos. 13 849.00 184.00 11,037.00 2,392.00 13,429.00 650 650.00 32.50 - 20.47 35.15 738 160
accessories ect .complete.

Providing, Fixing, testing & commissioning of Deluge Valves (Max pressure 17.5 kg/cm2).
The deluge valve shall be of hydraulically operated diaphragm valve of quick release type
with pilot trim,electrical trim (24 V Solenoid valve), water motor gong and all associated
F.3
fittings/accessories and shall be suitable for vertical mounting. The body and clapper
assembly material shall be of ductile iron with UL/FM aaproval. Note : The Integration of
Deluge Valve with Fire Alarm System shall be carried out by Fire Alarm System Contractor.

a 80 NB Nos. 1 78,441.00 2,875.00 78,441.00 2,875.00 81,316.00 60066 60,066.00 3,003.30 - 1,892.08 3,248.07 68,209 2500
b 100 NB Nos. R.O. 112,894.00 3,220.00 - - - 86,448 86,448.00 4,322.40 - 2,723.11 4,674.68 98,168 2800
c 150 NB Nos. R.O. 146,768.00 3,565.00 - - - 112,387 112,387.00 5,619.35 - 3,540.19 6,077.33 127,624 3100

Supply, testing and commissioning of 1100V Grade 2 core of 1.5 sqmm PVC insulated
F.4 FRLS(armoured) cable with necessary accessories etc complete for connecting Control Mtr 40 24.00 46.00 960.00 1,840.00 2,800.00 Polycab 35 17.50 0.88 0.55 0.57 0.97 20 40
relay module located on the zoning of water curtain piping to power socket.

F.5 POWER SUPPLY UNIT :


Supply, fixing and commissioning of 6 Amps 5 pin socket outlet 230V / 120 - 230V with
earth connector and required connecting accessories as required. for connecting Nos. 1 900.00 58.00 900.00 58.00 958.00 Legrand 810 688.50 34.43 - 21.69 37.23 782 50
Motorised butterfly valve

Supply, installation, testing and commissioning of Deluge Valve Logic Controller Panel
F.6 Nos. 1 49,749.00 4,975.00 49,749.00 4,975.00 54,724.00 40000 40,000.00 - - 1,200.00 2,060.00 43,260 4326
(DVLCP)

Total : "F" (F.1 to F5) 410,135 16,920 308,807 32,790 341,597

G EVACUATION AND FIRE SAFETY

G.1 Fire Shaft Nos. 6 126.00 46.00 756.00 276.00 1,032.00 96 96.00 4.80 - 3.02 5.19 109 40
100x300

G.2 Electrical Shaft Nos. 6 126.00 46.00 756.00 276.00 1,032.00 96 96.00 4.80 - 3.02 5.19 109 40
100x300

G.8 In Lift Lobby Nos. 12 168.00 46.00 2,016.00 552.00 2,568.00 128 128.00 6.40 - 4.03 6.92 145 40
200x200

G.9 For Staircase Nos. 12 126.00 46.00 1,512.00 552.00 2,064.00 96 96.00 4.80 - 3.02 5.19 109 40
100x300

G.10 For Fire Extinguishers Nos. 87 63.00 46.00 5,481.00 4,002.00 9,483.00 48 48.00 2.40 - 1.51 2.60 55 40
150x150

G.11 Direction Signs Double Sided With Chain Nos. 12 588.00 81.00 7,056.00 972.00 8,028.00 450 450.00 22.50 - 14.17 24.33 511 70
200x600

Total : "G" (G.1 to G.11) 1,197 311 17,577 6,630 24,207

Fire Fighting BOQ INFRA 11


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

OHP Rate Remark for Rate


0.15 Supply Labour reference

Quotated by
shanbhag
engineering
company
460,726.00 28,750.00 Rate is for one pump

Quotated by
shanbhag
engineering
company
fuel tank of 750 ltr
532,421.00 20,700.00
is considered in rate

2,212.00 552.00

Quotated by
shanbhag
engineering
company
77,154.00 17,250.00 Rate is for one pipe

64,363.00 3,450.00 Rate ref from Birla BOQ

30,837.00 6,325.00 ###


19,135.00 4,600.00 ###
11,741.00 3,174.00 ###
7,641.00 1,840.00 ###
- - ###

1,642.00 368.00 ###


2,132.00 552.00 ###
3,351.00 828.00 ###
3,686.00 1,104.00 ###

13,953.00 4,048.00 ###


22,712.00 6,325.00 ###
27,019.00 7,590.00 ###

3,128.00 552.00 ###


4,193.00 782.00 ###
8,396.00 1,449.00 ###
16,800.00 4,048.00 ###
27,018.00 6,325.00 ###

Fire Fighting BOQ INFRA 12


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

2,809.00 442.00 ###


3,981.00 782.00 ###
4,777.00 1,311.00 ###
5,732.00 1,748.00 ###
6,879.00 2,185.00 ###

738.00 115.00
1,828.00 148.00
2,652.00 230.00

3,065.00 782.00 ###


1,890.00 150.00

866.00 295.00 ###


1,180.00 368.00 ###
1,574.00 552.00 ###
2,439.00 736.00 ###

1,001.00 184.00

3,105.00 288.00 ###


3,726.00 386.00 ###

1,675.00 288.00

6,982.00 207.00
7,758.00 242.00 Rate ref from Birla
BOQ
8,620.00 288.00

367.00 92.00
1,224.00 295.00 ###
1,580.00 368.00 ###
2,316.00 552.00 ###
2,828.00 736.00 ###
3,498.00 920.00 ###
4,122.00 1,104.00 ###

105.00 36.00

2,316.00 552.00

1,580.00 368.00 Quoted by Vijay


sales corporation

1,083.00 295.00

677.00 184.00

672.00 - ###
458.00 - ###
314.00 - ###

2,905.00 230.00
1,390.00 148.00

2,905.00 115.00

3,351.00 690.00 ###

Fire Fighting BOQ INFRA 13


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

2,132.00 460.00 ###


1,731.00 368.00 ###
1,527.00 230.00

Rate ref form Birla


6,661.00 2,875.00
BOQ

Rate ref form Birla


3,526.00 748.00
BOQ

Rate ref form Birla


5,970.00 -
BOQ

Rate ref form Birla


4,105.00 -
BOQ

Rate ref form Birla


4,310.00 978.00
BOQ

Rate ref form Birla


3,426.00 288.00
BOQ

Rate ref form Birla


2,299.00 115.00
BOQ

Rate ref form Birla


5,463.00 7,475.00
BOQ

3,809.00 1,093.00
Rate ref form Birla
4,232.00 1,265.00 BOQ
4,702.00 1,380.00

Rate ref form Birla BOQ

6,866.00 345.00

Rate ref form Birla BOQ

7,724.00 345.00

1,675.00 288.00

1,568.00 115.00

58.00 115.00

2,526.00 552.00
1,723.00 368.00
1,181.00 295.00
946.00 240.00 Quoted by Vijay
739.00 184.00 sales corporation
524.00 148.00
535.00 118.00
415.00 92.00

3,351.00 690.00 ###


2,132.00 460.00 ###
1,642.00 368.00 ###
1,527.00 230.00

2,905.00 230.00
832.00 115.00

Fire Fighting BOQ INFRA 14


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

26,537.00 1,380.00

151.00 92.00
252.00 92.00
179.00 92.00
307.00 92.00
467.00 92.00
151.00 92.00

Rate ref form Birla


BOQ
1,150.00 115.00

262.00 115.00

862.00 173.00 Rate ref form Birla


BOQ
915.00 173.00

Rate ref form Birla


4,378.00 1,104.00
BOQ

47,013.00 5,750.00

105.00 36.00

- 161.00

- 150,000.00

295,267.00 34,500.00

80.00 58.00

51.00 58.00

24.00 58.00
19.00 58.00

49.00 23.00

78.00 81.00

83.00 81.00

99.00 98.00

114.00 98.00

Fire Fighting BOQ INFRA 15


PROJECT:- GALAXY MALL ( RESIDENTIAL BUILDING)

9,866.00 69.00
845.00 58.00
1,077.00 58.00
374.00 46.00

4,571.00 288.00

316,250.00 186,300.00

124,062.00 17,250.00

1,516.00 288.00

2,216.00 403.00

2,730.00 403.00

653.00 575.00

2,526.00 552.00 ###


3,765.00 368.00 ###
2,396.00 295.00 ###
946.00 240.00
9,403.00 184.00
524.00 148.00
535.00 118.00
415.00 92.00

Rate ref form Birla


849.00 184.00
BOQ

78,441.00 2,875.00 ###


112,894.00 3,220.00 ###
146,768.00 3,565.00 ###

24.00 46.00

900.00 58.00 White frame & plate

49,749.00 4,975.00

- -

126.00 46.00

126.00 46.00

168.00 46.00

126.00 46.00

63.00 46.00

588.00 81.00

Fire Fighting BOQ INFRA 16